Determination 12-24-123972

Insurer partially declined water damage claim for bathroom repairs relying on exclusions, and declined alternative accommodation

FirmAllianz Australia
Decided2025-08-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$25,924
Non-financial loss$3,000
Amount claimed$25,924
SourceAFCA PDF

Summary

Complainants claimed for bathroom repairs after a leaking pipe; the insurer paid a small cash settlement and relied on exclusions to refuse more. AFCA required payment of a further $25,923.50, $3,000 non-financial loss and interest, but rejected the alternative accommodation claim.

The insurer's own plumber found the leak compromised the waterproof membrane, so the repair was covered and the insurer had not established any exclusion applied.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-123972 | Financial firm | Allianz Australia Insurance Limited Case number: 12-24-123972 12 August 2025 1 Determination overview 1.1 Complaint The complainants held a home building and contents policy with the financial firm (insurer) in Victoria. The policy period was from 17 October 2023 to 17 October 2024. The complainants lodged a claim on 11 April 2024 for damage to their bathroom area due to the escape of liquid. The insurer partially accepted the claim and paid $1,782.82 on 7 May 2024 as a cash settlement as it said it could not warrant the repairs. The complainants accepted the partial cash settlement and reserved their rights to claim further amounts under the policy. The complainants and the insurer have not resolved their dispute regarding further amounts to be paid for the repairs, whether alternative accommodation benefits were payable or the amount of non-financial loss compensation. 1.2 Issues and key findings Has the insurer correctly assessed the claim? No. The insurer is to pay further costs for the repairs. The insurer is not required to pay for alternative accommodation. Are the complainants entitled to non-financial loss compensation? Yes. The complainants are entitled to an award of non-financial loss compensation. Why is the outcome fair? The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for the insurer to pay interest and for there to be an award of non-financial loss compensation. 1.3 Determination This determination is substantially in favour of the complainant. Within 28 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall: · pay the complainants a further cash settlement for the repairs in the amount of $25,923.50 (being $27,706.32 minus $1,782.82 already paid by the insurer) · pay the complainants $3,000 in non-financial loss compensation · pay the complainants interest on: > $18,750.20 under section 57 of the Insurance Contracts Act (ICA) for the period from 1 July 2024 to the date the payment of $25,923.50 is paid by the insurer > $7,173.30 under section 57 of the Insurance Contracts Act (ICA) for the period from 1 March 2025 to the date the payment of $25,923.50 is paid by the insurer 2 Reasons for determination 2.1 Has the insurer correctly assessed the claim? No. The insurer is to pay further costs for the repairs. The insurer is not required to pay for alternative accommodation. Coverage of the policy The complainants’ policy provided cover for insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and the Policy Schedule (Schedule) (together referred to as the policy). The policy was provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy to determine its obligations to the complainants. Complainants have the initial onus to establish a valid claim The initial onus is with the complainants to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a valid (or prima facie) claim. Once the complainants have established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy. Proximate cause When establishing the cause of the damage to the complainants’ property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause. Policy covered water damage subject to exclusions The policy provided cover for ‘Water or other liquid damage’ (page 18): What’s covered? Buildings and/or contents ✔ Loss or damage resulting directly from bursting, leaking, discharging or overflowing of any: • .. • fixed pipes, gutters or drainpipes, sinks, baths or water carrying apparatus • .. Buildings only ✔ If we have agreed to pay a claim for water or other liquid damage to your buildings and; - we authorise any exploratory work to locate the source of the damage, we will pay those costs. - you incur costs without our prior agreement, we will only pay the reasonable covered costs up to the amount we would have agreed to, had you asked us first What’s not covered? ✘ Loss or damage: • as a result of gradual escape of water or other liquid over time: - where you or a reasonable person could be expected to have been aware of this, or - from a shower base, shower recess, shower alcove or the walls surrounding the shower. • caused by rust, corrosion, algae, mould or mildew. However, we will cover you for loss or damage when it is a direct result of an insured event. ✘ The cost of repair or replacement of: • a defective part or parts that caused the