Text of the determination
Determination
|
Case number
|
12-24-126254
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-24-126254 15 November 2024
Determination overview
Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
The complainant’s property was damaged in a storm in March 2022. The complainant has lodged two previous complaints arising from the same event:
927639 – which was resolved by a determination setting out that the insurer was required to repair the storm and mould related damage to the home.
1015293 – which was also resolved by way of determination setting out how the insurer was to cash settle the complainant for the damage to the property and temporary accommodation (discussed below).
The complainant says the insurer has not correctly implemented determination 1015293 because its cash settlement is too low. She seeks that the insurer increase its cash settlement offer and pay further temporary accommodation.
Issues and key findings
Has the previous determination been complied with?
Yes, in part. The insurer should increase the cash settlement and pay the complainant $131,950.
Is the complainant entitled to compensation?
No. The complainant is not entitled to a further award of compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because both parties were provided clear directions from AFCA on how the claim was to be finalised. It is not reasonable for either party to act outside of these prescribed directions and outside of the accepted portions of the claim. The insurer has partially adhered to the previous determination but has not provided a cash settlement amount for mould remediation. On that basis, it is only fair that the cash settlement offer be increased to provide for this.
Determination
This determination is substantially in favour of the complainant.
If the complainant accepts this determination, the insurer should pay the complainant $131,950, less any amounts already paid, within 14 days of being notified of the complainant’s acceptance.
Reasons for determination
Has the previous determination been complied with?
Yes, in part. The insurer should increase the cash settlement and pay the complainant $131,950.
The complaint was subject to previous determinations
This matter her been the subject of two previous determinations. This complainant is about whether the insurer has implemented determination 1015293 correctly.
Determination 1015293 said the building repairs were to be settled as set out in section 3.2 of the determination. In summary, the parties were to:
engage an independent building consultant and hygienist to prepare a scope of works (SOW) for the required repairs
the SOW should include repairs completed by the complainant and outstanding works
the expert and hygienist should be agreed by the parties
once the SOW has been obtained, each party can obtain one or two quotes based on the full SOW
if only one quote is provided, the insurer is to cash settle the claim based on that amount plus a contingency
if more than one quote is provided, the insurer is to cash settle the claim based on the average of those amounts plus a 20% contingency.
With respect to temporary accommodation, the insurer was to continue to pay temporary accommodation until a cash settlement had been issued.
The insurer arranged a hygienist and builder to determine a SOW
In accordance with the previous determination, the insurer provided the complainant with three options for a builder and a hygienist. The complainant selected JM (hygienist) and QT (builder).
The insurer provided instructions to these providers by email prior to their attendance at the property. The email included copies of previous relevant information and determination 1015293.
JM (hygienist) said in its report dated 21 March 2024:
the rear living room, southwest bedroom and lounge room have already undergone refurbishment to the ceiling and walls
the roof space could not be inspected because of the presumed mould present at the manhole access to the ceiling cavity
heavy dust, dirt and mould were observed throughout the property including on skirtings, curtains, hallway walls, window frames and sills
it recommended:
> ensure all sources of water ingress have been fixed
> implement a regular system of maintenance to the gutters to prevent a buildup of foliage
> remove and isolate offsite any non-affected items
> dispose of unsalvageable mould and moisture dampened materials
> install HEPA filtered air scrubbers that continue to run throughout removal works
> clean all surfaces to remove all mould, dust and dirt
> any mould affected materials that have been cleaned but where mould cannot be fully removed can be encapsulated with an approved product
> ensure all materials are dried out by installing dehumidifiers and air movers
> conduct a final clean and post remediation verification to confirm areas are dry and free of mould.
QT (builder) prepared a report and SOW dated 9 May 2024 that said:
the mould remediation should be carried out as recommended in JM’s report
set out in detail the works required in bedroom one, two, three, the family room, and laundry. This included professional cleaning, replacement of ceiling panels and doors, preparation and painting.
The insurer obtained quotes based on the SOW
The insurer obtained quotes for the SOW from two separate builders, as follows:
AR provided a quote dated 24 June 2024 in the amount of $28,214.12, including GST.
BP provided a quote dated 5 July 2024 in the amount of $38,211.28, including GST.
Both quotes have listed line items that include professionally cleaning the mould affected areas, preparing, painting and replacing the sheeting in the kitchen/family room, bedrooms, built in robe and laundry.
The insurer acknowledges that neither quote included an amount for post remediation verification and has cash settled the complainant for this.
