Claim for ceiling collapse and structural damage largely declined as long-term defects and gradual deterioration; ex-gratia cash offer for one third of damage
Text of the determination
Determination
|
Case number
|
12-24-127680
|
Financial firm
|
Insurance Manufacturers of Australia Pty Ltd
Case number: 12-24-127680 25 February 2026
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (the insurer). On 3 July 2023, she lodged a claim following the collapse of the lounge room ceiling. The complainant says that this damage is related to an earlier claim in 2019 for an escape of liquid event which has caused significant movement and structural damage to the property.
The insurer says that it has been prejudiced by the complainant failing to allow its builder to assess the property in 2019. Also, that it has not been provided with evidence of repairs to prior damage to the property from leaking stormwater pipes detected in 2013. However, it has made an ex-gratia offer to resolve the dispute in the amount of $24,567.18.
The complainant disputes this and wants the insurer to accept liability for all the damage. She says that the property needs to be demolished and rebuilt and seeks the sum insured. She also seeks temporary accommodation, contents storage and compensation for the insurer’s claims handling.
The complainant is represented by her son. For convenience, unless indicated otherwise, reference to ‘the complainant’ will include both.
1.2 Issues and key findings
Is the insurer’s offer of settlement fair and reasonable?
Yes. However, the insurer should increase its offer to include a 20% contingency uplift and some temporary accommodation. The panel is satisfied that the insurer can limit its cover to one-third of the damage to the north-eastern area of the property. The remaining damage is excluded as it has been caused by long-term defects and gradual deterioration.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer’s offer of $2,000 in non-financial loss compensation is fair and reasonable.
Why is the outcome fair?
The outcome is fair as the insurer’s offer to repair the north-eastern part of the property is a fair assessment of the event related repairs. It would not be fair for the insurer to accept liability to repair the remaining portion of the property when the policy does not respond. It is fair that the insurer pays non-financial loss compensation to the complainant.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant accepts the determination, within 14 days of being notified of the complainant’s acceptance, the insurer is to:
· pay her $29,480.62 for repairs
· obtain an assessment for the time to repair the property from RB based on the quote provided and pay the complainant temporary accommodation equal to one third of this time
· pay her $2,000 for non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer’s offer of settlement fair and reasonable?
Yes. However, the insurer should increase its offer to include a 20% contingency uplift and some temporary accommodation. The panel is satisfied that the insurer can limit its cover to one-third of the damage to the north-eastern area of the property. The remaining damage is excluded as it has been caused by long-term defects and gradual deterioration.
Onus on complainant to establish a claimable loss
The complainant is required to show, on the balance of probabilities (that is more likely than not), that she suffered a claimable loss under the policy. This means that she must show the loss was caused by a risk for which she is insured.
Once the complainant, on balance, establishes a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on balance, the application of the exclusion or condition.
Policy covers insured events subject to exclusions
The insurer’s policy consists of the Certificate of Insurance (COI) and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainant.
The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The insured events are set out in the PDS and include ‘escape of liquid’ and ‘storm’.
The PDS defines an incident as a single occurrence, or a series of occurrences arising out of the one event.
Complainant says all the damage is caused by escape of liquid events
When the complaint lodged the claim for her ceiling damage, she claimed that it was caused by a storm. She also says that the damage to the roof, allowing the water ingress, has been caused by a water leak in 2019 for which she lodged a claim with the insurer.
The complainant has provided a quote from MH dated 14 June 2024 for repairs to the ceiling in the amount of $42,680.
The complainant has provided a copy of her water bill from her local water provider. It shows an adjustment in the amount of $1,121.62 for water usage in the period 5 March 2019 to 3 June 2019. This adjustment was dated 15 September 2021. The complainant says that this is evidence of the 376,000 litres of water that escaped in May 2019.
The complainant says that the insurer’s failure to respond appropriately following the claim lodgement has contributed to the deterioration of the property. The complainant says that she delayed pursuing this claim because of COVID-19. She says that the water flooded underneath the property and around the footings.
In support of her claim, the complainant engaged an engineer, CV, who provided a report dated 10 May 2024. CV was instructed by the complainant to assess the structural condition of the property. CV notes from the history provided by the complainant that:
· the property was built in 1982.
