Home / Allianz Australia / Determination 12-24-124818

Determination 12-24-124818

Partial denial of storm damage claim (eaves, air conditioner, roof tiles, shed cladding)

FirmAllianz Australia
Decided2025-05-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm and hail damage to his home and sheds; the insurer denied most items. AFCA found the insurer must cover the eaves (quotes plus 10% uplift) and air conditioner, but could deny roof tile and shed cladding damage.

The complainant established storm damage to the eaves and air conditioner and the insurer failed to prove an exclusion, but he did not establish hail damage to the tiled roof and shed cladding.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-124818 | Financial firm | Allianz Australia General Insurance Limited Case number: 12-24-124818 8 April 2025 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under his home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by a storm. The insurer has partially accepted the claim; however, it has denied the claim for damage to the eaves and roof tiles of the house, the roof cladding of the main shed and storage shed and the air conditioner mounted to the roof of the house. The insurer says that the complainant has not established a loss which is covered by the policy for these items. Alternatively, the insurer says that the cause of the damage for these items is excluded from cover under the terms of the policy. 1.2 Issues and key findings Is the insurer entitled to partially deny the complainant’s claim? Given the exchanged material, the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainant’s claim for damage to the tiled roof of the house and the metal cladding of the sheds, but it is not entitled to deny the claim for damage to the eaves and air conditioning unit. Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Similarly, where the complainant has established a loss covered by the policy, and insurer has failed to establish a policy exclusion applies to the damage, it is not fair for the insurer to deny the claim for that damage. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination, within 21 days of being notified of his acceptance, the insurer is to arrange: three actionable quotes for repair to the storm damaged eaves and to pay the complainant the amount of the highest quote, plus 10% uplift three actionable quotes for replacement of the air conditioning unit and to pay the complainant the amount of the highest quote 2 Reasons for determination 2.1 Is the insurer entitled to partially deny the complainant’s claim? Given the exchanged material, the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainant’s claim for damage to the tiled roof of the house and the metal cladding of the sheds, but it is not entitled to deny the claim for damage to the eaves and air conditioning unit. Coverage of the policy The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. Insured events include storm. Page 17 of the PDS details the storm cover as follows: What’s Covered? Buildings and/or contents Loss or damage caused by: • storm • cyclone* • rainwater • run-off (provided run-off is not combined with flood waters). ... The policy contains general exclusions that apply to all cover. The exclusions are listed from page 54 of the PDS and include the following: Things we won’t cover ... Always excluded Loss, damage, injury ... or legal liability as a result or, caused by or arising from ... Wear and tear Including depreciation, gradual deterioration, wear and tear or lack of maintenance. Inherent defects Including faulty design, structural defects or poor workmanship ... Rust, damp or chemical damage Includes loss or damage caused directly or indirectly by: • rust, corrosion, algae, mould or mildew. However, we will cover you for loss or damage when it is a direct result of an insured event ... It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainant lodged a claim for storm damage to his property on 5 March 2024. He said hail and rain damaged his roof and eaves during a storm on 7 January 2024. On receipt of the claim the insurer appointed assessor CF to determine the cause and extent of the damage. CF appointed roofer JF to inspect the damage. JF attended the property on 21 March 2024. They say the complainant advised them he noticed the damage when the roof gutters were overflowing during a storm. JF notes extensive water damage to the eave linings to the entire perimeter of the property and says that this is consistent with the complainant’s version of how the damage occurred. JF says: In our professional opinion based on the inspection carried out, the main roof and shed have been subject to hail damage to a large portion of main roof and shed as a result of a recent hail event in January 2024. All other structures around property have not been impacted by hail as a result of different material, profile and shading from trees. Assessor CF was not satisfied with the detail provided by JF to substantiate the loss, and so they engaged engineers FX to provide a detailed report and scope of works. FX attended the property on 8 May 2024. FX says the complainant did not allow access to inspect the inside of the property, however FX made the following observations of the external areas of the property: dark discolouration and distinct water staining rings are visible to the lining of the eaves corrosion to the roof and valley gutters and fixings of the eaves lining excessive spacing between the downpipes, exceeding the maximum acceptable building practice requirements the eaves gutters do not have adequate overflow provisions in accordance with acceptable building practice requirements roof tiles in areas were protruding past the acceptable maximum gutter overhang of 35mm in isolated areas downpipes were poorly and incorrectly installed, the downpipes were installed to the internal section of the gutter, rather than slotted to the external section, sealant was installed to fill the gap between the gutter and downpipe fretting to the roof tiles varying from slight to moderate with signs of historic fretting and repairs to the roof tiles, evident in the coating installed where the tile had lost cross-sectional area a cracked roof tile with sealant repairs roof tiles were uneven and partially dislodged in areas sediment accumulation at the ends of the roof tiles and debris between the roof tiles the evaporative system had screws installed to connect main frame to support the pads the eaves gutters do not have adequate overflow provisions in accordance with acceptable building practice requirements roof tiles in areas were protruding past the acceptable maximum gutter overhang of 35mm in isolated areas. Regarding the cause of the