Home / Suncorp Group / Determination 12-24-120957

Determination 12-24-120957

Compliance with prior determination on earthquake damage claim; scope and quote disputes, delay and temporary accommodation

FirmSuncorp Group
Decided2026-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,500
Amount claimed—
SourceAFCA PDF

Summary

Following an earlier AFCA determination requiring the insurer to settle an earthquake damage claim, the complainant said the insurer had not complied. AFCA found substantial compliance but required amended scope and quote, temporary accommodation costs, and $2,500 extra non-financial loss compensation.

The insurer substantially complied with the prior determination and the scope and quote are a reasonable basis for settlement once amended, but its late provision of the amended scope caused unnecessary delay warranting compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial lossrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-120957 | Financial firm | AAI Limited Case number: 12-24-120957 26 March 2026 1 Determination overview 1.1 Complaint The complainant lodged a claim for damage caused by an earthquake under a home and contents policy with the financial firm (insurer). The insurer declined the claim as it said the damage was due to excluded causes, and not an earthquake. The complainant disputed this decision. A previous AFCA determination (954470) found the damage was likely due to earthquake and required the insurer to accept the claim. It set out how the claim should be resolved. The complainant accepted the determination. The complainant says the insurer has failed to comply with the determination and that poor handling of the claim following the determination has resulted in stress and disruption. 1.2 Issues and key findings Has the insurer complied with the previous determination? Yes. The insurer obtained an engineering scope and actionable quote, and paid $1,000 compensation for non-financial loss. How should outstanding issues be resolved? The insurer should arrange for the scope and quote to be amended to specify brick capping and parge render. It should then either commence repairs or offer a cash settlement based on the actionable quote plus a 15% contingency. The insurer should also settle the complainant’s reasonable temporary accommodation cost as previously agreed. Is the complainant entitled to compensation? Yes. The insurer should pay the complainant an additional $2,500 compensation for non-financial loss. Why is this outcome fair? The insurer has complied with the previous determination. While there is some inconsistency between the quote and scope, I am satisfied that alongside written explanations for these issues, they may reasonably be relied upon as a basis for settlement of the claim. It is fair however that the insurer first amend these documents to rectify inconsistencies identified by the complainant. The exchanged information shows the insurer obtained an amended report that substantially addressed a central concern, yet did not provide this in a timely manner. This contributed to unnecessary delay and inconvenience in resolving the claim. In these circumstances it is fair that the insurer pay additional compensation for non-financial loss. It is also fair that the insurer assess and meet reasonable temporary accommodation costs as agreed in accordance with the policy terms. 1.3 Determination This determination is partially in favour of the complainant. If the complainant accepts the determination, the insurer should as soon as possible either commence repairs or offer a cash settlement, plus a 15% contingency, based on the amended quote for repairs. It should also settle the complainant’s reasonable temporary accommodation cost as previously agreed, and pay $2,500 in compensation for non-financial loss. It should also pay the complainant the separate $1,000 complaint-handling compensation previously offered by the insurer and later returned, if not already re-paid. 2 Reasons for determination 2.1 Has the insurer complied with the previous determination? Yes. The insurer obtained an engineering scope and actionable quote, and paid $1,000 compensation for non-financial loss. AFCA determination required insurer to settle claim for earthquake damage A previous AFCA determination was issued on 16 April 2024 and accepted by the complainant. It found the insurer was liable for damage to the complainant’s property caused by an earthquake, and required it to: · engage a suitably qualified expert to draw up a new and updated scope of works for earthquake-related repairs and associated works · obtain at least one actionable quotation based on that scope · either commence the repairs and associated works as soon as possible, or cash settle the complainant based on the cost of the quote plus a 15% contingency · pay the complainant $1,000 compensation for non-financial loss. The specific instructions set out in that determination are quoted in section 3.2 of this determination. Complainant says insurer has not complied with previous determination The central issue in this complaint is whether the insurer complied with the requirements of the previous determination by obtaining an appropriate engineering scope and actionable quote that reasonably address the earthquake damage. The