· an event in 2012-2013 found misalignment in the stormwater discharge pipe, resulting in blockages of the stormwater system
· this meant that all stormwaters had been retained in the property rather than being discharged outside since the property’s construction
· this led to saturation of the soil around the front, sides and rear of the property, causing water to seep into the footings/foundations
· that this has caused damage to the wall and ceiling linings in the kitchen, passageway and bedrooms
· a further leak was discovered under the property where 376,000 litres of water was found to have escaped
· a magnitude 5.9 earthquake occurred on 22 September 2021 and the complainant reported damage because of it.
CV reviewed the plumbers report (IL) dated 15 January 2013 which identified the stormwater pipe misalignment at the front right-hand boundary.
CV found that the misaligned storm water pipe works to be the principal cause of the current resultant damages. CV says that this defect is the result of poor workmanship at the time of installation. CV says that this has caused numerous cracks both externally and internally. This includes cracks to the windows, door frames, ceilings, bedroom, bathroom and toilet. CV observed uneven flooring throughout the internal areas which it says shows foundation problems.
CV refers to the history of 376,000 litres of water escaping in May 2019 and the that the property also experienced an earthquake on 22 September 2021, experienced damage.
CV concludes:
The combination of the earthquake and water leakage has significantly weakened the existing foundation by reducing the shear strength of the soil. These facts are the primary causes of cracks and settlement in the existing dwelling.
CV recommended that the property is demolished and rebuilt.
The complainant says that all damage should be accepted by the insurer. The complainant advised that the property is continuing to deteriorate with further water ingress through the ceiling. She says that the insurer was negligent in failing to repair issues back in 2012-2013 and refusing to undertake make safe repairs to the roof.
The complainant says that the faulty dislodged pipe was repaired and information was sent to the insurer confirming same. The complainant says that more recent plumbing testing has confirmed further leaking from stormwater pipes is causing more damage.
The insurer has obtained expert reports
After lodgement of the claim for ceiling and roof damage, the insurer engaged RB, a builder, to conduct an assessment. RB attended on 5 July 2023 and found evidence of pre-existing cracking and poor previous repairs to plaster around the air conditioning units to one of the walls. RB found that the plaster ceiling glue fixings to be deteriorated and delaminated. RB concluded that the cause of damage is due to general wear and tear, with no evidence of water causing damage to the ceilings.
The insurer appointed a plumber, TB, to provide a report regarding the roof. TB attended and inspected the roof and provided a report dated 14 July 2023. TB identified that a top ridge line had opened and created a gap for water to enter the building. TB found that the midsection of the top ridge had pulled apart, dislodging the ridge tiles and bedding. The truss bearers had pulled away from the centreline beam intern taking that side of the roof away from the centre line.
The insurer appointed an engineer, CE, who provided a report following an inspection dated 21 August 2023. CE provided numerous photographs of the cracking at the property. CE says that the level of cracking does not compromise the structural integrity of the building but indicates differential settlement, exceeding the serviceable limits expected for normal settlement. CE noted the largest brick cladding cracks were around the southeastern corner where a porch is recessed into the floor plan.
A floor level survey confirmed that there was a 113 mm difference across the site. The lowest point was at the northern elevation in the living room.
CE says that the gradual movement has caused a twist in the roof framing. This has distorted the ceiling plan and increasing the stress on the adhesive daubs that support the plasterboard ceiling. CE noted that the ceiling cavity showed signs of historical water entry with stained ceiling joists. CE concluded that the damage was not the result of a one-off event.
The insurer also appointed a geotechnical engineer (IN) to provide a report. IN took samples from two boreholes, one at the front and one at the rear and found no indication of excessive wetting across the soil profile.
After being provided with the complainant’s reports, the insurer appointed a plumber (TB) who inspected the property on 12 November 2024. TB identified the following issues following a CCTV inspection of the stormwater drain:
· poor design has left and right-side flow into each other before discharging into the street, slowing water flow and causing it to back up
· front right and rear right have cracked ninety-degree elbows allowing water to escape
· front left drain has large break in elbow allowing water to escape
· rear left drain is broken at the connect between the downpipe and the stormwater and separated beneath the concrete
· incorrect installation of stormwater grate allowing water to escape.
