Insurer declined cover for drummy tiles after burst flexi-hose flood; cash settlement amount, accommodation and compensation disputed
Text of the determination
Determination
|
Case number
|
12-24-126338
|
Financial firm
|
Youi Pty Ltd
Case number: 12-24-126338 12 May 2026
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (the insurer). They lodged a claim after the back half of their home was flooded by a burst flexi-hose.
The insurer accepted the claim. However, it has not agreed to pay the cost of replacing drummy tiles in the back half of the house. It says the tiles became drummy because of faulty installation. The complainants say the tiles were damaged by water from the flexi-hose.
The complainants say they have spent about $100,000 on building work and anticipate spending another $30,000. However, this includes other work in addition to repairing the insured damage. They say the insurer should pay:
· $79,000 for building damage
· the cost of three to five weeks’ accommodation
· compensation for stress and inconvenience.
The insurer says the cost of repairing the insured damage is $19,680.29. It has offered to settle the claim by paying:
· $22,632.33 ($19,680.29, plus a 15% uplift) for building damage
· the cost of two weeks’ accommodation
· $2,000 compensation for stress and inconvenience.
1.2 Issues and key findings
Is the tile damage covered under the policy?
Yes. The tile damage in the back of the house (excluding the bathroom) was most likely caused by the burst flexi-hose.
How should the claim be settled?
The insurer should settle the claim by paying:
· $84,322.32 ($73,323.76, plus a 15% allowance for the disadvantages of cash settlement), plus interest, for building damage
· the fair and reasonable cost of four weeks’ accommodation.
Are the complainants entitled to other compensation?
Yes. The complainants moved out of home while the insurer arranged restoration work. They had to move out of their home a second time because the work was not done correctly. The insurer must pay $4,000 compensation for the stress and inconvenience caused by this and other errors.
Why is the outcome fair?
The insurer says the tile damage in the back of the house (which was inundated with water) was caused by faulty installation. However, it has not explained why there was no damage to the matching tiles in the front of the house (where the water did not reach).
It is more likely than not that the tile damage in the back of the house (excluding the bathroom) was caused by the burst flexi-hose. It is fair for the insurer to cover this damage.
1.3 Determination
This determination is in favour of the complainants.
The insurer must pay:
· $84,322.32, plus interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) from 16 April 2024, for building damage.
· the fair and reasonable cost of four weeks’ accommodation
· $4,000 compensation for non-financial loss.
2 Reasons for determination
2.1 Is the tile damage covered under the policy?
Yes. The tile damage in the back of the house (excluding the bathroom) was most likely caused by the burst flexi-hose.
Complainants lodged claim for water damage
The policy covers damage caused by water escaping ‘suddenly and without warning’.
On 5 March 2024, the complainants lodged a claim for damage caused by a burst flexi-hose. According to the insurer’s records, they said:
I woke up and heard a whooshing noise and water was coming out from underneath the sink in the kitchen and I ran outside and turned off the mains and power. The back part of the house is flooded, kitchen, dining, 3 bedrooms, laundry and lounge area. Bedrooms have carpet and the rest of the areas are tiled and doorway with carpet has been soaked with water.
The insurer appointed a restorer, who performed restoration work (removing water, installing drying equipment, cleaning), from 5 March 2024 to 3 April 2024.
The insurer appointed another restorer, who inspected the home on 13 May 2024 and said restoration work was complete and the home was ready for repairs.
The insurer appointed a builder (LJ), who prepared repair quotes for:
· $11,109 on 13 April 2024
· $12,304.12 on 19 April 2024
· $19,680.29 on 6 June 2024
The insurer offered to appoint LJ to repair the home in accordance with its quote for $19,680.29. Alternatively, the insurer offered to settle the claim by paying $19,680.29, plus a 15% uplift, a total of $22,632.33. The complainants did not accept these offers.
The insurer appointed another builder (AB), who prepared repair quotes for:
· $89,559.97 on 16 April 2024
· $10,640.92 on 22 April 2024.
According to the insurer’s notes, AB’s first quote ‘included stripping out the bathroom and laundry and replacing tiles throughout the home - all of which was unrelated to the event’.
Complainants removed bathroom floor tiles from claim
The complainants reported drummy tiles throughout the back half of their home, including the bathroom. They said this occurred because water from the burst flexi-hose got under the tiles, weakening the adhesive connecting the tiles to the substrate.
The complainants did not see any water in the bathroom during the event. However, they said water from adjoining rooms could have gone through the walls and under the tiles.