complainant has provided extensive and highly detailed submissions which outline his concerns. Central to these are his concerns relating to the scope of works and quote obtained by the insurer. These are, in summary, that: · the insurer relied on an inaccurate engineering scope of works · the insurer continued to rely on the inaccurate scope despite the complainant notifying it of deficiencies · the engineering scope was influenced by a builder document that already contained a scope and quote. The complainant says the scope and quote are insufficiently detailed, and do not describe how certain aspects of the repair will be managed, such as how debris will be removed from the site. He considers certain aspects of the repair, such as the use of a caulking material rather than replacing existing mortar, does not constitute like for like repair. His concerns are not limited to these matters. Broadly, he is concerned the insurer’s engineer (MC) was influenced by existing assessments and did not complete a truly independent and updated scope of works. Overall, the complainant considers the insurer has not complied with the previous determination. Scope prepared by engineer should be adjusted to reflect brick capping Scopes of work prepared by MC require the removal and replacement of concrete capping. The complainant says the capping is brick and considers the scope incorrect and unreliable. The insurer sought comment from MC. MC said the “concrete caps” referred to in its scope and the “capping tiles” described by another engineer (KM) referred to the same item and that the terminology used did not affect the repair methodology or relevant building standards. The complainant later supplied photographs of the underside of the capping and a report from a bricklayer (BV). After reviewing the photographs, MC advised the capping appears to consist of rendered brickwork, although reinstatement using modern concrete products would be acceptable and may be preferable. MC said if the complainant wished to reinstate the caps in brick this could be arranged with the contractor and that an amendment to the scope was not required. The engineering scope identifies the required repairs, while the builder’s quote reflects the actual construction of the capping and forms the basis on which settlement has been calculated. That builder’s scope and quote allows for the removal and replacement of brick capping, which reflects the actual construction. In these circumstances, the reference to concrete caps in MC’s scope does not materially affect the basis on which settlement has been calculated. However, I accept the complainant remains concerned that the MC scope contains an inaccurate description. It is unclear why the insurer did not request that MC amend its scope when this issue became an obstacle to resolving the claim. While the terminology used by MC does not appear to materially affect the proposed repair method, the capping is in fact brick and the builder’s quote already reflects this. In these circumstances, it is reasonable for the scope to accurately describe the existing construction. Amending the scope to refer to installing and painting brick capping would not alter the substantive repair methodology but would resolve the inconsistency raised by the complainant. Of note, the insurer obtained a scope (titled ‘Scope of Works – Rev 2’ from MC in May 2025. Under the detailed requirements for construction, this document refers to brick caps, yet under order of remediation, it refers to concrete caps. This scope indicates MC recognises the capping is brick. However, there is no indication that this was exchanged with either AFCA or the complainant until December 2025. If the complainant accepts this determination, the insurer should instruct MC to amend its scope completely to reflect the actual construction of capping. Use of caulk at junctions is a suitable repair method The complainant is concerned that caulking will be used at the junction of pillars and infill walls rather than removing cracked mortar and replacing the mortar. He says caulk may fade over time and that this repair method is not like for like. MC says the use of caulking is appropriate at junctions between different materials, which expand and contract at different rates. It says this movement is likely to cause cracking in mortar, which is rigid. MC refers to AS4773.2 clause 7.3. MC says this requires contraction joints at junctions between different masonry materials and a flexible caulking material is appropriate in these circumstances. The policy does not require that all repairs be completed on a like for like basis. As an additional benefit, it covers the reasonable and necessary cost to repair damaged building components so they comply with current building regulations and laws. It is not reasonable to expect an insurer to return a property to its exact pre-loss condition if that condition may not comply with current standards or may lead to ongoing damage. I accept the explanation provided by MC. It is logical that materials which tolerate some movement should be used at junction points in buildings, which are prone to slight movement. The complainant has not provided information showing that the proposed use of caulking is inappropriate or inconsistent with accepted building