Insurer declined cover for damaged pool pathway; complainants also disputed contingency uplift, accommodation costs and sought non-financial loss
Summary
Complainants claimed for flood damage to their home; the insurer cash settled but disputed the pool pathway, contingency, accommodation and compensation. AFCA required the insurer to accept the pool pathway claim and pay $5,000 each for non-financial loss, rejecting the other requests.
The complainants established accidental flood damage and the insurer failed to prove the subsidence or defect exclusions applied, while claims handling caused severe stress; other items were consistent with policy terms.
Issues
- Claim denial primary · upheld
“insurer did not meet its onus to establish that any exclusions apply; must accept claim for pool pathway damage”
- Claim amount dispute secondary · not upheld
“contingency uplift of 15% was likely reasonable and sufficient”
- Poor claim handling secondary · upheld
“Significant flaws with the insurer's claims handling caused the complainants severe stress and inconvenience”
- Delay secondary · upheld
“insurer took too long to reach a reasonable scope of works and settlement amount”
- Repairs or contractors secondary · not upheld
“insurer not required to provide ongoing monitoring of the pool or cover further termite treatment”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossrepair or rectify
Text of the determination
Determination
|
Case number
|
12-24-126792
|
Financial firm
|
AAI Limited
Case number: 12-24-126792 17 December 2025
1 Determination overview
1.1 Complaint
The complainants held a home insurance policy with the financial firm (insurer). In February 2019 they lodged a claim for flood damage to their property.
The insurer accepted the claim and issued a cash settlement. However, some issues are still in dispute. The complainants say the insurer should:
· remove and replace the pool pathways, including the pool’s plumbing and piping
· appoint a registered surveyor to monitor the pool and its surroundings
· arrange termite treatment after the pool pathway is replaced
· increase the contingency uplift for the claim from 15% to 25%
· pay additional temporary accommodation costs
· pay $5,000 in non-financial loss compensation to each complainant, totalling $10,000.
1.2 Issues and key findings
Is the insurer liable for the pool pathway?
Yes. The insurer must accept the damaged pathways. However, the insurer is not required to provide ongoing monitoring of the pool or cover further termite treatment.
Is the insurer required to increase its contingency uplift?
No. The exchanged information shows the contingency uplift of 15% was likely reasonable and sufficient.
Are the complainants entitled to more accommodation costs?
No. The insurer paid more than the maximum temporary accommodation benefit the policy provides. The exchanged information does not show the complainants incurred additional costs.
Are the complainants entitled to non-financial loss compensation?
Yes. Significant flaws with the insurer’s claims handling caused the complainants severe stress and inconvenience. The complainants are entitled to $5,000 each.
Why is the outcome fair?
The outcome fairly addresses the complainants’ valid claim while ensuring payments remain consistent with policy terms and conditions the parties agreed to. It is fair for the insurer to cover the pool pathways because it did not meet its onus to establish that any exclusions apply. It is also fair for the insurer to compensate the complainants because its complaints handling caused the complainants severe and avoidable stress and inconvenience.
The insurer is not required to pay additional temporary accommodation allowance or increase the continency uplift because these elements of the insurer’s settlement were reasonable and consistent with the policy terms and conditions.
1.3 Determination
This determination is substantially in favour of the complainants.
Within 14 days of receiving notice the complaints accept this determination, the insurer must accept the claim for the damage to the pool pathway.
Both parties are to work together to determine the most appropriate method to repair or replace the pool pathway. If the insurer’s builder cannot repair or replace the pathway without replacing the pipework or discover that the pipework is already damaged, then it must also replace the pipework.
The insurer is also required to pay $5,000 to each complainant for non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer liable for the pool pathway?
Yes. The insurer must accept the damaged pathways. However, the insurer is not required to provide ongoing monitoring of the pool or cover further termite treatment.
Complainants have the initial onus to establish a claimable loss
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), that a claimable loss has occurred which is covered by the terms and conditions of the policy.
If the complainant can do this, the onus shifts to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
The parties agree:
· there was a flood that caused extensive damage at the property (the insurer accepted the claim for flood damage to the home)
· there is damage to the pool pathway including cracks at the western side and other areas.
The dispute is whether the policy respond to the damage to the pool pathway.
Policy provides cover for accidental damage including flood
The policy covers accidental loss or damage. It specifies that accidental loss or damage includes loss or damage from listed events including storm and flood.
The insurer’s submissions indicate that to establish a claimable loss the complainants must show the damage to the pool pathway was caused by a listed event, flood. However, the policy makes clear that the listed events (including flood) are ‘examples’ of accidental damage.
