Home / IAG / Determination 12-24-121400

Determination 12-24-121400

Denial of ensuite water damage claim and inadequate cash settlement offer for storm damage

FirmIAG
Decided2025-09-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$103,673
Non-financial loss$2,000
Amount claimed$117,810
SourceAFCA PDF

Summary

The complainant's storm claim was accepted but her ensuite water leak claim was declined and the cash settlement offer was disputed. AFCA upheld the ensuite decline but required payment of $103,672.80 for storm damage, eight weeks of temporary accommodation and $2,000 compensation.

The ensuite damage was caused by an excluded shower leak not linked to the storm, while the insurer's repair scope was not actionable so the complainant's builder's scope was adopted at 80% plus a 10% contingency.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-121400 | Financial firm | Insurance Manufacturers of Australia Pty Ltd Case number: 12-24-121400 11 September 2025 1 Determination overview 1.1 Complaint The complainant lodged two claims with the financial firm (insurer) under her home insurance policy. This is for damage sustained to her home as a result of a storm and escape of liquid. The insurer accepted the storm damage claim. The insurer declined the escape of liquid damage to the ensuite on the basis water was escaping from the shower recess, which the policy excludes from cover. The insurer has offered to either repair the storm-related damage or, alternatively, to cash settle the complainant for the cost of repairs, totalling $54,182.82. The complainant states that the amount offered is inadequate, as it does not include repairs to the ensuite or temporary accommodation. 1.2 Issues and key findings Can the insurer deny the ensuite claim? Yes. The complainant did not establish a claimable loss for the ensuite damage. Is the insurer required to increase its offer for storm damage? Yes. The insurer is required to pay the complainant $103,672.80 for the storm related damage, including mould remediation. Is the insurer liable for temporary accommodation? Yes. The insurer is required to pay the complainant eight weeks of accommodation. Is the insurer liable for compensation? The insurer’s $2,000 offer is fair in all the circumstances. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of receiving notice the complainant accepts this determination, the insurer is required to pay the complainant: · $103,672.80, for the storm-related damage · the cost of 8 weeks of temporary accommodation · $2,000 in non-financial compensation. 2 Reasons for determination 2.1 Can the insurer deny the ensuite claim? Yes. The complainant did not establish a claimable loss for the ensuite damage. Complainant must establish claimable loss A party making an insurance claim must establish they suffered a loss that is covered under the insurance policy. They must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer must accept the claim, unless it can establish the application of a relevant exclusion. The insurer must establish the exclusion on the balance of probabilities. The complainant’s home insurance policy provides cover for loss or damage to the building caused by an insured event during the period of insurance. The policy is an ‘insured event’ policy. This means not all loss or damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events, and not subject to exclusions, is covered. Storm and water leak are insured events under the policy. There is no dispute the complainant lodged two claims: one following a storm (claim ending in 879), and another for a water leak (claim ending in 334). The insurer accepted the storm claim. However, it denied indemnity for the water leak claim. The complainant says the bathroom damage is linked to the roof damage caused by the storm event in November 2023. Under ‘Water and oil leaks’, the policy covers loss or damage caused by water or oil leaking or escaping from several items including: · house gutters, drainpipes or pipes · sanitary fixtures – for example, baths or toilets · appliances – for example, washing machines or dishwashers · waterbeds · aquariums · water tanks · swimming pools. Under the same insured event, the insurer says the policy excludes: · water leaking or escaping from a shower recess or shower base · costs to repair or replace the item that the water or oil leaked or escaped from. The insurer also refers to general exclusions under the policy, which exclude loss or damage arising from: · rust, corrosion, gradual deterioration, depreciation, wear or tear · mould, unless arising from loss or damage covered by a listed event. Parties dispute the proximate cause of damage to ensuite I accept the insurer’s liability depends on the proximate cause of the damage. