Home / Suncorp Group / Determination 12-24-129570

Determination 12-24-129570

Insurer denied cover for plumbing and roof repairs after storm damage claims and handling of the claims

FirmSuncorp Group
Decided2025-03-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$11,750
SourceAFCA PDF

Summary

The complainant lodged two storm damage claims; the insurer partially accepted them but refused plumbing and roof repairs. AFCA upheld the refusal but increased non-financial loss compensation by $1,000.

The complainant did not establish storm damage to the plumbing or roof, so the policy did not cover those repairs, but the insurer's claim handling warranted higher non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-129570 | Financial firm | AAI Limited Case number: 12-24-129570 14 March 2025 Determination overview Complaint The complainant lodged two claims with the financial firm (insurer) under her home and contents insurance policy for storm damage to her property that occurred on 26 October 2022 (Claim 1) and 13 February 2024 (Claim 2). The insurer initially denied cover for Claim 1. It then partially accepted liability for the resultant storm damage but refused to pay for plumbing repairs. The insurer partially accepted liability for the resultant storm damage under Claim 2 but refused to fix the roof. The insurer offered $2,000 compensation and agreed to waive the policy excess on Claim 1. The complainant seeks the insurer to pay for the plumbing repairs, fix the roof and pay compensation for the handling of both Claim 1 and Claim 2. Issues and key findings Is the insurer entitled to deny cover for plumbing repairs? Yes. The complainant has not shown the plumbing at the property sustained storm damage. The insurer is not responsible for plumbing works required to divert water away from the property and avoid water ingress into the property in the future. Is the insurer entitled to deny cover for the roof repairs? Yes. The exchanged information does not show the roof sustained storm damage. Both the insurer’s and the complainant’s experts did not identify storm as the cause of damage to the roof including the flashing. Should the insurer increase the compensation offered? Yes. The insurer’s incorrect claim decision, restoration delays, incorrect advice on applicable excess, and its overall claims handling caused stress, frustration and inconvenience to the complainant. The insurer should increase the non-financial loss compensation offered. Why is the outcome fair? The parties are bound by the policy terms. It is unfair to require an insurer to accept liability for damage that falls outside the scope of the policy. The insurer should pay compensation for its claim handling. Determination This determination is mostly in favour of the insurer. Within 14 days of being notified of the complainants’ acceptance of this determination, the insurer is required to pay $1,000 non-financial loss compensation. This is in addition to the $600 excess waived and $2,000 compensation paid previously. The insurer is not required to take any other action regarding the claims or this complaint. Reasons for determination Is the insurer entitled to deny cover for plumbing repairs? Yes. The complainant has not shown the plumbing at the property sustained storm damage. The insurer is not responsible for plumbing works required to divert water away from the property and avoid water ingress into the property in the future. Complainant should establish a claimable loss under the policy When making a claim, an insured party has the onus of establishing she suffered a loss for which the insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. Insurer partially accepted Claim 1 The complainant lodged a claim on 28 October 2022: Heavy raining has caused downstairs to flood, carpet is wet and damaged, bedroom is flooded… - IO explained that she is not sure where the water is coming from but due to storm her downstairs area is flooded - carpet is soaked and wet and rising into downstairs bedroom The insurer partially accepted liability for the claim. It settled the claim for the damaged carpets in the lounge and two bedrooms. It waived the $600 excess applicable to the contents claim. Insurer not required to pay for plumbing works under Claim 1 The complainant says: ground level requires plumbing work to stop water ingress. This is because the backyard is on a slope and the water runs down very easily into the room and through the room to other areas water has come in only twice in the past three years there were broken pipes on the side of the fence and her plumber said they need to replace the pipes to manage the flow of water. If the pipes were not broken, they would allow the flow of water easily all the way down to the backyard the insurer paid for the damaged carpets and should pay to fix the issue that caused the damage. The insurer says: the leak detection report from N said the water was leaking into the bedroom between the weather board and chimney joint on the external wall because there was no flashing the lack of flashing was not caused by an insured event. The policy covers loss or damage caused by a storm. The complainant seeks the insurer to pay for plumbing costs. She is required to show, on the balance of probabilities (that it is more likely than not), that the storms or another insured event caused damage to the plumbing or building which requires these repairs. The complainant’s plumber did not explain the reasons why excavation, piping, waterproof, bitumen and backfill works were required. They did not say the storm damaged the piping around the subject area. There is no information to suggest these works are necessary to repair the claim related damage (see section 3.2). The exchanged information shows that there is no storm damage to the existing plumbing. The additional works are not necessary to repair the other damage accepted. Instead, it appears these works are required to protect the property from further occurrences. However, that is not a cost covered by the policy. This is because the policy only covers the repairs necessary for damage caused by the event. It does not extend to works to further protect the property. Given the above, I