Home / Suncorp Group / Determination 12-24-123483

Determination 12-24-123483

Dispute over whether fire-damaged home must be knocked down and rebuilt or repaired, and the cash settlement amount

FirmSuncorp Group
Decided2026-02-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed$1,091,585
SourceAFCA PDF

Summary

After a kitchen fire, the complainant sought a cash settlement for a knock down and rebuild (about $1.09m). AFCA found the home is repairable, ordered an updated scope and quote with cash settlement plus 20% contingency or repair at her election, and awarded $2,000 for non-financial loss.

The insurer's engineer's report was more persuasive than the complainant's, and the PDS limits a cash settlement to the insurer's own repair cost, while poor claim handling warranted non-financial loss compensation.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-123483 | Financial firm | AAI Limited Case number: 12-24-123483 12 February 2026 1 Determination overview 1.1 Complaint The complainant holds home building and contents insurance with the financial firm (insurer). On 9 March 2024, she lodged a claim after her home and its contents were damaged in a fire. The insurer accepted the claim and paid the complainant the contents sum insured. It says the building damage can be repaired and is prepared to engage builder PB to do so. PB has quoted approximately $324,000 to undertake the repair work. The complainant maintains that the home’s structural integrity has been compromised. She seeks a cash settlement based on a quote dated 26 June 2025 by builder HP to knock down and rebuild the home. She also seeks compensation for her stress and inconvenience. 1.2 Issues and key findings Is the insurer required to cover a knock down and rebuild? No. It has not been established that a knock down and rebuild is required to reinstate the home. If the insurer attends to the necessary repairs, a lifetime guarantee will apply to them. Can the complainant request a cash settlement? Yes. The policy allows the complainant to choose whether to accept the insurer’s offer to attend to repairs. However, the policy also says if she chooses not to accept the offer, the insurer is only required to pay her what it would cost it to attend to repairs. The insurer is to obtain updated information to establish that. Is non-financial loss compensation payable? Yes. The insurer acknowledged it could have handled the claim better. The claim handling issues caused the complainant stress and inconvenience. The insurer is to pay her $2,000. Why is the outcome fair? The claim outcome is fair because it reflects the insurer’s obligations under the policy terms as they apply to the known facts. However, it is also fair to require the insurer to compensate the complainant for the stress and inconvenience it unreasonably caused her. 1.3 Determination This determination is partially in favour of the insurer. If the complainant provides written notice (notice) that she accepts this determination: · within 7 days, the insurer is to ask IE for an updated scope of works (SOW) reflecting the work required to repair the current state of the home · within 7 days of receiving IE’s SOW, the insurer is to request PB for an updated quote reflecting its current prices · within 7 days of receiving the quote, the insurer is to provide a copy to the complainant · within 14 days of receiving the quote, the complainant is to tell the insurer if: > she wants a cash settlement, in which case the insurer is to within 14 days pay her the quoted amount plus a 20% contingency uplift > she wants the insurer to attend to repairs, in which case the insurer is to have PB do so · within 14 days, the insurer is to pay the complainant $2,000 in compensation. 2 Reasons for determination The complainant relies on HP’s quote totalling $1,091,585. She has agreed to proceed with her complaint on the understanding the maximum AFCA may award per claim is $631,500. 2.1 Is the insurer required to cover a knock down and rebuild? No. It has not been established that a knock down and rebuild is required to reinstate the home. If the insurer attends to the necessary repairs, a lifetime guarantee will apply to them. Background On 9 March 2024, a stove top fire in the complainant’s kitchen burnt up through the rangehood duct and ignited combustible materials above, including timber ceiling joists. Later that evening, the complainant lodged a claim for damage to her home and its contents. The insurer arranged temporary accommodation for the complainant and her family and attended to preliminary make safe repairs. On 18 March 2024, an inspection of the home took place involving the complainant, the insurer’s assessor and building co-ordinator, as well as its appointed external building consultant SE and external builder CB. The complainant was advised that her home would be able to be repaired as the majority of rooms were only smoke damaged. The complainant sent an email to the insurer later that day expressing concerns about the home’s structural integrity. She said that ‘an engineer will be the ideal person to certify it before we plan anything further’. On or about 3 April 2024, the insurer accepted that the claim was covered subject to the terms and conditions set out in the product disclosure statement (PDS). Insurer maintains home can be repaired The insurer says it has: accepted complete replacement of the damage caused to the roof, trusses and fire affected top plates, inclusive of fire, smoke and water damage caused to the affected section of the dwelling. On 7 January 2025, the insurer obtained from PB a repair quote totalling $324,232.71, based