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss. If there are several causes operating at the same time, AFCA will consider each one to determine which cause set the train of events in motion. The insurer engaged a building consultant (JL) to assess the damage to the property. JL noted the following: · efflorescence damage to the shower recess floor tiling · water damage to the window. A plumbing report by KP noted black mould on the shower floor and wall tiles. In his report, KP concludes that the shower within the ensuite has a faulty or no existing waterproofing membrane, allowing water to escape from the shower into the wall cavity beside the shower. A further leak detection report by a plumber NL noted the spray test to the shower screen has failed. NL observed: · a leak on the front left hand shower screen tracking into adjacent wall towards window. · leaks on the right-hand side of shower screen leaking directly onto the bathroom floor. NL concluded that the swelling of the window frame and flooring damage resulted from water escaping through the shower screen, tracking into the wall toward the window and under the flooring. The complainant’s plumber IB stated the ensuite has evidence of water escaping from the roof, down the wall cavity, and under the tiles. I note IB referred to his conclusion as a ‘theory’. The complainant’s builder (VE) agreed that the mechanism of the damage is consistent with IB’s report, suggesting water entered through the ceiling and via the shower wall cavity, resulting in calcium deposits. However, VE did not provide any persuasive evidence explaining why efflorescence manifested on the flooring rather than the walls, where the water supposedly travelled. The insurer appointed an engineer (SW) to assess the ensuite damage and determine causation. SW noted the ensuite shower is located above the northern wall of the rumpus and laundry, where water tanks are fixed directly onto the external wall of the dwelling. Regarding the efflorescence observed in the ensuite shower, SW stated that during the shower renovation, the contractor failed to apply an efflorescence protection additive to the shower screed. SW referenced Australian Standard AS3740:2010 – Waterproofing of Domestic Wet Areas, which was applicable at the time of the 2019 renovations. Under this standard, when a tile bed or screed is used, the waterproofing membrane must be installed either above or below the tile bed/screed. SW concluded that the observed efflorescence resulted from inadequate preparation or construction of the screed layer below the tiles and adhesive. SW concluded that the efflorescence resulted from inadequate preparation or construction of the screed layer beneath the tiles and adhesive. He asserted that efflorescence develops over time due to repeated wetting and drying cycles from daily use, rather than short-term exposure from a roof leak. SW also concluded that the claimed damage to the ensuite shower is unrelated to any storm events. Further, the exchanged evidence shows the shower has been leaking onto the adjacent walls and surrounds causing further damage. The complainant did not provide any persuasive evidence to refute SW’s findings. The insurer can deny the claim for the ensuite I have carefully considered the exchanged evidence and the parties’ arguments. I am not satisfied the complainant has established a claimable loss for the ensuite. Firstly, under the insured event ‘Water and oil leaks’ the policy covers loss or damage caused by water escaping from a number of items. I note shower recess is one of these items. Conversely, under the same insured event, the policy excludes damage caused by water leaking from a shower recess. Secondly, there is no persuasive evidence to establish a causal link between the storm event and the resultant damage to the ensuite and the adjacent walls. I note that two distinct mechanisms of damage are evident in the ensuite: the manifested efflorescence, and the damage sustained to the surrounding areas of the shower recess as a result of water escaping. I do not find IB’s assessment to be conclusive or persuasive. IB did not provide any supportive evidence to substantiate his assertions. Neither IB nor VE refuted SW’s findings or provided evidence to show that the ensuite was compliant with the relevant building code at the time of its renovation. Lastly, the plumbing testing clearly shows the failure of the waterproofing mechanism of the shower recess. There is no persuasive evidence to show that this failure is caused by either the storm or any other insured event. I find KP, NL and SW persuasive, logical, and conclusive in their findings. I am not satisfied the exchanged evidence establishes a causal link between the storm event and the ensuite damage. Conversely, the damage to the shower area is linked to the leaking shower screens which is expressly excluded under the terms and conditions of the policy. Given all this, the insurer can deny this aspect of the claim and is not required to take any further action in this regard. 