Dispute over scope of repairs after escape of liquid: replacement of skirting boards and plasterboard, and claim handling
Text of the determination
Determination
|
Case number
|
12-24-123999
|
Financial firm
|
AAI Limited
Case number: 12-24-123999 18 September 2025
1 Determination overview
1.1 Complaint
The complainant is a director of the insured company. The insured holds a landlord building and contents policy of insurance issued by the financial firm (insurer).
The complainant has made a claim for damage to the building as a result of a burst water pipe in an ensuite which occurred on 2 April 2024. The insurer accepted the claim and its builder, Builder A, prepared a scope of works. Works were carried out involving the replacement of water damaged cabinetry in the ensuite, carpets in the bedrooms and the preparation and painting of skirting boards. The complainant says the skirting should have been replaced. The complainant also says that the insurer should have replaced the plasterboard walls in the affected rooms. The insurer disagrees that the plasterboard sustained any damage or that the skirting required replacement.
Additionally, the complainant says that the insurer mishandled the claim.
1.2 Issues and key findings
Is the insurer required to replace the skirting boards?
No. There is no information which indicates that the skirting has not been restored to its pre-event condition by the preparation and repainting that has already been carried out. In the absence of such information, the works carried out are adequate.
Is the insurer required to replace the plasterboard?
No. On the available information, I am not persuaded that the plasterboard has sustained mould and/or water damage related to the loss event. Therefore, the insurer is not required to replace the plasterboard.
Is the complainant entitled to non-financial loss?
Yes. I am satisfied that the complainant has experienced an unusual degree of stress due to the insurer‘s handling of the claim. Specifically, the insurer failed to adequately explain to the complainant the reason that the skirting would be prepared and painted rather than replaced. The complainant is awarded the amount of $1,000.00 for non-financial loss.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has not shown the insurer’s repairs to the skirting, being preparation and repainting, has failed to restore the skirting to its pre-event condition. It would be unfair to require the insurer to replace the skirting;
· I am not convinced that there is mould or moisture damage to the plasterboard caused by the loss event based on the available information. It would be unfair to require the insurer to replace the plasterboard; and
· The insurer failed to adequately communicate with the complainant during the claim assessment process in relation to the scope of works as it related to the skirting. This caused an unusual degree of stress. It is fair that the complainant is awarded $1,000.00 for non-financial loss.
1.3 Determination
This determination is substantially in favour of the insurer. However, the complainant is awarded an amount for non-financial loss. If the complainant accepts this determination, within 14 days of receiving notice of that acceptance, the insurer is required to pay the amount of $1,000.00 to the complainant.
2 Reasons for determination
2.1 Is the insurer required to cover replacement of the skirting?
No. There is no information which indicates that the skirting has not been restored to its pre-event condition by the preparation and repainting that has already been carried out. In the absence of such information, the works carried out are adequate.
Onus is on the complainant to establish a claimable loss
The complainant has the initial onus of establishing he suffered a loss from an event covered by the policy. If the complainant can establish he suffered a valid claimable loss, the onus shifts to the insurer to show, on balance:
· it is entitled to rely on an exclusion under the policy, or
· it is otherwise entitled to decline the claim.
For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
Policy covers loss and damage caused by an escape of liquid
The cover provided by the policy is set out in the product disclosure statement (PDS) and Certificate of Insurance (COI).
The policy is an 'insured events‘ policy which means it only covers damage caused by specific events. The insured building is covered for damage caused by an escape of liquid. At page 50 of the PDS, the policy states:
Escape of Liquid
We cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:...
- Any drain, fixed pipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base);...
- Water main, fire hydrant or water supply pipe;...
It is not in dispute that an escape of liquid occurred in the ensuite and that the resultant damage falls for cover under the policy. The issue in dispute is whether the insurer carried out all necessary works to restore the property to its pre-event condition. Specifically, the complainant says:
· the insurer failed to replace the damaged skirting despite this being recommended by Builder A.
· the insurer failed to replace plasterboard walls which he says sustained mould damage and deterioration due to the leak.
Repainting of the skirting boards is adequate in the circumstances
Based on the available information, I am not persuaded that replacement of the skirting boards was necessary to restore the property to its pre-event condition. I accept that Builder A initially recommended replacement. Builder A‘s report titled ‘Escape of Liquids’ (undated ) stated:
Builders Observations
The leak has caused damage to the skirtings, carpets, vanity cabinet, architraves and ensuite door that will need to be removed and replaced to bring the property back to the pre event condition.
The insurer says that it did not replace the skirting because it was not part of Builder A’s scope of works set out in the document titled 'Property & Speciality Claims Panel Estimate/ Invoice Format‘ dated 9 April 2024 . The insurer says that the scope of works only included preparation and painting, not replacement.