on a SOW prepared by engineer IE. PB is prepared to do the work involved. The insurer notes it has informed the complainant several times that variations to the SOW are likely once the work begins, and that any unforeseen damage will be accounted for. The insurer does not agree with the complainant that the home must be knocked down to its concrete slab then rebuilt. Its position is based on several reports by IE. On 6 May 2024, IE inspected the home for the first time. It noted that there was extensive damage to the roof frame. IE reinspected the home on 29 October 2024, after necessary demolition work had been completed. IE concluded that the home was repairable and prepared an 85-page SOW, on which PB based its subsequent quote. In its SOW, IE confirmed that other building repairs may become necessary if additional damage was discovered once work begins. As discussed further below, the complainant’s engineer TM provided a report dated 13 February 2025. TM concluded that the fire had compromised the home’s timber framed structures. TM recommended ‘the entire home be demolished and reinstated’. On 27 February 2025, IE reinspected the home. In its report dated 14 March 2025, IE said: · there was no evidence that supported TM’s position the timber wall frames had been fire damaged, necessitating all wall frames to be demolished and replaced · it disagreed with TM’s recommendation · its SOW allowed for an entire new timber roof structure, and had identified that some timber wall frame top plates needed to be replaced · additional debris had been cleared away since its inspection of the home in October 2024, and it was now clear an increased extent of top plate replacement was required · its SOW had recognised that might be a possibility · ‘In our opinion, once the fire damaged timber wall frame elements are replaced and a new timber roof frame reinstated, the dwelling will be returned to the structural condition that was present before the fire damaged it’. The insurer acknowledges that its make safe repairs, of which there have been several, have not prevented water ingress through the damaged roof. It says it ‘will address all areas raised as concerns once it is able to gain access and begin the strip out to complete repairs…’. The insurer submits that it: remains willing and committed to repairing the entirety of the roof structure and addressing the damages identified due to the insured event. The Insurer will update the scope of repairs with any unforeseen damage that may be discovered during the repair works and return the Customer’s property to the condition it was in prior to the fire damage occurring. The Insurer believe[s] that the structural integrity has not been compromised to the degree that requires a complete knock down and rebuild of the property. Complainant says knock down and rebuild is required The complainant relies on TM’s reports. After an initial inspection on 31 May 2024, TM said fire and smoke damage had significantly affected the entire roof structure and a significant portion of the timber wall framing. It considered the home’s structural integrity had been compromised, and recommended further investigations be undertaken into the extent of that. TM reinspected the home on 1 December 2024 and 29 January 2025. On 13 February 2025, it reported that: · ‘there had been significant structural failures throughout the external roof cladding & timber roof framing, with subsequent structurally compromising effects [on] the associated timber wall framing members’ · the timber members’ integrity had been compromised, with the potential for creep and distortion. That, in turn, could compromise the integrity of associated connection fixings · flame and heat exposure during the fire had structurally compromised the home’s timber framed structure and associated structural elements · it recommended ‘the entirety of the structure (not including, reinforced concrete slab & footings) be demolished and reinstated’. On 24 June 2025, TM inspected the home again and confirmed the views it had expressed in its report dated 13 February 2025. The complainant says TM’s conclusions are not opinion-based. Rather, they are based on site inspections and a detailed assessment of the damage present. She acknowledges that there can be differing views between engineers but says ‘the ultimate goal should be to restore a home that is structurally safe and healthy for its occupants’. The complainant says as its owner, she has continuing concerns about the long-term safety and potential health implications of the home without a knock down and rebuild. In addition to the matters identified by TM, she refers to ongoing weather-related water ingress and likely resultant mould. She also submits that the amount PB quoted is unlikely to be enough to cover the cost of repairs. She notes that CB provided the insurer with a quote that exceeded PB’s quote by more than $100,000, and that HP, which describes itself as an insurance building company, has quoted $690,570.30 based on the insurer’s SOW. Insurer is not required to knock down and rebuild the home Based on the exchanged information, I am not satisfied that it has been established that a knock down and rebuild is required to reinstate the home. Rather, I am persuaded the home is repairable. This is because: · I find IE’s report dated 14 March 2025 more persuasive than those of TM. It is more detailed and contains greater analysis in support of the conclusions reached · IE has provided a carefully reasoned review and response to TM’s views · IE has provided a comprehensive SOW setting out the repairs required, and both it and the insurer