2.2 Is the insurer required to increase its offer for storm damage? Yes. The insurer is required to pay the complainant $103,672.80 for the storm related damage, including mould remediation. It is reasonable for the building claim to be cash settled Under the terms of the policy, the insurer may settle a claim for damage to the home by either: · arrange the repairs of the home; or · pay the complainant the reasonable cost to repair the home. In this case, the insurer initially offered to authorise its builder, JL, to attend to repairs. However, JL advised it is unable to complete the repairs. The complainant raised concerns regarding the insurer’s proposed repairs and is seeking a cash settlement. Given this and allowing for the deterioration in the relationship between the parties, I am satisfied it is reasonable for the claim to be settled by a way of cash settlement. A cash settlement must be based on a quote that would be actionable by the complainant and should generally allow an uplift for contingencies due to any unforeseeable damage. Insurer’s scope of work is not actionable In his report, JL stated the internal damage is consistent with stormwater leaking from the broken roof tiles. JL accepted storm damage to the study and the rumpus room below. JL initially provided a costed scope of work and subsequent variations totalling $43,485.68: · $17,943.77 to rectify the water damage to the study room · $3,886.42 to rectify the ensuite ceiling damage, including the replacement of the insulation battens · $11,927.61 to rectify the water damage to the downstairs storage/rumpus · $9,727.88 for the mould remediation to different areas of the property. I note these quotes were compiled in December 2023. On balance, I accept the cost of repairs, including materials, has increased due to the passage of time. In an email to the insurer dated 23 December 2024, JL states that it is unable to confirm whether the current scope of work can be completed for the current quoted cost. This is due to being uncertain that additional works may be required. JL also noted the estimate is one year old and prices may have changed. On 31 December 2024, JL advised the insurer that the quotes are actionable if it had to perform the works for the complainant however JL is not undertaking any works for customers. Subsequently, the insurer offered an extra 20% uplift totalling $8,697.14. I have carefully considered JL’s quotes, and I am not satisfied that these quotes are actionable or fairly reflect the fair and reasonable repair cost of the storm damage. Amongst other things, the quotes: · excludes the removal of contents or personal items to facilitate the work · only provides provisional sums for some specialist costs such as electricians rather than actual costs · do not account for all potential further damage in the ceiling cavities of the ensuite and the study · does not include the removal and the storage of the contents to facilitate the repairs. Importantly, I note JL’s initial scope of work was only for $17,943.77 where he continued to raise variations to factor missed damage. I am not satisfied that JL has conclusively scoped the storm damage. Given JL’s unwillingness to undertake the repairs and the uncertainties around the costings, I am not satisfied the insurer’s offer, including the additional uplift, is either fair or reasonable. In other words, I do not accept the insurer’s cash settlement offer accurately establishes the extent of its liability under the policy. The complainant’s scope of works is a fair base for quantum assessment The complainant says that the insurer’s cash settlement offer was inadequate, as it did not represent a reasonable assessment of the cost of repairing the storm-related damage. I agree. In July 2025, VE provided a costed scope of work for the repairs totalling $117,810. For completeness, the insurer does not dispute VE’s scope of work. I have carefully considered VE’s scope of work and I note, amongst other things: · under the preliminaries and site preparation, the scope includes labour to remove the ensuite affected areas such as the vanity and shower screen · it includes rectification repairs to the ensuite totalling $15,560 (excluding builder’s margin and GST) · it includes installation of insulation to the master bedroom walls adjoining the ensuite and floor coverings. I accept VE’s scope of works includes the rectification costs of the ensuite damage that falls outside the scope of the policy as outlined above. However, I also accept most of the damage scoped by VE is reflected in JL’s quotes including the study room, ceilings of the ensuite and the storage room/rumpus on the ground floor. While VE’s scope does not provide a breakdown for labour and materials, it is itemised and categorized by areas of damage. I accept VE’s scope of work is a fair starting point for assessing the cost to repair the storm damage. Further, VE notes damage to the master bedroom flooring and walls. There is no conclusive evidence to show the cause of this area of damage. In other words, it is unclear whether this moisture damage is linked to the storm damage or the leaking shower. The master bedroom is above the storge/rumpus area, where storm damage has been identified and forms part of the insurer’s scope of work. On balance, I accept part of the damage to the master bedroom is linked to the storm. This is because, for rainwater to have travelled from the roof to the ground floor, it would have likely affected the area above it on the first floor. I accept that, given the passage of time, the damage would have deteriorated, and mould would have spread beyond the areas initially assessed in 2023. This is in addition to the possibility of unforeseeable damage that the insurer has not quantified, which may only become apparent once repairs commence. While the cost of the removal of contents and personal belongings fall under the temporary accommodation