I acknowledge that there is an inconsistency between Builder A’s initial recommendation for replacement and the method of repair included in the scope of works. Given the complainant’s concerns, the insurer should have provided an explanation to the complainant as to why the builder ultimately deemed that replacement of the skirting was not necessary.
However, there is no available information which shows that the repainting was not sufficient to restore the item to its pre-event condition. The complainant has not provided any information which shows that the skirting remains damaged or is not in a satisfactory condition. Therefore, I am not satisfied the insurer is required to replace the skirting or the information shows the works were inadequate.
2.2 Is the insurer required to replace the plasterboard?
No. On the available information, I am not persuaded that the plasterboard has sustained mould and/or water damage related to the loss event. Therefore, the insurer is not required to replace the plasterboard.
Insurer’s evidence regarding mould and moisture damage is preferred
Each of the parties has obtained expert evidence regarding the presence of moisture and mould. In particular:
· the insurer engaged a cleaning and restoration company (restorer) to carry out restoration works. The restorer carried out moisture testing of the walls in the affected areas. The insurer says that moisture levels were tested on five different occasions between 3 April 2024 and 23 April 2024. The restorer’s restoration report with the results of their testing states that as of 23 April 2024, the wall linings which previously showed elevated moisture levels had met the dry standard. I acknowledge that the complainant has raised concerns about the ‘standard’ applied by the restorer and the restorer‘s qualifications and expertise to carry out moisture testing.
· the same restoration report states that there was no visible microbial growth in any of the affected rooms. Some affected rooms had an odour and antimicrobial treatment was applied. As at 23 April 2024, only the second bedroom had a ‘minor odour’ and the restorer recommended replacement of the carpet.
· the complainant took moisture readings of affected walls on or about 11 June 2024 which he says showed elevated moisture levels. The insurer instructed its restorer to re-attend the property on the same day and conduct testing. At this time, the restorer carried out invasive testing by removing a small section of plasterboard and using a moisture metre in the two bedrooms. The related restoration report states that the walls met the dry standard and there was no visible microbial growth or odours in the tested areas.
· on 18 June 2024, the insurer arranged a reinspection of the property. The reinspection report by Builder A of the same date says that three internal doors had sustained water damage but this had been missed in the scope of works. The report also states that based on the restorer’s reports and recent invasive inspection of the wall cavities in both bedrooms, there is no evidence of moisture or microbial growth.
· the complainant has provided reports by two construction companies, L and B. In summary, both L and B agree that the plasterboard should have been replaced. Both L and B refer to the need for replacement based on the manufacturer’s guidelines. B also refers to other indicators including the extent of the flooding damage to other items such as cabinetry. The complainant says that L and B‘s opinions are based on extensive industry experience and supported by visual and environmental assessments.
· the complainant has obtained a mould analytical report from laboratory, IL. The report is based on tape samples received on 27 May 2025. The complainant collected and supplied the samples to IL. The complainant says the samples were taken from plasterboard in the main bedroom walk-in-robe after he removed a section of the skirting. The IL report identified high levels of cladosporium and elevated levels of fungal hyphae with the latter being indicative of recent active mould growth.
· the insurer has obtained a hygienist’s opinion regarding IL’s report and findings. The hygienist disputes IL‘s findings noting:
> the exact surfaces sampled have not been provided and therefore the results are meaningless; and
> the genera of mould identified in the IL report are commonly found indoors and not of a type associated with materials which have been left wet for a prolonged period.
Weighing the available information, I prefer the insurer’s reports relating to the presence of microbial growth and moisture levels for the following reasons:
· the insurer’s restorer tested the walls for elevated moisture levels and visual indications of microbial growth on six different occasions. By 23 April 2024, the walls met the dry standard. As at 11 June 2024, invasive testing showed no microbial growth or odour that would indicate the presence of mould. In accordance with AFCA’s approach, these tests carried out closer in time to the loss event should be given more weight than mould testing arranged by the complainant more recently in late May 2025;
· even if I were to accept that the findings in the IL report are accurate and that mould is present, I am not convinced that any mould is related to the loss event and not other environmental factors. In this regard, due to the amount of time that has passed between the loss event and IL’s report, it cannot be said on the balance of probabilities that any mould detected is as a result of the burst pipe that occurred in early April 2024;
· I am not persuaded that the IL report is reliable due to the circumstances in which the samples were collected. It is not clear the complainant has had suitable training in tape sample collection. The samples tested by IL were collected and supplied to IL by the complainant. The IL report states:
“Samples should be collected by people with suitable training. Samples collected by untrained personnel may be inaccurate due to sampling errors, poorly selected sampling locations or other”.;
· I am satisfied that the restorer engaged by the insurer to carry out the moisture testing had the requisite experience and expertise. I note that photographs are provided in the restorer’s reports which support their conclusions regarding moisture levels detected in the walls at the time of testing; and
· finally, the complainant’s experts, L and B have not provided the results of any testing of the plasterboard to support their views that replacement is necessary due to water damage.