Therefore, in order to establish a claimable loss, the complainants must establish it is more likely than not that the damage to the pathway is accidental.
The policy says that accidental loss or damage includes loss or damage from incidents the insured did not intend to happen.
The policy does not define ‘accidental’. The ordinary meaning of this word, according to the Macquarie Dictionary’s definition is:
happening by chance or accident, or unexpectedly.
Complainants have established claimable loss
None of the exchanged information shows the cracks in the pool pathways were intended or expected. Therefore, the complainants have established a claimable loss and the onus falls on the insurer to show it is entitled to rely on an exclusion to decline the claim.
The insurer relies on exclusions including for:
· erosion and subsidence, except where the subsidence damage is caused by storm, flood, explosion, earthquake, or tsunami, if the damage occurs within 72 hours of the insured event
· default, structural fault or faulty design that the insured knew or should reasonably have known about and did not fix before the loss or damage happened.
Parties’ experts dispute cause of damage
The insurer relies on engineer JH’s reports, which makes findings including that:
· cracking in the pool pathways resulted from ground movement
· this movement was due to long-term swelling and shrinking of reactive subsoil
· contributing factors include large trees with extensive roots and installation issues (such as no flexible joint in the pool pump system) making the subsoil vulnerable to movement.
The complainants rely on engineer FM’s reports that make findings including that:
· damage to the pathway was caused by subsidence from floodwater and occurred within 72 hours of the flood
· this damage would have likely occurred even without the installation issues
· the subsidence is unlikely to be caused by trees or seasonal changes.
Damage to western side of pool pathway likely caused by flood
Based on the exchanged information, I am satisfied the damage to the pool pathway (including to the western side) was likely caused by the flood.
This is because:
· the parties agree there was a significant flood event
· there is insufficient information to show the damage existed before the flood or developed over a long time and information supporting that it occurred directly after the flood
· in general, I find FM’s reports, which identify flood as the likely proximate cause, more persuasive than JH’s, which did not adequately consider flood as a cause.
· I accept:
> there has been a 60mm movement of the slab at the fence line (subsidence) because this finding is well supported by FM’s testing and supporting information and not disputed by the insurer
> it is unlikely that seasonal variations and/or the nearby palm trees could cause such significant subsidence
> the damage from the subsidence likely occurred within 72 hours of the flood as the complainants’ account is credible and supported by a photograph.
My reasons why FM’s reports are more compelling than JH’s include:
· FM’s explanation for why the damage was likely caused by flood are better reasoned than JH’s and more consistent with the exchanged information
· JH did not consider flood as a possible cause of the damage, even when the insurer had accepted there was a flood at the relevant time and the flood caused extensive damage to the complainants’ property
· JH incorrectly classified the soil without testing it (despite FM’s request)
· JH’s findings that nearby palm trees were large enough and had root systems sufficient to cause the scale of the subsidence damage that occurred are inconsistent with exchanged photographs and not well reasoned (for instance, JH says the trees are ‘capable’ of causing long term subsidence, without providing sufficient information to establish that the trees likely caused this damage)
· many of JH’s responses to reasonable issues FM raised focussed on details that are peripheral to the main issue of causation (including for example, dismissing FM’s description of the slab as ‘permanent’ because that word precludes the possibility of future movement and challenging FM’s finding about the movement of the slab because FM’s finding was that it moved ‘approximately’ 60mm, suggesting this may be out by a couple of mms
· FM’s conclusion that there had not been ongoing significant movement was well supported by photographs preceding and following the flood and two detailed inspections after the flood.
Insurer must accept the claim for the pool pathway
For the reasons set out above:
· the complainants have shown the damage to the western side of the pool was likely caused by subsidence caused by flood, with that damage occurring within 72 hours of the flood
· the insurer has not shown that the exclusion for erosion and subsidence applies.
The insurer also says, and I accept, that the absence of joints may have caused minor cracks in other parts of the pathway. Both parties’ experts have confirmed this.
The policy excludes defects or faulty design only if the complainants knew, or reasonably should have known, about the issue and failed to fix it before the damage occurred.
As there is insufficient information to show the complainants knew or could reasonably have known about the lack of joints, the insurer has not established that this exclusion applies.
Within 14 days of receiving notice the complainants accept this determination, the insurer must accept the claim for the damage to the pool pathway.
Both parties are to work together to determine the most appropriate method to repair or replace the pool pathway. Additionally, if the insurer’s builder cannot repair or replace the pathway without replacing the pipework or discover that the pipework is already damaged, then it must also replace the pipework.