loss or damage, or • any broken main or pipe. Complainants sought the insurer pay $25,923.50 for further repair costs The complainants engaged their own plumber, MC, due to the insurer’s partial settlement and refusal to perform the repair works. MC invoiced the complainants on 4 July 2024, 29 July 2024 and 19 August 2024 for the repair works performed by MC. The total cost of the works was $20,533.02 based on an invoice dated 19 August 2024. The complainants also provided a quote from MC to the insurer prior to 1 July 2024 for that amount which was itemised: 1st visit: · Attend property · Isolate water mains · Remove tapware and cap pipework · Remove tiles from the walls · Remove plasterboard · Install customer supplied bath and alter the waste to suit · Turn on water 2nd Visit: · Install new water stops to the walls and floor · Supply and install plasterboard · Waterproof area · Re-tile area · Grout tiles 3rd Visit: · Isolate water supply · Fit off tapware · Caulk area · Tidy work area · Final tidy and clean for handover · Issue compliance certificate .. Demolition Remove tiles and plasterboard Builders works Straighten walls Frame out for bath Plumbing Cap off plumbing Alter waste to suit new bath Alter pipework to suit new customer supplied tapware Install customer supplied bath and tapware Plaster/Tiling Insert water stops Plaster walls Waterproof walls Tile walls Grout tiles Caulking Caulk work area Final Tidy and Clean Final clean and tidy for handover to customer The complainants also provided invoices for: · shower door over bath - $4,590 dated 18 July 2024 · shower head and mixer tap - $1,162 dated 6 July 2024 · bathroom tiles – $1,421.30 dated 4 July 2024 and 5 July 2024 On 15 February 2025 the complainants sought the insurer to pay for MC’s repair works ($20,533.02), shower door ($4,590), shower head and mixer ($1,162) and bathroom tiles ($1,421.30) – a total of $27,706.32. The insurer had already paid $1,782.82 on 7 May 2024. Accordingly, the amount sought by the complainants for the cost of repairs was $25,923.50 (being $27,706.32 minus $1,782.82 which the insurer had already paid). Insurer offered a further $1,445.70 On 12 February 2025 the insurer offered to pay $2,574.58 to resolve the claim. This amount was based on a Statement of Works (SOW) from its plumber, KB, in the amount of $1,728.82 plus a 20% contingency ($345.76) plus a $500 ex gratia payment. The insurer also agreed to waive the $500 excess payable under the policy. On 24 February 2025 the insurer revised its offer and said it had paid $1,782.82 on 7 May 2024 and offered a further $1,445.70 (being a 25% contingency ($445.70) (which was based on $1,782.82 rather than $1,728.82) and an ex gratia payment of $1,000). Insurer’s plumber prepared reports The insurer’s plumber, KB, prepared a report dated 17 April 2024 (based on an inspection dated 17 April 2024) (3 pages, no supporting photographs). KB concluded: · the complainants’ plumber had identified the leak to the cold water service under the bathhouse in the rear bathroom area · the only resulting damage was minor and had affected the laundry adjoining wall · to repair the leaking service, the bath would need to be removed where the concrete could then be cut, allowing access to repair the leaking cold water service · however, when the bathtub is being removed, this will then impact the water proofing membrane and a full removal and reinstatement of the bathroom area will be required · there was only a single bathroom/ laundry/ wc at the complainants’ home and these repairs would render this location inaccessible and accommodation would be required KB prepared a further Variation Report dated 4 June 2024 (based on an inspection on 20 May 2024) (7 pages, together with supporting photographs): Description of Damages Following leak waterproof membrane has been compromised. This is a continuous are [sic, area] from the bathroom flowing onto the laundry and toilet. Additional tile cracking has also occurred. No resulting damages from the leak were identified following the removal of the bath. The cracked tile is a result of general movement. The cracking cannot be correlated with the claimed leak. The repair method for this would be for the [complainant] to remove and replace the tile with a tile to closest match existing. Cause/ Circumstances (How damage occurred and causes) Waterproof membrane compromised and tile cracking Insurer denied the complainants’ claim for the cost of further repairs based on exclusions On 18 June 2024 the insurer said to the complainants: · it accepted the resultant water damages to the laundry and recommended a cash settlement due to recommended maintenance required · KB re-attended after the bath was removed to complete the leak repairs and no resulting damages from the leak were identified following the removal of the bath · a cracked tile was found however this was as a result of general movement and the cracking could not be correlated with the claimed leak · the complainants’ claim was not covered because the policy ‘excludes the costs associated with fixing the item that has leaked’ On 1 July 2024 the