observed damage, FX concluded: water damage to the eaves lining to the perimeter of the building is consistent with long-term wetting and drying from an accumulation of storms and is caused by a combination of factors rather than a single one-off event the damage to the roof tiles is caused by a combination of factors including, installation, thermal expansion and the significant accumulation of organic debris within the tile joints there is no hail impact damage to the roof tiles of the house detachment of the roof mounted AC pad is caused by a combination of factors, including strong winds in combination with poor maintenance and/or incorrect installation of the pad, where the pad has not been sufficiently slotted back into its required position two roof tiles were damaged because of the AC pad detaching; however, these have been replaced by the Insured no hail impact denting was identified to the tiled roof of the house or the storage shed or to the main shed sheet metal roof cladding very slight hail impact denting was identified to the whirly birds of the main shed only. On 28 May 2024, based on the FX report the insurer accepted damage to two whirly birds, two light fittings and two roof tiles, but denied the claim for most items saying the damage was due to defects, deterioration and wear and tear, which are excluded from cover. The complainant disagrees with the insurer’s decision and says the roof and eaves did not have any damage until after the hailstorm in January 2024. He says the hailstones blocked the roof gutters, causing it to overflow and wet the eaves linings during the storm. The complainant disagrees with the FX report and specifically addressed some of the findings. He says: the eaves on the house are not discoloured, they are covered in mould due to being soaked in water for a period of time because of the storm the gutters are functional, and on 25 November 2024 there was a rain event where his property received 52mm of rain and the gutters did not overflow and the eaves did not flood the air conditioner was maintained and serviced. It had a pre summer check before the storm. The picture taken by FX was months after the storm, by which time the complainant had put screws in it to patch it up so he could use it. The complainant obtained a report from plumber SP dated 30 May 2024. SP had inspected the property both before and after the storm and provided a report as follows: Storm and hail damage is evident to residence and sheds. Damaged metal roofing. Damaged roof tiles, eave linings and mould is present as a result from this storm event. Evaporative air conditioner impacted by the storm and should not be operated. At Pre summer inspection Air conditioner was in good working order with pads correctly installed. In my opinion all roofing requires replacement inclusive of eve lining and evaporative air conditioner due to hail and storm damage. As stated, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy. There is no doubt there is damage to the complainant’s property, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainant must establish that the damage was caused by the storm as detailed within the terms and conditions of the policy. Once this is established, the onus shifts to the insurer to show, on balance, the cause of damage is excluded under the policy. I am satisfied the complainant has established storm damage to eaves and air conditioning unit The complainant provided photos and videos of the storm as it was occurring. The videos show heavy rain falling on the date he says the damage occurred at the property. The insurer says the rainfall on the date of loss was not particularly high. The complainant says the rainfall was intense over a short period, and that the damage was also caused by the gutters being blocked by hail. The insurer accepts there was hail during the storm. The complainant provided photos of the eaves at the property before the storm and after the storm which show they were damaged by the event. Given the above, I am satisfied, on balance, the complainant has established a loss of the type covered by the policy regarding the eaves and the air conditioning unit. I am not satisfied, on balance, the insurer has established the cause of damage to the eaves is excluded under the policy I have considered the report from engineer FX regarding the damage to the eaves. FX says the dark discolouration and multiple shades of staining on the eaves is consistent with multiple wetting and drying events, suggesting the damage was not caused by the storm event. FX says because the eave gutters and valley gutters are corroded in places the cause of water damage to the eaves is not the storm event. While the photographs attached to the report support that the gutters are corroded in places, there is no information in the report to suggest they have corroded through. FX has not indicated in his report how this corrosion has caused the water damage to the eaves. I consider it unlikely the corrosion, which has not compromised the structure of the gutter, could have any impact on the gutter’s ability to carry storm water. FX says the corrosion supports long term debris build up in the gutters, however I note the complainant purchased the property approximately 18 months prior to the event. There is no information to support the gutters were filled with debris during the storm and that this caused the gutters to overflow. Further, as stated, the complainant provided photographs of the eaves before the storm event showing no water marks which suggests the gutters had not previously overflowed. He also provided photographs of the dry eaves following a rain event in November 2024 where 51mm of rain fell during the 24-hour period which suggests the gutter were functional. The policy contains an exclusion for corrosion; however, the exclusion applies where the damage was caused by or arises from the corrosion. I am not satisfied, on balance, the fact that the gutters had some corrosion likely caused by build-up of debris at some time before the storm, of itself, establishes the cause of the damage to the eaves is caused directly or indirectly by rust or corrosion, or otherwise by wear and tear, deterioration or lack of maintenance. FX also says the downpipes at the property are not compliant in both the distance between the pipes, which exceeds 12 metres, and that the eave gutters do not have adequate overflow provisions in accordance with acceptable building practice requirements. FX does not provide any further detail regarding the noncompliance. FX notes the property was built in about the 1970s. FX provides no information regarding the standards they refer to, or information about whether the building may have been