practice. In these circumstances, I am satisfied the proposed repair method is reasonable. Builders scope should allow for parge render and painting of caps The complainant notes the MC Rev 2 scope allows to ‘prepare, render, paint’ brick caps, whereas the CR scope and quote allows to prepare and paint brick capping to match. The complainant’s report from bricklayer BV says the capping is brick with a parge render painted in white. In these circumstances, the insurer should instruct CR to adjust its scope to include parge render and allow for any increased cost that may result from this method of repair. A scope of works is not an exhaustive specification The complainant raises a number of concerns relating to works that are required but not listed in the MC scope. However, most of these are listed in the builder’s quote and scope prepared by CR. In my view, this does not necessarily indicate an error or omission in the MC scope. The previous determination requires that an engineer is engaged to prepare a scope of works for earthquake related repairs and associated works. The purpose of an engineer scope is to identify building damage and the repairs required from an engineering perspective. It is reasonable that matters such as site access, landscaping disturbance, protection of surrounding areas, waste removal, and other construction logistics should be addressed by the contractor that will by carrying out these works. In these circumstances, the fact that CR has allowed for certain practical matters that are not expressly described in the MC scope does not mean the MC scope is deficient or requires amendment. The CR quote and scope allows for a professional gardener to arrange clearance of plants so work can proceed with minimal disturbance, to relocate if required, and to provide reimbursement if plants are destroyed. It allows for removal of debris, and a site clean. I accept that these are practical site-access and reinstatement matters and it is suitable that they are addressed by the contractor undertaking the works. Their inclusion in the CR quote, but not the MC scope, does not indicate the MC scope is incomplete. Should unanticipated issues arise, their treatment will depend on the method of settlement. If the insurer completes the works, they may be addressed through a variation or applicable repair guarantee; if the complainant elects a cash settlement, allowance is made through the contingency uplift. I am not satisfied the insurer is required to amend the scopes to include additional detail about debris removal or further protection measures. If the complainant’s property is damaged as a result of repairs carried out on the insurer’s behalf, the insurer would remain responsible for rectification. If the claim is instead resolved by way of a cash settlement, an allowance for contingencies would ordinarily exist to address matters of this nature. Not established that temporary fencing is required to enact repairs The complainant says the scope and quote should allow for temporary fencing because the damaged area is in the front yard and is accessible to the public. The works described in the scope involve limited demolition and reinstatement of brickwork associated with the veranda wall and capping. They do not involve demolition of a load-bearing wall or large-scale construction works. The contractor undertaking the repairs is responsible for managing site safety and implementing appropriate controls during the works. If fencing or other safety measures are required, this would ordinarily be determined by the contractor as part of its site management obligations. The complainant has not provided information showing that temporary fencing is required for works of this nature. In these circumstances, I am not satisfied the absence of temporary fencing in the scope or quote indicates an error or omission requiring amendment. Insurer sought to comply with the previous determination The exchanged information shows the insurer complied with the previous determination in relation to the payment of non-financial loss compensation, and obtaining a scope from an appropriately qualified expert and then a quote based on this. It did not, within 14 days of receipt of the scope and quote, commence repairs or cash settle the claim. However, this was due to concerns with the scope and quote raised by the complainant. The insurer was unable to settle the claim given the ongoing dispute over the scope and quote which was to form the basis of that settlement. I am satisfied the insurer has substantially complied with the requirements of the previous determination. It engaged a suitably qualified expert to prepare an engineering scope of works and obtained an actionable quote based on that scope. While the complainant has raised a number of detailed concerns about aspects of the documentation, I am satisfied the scope and quote reasonably address the earthquake damage and provide a suitable basis on which the claim may be settled. I appreciate the complainant is within his rights to question the various reports that form the bases of settlement. I accept that, when the issue is whether repairs will be successfully carried out to a treasured asset such as a family home, it is reasonable to carefully review all such reports and request clarification