The second restorer said the bathroom was probably not damaged by the burst flexi-hose. LJ said the bathroom ‘could not possibly be affected’ by the burst flexi-hose.
The complainants appointed an engineer, who inspected the home on 10 June 2024. The complainants’ engineer said they believed water had damaged tiles, but did not comment specifically on the bathroom tiles.
The insurer appointed an engineer, who inspected the home on 16 January 2025. The insurer’s engineer said:
· the floor level of the bathroom is at least 15mm higher than the floor levels of the surrounding rooms. Water in surrounding rooms did not reach this level
· if the bathroom complied with the codes in force at the time of construction (circa 1998), it would have a waterproof membrane and at least 75mm of wall flashing around the perimeter. This would have prevented water entering from surrounding rooms
· there was no evidence that the bathroom tiles had been damaged by water from the flexi-hose
· the continual use of the bathroom over its lifetime had caused moisture to enter the tile mortar bed, weakening the bond between the tiles and the substrate. This was the cause of the drummy tiles in the bathroom.
After reviewing the insurer’s engineer’s report, the complainants admitted water from the flexi-hose may not have damaged the bathroom. They agreed to remove the bathroom tiles from the claim. However, they maintain water flooded the other tiled rooms in the back of the house, and damage to these tiles should be covered under the claim.
Experts disagree on whether water damaged tiles
A report by the first restorer (covering work from 5 March 2024 to 3 April 2024) said the floor tiles in the back half of the house were ‘non-restorable’, while the floor tiles in the front half of the house were ‘unaffected’. The report said the tiles were still wet on 3 April 2024.
On 3 June 2024, LJ attended the property with a ‘tile injection specialist’, who said:
· all drummy tiles in the home were perimeter tiles (tiles at the edges of rooms). Perimeter tiles are mostly smaller tiles and may not be fully covered by glue when laid
· in rooms where carpet had been removed, the floor had paint overspray around the perimeter (from painters spraying the walls before the carpet was laid). The tiled floors would also have paint overspray around the perimeter. This would have reduced the effectiveness of the tile glue
· the drummy tiles ‘were not event related’.
On 10 June 2024, the complainants’ engineer said, in their opinion, water from the flexi-hose had damaged ‘perimeter tiles where water would have ingressed in under the skirting boards and back under the tiles’.
On 16 January 2025, the insurer’s engineer said:
· there were some drummy floor tiles in in the back half of the house, mostly around room perimeters. There were no drummy floor tiles in the front half of the house
· the floor tiles did not comply with the codes in force at the time of construction, because:
> they spanned up to approximately 9m with no intermediate movement joints (the relevant Australian Standard required intermediate movement joints every 4.5m if any dimension exceeded 9m)
> they did not have perimeter movement joints (the perimeter had cement-based grout covered with a flexible sealant; this is not an effective perimeter movement joint)
· the lack of movement joints, combined with seasonal shrinking and swelling, caused the tiles to become partially detached from the substrate. This was the cause of the drummy tiles.
Tiles likely damaged by insured event
LJ’s tile injection specialist and the insurer’s engineer said the drummy floor tiles were related to the method of installation. However, neither offered any explanation for why drummy tiles were only found in the back of the house. The floor tiles in the front of the house match the floor tiles in the back of the house, and were installed using the same methods. The complainants say that if the tiles became drummy because of the method of installation, this would have occurred at both ends of the house. The insurer has not commented on this.
The complainants say water remained under the tiles for some time, and the number of drummy tiles increased after they lodged the claim. They say this indicates the tiles were damaged by water from the burst flexi-hose, not by wear and tear in the years before. However, other than the insurer’s engineer’s report, the expert reports do not provide much detail on the number and locations of the drummy tiles. The reports do not confirm the number of drummy tiles increased in the weeks and months after claim lodgement.
LJ said perimeter tiles may not have been glued as effectively as other tiles. This could explain why almost all the drummy tiles were perimeter tiles. However, the complainants’ engineer said water entered under the skirting boards and back under the tiles. This could also explain why almost all the drummy tiles were perimeter tiles. It would also explain why there were no drummy tiles at the front of the house.
There were drummy tiles in the bathroom, where water from the flexi-hose did not reach. However, this could be because the bathroom was exposed to higher moisture levels over its lifetime than the rest of the house. As stated in the insurer’s engineer’s report, the continual use of the bathroom over its lifetime could have caused moisture to enter the tile mortar bed, loosening the tiles.