am not satisfied that on the balance of probabilities, the complainant has established a claimable loss for the plumbing works, under the policy. The insurer is entitled to deny this part of the claim. The insurer is not responsible for plumbing works required to divert water away from the property and/or the flashing required to avoid water ingress into the property, in the future. Is the insurer entitled to deny cover for roof repairs? Yes. The exchanged information does not show the roof sustained storm damage. Both the insurer’s and the complainant’s experts did not identify storm as the cause of damage to the roof including the flashing. Insurer partially accepted Claim 2 The complainant lodged a storm damage claim on 14 February 2024: Loss of power on the day before valentines day made us loose our fridge and freezer content. The rain entered through the roof, there is damage to the ceiling. Our fridge is not making ice or giving water anymore (sic). The insurer accepted liability for internal building damage, fridge and food spoilage. The complainant is required to show, on the balance of probabilities (that it is more likely than not), that the storms damaged the roof requiring repairs. Parties provided different views on the cause of roof damage under Claim 2 The complainant says: if the flashing was bad and old, then why was there no water ingress when it rained on other occasions. Water got in after the second storm because due to the massive rain, the flashing had moved and become very loose the house is not new, and all the old houses have wear and tear the insurer’s roofer said the flashing needs to be longer because it can’t manage the amount of water, which is due to the storm she maintains the roof by cleaning the gutters twice a year, washing the tiles and getting rid of mould by spraying at least once a year. The insurer relied on its roofer T’s findings and refused liability on the basis the flashing was not damaged by the storm. T observed: the lead flashing around the chimney had distorted over time and created an unsealed opening which was allowing the water to ingress into the property causing the damage to the ceiling and cornice in the kitchen the ridge tile bedding required attention there were broken tiles that had previously been repaired with silicone. The complainant’s roofer did not comment on the cause of the roof damage. They said the work required was removal of the old and damaged lead flashing and old damaged/rusted circuit tray. The works included replacement of the cracked/broken tiles and top up silicon where needed. None of this supports the complainant’s position that the roof was damaged by the storm. While I acknowledge the complainant’s view that the roof flashing had moved during the storm event, this was not supported by either expert. Further T recommended the complainant should engage a roof plumber to replace the chimney lead flashings, so they have enough cover over the soaker flashings. Given the above and the exchanged information, I am not satisfied the flashing was damaged and required replacement because of the storm. The insurer is not also liable to repair previously damaged ridge tile bedding and tiles. The image of the water ingress point on the roof supports T’s recommendation that a longer flashing would most likely prevent future water ingress via this area. The insurer is therefore entitled to deny cover for the roof repairs/rectification works. Should the insurer increase the compensation offered? Yes. The insurer’s incorrect claim decision, restoration delays, incorrect advice on applicable excess, and its overall claims handling caused stress, frustration and inconvenience to the complainant. The insurer should increase the non-financial loss compensation offered. AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of: physical inconvenience time taken to resolve the situation interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events. Insurer should increase the non-financial loss compensation offered The complainant says: her house had remained unrepaired for two years. A person living in this room left. She has not been able to entertain her friends during this period. Her personal effects were everywhere in the house having to deal with several experts appointed by the insurer and responding to many emails and spending at least 10 to 15 hours with the insurer’s builder P was difficult, inconvenient and stressful she lost a good client during the insurer’s claim process because of the time taken by the claims. When the client called, she did not give her a chance to talk and had asked her to leave the various trades attending the property caused her stress as they were calling her for the same issue and tradesmen who attend were not across the previous experts’ findings. The insurer says: there were some delays in progressing the claim and these delays could have been avoided through more efficient management it settled $2,000 as compensation and waived the $600 excess on Claim 1 P attended within two weeks of the claim being lodged and provided an update within three days N attended on 18 November 2022 and provided the report within 10 working days it reviewed the reports and provided an outcome within 10 working days after receiving the reports when the claim was reopened, it completed a review within four days and agreed to arrange an assessor to review the reports. The assessor completed her review within eight days, and it provided the outcome within seven days. The insurer decided to change Claim 1 to a content only claim on 16 June 2024. It did not discuss this option with the complainant before she withdrew the claim twice in December 2022 and April 2024. The insurer incorrectly denied the claim initially. Once it accepted cover for the resultant damage under Claim 1, it settled the claim within a reasonable timeframe after receiving the complainant’s quote for the same. The incorrect denial also meant the complainant continued living in the water damaged home without carpets between December 2022 and June 2024, until the insurer accepted the claim for replacement of the carpets. The claim notes show the insurer’s appointed restorer did not attend the property