when required. However, I do not consider that delays stemming from this, resulting in settlement being delayed, constitutes a failure to comply with the determination. The complainant provided extensive and detailed submissions raising a large number of specific concerns about the wording of the scope and quote, as well as with the qualifications of relevant experts, whether photographs and other material in support of his claim had been considered, and so on. I have carefully considered all of the complainant’s submissions. The central issue in this determination is whether the insurer complied with the requirements of the previous determination by obtaining an engineering scope of works and an actionable quote that reasonably address the earthquake damage. In considering this question, it is not necessary to resolve every concern raised about the wording or detail of the scope and quote. Having considered the material available, I am satisfied the scope and quote broadly achieve that purpose. For these reasons, I am satisfied the insurer has substantially complied with the previous determination, subject to the minor amendments identified above. 2.2 How should outstanding issues be resolved? The insurer should arrange for the scope and quote to be amended to reflect brick capping and parge render. It should then either commence repairs or offer a cash settlement based on the actionable quote plus a 15% contingency. If temporary accommodation was previously agreed, the insurer should assess and meet reasonable costs in accordance with the policy terms. Insurer should amend scope and quote The insurer should arrange for MC to amend its scope so that it consistently refers to brick capping, and for CR to amend its scope and quote to include parge render and allow for any increased cost that may result from this method of repair and from any changes in building costs since the quote was prepared. It should then base settlement on this quote, in accordance with the requirements of the previous determination. Given I am satisfied the MC scope and CR scope and quote are a reasonable basis for settlement (once adjusted as set out above), the insurer should within 14 days of the complainant accepting this determination, either: · appoint a contractor to commence the necessary repairs and associated works as soon as possible, or · offer a cash settlement to the complainant comprising a sum equal to the total CR’s actionable quotation, plus a 15% contingency on top of this. For clarity, I remain satisfied that the existing reports are sufficiently detailed and may reasonably be relied upon for the purpose of settlement. MC has confirmed that the capping is brick, and the available material indicates that parge render would be used in the repair. While the discrepancy between the reports regarding paint and parge render is understandably a source of concern for the complainant, I do not consider this discrepancy undermines the reliability of the scope or quote. However, it is reasonable for the insurer to arrange these minor amendments so that the documentation clearly reflects the intended repair methodology and provides the complainant with confidence about the proposed works. These matters do not amount to a failure by the insurer to comply with the previous determination. Rather, their significance lies in the delay and inconvenience caused while the issues were being raised and clarified, which I have considered in relation to non-financial loss below. Insurer should cover temporary accommodation in line with policy terms The complainant says the insurer agreed to cover temporary accommodation as part of the initial claim lodged for earthquake damage in 2021. The complainant has helpfully supplied quotes from a hotel for seven days accommodation at a cost of $5,015, although the quote has since expired. The policy provides cover for reasonable and necessary temporary accommodation when the building is damaged to the extent it cannot be lived in. The exchanged information shows the insurer has agreed to cover temporary accommodation. There is no information showing the complainant’s quote, although now expired, is not reasonable. The complainant should obtain an up to date quote from the accommodation provider, and the insurer should settle the complainant the reasonable cost of this accommodation. 2.3 Is the complainant entitled to compensation? Yes. The insurer should pay the complainant an additional $2,500 compensation for non-financial loss. AFCA may award compensation in certain circumstances Under our Rules, we can award up to $6,300 compensation for non-financial loss. We may award compensation if a complainant has suffered an unusual degree of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s handling of the claim. In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. How AFCA assesses multiple claims for non-financial loss AFCA considers a claim to be a set of facts that together give a right to seek a remedy. A single complaint can contain more than one claim for non-financial loss if there are separate circumstances causing distinct inconvenience, stress or disruption. AFCA typically treats claims handling issues as one claim for non-financial loss. The various events experienced by a complainant are generally viewed together as