The information provided by the parties indicates it more likely than not that the tiles in the back of the house (excluding the bathroom) were damaged by the burst flexi-hose. Therefore, the policy covers the cost of repairing or replacing these tiles.
2.2 How should the claim be settled?
The insurer should settle the claim by paying:
· $84,322.32 ($73,323.76, plus a 15% allowance for the disadvantages of cash settlement), plus interest, for building damage
· the fair and reasonable cost of four weeks’ accommodation.
Tiles could not be repaired with glue injection
The insurer says the drummy tiles are not related to the burst flexi-hose. However, as a gesture of good will, the insurer offered to pay the cost of injecting glue under the tiles.
On 3 June 2024, LJ’s tile injection specialist said it ‘would not be possible’ to repair the flooring with tile injection because ‘the adhesion could prove unsuccessful’.
On 16 January 2025, the insurer’s engineer said the tiles could be re-bonded to the substrate with a glue injection. They did not say how they reached this conclusion. They did not comment on the earlier report saying this would not be possible.
The tile injection specialist is the expert most qualified to determine whether tile injection is an appropriate repair method. I have given their opinion on this issue more weight than the engineer’s opinion.
The expert evidence indicates the tile damage could not be repaired with tile injection. The cost of repairing the tile damage includes the cost of removing and replacing the tiles.
Cost of repairs is $73,323.76
AB’s quote of 16 April 2024 for $89,559.97 includes the removal of tiles and the installation of new tiles throughout the back half of the house (including the bathroom).
The parties obtained other repair quotes. However, the claim settlement should not be based on these quotes, because:
· AB’s quote of 22 April 2024 for $10,640.92 does not include tiling
· LJ’s quotes (the highest being for $19,680.29) do not include tiling
· the complainants obtained a quote dated 20 Apr 2024 for $10,890. The quote only includes tiling. It does not include repairs to any other damage caused by the burst flexi-hose
· the complainants obtained a quote dated 16 July 2024 for $185,280.76. They said this quote was for ‘full renovations’ and included more than what was required to repair damage caused by the flexi-hose. The quote is not as detailed as AB’s quotes. It is not detailed enough to determine how much of its cost is for claim-related repairs.
For the above reasons, the claim settlement should be based on AB’s quote of 16 April 2024 for $89,559.97. The quote includes $16,236.21 ($12,403.52, plus 19% builder’s margin and 10% GST) for repairs to the bathroom. As the bathroom was not damaged by the burst flexi-hose, these items should be removed from the quote. This leaves a total of $73,323.76.
Insurer must pay 15% allowance for transfer of risk
When an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power.
AFCA considers that if an insurer cash settles a claim, it should consider paying an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
The insurer offered to appoint LJ to carry out repairs. However, those repairs would not have included repairs to the damaged floor tiles. The complainants did not have the option of having the insurer repair all insured damage. Therefore, I consider it fair for the insurer to pay an allowance for the transfer of risk.
The complainants’ engineer said the damage to the home was non-structural. However, the repairs required are extensive. The risk of additional damage is moderate. I consider a fair allowance for the transfer of risk would be 15% of the estimated cost of repairs.
The best available estimate of the cost of repairing claim-related damage is $73,323.76. 15% of this amount is $10,998.56. These amounts total $84,322.32.
Insurer must pay interest
The complainants were entitled to payment for building damage from March 2024, but have not yet received the payment. Furthermore, building costs have likely increased since AB prepared their quote on 16 April 2024.
To compensate for the delay in receiving payment, and the likely increase in building costs, the insurer should pay interest from the date of the quote.
The insurer must settle the claim paying $84,322.32, plus interest at the rate determined under section 57 of the Insurance Contracts Act 1984 (Cth) from 16 April 2024.
Insurer must pay for four weeks’ accommodation
The policy covers the cost of temporary accommodation if the complainants cannot live at the home because of insured damage.
The insurer has paid for some temporary accommodation. The insurer has agreed to pay the fair and reasonable cost of temporary accommodation during repairs.
The insurer estimates repairing the insured damage would take up to two weeks. The complainants estimate repairing the insured damage would make the home unliveable for three to five weeks.
The insurer’s estimate is based on the repairs quoted by LJ, which did not include tiling. I have concluded tiling is covered under the policy. Therefore, the insurer’s estimate is likely an underestimate. The complainants’ estimate is more likely to be correct.
The insurer must pay the fair and reasonable cost of four weeks’ accommodation.