TB says that these issues are contributing to movement in the property. TB also noted that the above ground join between the 80mm and 100mm riser is not connected.
These findings are consistent with the complainant’s plumber (JB) who inspected the property and provided a report dated 10 July 2024. JB concludes that the damaged section of the stormwater, as well as the poor discharge junction design, is causing movement. However, these were not the sole cause of the movement.
CE provided a further report in response to the findings from TB dated 25 November 2024. CE acknowledged that the available information for its initial report was the misalignment of the stormwater pipe in the front yard. CE referred to a previous report (Engineers’ Initial Visual Report No 2) where it noted:
6.25. The amount of movement and crack damage, considering the topography, perimeter surface conditions and age of the property is abnormal.
6.26. While there are some small garden beds, there are no trees or large abnormalities congruent with the level of damage observed.
6.28. The Plumbing report by IL has provided a mud map showing stormwater running down both the east and west elevations, in front of the northern elevation and becoming blocked in the northern discharge point.
6.29. Backflow would be the primary mode of ground saturation, noting the worst settlement is toward the northern frontage area.
CE says that the movement related cracking damage is attributable to or exacerbated by the stormwater defects and breaks identified in the TB report.
On 16 January 2025, the complainant requested the re-attendance of TB to reassess the plumbing as the complainant had exposed the stormwater pipe which showed that the pipe had split. TB provided a report dated 21 January 2025. TB found:
· the stormwater drain at the front left corner was fully dislodged
· a flow test confirmed that the water was backflowing from the right-hand side of the property as it was exiting through the crack drain on the left
· the cracking and structural movement is consistent with long term drainage issues.
CE provided a supplementary report considering the findings from TB dated 2 February 2025. CE noted that the assessment of the property was complicated by the age of the property and the multiple construction defects. These particularly involve the stormwater system and have persisted since construction, including those related to claims lodged between 2012 and 2013. CE found:
· the floor level survey confirmed the lowest point as the northwest corner of the master bedroom, correlating with visible curvature and cracking
· previous drainage reports have confirmed damage to the stormwater system is also present at the rear left, front right and rear right
· it estimates the likely effects of the broken pipe, when considering the floor level survey, as being one third of the front dwelling radiating from this point, radiating an estimated six (6) metres from the northeast corner
· this includes one third of the total differential foundation movement, and all cracks and movement associated damage radiating from this area, including:
> the master bedroom
> bedroom 2 (adjacent to the master bedroom)
> the central passage side of the lounge room
> and half of the central hallway.
CE provided a further report dated 29 April 2025 following a review of historical claims information. CE noted:
· there is no evidence the property is earthquake damaged, and there would be no practical change to the damage profile or repair methodologies that were already required
· the property has been experiencing long-term poor performance and the ceiling damage within the living room is not related to a single event
· the new plumbing report confirmed below-ground plumbing damage that was not previously known. There is a combination of long-term stormwater damage, but circumstances indicate newer damage to the northeastern corner
· this is based on the notable change in the foundation performance at the northern end of the property as measured by the floor level survey, correlating to the plumbing report
· the property is in a poor condition, with no evidence of adequate repairs to address long term issues
· no damages observed would have been associated to have occurred within 72 hours of any single defined event
· the damage has been occurring over many years
· the complainant is re-opening an existing claim for the same damage from 2012.
The insurer obtained a quote from RB based on the scope of works (SOW) provided by CE. The quote dated 9 May 2025 is in the amount of $73,701.55.
The insurer says it has no liability for 2019 claim
The insurer says that the complainant has made several claims over many years. However, the complainant has not provided any evidence that she has rectified pre-existing issues that related to a misaligned stormwater drain identified in 2012 caused by faulty workmanship. Experts, including IL, identified maintenance requirements regarding the stormwater drainage which had caused settlement issues to the property at this time.
The insurer says that the only evidence of maintenance works completed by the complainant is an invoice for plumbing works undertaken on 21 May 2019. However, it says that the invoice is not itemised with the works that were completed.
The insurer relies on the PDS which requires an insured to co-operate fully with the insurer. This includes giving access to the home for a repairer or other specialist chosen by the insurer to assess the home.