Insurer not required to monitor the pool for damage
The insurer’s trades drained the pool without removing the hydrostatic valve. FM says the insurer should engage an expert to monitor the area ongoing because draining the pool in this way can cause cracking and movement over time.
In response, the insurer organised a hydraulic survey of the pool. The survey results show a 6mm variation across the pool coping, which the insurer says is within acceptable tolerances and indicates no significant lift of the pool shell from draining.
In these circumstances, I am not satisfied there is sufficient information to establish the actions of the insurer’s trades have damaged the pool in the considerable time that has passed since the pool was emptied.
The insurer is not required (under the policy or otherwise) to provide further ongoing monitoring services.
If the complainants identify damage they say was caused by the insurer’s trades they can lodge a claim.
Insurer not required to arrange further termite treatment
The insurer cash settled repairs to the house and other costs including for termite treatment. This included a contingency uplift of 15%.
The complainants say:
· repair of the pool pathway may warrant another termite treatment to the affected area if it removes the existing treatment
· the insurer should arrange for this further termite treatment of the affected area.
I do not consider it fair to require the insurer to cover further termite treatment at this stage because there is insufficient information to establish:
· the complainants have exhausted the cash settlement paid to cover termite treatment costs
· the cost of any further termite treatment (if in fact it is warranted) will exceed the cash settlement already paid.
2.2 Is the insurer required to increase its contingency uplift?
No. The exchanged information shows the contingency uplift of 15% was likely reasonable and sufficient.
Insurer not required to increase contingency payment
Based on the exchanged information, I am satisfied the cash settlement the insurer paid the complainant is likely sufficient to repair the damage (excluding the pool pathway) covered under the policy.
Multiple scopes of work were provided and disputed during the claims handling process. The complainants agreed to the insurer’s final cash settlement amount, which was significantly higher than earlier offers.
The settlement included a 15% contingency to cover:
· unexpected variations during repairs
· loss of the lifetime guarantee.
I acknowledge the complainants have identified AFCA decisions awarding higher contingencies. But I consider 15% fair because:
· no information was provided that actual repair costs exceeded the settlement
· previous AFCA cases referenced were not shown to be comparable
· no further repair issues or additional costs were reported.
Therefore, I am not persuaded the contingency is insufficient and the insurer is not required to make any further payment
2.3 Are the complainants entitled to more accommodation costs?
No. The insurer paid more than the maximum temporary accommodation benefit the policy provides. The exchanged information does not show the complainants incurred additional costs.
The insurer exceeded its obligation to cover accommodation costs
The insurer paid 26 weeks more than the maximum temporary accommodation benefit the policy provides.
The complainants seek further payment for temporary accommodation because they say the insurer’s delays in claims handling caused an extended need for accommodation.
The policy only requires the insurer to cover temporary accommodation costs actually incurred.
I acknowledge there were avoidable delays in the insurer’s handling of the claim. However, the complainants have not shown these delays resulted in additional accommodation costs. The complainants confirmed they stayed at a family member’s property and did not provide sufficient information to establish additional expenses.
Insurer not required to pay further accommodation costs
In these circumstances, it would not be fair to require the insurer to pay more temporary accommodation costs.
2.4 Are the complainants entitled to non-financial loss compensation?
Yes. Significant flaws with the insurer’s claims handling caused the complainants severe stress and inconvenience. The complainants are entitled to $5,000 each.
Poor claims handling caused significant prolonged stress and inconvenience
The complainants raised several concerns about the insurer’s handling of the claim and its impact on them. While I have not addressed every issue in detail, I accept the insurer’s actions caused severe and prolonged stress and inconvenience. For instance:
· the insurer’s builder drained the pool without following proper procedures or the complainants’ consent
· the complainants had to engage their own experts to identify mould in the roof before the insurer agreed to cover the damage
· the insurer took too long to reach a reasonable scope of works and settlement amount, increasing both significantly in response to reasonable information the complainants provided.
These actions had a serious impact on the complainants over several years. I am satisfied the complainants are entitled to $5,000 each for non-financial loss.
Within 14 days of receiving notice the complaints accept this determination, the insurer is required to pay each complainant $5,000.
2.5 Why is the outcome fair?
The outcome fairly addresses the complainants’ valid claim while ensuring payments remain consistent with policy terms and condition the parties agreed to. It is fair for the insurer to cover the pool pathways because it did not meet its onus to establish that any exclusions apply. It is also fair for the insurer to compensate the complainants
At the same time, the insurer is not required to pay additional temporary accommodation allowance or increase the continency uplift because these elements of the insurer’s settlement were reasonable and consistent with the policy terms and conditions.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.