2.3 Are the complainants entitled to other compensation?
Yes. The complainants moved out of home while the insurer arranged restoration work. They had to move out of their home a second time because the work was not done correctly. The insurer must pay $4,000 compensation for the stress and inconvenience caused by this and other errors.
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $6,300 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim.
We will only award this type of compensation if there has been an unusual degree of stress, inconvenience, or delay. We will not award compensation for the usual amount of inconvenience involved in making a claim. We will not award compensation for delays caused by a complainant, or other factors outside the insurer’s control.
Insurer must pay $4,000 compensation for non-financial loss
The complainants had to move out of their home because of the damage caused by the burst flexi-hose. They say this was especially difficult for them because they have two children with disabilities, and the changes in their living environment made their treatment more difficult.
The damage to the home would have caused stress and inconvenience regardless of how the insurer handled the claim. However, the insurer made errors that exacerbated the complainants’ stress and inconvenience:
· the General Insurance Code of Practice (to which the insurer subscribes) requires insurers to take ‘extra care with customers who experience vulnerability’. On 25 March 2024, the complainants told the insurer that one of their children was disabled. The insurer says it should have recorded this on the claim, but did not immediately do so. On 7 November 2024, the insurer said the complainants’ vulnerability had been recorded on the claim and it was ‘now being handled by a specialist priority assistance team’
· on 2 April 2024, the insurer said the complainants could move back into their home because it was dry (except for the tiles) and there was no mould. Later tests revealed parts of the home were still retaining moisture. The insurer’s note of 17 May 2024 said its restorers should have removed skirting boards and drilled holes in kick boards to facilitate drying
· on 14 August 2024, the complainants emailed the insurer. Due to a technical issue on the insurer’s end, the insurer did not respond to the email.
The insurer admitted it was responsible for delays that occurred because the initial drying of the house was unsuccessful. It offered to pay $2,000 compensation for non-financial loss.
The unsuccessful restoration work meant the complainants had to move back out of their home to allow further restoration and mould testing. This would have been stressful for most people. It was especially stressful for the complainants because of their children’s disabilities. The complainants were also distressed by the possibility that the unresolved moisture issues would cause mould contamination in their home.
In my view, the stress and inconvenience caused by the insurer’s errors warrants compensation for non-financial loss in the sum of $4,000.
Other issues do not warrant further awards of compensation
In April 2024, the complainants said the home was not safe for their children because the bedrooms had uncovered concrete floors. The insurer said the floors could be covered with corflute or cardboard. The complainants say they were ‘disgusted and devastated’ by this suggestion. Neither party has provided information showing whether corflute floor covering would have been safe. I do not have enough information to decide whether the insurer’s suggestion was appropriate.
The complainants contributed to the delay in resolving the claim. On 22 August 2024, the insurer said it wanted to arrange further inspections by an engineer and a hygienist. On 10 October 2024, the complainants’ lawyers wrote to the insurer asking it to reevaluate the claim, but did not say whether the complainants would allow further inspections. The complainants did not agree to allow further inspectors until 6 January 2025.
The complainants only agreed to allow further inspectors after the insurer met certain conditions. These included allowing the complainants to dictate the instructions given to the insurer’s experts. The complainants say the insurer was responsible for the delay because it did not agree to their conditions earlier. However, the complainants could have allowed further inspections without these conditions. In my view, the insurer is not responsible for this delay.
The insurer denied cover for the tile damage. For the reasons set out above, I disagree with this decision. However, that alone does not justify an award of compensation. The insurer’s decision was based on expert reports saying the tile damage was not related to the insured event. It acted reasonably in making the decision.
The insurer offered to pay for counselling sessions, which the policy provides cover for. The complainants said they did not have time for counselling, but admitted they could benefit from it.
Having reviewed the information provided by both parties, I am not persuaded the insurer made any other errors that caused an unusual degree of stress, inconvenience, or delay. Therefore, the insurer is not required to pay any further compensation for non-financial loss.
2.4 Why is the outcome fair?
The insurer says the tile damage in the back of the house (which was inundated with water) was caused by faulty installation. However, it has not explained why there was no damage to the matching tiles in the front of the house (where the water did not reach).
It is more likely than not that the tile damage in the back of the house (excluding the bathroom) was caused by the burst flexi-hose. It is fair for the insurer to cover this damage.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
3.2 Relevant policy terms
Product Disclosure Statement
|
Insured events (pages 13 – 16)
|
Your buildings and contents are covered up to the sum insured shown on your policy schedule for the following events where they occur at the insured premises.
|
8.Escaping Water
What is covered?