insurer said to the complainants: To repair the leaking pipe the bathtub required removal and, as a result of this, the waterproof membrane was disturbed. Resultantly, due to what was required to repair the pipe the entire bathroom requires removal and replacement to replace the waterproof membrane. This is a cost associated with the broken pipe which is not covered by the policy. On 1 October 2024 the insurer relied upon the exclusion for the cost of repair or replacement of any broken main or pipe. The insurer also relied upon the exclusion under the policy for ‘wear and tear – including depreciation, gradual deterioration, wear and tear or lack of maintenance’ and the exclusion for ‘inherent defects – including faulty design or materials, structural defects or poor workmanship’. On 1 October 2024 the insurer also said the damage to the membrane was caused by the complainant’s own contractor ‘removing the bathtub to fix the leaking pipe’ and that the complainants should make a claim against their contractor. Complainants established a valid claim and insurer was not entitled to rely upon exclusions The policy provided cover for loss or damage resulting directly from bursting, leaking, discharging or overflowing of ‘fixed pipes’ or ‘water carrying apparatus’. KB’s first report recorded that ‘to repair the leaking service, the bath would need to be removed where the concrete could then be cut, allowing access to repair the leaking cold water service’ and that ‘when the bathtub is being removed, this will then impact the water proofing membrane and a full removal and reinstatement of the bathroom area will be required’. The more detailed Variation Report from KB (together with supporting photographs) recorded that following the leak ‘the waterproof membrane had been compromised’. Based on the information and the policy wording, the complainant has established a valid claim for water damage and for the insurer to pay for the cost of the complainants’ repairs. The onus was then on the insurer to establish that it was entitled to exclude ‘the cost of repair or replacement of: • a defective part or parts that caused the loss or damage, or • any broken main or pipe’. Based on the information, the part that caused the loss or damage was the cold water pipe. The insurer has not provided a quote for the cost of repair or replacement of the ‘defective part or parts [the cold water pipe] that caused the loss or damage, or any broken main or pipe’. The complainants said that they accepted that they were not entitled to the cost of the repair to the part (the cold water pipe) that caused the damage. The insurer’s position was incorrect because its own plumber, KB, had recorded on 4 June 2024 that ‘following the leak the waterproof membrane had been compromised’ i.e. the waterproof membrane was damaged (compromised) by the leak. Accordingly, the cost of repairs to the waterproof membrane was, according to the policy terms, loss or damage resulting directly from leaking of a fixed pipe. The repair to the waterproof membrane was not a cost of repair (as per the exclusion) of the part that caused the damage or any broken pipe. Accordingly, the insurer was not entitled to rely upon the exclusion in the ‘Water or other liquid damage’ cover to deny (or reduce) the complainants claimed repair costs. The complainants acknowledged that they were not entitled to the cost of the repair to the part (the cold water pipe) that caused the damage but the insurer has not provided any information regarding that cost. Accordingly, the complainants’ cost of repairs should not have been denied by the insurer or reduced. In relation to the insurer’s reliance on the wear and tear exclusion and the inherent defects exclusion, the insurer’s expert, KB, provided no opinion in its reports which provided any basis for the insurer to rely upon these exclusions other that there was one cracked tile which was a result of general movement. In the context of the repairs and the claimed damage, one cracked tile was minor to the point of being insignificant and trivial and should not have been sought to be relied upon by the insurer to deny or reduce the claim. The insurer has not established that it is entitled to rely upon either of those exclusions to deny or reduce the claim. In relation to the insurer’s contention that the damage to the membrane was caused by the complainant’s own contractor ‘removing the bathtub to fix the leaking pipe’ and that the complainants should make a claim against their contractor, the insurer’s expert, KB, provided no opinion in its reports which provided any basis for the insurer to make that assertion. Accordingly, the insurer was not entitled to deny the complainants’ cost of repairs or to reduce the amount they sought on that basis. Based on the information, it is also fair in the circumstances that the insurer should pay the amount of the complainants’ claimed costs. The insurer sought to rely upon exclusions under the policy (each of which have not been established by the insurer) and in circumstances where the insurer’s own expert, KB, had provided it with a detailed and revised