The insurer says that the complainant’s action in refusing access to its builder to assess the property in 2019 has prejudiced its ability to assess the damage from this leak event. Particularly noting the complex previous claim history, including denials of previous claims. The insurer says that the complainant advised she had engaged an engineer. It says that the complainant never provided it with any engineer’s report. As the complainant refused access to its builder, it closed the claim in 2019. It says that it received no further communication from the complainant until a Freedom of Information request was lodged with it in September 2023.
The insurer seeks to rely on section 54(2) of the Insurance Contracts Act (1984) (Cth) (the Act) to limit its liability to nil for the 2019 claim.
Insurer says liability should be limited
The insurer acknowledges that more recent plumbing inspections has confirmed a dislodged stormwater pipe in the northeastern corner of the property. It is not known how long the issue has been occurring. However, based on the plumbing reports from TB and JB, the property has numerous cracks in the stormwater pipes identified in July 2024.
The insurer relies on the findings of CE that the roof and ceiling damage has been caused by gradual movement and not a once off event. It says this is consistent with the signs of historical water entry with stained ceiling joists and ongoing movement of the property since 2012. The insurer says that this movement has been caused by subsidence due to changes in weather and moisture content of the soil (rather than being caused by subsidence immediately following an earthquake, explosion, storm or flood), and/or faulty workmanship in the installation of the stormwater pipes. It says that this is consistent with the views expressed by CV and CE.
The insurer says that the broader movement is due to excluded long-term defects and a lack of maintenance. It says that CE’s assessment of one-third of the movement in the front/localised zone is an engineering apportionment of movement and does not equate to liability. The insurer considers only minor cosmetic items ($5,000 - $6,000). It denies liability for all other damage as it says that it was pre-existing and caused by gradual deterioration and defective workmanship.
The insurer has offered, on an ex-gratia basis, one third of the total foundation movement-to the northeast corner based on the findings from CE. The insurer has offered a cash settlement based on the quote from RB of $24,567.18. This is one third of the total quote.
Fair that insurer can limit its liability
The complainant’s property has been subject to many claims over the years. In relation to the 2019 EOL event, the panel acknowledges that the complainant has shown a large volume of water escaped. However, there is little evidence to support that this EOL event has caused or contributed to the damage.
The panel acknowledges that bore testing results from IN are of little relevance more than four years after the event.
However, the panel accepts that based on the expert findings from CE and CV, the faulty workmanship of the below ground pipes is a major contributing factor to the cracking damage. This has not been disputed by the complainant, although she continues to claim that the insurer should be responsible for these repairs.
The complainant has not shown that repairs were undertaken after 2012 to rectify the settlement issues, despite requesting evidence of this from her.
The panel acknowledges the complainant’s comments that the neighbouring property had a claim accepted for damage caused by water leaking from their property under the adjoining fence. While this may support that there was an escape of liquid event, it does not establish that this event was the cause of the damage to the property.
The panel notes that CE’s evidence supports that:
· a long-term leak can create soil moisture variation and localised movement; however
· the property’s damage is cumulative and multifactorial, including long-term water ingress, surface/subsurface drainage defects, pre-existing deterioration, and age-related movement.
In relation to the 2023 claim for the ceiling collapse and roof damage, the insurer says the damage is not attributable to a single event but to long-term poor performance/deterioration.
Damage can have more than one cause. When deciding whether the policy responds, it is necessary to identify what the proximate cause of the damage was. This is a question of fact depending on the circumstances. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
Based on the information provided by CE, the panel accepts that the roof shows signs of long-term water ingress. The panel is not satisfied that a storm has caused the damage to the roof and ceiling collapse.
However, based on the more recent plumbing repots and CE’s apportionment and localisation, the panel is satisfied that:
· the north-eastern zone damage is proximately caused (at least substantially) by the EOL/broken pipe detected in 2025; and
· the remaining property damage is proximately caused by long-term excluded factors.
As there have been separate losses/areas with different proximate causes, it would not be fair for the insurer to deny the claims in their entirety. The insurer says that it was prejudiced by the complainant’s refusal to allow access to its builder to assess the damage following the 2019 EOL. However, it continued to insure the property and did not impose specific renewal conditions requiring proof of repair or verification steps. The panel is not satisfied that the insurer can rely on s 54(2) of the Act for the insurer to refuse the claim in its entirety.