The complainant obtained quotes
The complainant also obtained quotes from two separate providers, DS (hygienist) and HB (builder), as follows:
DS provided a quote dated 29 June 2024 for $73,425 plus GST for mould remediation works
HB provided a quote dated 21 July 2024 for $134,970 including GST for building works.
DS’s quote included mould remediation for the three bedrooms, rear lounge room, bathroom/toilet, living room, kitchen and dining, storage room, roof cavity and hallway.
HB’s quote was based off the SOW set out in DS’s report and included replacing the wall sheeting, doors, architraves and skirting boards. It also included removal of the existing floor in the family room, new lights and fans, a new kitchen and bathroom.
The parties dispute the extent of the damage
The complainant says the SOW prepared by JM and QT are incomplete, primarily because she says the insurer told them not to access certain areas of the house where mould was present.
I note that the complainant has been cash settled by the insurer for repairs she already undertook. This was based on the reports of KB and NS.
The quote from KB includes repairing damage to the kitchen, toilet, lounge room and bedrooms. It includes removal and replacement of skirting boards, window reveals, robes, and cornices. The complainant has been cash settled $69,458.19 including GST for these works.
In addition, the complainant was cash settled $11,793.97 for a hygienist to remediate areas of the bedrooms, laundry, toilet, bathroom, living room and kitchen.
The complainant says:
the insurer instructed JM to not access parts of the house that were mould affected as part of their inspection and preparing the SOW. She says these areas were the primary areas impacted by water ingress and these areas were not dried out by the insurer who did not inspect the property for 6 months. She says this is reflected in JM’s report that confirms it had no access to various rooms behind the wall void, skirtings and ceiling voids
JM did not have the relevant documents as stated in its report
the QT SOW is limited and appears to be a restoration SOW only. QT agreed that there is mould contamination requiring a mould remediation specialist
BP did not physically attend the property but instead provided a desktop assessment
AR confirmed in an email to her that it had provided for some restoration works, however not for mould remediation.
The insurer has provided a settlement offer
The previous determination set out how a cash settlement figure should be arrived at.
I accept that the parties adhered to the determination by appointing a single expert builder (QT) and hygienist (JM) to prepare SOW for further works required.
The insurer then obtained two quotes from AR and BP (both builders). The complainant obtained two quotes from DS and HB (a hygienist and a builder).
The determination said that a cash settlement should be arrived at by the average of the quotes obtained plus a 20% contingency.
The insurer has provided a settlement offer on 5 August 2024 in the amount of $44,055.24 which incorporates:
Average of building quotes provided by [the insurer] = $33,212.70 (A= $28,214.12 & B = $38,211.28)
20% Contingency ($33,212.70) = $6,642.54
6 weeks of temporary accommodation @ $700.00 per week = $4,200.00
The settlement offer needs to be increased
The insurer’s settlement offer needs to be increased, to reflect an amount for mould remediation in addition to restoration works.
I note the previous determination required two experts to be appointed to prepare a SOW – a hygienist and a builder. The insurer has provided a settlement offer based on quotes prepared from the builder’s SOW and not provided any quotes from a hygienist for remediation works.
The insurer says its builder’s quotes include amounts for mould remediation. However, I do not accept this. I acknowledge the email the complainant has provided from one of the insurer’s builders, AR, that it did not include an amount for remediation works in its quote.
It is not in dispute that there is mould at the property, which is likely extensive given that some areas could not be accessed (because of the mould concentration, not necessarily because the experts were instructed not to go there).
The only quote from a hygienist for mould remediation is that of DS which has been provided by the complainant. I acknowledge that the insurer says DS’ quote goes beyond the SOW prepared by JM. However, given the extent of mould and the fact that the insurer did not obtain a quote for remediation works, I consider this quote the best representation of what it would actually cost the complainant to remediate the mould.
The complainant’s quote from HB cannot be included in any assessment of restoration works. On my review of the quote, HB’s quote is not aligned with the SOW prepared by QT. It includes several items that the complainant has likely been cash settled for earlier or restoration works that are structural and not related to damage caused by the insured event.
Any cash settlement amount needs to actionable for the complainant. It also needs to provide for contingencies and variation, in this case, that further mould could be discovered and further repairs required to be undertaken. I also acknowledge this is the third time that the complainant has come to AFCA arising from the same insured event and it is important for both parties to provide finality to this dispute.
The insurer says the complainant is entitled to six weeks of temporary accommodation. It says this is based on the building consultant’s assessment that the work would take two weeks, but it has allowed six weeks. The complainant has claimed ten weeks but has not provided reasons why repairs would take this long. I consider the insurer’s assessment of temporary accommodation fair.