to complete emergency make safe works for approximately five to six weeks after they were appointed. The complainant could not accommodate them initially and the restorer had contacted her on a Sunday to discuss its attendance. The complainant however followed up the insurer about this matter several times and the restorer did not attend the property for restoration works until December 2022. This inconvenienced the complainant. It is unclear why the complainant did not pursue the insurer’s claim denial. The insurer’s claim denial letter gave her an opportunity to dispute the claim decision. The insurer’s miscommunication about the excess applicable to the claim ($5,000 instead of $600 for contents only claim) did not assist. The claim notes and correspondence between the parties clearly show there was confusion about liability under each claim. I acknowledge the complainant’s concern over several visits by the insurer’s experts for various inspections relating to both claims. This is because Claim 1 was reopened and Claim 2 was lodged around the same time and the assessments occurred around the same period. The complainant says she also lost a client because of the time spent on the claim and the stress caused by the insurer’s claim handling. I am not satisfied the complainant has established a causal link between the two events. The information does not clearly show the reason the client was lost was due to the insurer’s unreasonable handling of the claim as opposed to other factors. I also acknowledge the insurer was entitled to partially deny the claims for the reasons explained above. Given the above, I accept the complainant suffered stress, frustration and inconvenience because of the insurer’s incorrect claim decision and overall claims handling. The insurer accepts it could have efficiently managed the claim and apologised for the complainant’s experience. While the insurer waived the excess on Claim 1, it is fair in all the circumstances that it also increases the compensation to $3,000. Finally, the complainant raised concerns the insurer offered $5,000 to resolve the complaint and that this offer was withdrawn after she pursued the claim through AFCA. The insurer is entitled to make a commercial offer to resolve the complaint. AFCA cannot compel an insurer to reinstate a commercial offer that has been withdrawn after the complainant decided to pursue the complaint through AFCA. Why is the outcome fair? The parties are bound by the policy terms. It is unfair to require an insurer to accept liability for damage that falls outside the scope of the policy. The insurer should pay compensation for its claim handling. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Expert reports | Record | Key points | Insurer’s builder P Report 8-11-2022 | In conclusion, the balance of probability suggests the water ingress is occurring due to seepage as the ground level sits approximately 1 meter above the external wall. Due to the lay of the land water may be gushing down the side of the property wetting the soil and seeping through. The previous owner has installed new drainage which appears to have been done to stop a water ingress issue. | Insurer’s leak detection specialist N Report 18-11-2022 | On inspection: Inspected the subfloor to the property behind the lower-level bedroom, moisture is present throughout the subfloor and Ag drain behind the lower-level bedroom is present. Moisture was detected in the wall prior to commencing testing. Conducted a spray test to the external wall of the lower-level bedroom, failed, leak was detected in the lower-level bedroom during spray test to weather board and chimney joint on external wall. Based on the evidence collected on site we believe the source of the water ingress to the lower-level guest bedroom is due to no flashing provision behind the weather board wall where it meets chimney brickwork. This is allowing water to enter the wall cavity below causing flooding during heavy periods of rainfall. | Insurer’s builder P Report 21-11-2022 | Please note onsite the only damage was to carpet however, due to water entering through walls [P] recommends restoration be appointed if claim is accepted to determine possible trapped moisture. | Insurer’s restorer R Report 9-12-2022 | 09/12/22 Technicians attended site on the 9th of December 2022 to assess the affected areas. Moisture reading was conducted, readings returned elevated, so drying equipment was installed. Non-salvageable carpet, underlay and smooth edge was removed and disposed of prior to the area being treated with an antimicrobial solution. 12/12/22 Technicians attended Site on the 12th of December 2022 to monitor the drying process. Moisture readings were conducted, readings returned within normal parameters so drying equipment was removed. | Insurer’s roofer T Report 19-2-2024 | Inspections of the roof identified the chimney flashings directly above the damaged area as the reason for water ingress. The lead flashings had distorted over a period of time and have minimal coverage, in turn this has created and unsealed opening for ingress to occur from. Engage a roof plumber to replace the chimney lead flashings so they have enough cover over the soaker flashings. Ridge tile bedding requires attention. Previous broke tiles that have been repaired with silicone. | Insurer’s builder P Report 27-6-2024 | Damages have been sustained to the carpet within the bedroom and lounge area. No resultant building damages are visible at this stage. It is unsure on if the insured has facilitated any maintenance repairs. The insured advised that they only wanted the carpet to be addressed with the claim. | Complainant’s roofer Quote 3-7-2024 | Remove all old damaged lead flashing on section of the roof tiles Removed old damaged/rusted circuit tray on section of the roof tiles Replace with brand-new lead flashing Replace with brand-new zinc circuit tray Apply a weather, sealer where needed to make everything waterproofing Top up of silicon, where needed Change any cracked/broken tiles on the roof - $3,950 | Complainant’s plumber Quote 18-6-2024 | Excavation, piping, waterproof, bitumen and backfill - $7,800

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.