acknowledge that variations may be required once repairs are commenced · the insurer accepts that variations may be required to address post fire water ingress · PB’s quote was based on IE’s comprehensive SOW · as the insurer is willing to have PB undertake the work, it will be responsible for the necessary cost involved. That includes any variations. Therefore, that other builders have quoted more for the work based on the SOW does not establish that those quotes should be preferred. I also note that if the insurer attends to the necessary repairs, it guarantees ‘the quality of workmanship for the lifetime of your home’. This is confirmed on pages 95 and 96 of the PDS. 2.2 Can the complainant request a cash settlement? Yes. The policy allows the complainant to choose whether to accept the insurer’s offer to attend to repairs. However, the policy also says if she chooses not to accept the offer, the insurer is only required to pay her what it would cost it to attend to repairs. The insurer is to obtain updated information to establish that. Complainant wants a cash settlement The complainant seeks a cash settlement based on HP’s quote dated 26 June 2025. HP referred to TM’s findings and recommendations and estimated the cost of a knock down and rebuild would be $1,091,585. The complainant has also provided a quote by builder IV. After inspecting the home on 15 June 2025, IV quoted $987,000 for a knock down and rebuild. The complainant notes that IV referred to elevated moisture readings, mould and damp insulation as well as to fire damage. The complainant wants a cash settlement based on HP’s quote as she intends to retain it, or IV to undertake the work. She says ‘both have demonstrated professionalism, transparency, and attention to structural safety from the outset — in contrast to the experience I’ve had with [the insurer] and its appointed teams’. Policy includes specific provisions about cash settlement How the insurer is to settle loss or damage to an insured home is set out on pages 90 and 91 of the PDS. If one of the insurer’s builders is prepared to attend to repairs, the insurer is to offer the insured the choice of having their home repaired by that builder. If the insured: · accepts the offer, the insurer will engage the builder to complete the repairs · does not accept the offer, the insurer will pay the insured the amount of the builder’s assessed quote. However, the PDS specifies ‘this amount may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network’. That the insurer may be able to secure supplier discounts and repair the home for less than other repairers does not invalidate the obtained quote. The insurer is prepared to undertake the work. Given it will be subject to a lifetime guarantee, I consider the complainant is not prejudiced by this. Insurer is to take further steps to finalise claim PB is prepared to undertake repairs. The insurer has offered the complainant the option of having PB complete them. I accept that under the PDS, if the complainant does not accept that offer, the insurer may cash settle the claim based on PB’s assessed quote totalling $324,232.71. However, that quote was prepared more than 12 months ago, and was based on IE’s SOW which was prepared following an inspection on 29 October 2024. Further, IE, PB and the insurer accept that additional damage is likely to be discovered once repairs begin, which will necessitate variations. The insurer also accepts that water ingress damage has occurred. It is therefore fair that the following steps be taken to enable the claim to be finalised: · within 7 days, the insurer is to ask IE for an updated SOW reflecting the work required to repair the current state of the home · within 7 days of receiving IE’s updated SOW the insurer is to ask PB for an updated quote reflecting its current prices · within 7 days of receiving the quote, the insurer is to provide a copy to the complainant · within 14 days of receiving the quote, the complainant is to tell the insurer if: > she wants a cash settlement, in which case the insurer is to within 14 days pay her the quoted amount plus a 20% contingency uplift > she wants the insurer to attend to repairs, in which case the insurer is to have PB do so. 2.3 Is non-financial loss compensation payable? Yes. The insurer acknowledged it could have handled the claim better. The claim handling issues caused the complainant stress and inconvenience. The insurer is to pay her $2,000. AFCA can award compensation for non-financial loss ​​​​​​​​​​Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind. ​​​Insurer unreasonably caused stress and inconvenience ​The complainant is unhappy with the insurer’s claim management. She says her experience has been stressful and is concerned about a perceived lack of transparency by the insurer. She also says the insurer’s builders have carried out works without prior notification to her. ​The insurer accepts there were issues with its claim management and that it could have done better. It has apologised to the complainant for her unsatisfactory claim experience. I am satisfied that the claim handling issues unreasonably caused the complainant considerable stress, frustration and inconvenience. It is fair to require the insurer to pay her $2,000 in non-financial loss compensation. 2.4 Why is the outcome fair? The claim outcome is fair because it reflects the insurer’s obligations under the policy terms as they apply to the known facts. However, it is also fair to require the insurer to compensate the complainant for the stress and inconvenience it unreasonably caused her. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.