On that basis, the settlement amount is to be calculated as follows:
average of building quotes provided by AR, BP and DS = $33,213 (AR= $28,214.12 and BP = $38,211.28), plus
complainant’s quote from DS (hygienist) = $73,425 plus GST, plus
20% contingency = $21,292 plus
6 weeks temporary accommodation at $700 per week = $4,200
The insurer is to cash settle the complainant a further $131,950. This is in addition to the cash settlement already paid.
Is the complainant entitled to compensation?
No. The complainant is not entitled to a further award of compensation.
AFCA may award non-financial loss compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, AFCA may award compensation for non-financial loss (capped at $6,300) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind.
The complainant says she has suffered undue stress and inconvenience
The complainant says the insurer has consistently tried to limit her entitlement under the claim. She has expressed her frustration at having to have lodged three complaints with AFCA to try and get this matter resolved. She also says the insurer has emailed her indicating it called her but no phone conversation has actually taken place.
The complainant is also critical of the insurer because one of its contractors, BP, provided a desktop assessment and did not attend the property to price the SOW.
The complainant not entitled to further compensation
The insurer says that it has attempted to comply with the previous determination, including the timeframes set out in it. However, it says that the complainant was not available which made it challenging for its contractors to attend and for it to meet the relevant timeframes.
I acknowledge the submissions of both parties in the matter, but do not find that the complainant is entitled to a further award of compensation. I note she has been compensated previously for the insurer’s mismanagement of the claim. Whilst I accept the complainant is frustrated by the time taken to resolve the dispute, I consider the insurer‘s actions in trying to implement the previous determination were reasonable overall and the complainant is not entitled to further compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because both parties were provided clear directions from AFCA on how the claim was to be finalised. It is not reasonable for either party to act outside of these prescribed directions and outside of the accepted portions of the claim. The insurer has partially adhered to the previous determination but has not provided a cash settlement amount for mould remediation. On that basis, it is only fair that the cash settlement offer be increased to provide for this.
Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
AFCA Determination 1015293
Claim should be settled in this way
As neither party has been able to establish a fair quantum, then I consider it fair the building repairs be settled in the following way.
The parties are to engage an independent building consultant (expert) and an independent hygienist (hygienist) to inspect the property for the purpose of providing a full SOW for all the required repairs. In doing so, these experts are to take into consideration the following:
AFCA’s previous determination
include the areas the insurer has accepted liability for
the quotes and SOWs relied upon by both parties as set out in this determination
the invoices and scope of works for the works completed by CD and paid for by the complainant
MP’s report
To clarify, the SOW should include both the repairs completed by the complainant and the outstanding works. Also, if possible, one SOW should be provided for all the repairs. This may be done by the hygienist recommending a SOW for the mould remediation which the expert should include in the full SOW.
The expert and hygienist should be one agreed to by the parties. This can be done by the insurer providing a list of three each (i.e. three building consultants and three hygienists) that the complainant can choose one from. The expert and hygienist should be appropriately licenced and qualified to do this. Neither should have previously been involved in the claim.
Their costs are to be borne by the insurer. They should be appointed within 14 days after both have been agreed on.
Once a full SOW is completed, each party can obtain at least one, and no more than two, quotes for the full SOW. To clarify, one quote for the full SOW can include more than one contractor’s quote if different contractors are required to quote on different aspects of the full SOW (e.g. if mould remediation is to be quoted by mould specialist and the balance by a builder).
Any quotes obtained should be submitted within 45 days of the full SOW being provided to the parties. The contractors who are engaged should also provide an estimate of the likely timeframe to complete the works quoted on.
Within 14 days of the quotes being received, the insurer should cash settle the claim this way.
If there is only one amount quoted for the full SOW, then the insurer is to cash settle the claim based on that amount plus a 20% contingency. If more than one amount is quoted for the full SOW, then the insurer is to cash settle the claim based on the average of those amounts with a 20% contingency.
The contingency is to address the fact the risks of the works are passing to the complainant. These risks include the likely possibility there may be variations required during the works.
Temporary accommodation to be settled in this way
The insurer must continue to pay temporary accommodation until a cash settlement has been issued in line with section 2.1. After that point, the insurer is to continue to pay temporary accommodation until the estimated time to complete the repairs has lapsed. This timeframe should be based on the estimates provided by the contractor/s when quoting on the full SOW as set out in section 2.1. If more than one overall estimate is provided for the full SOW, then the insurer is to apply the average. A 20% contingency should also be added to the estimate (e.g. if the estimate is 10 weeks, then the insurer should allow 12 weeks).