additional benefit, it has already been factored in VE’s scope of work. I accept that part of VE’s costings, likely around 20% of the total quote, relates to damage to the ensuite, which is expressly excluded under the policy. However, the balance of the scoped damage was caused by the storm event, and therefore the insurer is liable for it. To bring this long-standing complaint to a close, I consider it fair and reasonable that the insurer pays the complainant 80% of VE’s scope of work, totalling $94,248. This is because I accept this percentage of VE’s scope of work likely reflect the cost to repair the claim related damage. Additionally, it is appropriate for the insurer to apply a 10% contingency uplift, as VE’s scope anticipates further damage may be identified once repairs commence. Accordingly, the insurer is required to pay the complainant a total of $103,672.80, comprising: · $94,248, being 80% of VE’s scope of work · $9,424.80, representing a 10% uplift for unforeseeable damage. 2.3 Is the insurer liable for temporary accommodation? Yes. The insurer is required to pay the complainant eight weeks of accommodation. The policy covers temporary accommodation The complainant’s policy covers the cost of temporary accommodation for the complainant, her family and pets if: · a listed event causes loss or damage to the home; and · the complainant is unable to live in the home and need to move out so it can be repaired. This additional benefit also covers any additional living expenses. It is fair the insurer pays for eight weeks of accommodation JL states that the property is habitable during repairs. However, I am not satisfied that this is the case. The extent of the damage, including widespread mould, will require substantial repairs, including the removal of walls, ceilings, and flooring, in addition to mould remediation. The exchanged evidence confirms the presence of mould in multiple areas of the property. There is no dispute the complainant has young children. I accept that the rectification works, particularly mould remediation, pose significant safety and health risks. VE notes in his scope of works that the repairs would take approximately 10 weeks, during which the complainant would need to place her contents into storage. For finality, I accept the insurer is required to pay the complainant 80% of her temporary accommodation being 8 weeks. As outlined above, I do not accept that all of the repairs reflect the storm related damage. The complainant provided previous accommodation quotes. However, due to the passage of time, I am not satisfied that these accommodation quotes are actionable. Therefore, the insurer is required to assess the fair and reasonable cost of 8 weeks of temporary accommodation and settle the complainant accordingly. The exchanged evidence shows that there is contents damage The exchanged evidence, including the assessment photographs, show that there is water and mould damage to the contents. The Certificate of Insurance shows the insurer insured the contents for $78,492. It is unclear from the exchanged evidence whether the insurer has assessed or restored the storm damaged contents. Unless it has already done so, the insurer is required to assess the extent of the water and mould damage to the contents and settle the loss (if any) accordingly. 2.4 Is the insurer liable for compensation? The insurer’s $2,000 offer is reasonable in the circumstances. AFCA may award compensation for non-financial loss AFCA may award compensation for non-financial loss if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and delays. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The insurer’s offer is fair in the circumstances The complainant is dissatisfied with claim delays and the way the insurer handled the claim. The exchanged evidence shows the insurer was initially willing to undertake the repairs. However, the complainant refused due to the parties’ disagreement regarding the ensuite damage. I have reviewed the exchanged evidence, including the contemporaneous claim notes for both claims. I am not satisfied the insurer handled the claim unreasonably or failed to progress the claims in a timely manner. The claim notes show the insurer was willing to undertake the storm related damage as early as February 2024. There is no dispute the complainant refused to sign the building contract or agree for JL to commence repairs. The insurer engaged relevant experts to assess the cause of the damage. Overall, I accept the insurer handled both claims reasonably. The insurer offered the complainant $2,000 non-financial compensation. I accept this offer is reasonable and no further compensation is warranted in the circumstances. 2.5 Why is the outcome fair? The outcome is fair because: · the parties are bound by the terms and conditions of the policy · the exchanged expert evidence does not assist the complainant in establishing the cause of the ensuite damage is an insured event under the policy · on balance, the insurer’s costed scope of work is not actionable by the complainant – as such, the complainant’s costings are preferred · the insurer’s non-financial compensation offer is fair in the circumstances. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.