Loss or damage to the insured property caused by escaping water that occurred:
· suddenly and without warning; or
· slowly over a period of time and you could not reasonably have been aware of it.
…
|
Extra cover (pages 17 – 24)
|
The extra covers listed below are automatically included in your policy unless it is stated to only apply to buildings or contents cover specifically. Where applicable, the most we will pay for each claim is noted.
|
2.Temporary Accommodation: Insured Events
What is covered?
Buildings
Where the premises is owner-occupied, the actual cost you incur for your suitable temporary accommodation for a period of up to 12 months, while your buildings are being repaired or rebuilt, if you cannot live at the premises after an insured event for which a claim is accepted under your buildings policy and we agree that temporary accommodation is required.
The most we will pay for each claim is 12% of the buildings sum insured, which includes up to:
· 4 weeks in suitable emergency or short-term accommodation;
· 48 weeks in suitable residential accommodation at a similar standard to your home; and
· the reasonable and necessary costs for:
‒ redirection of mail from the insured premises for up to 12 months;
‒ utility connection costs at the temporary accommodation residence; and
‒ relocation of your contents to and from the temporary accommodation residence if you have contents cover under this policy.
We will also pay up to $250 per month for pet accommodation, up to a limit of $3,000, for each claim.
Suitable accommodation will be assessed based on factors including number of household members, proximity to the insured property, parking requirements and availability.
…
What is not covered?
…
Consequential costs that arise from you having to live in the temporary accommodation, such as the costs of travel to the temporary accommodation.
|
24.Counselling Services
What is covered?
Out-of-pocket costs for your counselling sessions with an accredited counsellor resulting from an incident where a claim has been accepted for loss or damage to the insured property or in relation to your legal liability. You should arrange the counselling sessions and if a claim is accepted under this section, we will reimburse you for costs incurred.
The most we will pay for each claim is $1,500 per person.
What is not covered?
Additional costs incurred by attending counselling sessions; for example, transport and parking costs.
|
Insured events (pages 28 – 30)
|
These general exclusions apply to all sections of your policy.
We will not pay for:
1. repair of any damage that existed prior to the start date of the policy;
2. additional costs resulting from your buildings or any part thereof not being compliant with building codes, regulations or laws, including any required approval by the relevant building authority, that were already in place when the buildings were originally built, subsequently altered or renovated;
3. upgrading undamaged parts of your buildings to comply with current building codes, regulations and laws;
4. repair of any item that has poor or faulty design specification, materials, planning or workmanship, or a defect, unless that item is guaranteed under our Quality Guarantee;
…
We will not pay for death or bodily injury to any person, or loss or damage to property, caused directly or indirectly by:
…
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37. wear and tear, rust, corrosion, or deterioration;
38. rising damp or seepage of water from the ground;
39. mould, rot, damp, or the effects of the climate or weather, unless as a direct result of an incident for which we have accepted a claim;
…
40.
41.
42. poor or faulty design specification, materials, planning or workmanship, or by a defect, unless you were not and could not reasonably have been aware of the problem prior to the incident; for example, if the defect was identified in any report that you received about the condition of your insured property or was reported to you in connection with previous work carried out on your buildings;
…
|
How we settle your claim (pages 31 – 33)
|
1.If you are claiming for buildings
If we can, we will settle your buildings claim by:
· repairing the damaged parts of your buildings if it is both possible for the parts to be repaired and economical for us to repair those parts because the cost of repair is less than the cost of rebuilding; or
· rebuilding the damaged part of your buildings if it is either not possible for those parts to be repaired or not economical for us to repair those parts because the cost of repair is more than the cost of rebuilding.
The circumstances in which we may be unable to repair or rebuild the buildings include:
· if materials needed for the repair or rebuild are not readily available;
· if the repair or rebuilding cannot commence for a significant amount of time; for example, due to availability of service providers;
· if the pre-incident condition of the buildings prevents us from repairing or rebuilding them; or
· if the insured event makes the land unsafe to build on; for example, after an earthquake.
If we cannot repair or rebuild the damaged part of your buildings, we will pay you an amount equal to the reasonable cost that you would incur to repair or rebuild the buildings up to the limits noted in your policy. We will undertake a search of the market to determine what this cost would be in your area, based on factors including scope of works and comparison quotes from repairers or builders.
We can use a combination of the above settlement methods if we are able to partially repair or rebuild the damaged part of your buildings.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.