I acknowledge the complainant points to the manufacturer’s recommendation that plasterboard be replaced if it becomes substantially wet. However, general recommendations are insufficient to establish a claimable loss under the policy. For cover to extend to replacing the plasterboard, the complainant must establish the plasterboard has indications of damage caused by the loss event. On a balanced view of the testing carried out, it has not been established on the balance of probabilities that the plasterboard has sustained mould damage or is otherwise affected by moisture related to the loss event.
For the reasons set out above, the insurer is not required to replace the plasterboard.
2.3 Is the complainant entitled to non-financial loss?
Yes. I am satisfied that the complainant has experienced an unusual degree of stress due to the insurer‘s handling of the claim. Specifically, the insurer failed to adequately explain to the complainant the reason that the skirting would be prepared and painted rather than replaced. The complainant is awarded the amount of $1,000.00 for non-financial loss.
Non-Financial Compensation is awarded conservatively
Under the AFCA Rules, we can award up to $6,300 compensation per claim for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled their claim. We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly.
We take a conservative approach to compensation for non-financial loss. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if your loss was partially caused by your own actions, or by factors outside the insurer’s control.
Complainant’s concerns regarding claim assessment
The complainant has raised a number of concerns regarding the insurer’s handling of the claim including but not limited to the following:
· he was misled by the insurer as he was not advised “that I had the option of using my own builder to carry out repairs to my property”;
· the insurer made changes to the original scope of works prepared by the insurer’s builder without proper reason which “reduced” the scope of works. This was a “deliberate act of misdirection”;
· changes to the scope by the insurer caused confusion and delays;
· the insurer should have removed affected skirting and tested the plasterboard behind it; and
· the insurer should have arranged for laboratory mould testing in the early stages of the claim.
No misleading conduct by the insurer
On the information available, I am not convinced there was any misleading conduct by the insurer. With respect to the selection of the builder to carry out repair works, at page 86 of the PDS, the policy states:
We will aim to use a member of our supplier network to repair or rebuild the damage to the property. Sometimes, this is not always possible for example if there is pre-existing damage. This will determine how the property claim will be settled.
At page 99 of the PDS, the policy states:
When your claim for loss or damage to the property is covered and a member of our supplier network is unable to complete the repair or rebuild, we will ask you to engage a builder to provide a scope of works and provide a quote on the cost to repair or rebuild the property on a ‘new for old’ basis..
If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount...
I am not persuaded the insurer made misleading comments to the complainant about the process for settling the claim. The policy does not state that in all circumstances the complainant may choose to use a builder of his choice to complete repair works.
Lack of communication by the insurer
I do not accept the insurer was required to replace the skirting boards if the building expert engaged by the insurer ultimately recommended that preparation and repainting was sufficient. However, I accept the change caused the complainant confusion and stress. The insurer should have provided the complainant an explanation as to why it was deemed that preparing and re-painting was sufficient to restore the skirting to its pre-loss condition.
I am satisfied the complainant has suffered an unusual degree of stress due to the insurer’s failure to properly communicate its decision regarding the skirting. Given this, it is fair in all the circumstances that the complainant is awarded $1,000.00 for non-financial loss. For completeness, I am not persuaded however that the change in the scope of works amounted to misleading conduct by the insurer.
Finally, I am not convinced the insurer should have arranged laboratory mould testing of the plasterboard at an earlier stage in the claim assessment. The insurer arranged for its restorer to test moisture levels and visual indications of microbial growth on a number of occasions, including an invasive test. As the last of those tests indicated normal moisture levels had returned and none of the visual tests detected microbial growth, it was reasonable that the insurer did not arrange further testing.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because:
· the complainant has not shown the insurer’s repairs to the skirting, being preparation and repainting, has failed to restore the skirting to its pre-event condition. It would be unfair to require the insurer to replace the skirting;
· I am not convinced that there is mould or moisture damage to the plasterboard based on the available information. It would be unfair to require the insurer to replace the plasterboard; and
· The insurer failed to adequately communicate with the complainant during the claim assessment process in relation to the scope of works as it related to the skirting. This caused an unusual degree of stress. It is fair that the complainant is awarded $1,000.00 for non-financial loss.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.