report on 4 June 2024 that ‘following the leak the waterproof membrane had been compromised’. The complainants, at their own cost, sourced and paid for materials and paid for their own plumber to perform the repairs at their own cost. The insurer’s position was not fair in the circumstances and it is fair that the insurer should pay the complainants’ claimed costs. Accordingly, the insurer is to pay the complainants the amount of $25,923.50 (being $27,706.32 minus $1,782.82 already paid by the insurer). Insurer to pay interest Section 57 of the Insurance Contracts Act 1984 (Cth) (the ICA) says that an insurer has to pay interest on a benefit: commencing on the day as from which it was unreasonable for the insurer to have withheld payment AFCA has a published an Approach to Awarding Interest in Insurance, which says: Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be: • the date the claim was denied • if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or • the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy). AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm. The insurer’s second denial was on 1 July 2025 at which time it had received the quotation of the complainants’ plumber’s costs ($20,533.02). Based on the information, it is not clear (but appears to be in or about 15 February 2025) when the complainants provided the invoices and amounts for the shower door ($4,590), shower head and mixer ($1,162) and bathroom tiles ($1,421.30) totalling $7,173.30. In the circumstances, it was unreasonable for the insurer to have withheld payment from 1 July 2024 on the amount of $18,750.20 (being the insurer’s plumber’s costs $20,533.02 less the amount of $1,782.82 which the insurer had already paid on 7 May 2024). It was also unreasonable for the insurer to have withheld payment from 1 February 2025 on the amount of $7,173.30 from 1 March 2025 (a fortnight after 15 February 2025). Accordingly, the insurer should pay the complainants interest on: · $18,750.20 under section 57 of the Insurance Contracts Act (ICA) for the period from 1 July 2024 to the date the payment of $25,923.50 is paid by the insurer · $7,173.30 under section 57 of the Insurance Contracts Act (ICA) for the period from 1 March 2025 to the date the payment of $25,923.50 is paid by the insurer No alternative accommodation benefits payable The policy provided ‘Alternative accommodation for you and your pets’ (page 28): If your home building is damaged by an insured event during the period of insurance to such an extent that you can’t live in it, we’ll pay the rental costs for accommodation for you and your pets for the period it reasonably takes, to repair or rebuild your home building. This is an extra amount, paid in addition to your buildings sum insured. No excess applies to this benefit. The complainants said they were advised by the insurer that temporary accommodation would be on a week-by-week basis. The complainants said that a week-by-week temporary accommodation arrangement would have created uncertainty and disruption. The complainants also said that their home could not accommodate a portable ensuite, which the insurer had offered, due to access and space constraints. The complainants said they had two pets which could not be accommodated other than by extended kennelling and that such an approach was not achievable on a week-by-week basis. The complainants could, and did, live in their home during the bathroom repair period. The inconvenience they experienced of showering at the gym and at their workplace has been included in the award of non-financial loss compensation in section 2.2 below. Based on the information and the policy wording, the complainants were not entitled to temporary accommodation benefits. 2.2 Are the complainants entitled to non-financial loss compensation? Yes. The complainants are entitled to an award of non-financial loss compensation. AFCA can award compensation for non-financial loss Under AFCA’s Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer is the required to pay non-financial loss compensation Based on the information available, the complainants made the claim on 11 April 2024 and finalised the repairs at their cost by the end of August 2024. The complainants were inconvenienced by the insurer’s delays and the need to follow up the insurer regarding the status of their claim. The complainants experienced inconvenience due to their inability to have access to their own bathroom facilities and the need to shower at a gym or their workplace until they conducted the repair work themselves. Whilst the insurer had offered temporary accommodation and a portable ensuite, neither were accepted by the complainants as they were not suitable. In the circumstances, the complainants are entitled to compensation for non-financial loss in the amount of $3,000. 2.3 Why is the outcome fair? The outcome is fair because the insurer is obliged to comply with the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for the insurer to pay interest and there to be an award of non-financial loss compensation. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.