compliant with the building codes at the time it was built. Further, while I note FX disagrees with the JF report, builder JF in their report specifically note that there were no non-compliant building structures at the property. Given the lack of clarity and detail in the FX report on this issue, and the inconsistency with the JF report, I am not satisfied on balance, they have established that the policy exclusion of inherent defects or design flaws caused the water damage to the eaves. Similarly, FX says the downpipes are poorly installed yet provides no information about how this may have caused the damage. There is no information to show the downpipes being installed to the inside, rather than outside, of the gutter, impacts the volume of the water they can carry, or how the complainant’s downpipes being attached to the inside of the gutters has otherwise caused the water damage to the eaves. Further, I note the JF report specifically mentions that there are adequate downpipes at the property. Given the above, I am not satisfied, on balance, the insurer has shown the policy exclusion of wear, tear gradual deterioration or lack of maintenance was the cause of damage to the eaves of the house. The insurer has not met its onus to establish an exclusion detailed in the terms and conditions of the policy applies, and the result is that the insurer is not entitled to deny the complainant’s claim for this damage. Should the complainant accept this determination, within 21 days of being notified of his acceptance, the insurer is to arrange three actionable quotes for repair to the storm damaged eaves and to pay the complainant the amount of the highest quote, plus 10% uplift to compensate the complainant for taking on the risk of the repairs. I am not satisfied, on balance, the insurer has established the cause of damage to the air conditioning unit is excluded under the policy The complainant says the roof mounted air conditioning unit was damaged in the storm. He says plumber SP inspected the air conditioner before the storm for pre summer maintenance. The report from plumber SP includes the following opinion regarding the air conditioning unit: Evaporative air conditioner impacted by the storm and should not be operated. At Pre summer inspection Air conditioner was in good working order with pads correctly installed. FX agrees the detachment of the air conditioner was caused by strong winds, although they also say poor maintenance ’and/or‘ incorrect installation of the pad contributed to the damage. FX says the damage was limited to the two roof tiles the insurer has accepted liability for; however, FX provides no view regarding the damage to the unit itself. While SP’s report is brief and lacks analysis regarding how they reach the conclusion they reach regarding the cause of damage, I consider the report still to be helpful because SP serviced the air conditioning unit soon before the storm occurred and inspected it after the storm. For this reason, I am persuaded by the SP view that the air conditioning unit was damaged by the storm. I also accept that SP is suitably qualified to provide an opinion that the unit needs replacing. Regarding the installation of the pads, the complainant says FX inspected the air conditioner a month after the storm. By that time, he had put screws in the pad to patch it up. The complainant says he advised FX of this, however FX failed to include this information in their report. I am satisfied the complainant has established the air conditioning unit was damaged by the storm. The insurer has not met its onus to establish an exclusion detailed in the terms and conditions of the policy applies, and the result is that the insurer is not entitled to deny the complainant’s claim for this damage. Therefore, I am satisfied this damage is covered by the policy. Should the complainant accept this determination, within 21 days of being notified of his acceptance, the insurer is to arrange three actionable quotes for replacement of the air conditioning unit and pay the complainant the amount of the highest quote. I am not satisfied, on balance, the complainant has established the storm caused hail damage to property The insurer says the complainant has not established a loss of the type covered by the policy regarding hail damage to the tiled roof of the house and the metal roof cladding of the two sheds. The insurer accepts there was a hailstorm with hail sufficiently large and forceful to damage the two whirly birds however it says the hail was not sufficiently large or forceful to cause any further damage. Engineer FX says there is no hail damage to either shed, but they observed creasing damage to the metal roof cladding which is not associated with impact from hail. FX also says there is no hail damage to the tiled roof of the house, but there is fretting damage varying from slight to moderate. FX says these minor chips and marks on the tiled roof are due to several factors including installation, thermal expansion and the significant accumulation of organic debris within the tile joints. I note builder JF considers there is hail damage to the roof of the house and cladding of the sheds, however the JF report shows photos of hail damage indentation to the whirly bird only. The report contains photos of longer streak marks on the metal roof but there is no explanation from JF why they attribute these marks to hail damage. I am satisfied that the report from FX regarding the hail damage is thorough, logical, compelling, and supported by helpful photographs. FX also provides a helpful analysis of the size and force of hail required to cause damage to roof tiles. I am persuaded by the FX analysis, and the conclusion that had the hailstorms been large enough to cause damage to the tiled roof there would be severe hail damage to the metal roof cladding of the sheds, which did not occur. As stated, the photos do not show denting damage to the metal roof cladding, only to the whirly birds which FX says are made from softer metal. In my view, FX has established, on balance, that the tiled roof of the house and the metal cladding of the sheds has not been damaged by hail. Therefore, I am not satisfied the complainant has established a loss of the type covered by the policy regarding this damage, and the insurer is entitled to deny the claim for damage to the roof of the house and two sheds. 2.2 Why is the outcome fair? The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim. Where the complainant has established a loss covered by the policy, and insurer has failed to establish a policy exclusion applies to the damage, it is not fair for the insurer to deny the claim for that damage. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.