a single issue, with the cumulative impact deciding whether compensation for non-financial loss is warranted. A claim is generally viewed as a whole, and considering a series of isolated incidents can produce unfair outcomes, especially where the insurer has otherwise acted reasonably. AFCA therefore usually looks at the overall claims experience when assessing non-financial loss. However, if the insurer’s conduct has separate and independent effects, and each issue relating to this conduct is distinct and removed from the other, AFCA may treat them as multiple claims within the same complaint. Where AFCA treats multiple claims seeking a remedy for a poor experience as several claims, we may award up to our compensation limit per claim. However, where considered as a single claim, our limit of $6,300 in compensation as a remedy for non-financial loss applies. The complainant has raised concerns relating to the insurer’s communications, claims handling conduct, and interactions with the complainant and his partner. He describes a misleading settlement offer, unauthorised payments and privacy breaches, and the aforementioned issues with scopes of works and quotes. In my view, these are issues that stem from the insurer’s management of the claim since the previous determination. While a misleading settlement offer and poor communication are different instances, they are all in relation to the same issue of claims handling and compliance with the determination. I consider they relate to a single claim against the insurer in relation to its claims handling, and are subject to our compensation limit of $6,300. Overall claims experience considered in determining non-financial loss The complainant has raised a large number of detailed concerns about the insurer’s conduct and management of the claim. These include matters relating to communications, site management, interactions with the complainant and his partner, requests for information, and the conduct or competence of individuals involved in the assessment and repair process. While it is not necessary to make separate findings on each matter in order to determine an appropriate remedy, I have considered these issues as part of the overall claims experience. In assessing non-financial loss, AFCA generally considers the cumulative effect of claims handling issues rather than determining each allegation in isolation. Compensation not warranted for payment into nominated bank account The insurer paid compensation to the complainant into an account it described as a “nominated bank account”. The complainant says he did not nominate this account or provide authority, therefore the description of a nominated bank account is false. The complainant says this is an unauthorised payment and raises privacy concerns. Given the insurer made a payment into the complainant’s account, I am not satisfied this is an unauthorised transaction. Nor do I agree it is a breach of privacy given there is no suggestion the complainant’s private information was released. The insurer had previously made deposits into this account. The exchanged information does not show the insurer’s use of the term ‘nominated bank account’ has caused any stress or disruption. In absence of information showing otherwise, I am not satisfied an award of non-financial loss compensation is justified on this basis. Insurer’s settlement offer was not misleading The insurer made an offer of $1,000 on 10 February 2025 seeking to resolve the complainant’s concerns regarding service issues. The complainant says this was described as ‘Compensation directed by AFCA’, yet the AFCA-directed $1,000 compensation had previously been paid. For clarity, this referred to a separate compensation payment, not the $1,000 previously directed under the prior determination. The complainant says that by referring to a different compensation payment as ‘directed by AFCA’, the insurer generated confusion and pressure to accept an inadequate offer to resolve many issues in dispute. He also notes that questions asked about this offer via email on 7 April 2025 remain unanswered. As noted, AFCA expects a person to be moderately robust, and bear a normal amount of inconvenience. It is unclear how significant a level of stress and disruption this issue caused the complainant. In the absence of information showing it was beyond a normal amount, I am not satisfied it would be fair to award compensation for what is essentially an error in describing a payment, and which has not been shown to be a deliberate effort to mislead the complainant. The complainant returned this separate $1,000 compensation payment. If it has not done so already, the insurer should pay the complainant this amount. Inadequate communication resulted in further delay As noted, the insurer obtained an amended engineering scope from MC in May 2025 (titled Scope of Works – Rev 2). There is no indication this document was provided to the complainant until it was produced in a submission to AFCA in December 2025. Prior to this, the insurer’s position appeared to be that a dual assessment was required to address the complainant’s concerns. AFCA issued a preliminary assessment in May 2025 suggesting the parties work together to resolve outstanding issues, including through a dual assessment. However, the dual