The panel is not satisfied that the property is a total loss as claimed by the complainant. The report from CV who submitted that the property needed to be demolished, also claimed that most of the damage had been caused by the misaligned pipe. These damages do not form part of this claim.
The panel is satisfied that, based on the unrefuted evidence from CE, that an estimate of thirty per cent of the damage in the northeastern corner (being 6 metres from the broken pipe) is a fair assessment of the damage. This confines the insurer’s liability to:
· damage/works attributable to the event-related movement in the north-eastern zone; and
· excludes rectification of long-term defects (to the extent they are not necessary to repair event-related damage).
The panel is satisfied that most of the damage to the property has been caused by long-term defects in the stormwater drainage which have not been rectified and gradual deterioration. The damage is not consistent with a single, one-off event.
However, as the insurer is cash settling the complainant for this damage, it is fair that a contingency uplift of 20% is applied. That is, the insurer is to pay the complainant $29,480.62.
The panel is satisfied that the property would be uninhabitable during the repairs. However, it is fair that the insurer can limit its liability for temporary accommodation to one third of the estimated total time for the repairs.
Should the complainant accept the determination, the insurer is to obtain an estimate from RB for the time to complete the repairs in accordance with the quote that it has provided, based on the SOW from CE. The insurer is to pay the complainant for one-third of this total time for temporary accommodation in accordance with its policy terms.
Insurer was not responsible for ongoing maintenance
The complainant says that the insurer was negligent:
· in failing to repair the property in 2012
· in failing to perform adequate make safe repairs and assess the property in 2019
· in failing to undertake make safe repairs to the roof (including placing a tarp over it) in 2023.
The 2012 claim has not been considered as part of this complaint.
For the reasons outlined above, the panel is satisfied that the complainant’s refusal to allow its builder to assess the property prejudiced the insurer’s ability to assess the claim. The panel is not satisfied that this was due to negligence of the insurer.
Make safe repairs are temporary measure only. They are undertaken by an insurer at an early stage on a without prejudice basis, pending assessment of the claim. However, as the insurer relied on its expert report findings to deny the claim for the roof and ceiling based on long-term defects, the panel is satisfied that the insurer was not required to undertake make safe repairs.
2.2 Is the complainant entitled to non-financial loss compensation?
Yes. The insurer’s offer of $2,000 in non-financial loss compensation is fair and reasonable.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Insurer should compensate the complainant
The insurer has offered to pay the complainant $2,000 in non-financial loss compensation.
The panel acknowledges that the claims have been ongoing for an extensive period. However, the panel is not satisfied that all the delays are attributable to the insurer. The insurer has responded to the complainant’s concerns and appointed relevant experts to attend and assess the damage.
However, there were several occasions where the insurer’s communication and claims handling could have been improved.
The complainant refers to the stress and inconvenience caused when a plumber failed to attend as arranged in December 2023. The insurer has subsequently apologised for this.
Further investigations undertaken by the complainant’s representative identified issues with the stormwater pipes that were undetected by the insurer’s plumber. However, the panel notes that TB’s findings were consistent with those of the complainant’s plumber JB. The panel acknowledges that this has caused the complainant stress and inconvenience.
The panel is satisfied that in all the circumstances, the insurer’s offer of $2,000 in non-financial loss compensation is fair in all the circumstances.
2.3 Why is the outcome fair?
The outcome is fair as the insurer’s offer to repair the north-eastern part of the property is a fair assessment of the event related repairs. It would not be fair for the insurer to accept liability to repair the remaining portion of the property when the policy does not respond. It is fair that the insurer pays non-financial loss compensation to the complainant.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Damages from 2012 escape of liquid event and earthquakes is not considered
AFCA provided the complainants with a Rules assessment that determined that any damage that relates to previous matters from 2012 (claim reference ARVHH12/34802) would not be considered as part of this complaint. This includes cracks in the front garden brick fence and cracking throughout the house.
The complainant has also lodged previous claim for earthquake damage in 2024 (RAV245540693). This claim was not considered in this determination. The complainant retains all her rights and interests in relation to this claim.