assessment had already occurred. The insurer did not clarify this or provide the amended scope obtained following that assessment. The amended scope refers to brick caps, whereas earlier scopes referred to concrete caps. The complainant had repeatedly raised this discrepancy and considered it a key reason the engineering scope could not be relied upon. While the insurer indicated it understood the caps to be brick, the settlement proposal relied on the engineering scope. In those circumstances, it was reasonable for the complainant to expect that the engineering scope accurately described the relevant building elements. In my view, providing the amended scope earlier would likely have addressed one of the complainant’s central concerns and may have allowed the dispute to be resolved sooner. The failure to do so appears to have prolonged the dispute and contributed to the complainant’s ongoing concerns about the reliability of the scope. This delay has resulted in inconvenience to the complainant. It has increased time spent attempting to resolve issues, and inconvenience associated with the claim. Taking these circumstances into account, I am satisfied the insurer’s failure to provide the amended scope in a timely manner contributed to unnecessary delay and inconvenience. In the circumstances, I consider it appropriate to award a modest amount of compensation for non-financial loss. In my view, given the dispute may have resolved many months sooner if not for this, it is appropriate that the insurer pay the complainant an additional $2,500 compensation for non-financial loss. Complainant not entitled to reimbursement of legal costs Under the AFCA Rules, we can require the insurer to reimburse a complainant for costs incurred in making a complaint. This may include legal costs, expert report fees, or travel expenses. In these circumstances, AFCA will consider whether they were reasonable and whether they helped resolve the complaint. AFCA tries to make our service accessible without any need for legal representation. If a complainant chooses to be legally represented, they will generally have to pay for this themselves. However, we may still require the insurer to contribute to legal costs if the complaint raised complex legal issues. Unless there are exceptional circumstances, AFCA will not require an insurer to contribute more than $5,000 to these costs. The complainant has presented an invoice for legal fees incurred. It is not clear exactly what services were provided. However, having considered the issues in dispute between the parties I am not of the view these were overly complex, or reasonably required legal representation. Therefore, the insurer is not required to reimburse the complainant for any legal fees incurred in pursuing the claim and complaint. 2.4 Why is this outcome fair? The insurer has complied with the previous determination. While there is some inconsistency between the quote and scope, I am satisfied that alongside written explanations for these issues, they may reasonably be relied upon as a basis for settlement of the claim. It is fair however that the insurer first amend these reports, rectifying inconsistencies identified by the complainant. The exchanged information shows the insurer obtained an amended report that substantially addressed a central concern, yet did not provide this in a timely manner. This contributed to unnecessary delay and inconvenience in resolving the claim. In these circumstances it is fair that the insurer pay additional compensation for non-financial loss. It is also fair that the insurer assess and meet reasonable temporary accommodation costs as agreed in accordance with the policy terms. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all information the parties have provided. While the parties have raised numerous issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Excerpt from previous determination How should the complaint be resolved? Within 14 days of receiving notice the complainant accepts this determination, the insurer must accept the claim in accordance with the terms and conditions of the policy and pay to the complainant the sum of $1,000 in non-financial loss compensation. Within 21 days of receiving notice the complainant accepts this determination, the insurer must engage a suitably qualified expert (such as an engineer or building consultant) to draw up a new and up-to-date scope of works (SOW) regarding the necessary earthquake-related repairs and associated works to the complainants premises. Then, within a further 21-day period of receipt of the SOW, the insurer is to obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. Within 14 days of receipt of the SOW and associated quotation(s), the insurer must elect to either: · commence the necessary repairs and associated works as soon as possible, or · offer a cash settlement to the complainant comprising a sum equal to the total of the preferred actionable quotation, plus a 15% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required. I note the insured event occurred approximately two and a half years ago, and this claim has been on foot for almost the same period. It follows that time is of the essence in the satisfactory resolution of this complaint.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.