Home / Allianz Australia / Determination 12-24-119856

Determination 12-24-119856

Storm damage claim settlement offer for building damage disputed, including mould remediation, flooring and front door

FirmAllianz Australia
Decided2025-09-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$85,450
SourceAFCA PDF

Summary

The insurer accepted a storm damage claim but offered $14,557.84 for building damage while the complainant sought about $85,450. AFCA found the offer inadequate, mainly for mould, flooring and the front door, but required the complainant to allow a final reassessment by new consultants, with a 15% contingency uplift on cash settlement and reimbursement of report costs up to $3,000 plus interest.

The offer did not fairly cover mould remediation, matching flooring or the front door under the policy, but the insurer was entitled to a final assessment because the complainant unreasonably refused access.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-119856 | Financial firm | Allianz Australia Insurance Limited Case number: 12-24-119856 29 August 2025 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 26 December 2023, a claim was lodged for storm damage to the insured property that occurred on or about 23 December 2023. The insurer has accepted the claim. The complainant has been settled for the damage to the insured contents. However, the complainant is dissatisfied with the insurer’s assessment of its liability and associated claim settlement offer for the damage to building. 1.2 Issues and key findings Does the insurer’s final claim settlement offer meet is policy obligations? No. The exchanged information does not show the insurer’s final claim settlement offer of $14,557.84 fully satisfies its obligations under the policy. However, in saying that, it is also fair to accept the complainant has failed to reasonably co-operate with the insurer and her expected settlement amount of $85,540 from ‘W3’ appears excessive in the circumstances. Why is the outcome fair? The outcome is fair because it is based on the exchanged information and the policy. The insurer’s claim settlement offer does not reasonably include cover for mould remediation, replacement of the correct type and area of flooring and possibly some additional water ingress damage to the insured building. However, the insurer has not been given fair opportunity by the complainant to complete a further assessment to determine its liability under the policy. It would be unfair to require the insurer to increase its final claim settlement offer without first permitting it to complete a final assessment. 1.3 Determination This determination is significantly in favour of the complainant. Subject to the complainant’s acceptance of this determination, the claim is to be settled as set out in section 2.1 of this determination. 2 Reasons for determination 2.1 Does the insurer’s claim settlement offer meet its policy obligations? No. The exchanged information does not show the insurer’s final claim settlement offer of $14,557.84 fully satisfies its obligations under the policy. However, in saying that, it is also fair to accept the complainant has failed to reasonably co-operate with the insurer and her expected settlement amount of $85,540 appears excessive in the circumstances. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Storm, cyclone, rainwater or run-off’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainant has also included the optional accidental damage benefit to the policy. Cover under this policy benefit is also subject to the conditions, limitations and exclusion specified in the PDS. Information relevant to the consideration of this complaint I have considered the exchanged information and am satisfied it establishes the following: · there is no dispute the insured building presents with damage consistent with a stormwater ingress event and this is covered under the policy · the insurer appointed C1 to investigate the cause and extent of the damage · C1 appointed R2 to inspect the roof and internal water ingress damage · R2 has provided reports in support of its proposed scope of works (SOW) and cost of repairs · there was no evidence of storm damage to the roof. Rather, it is more likely than not that the stormwater ingress was due to maintenance related issues with the roof · the complainant was informed of these maintenance related works by the insurer and that it was her responsibility to arrange them · there is no evidence of the complainant having arranged the necessary maintenance works or any persuasive information from the complainant disputing R2’s findings regarding the roof maintenance works · in saying that, there is an absence of any persuasive information regarding what, if any, make safe works were undertaken by R2. Also, whether these works were successful in preventing further stormwater ingress in the short term · the complainant has unreasonably denied the insurer fair access to the building so to further assess/investigate the concerns raised by as well as the basis for W3’s SOW and repair quote. Insurer is entitled to seek a further and final assessment of the building The parties rely on the reports and opinions provided by their appointed consultants in assessing their entitlements and obligations under the policy. I note that the positions of the parties in this regard are significantly different. The insurer has assessed its liability claiming the SOW and cost of repairs for event related damage stand at $14,557.84, including a 20% uplift. The complainant is seeking a settlement based on W3’s SOW and repair quoted in the amount of $85,450. The complainant’s expectations are based on her view that the insurer’s assessment of its liability is not fair. She says, amongst other damage, the insurer has not accounted for mould remediation, replacement of a larger area of flooring, the quality of flooring, replacement of contaminated materials, ceilings damage, ceiling lights, wall linings and replacement of the front door and its surrounds. I accept the insurer’s position that the complainant (and W3) had not initially provided supporting information for quoted repairs such as mould remediation and replacement of approximately 95sqm of flooring. Also, that given the significant difference in the parties’ preferred SOW’s, it was reasonable that the insurer arranges a further assessment. The complainant refused the insurer’s request for access to the building. Since the AFCA preliminary assessment was provided to the parties dated 21 February 2025, the complainant has provided a Mould and Moisture Assessment report from ‘IE’. I accept this report confirms the presence of mould in various areas of the home which requires remediation. This will be addressed later in the determination. I acknowledge the complainant’s dissatisfaction with the insurer’s assessments and appointed consultants forms the basis for her refusal to allow them access to her home. However, I am not satisfied the complainant’s failure to cooperate and allow the insurer access to the building is reasonable in the circumstances. I am satisfied the insurer’s request to complete a further assessment, given the significant difference in the parties’ preferred SOW’s and additional information from the complainant, is reasonable. I accept an additional and final assessment is necessary to permit the insurer to determine the extent of its liability in line with the policy and this determination. Therefore, it is fair and consistent with the policy that the complainant allows the insurer access to the building. This is so the insurer can complete a final assessment to determine its liability under the policy. The final assessment relates to the claimed building damage as well as the necessary mould remediation works required. In saying that, I accept the complainant has lost trust in R2. Therefore, in the interest of bringing this matter to conclusion, it is reasonable that the insurer uses the services of consultants who have had no prior involvement with the claim. The complainant is responsible for the roof maintenance works The exchange information confirms the insurer investigated the cause for the stormwater ingress and found that it was not due to storm damage. Rather, that the stormwater ingress occurred due to maintenance related issues noted to the roof. These identified maintenance issues were: · unsealed lead flashing to the small roof above the affected area · an unsealed location at the peak of the ridge capping · the windows above the affected areas had small gaps due to wear and tear. I accept the complainant was informed of these concerns as early as 3 February 2024 and that it was her responsibility to arrange the necessary rectification works. The complainant has not provided any information establishing she has arranged for these works to be completed. The complainant has also not provided any information contrary to R2’s findings regarding the roof maintenance works. Given this, it is fair for the insurer not to authorise the internal repairs or mould remediation works. Instead, given the complainant is not prepared to arrange the necessary roof maintenance works, it is reasonable that the insurer be permitted to cash settle the complainant under the claim. Insurer is to cover fair mould remediation expenses I have considered the mould and moisture report from IE. I am satisfied this report and supporting information confirms the presence of mould within the building as well as provides recommendations to remediate the mould. I accept the report establishes it is more likely than not that the mould is present due to the water ingress event in December 2023 and associated water damage to the building. The insurer is therefore required to cover the complainant for the fair and reasonable cost to complete the necessary mould remediation works. To avoid any confusion in this regard, it is fair that the insurer be permitted access to the building to determine the extent of mould remediation works required and the cost of these works. This is to allow the insurer to determine a fair cash settlement amount for these works. To clarify, the insurer is not entitled to investigate the cause for the mould to determine the complainant’s entitlement to cover under the policy. Instead, the inspection is to allow the insurer a fair opportunity to determine the reasonable cost of the necessary mould remediation works. I have considered the insurer’s concerns that the mould infestation is not due to the storm event in December 2023. The insurer seems to insinuate the mould is due to the complainant’s failure to complete the recommended maintenance works and/or that this is a long term issue. I am not satisfied the insurer has provided any persuasive supporting information in this regard. There is no evidence of this being a pre-existing issue from before the storm event in December 2023. Also, given the insurer’s position that it arranged make safe works to the roof, it is reasonable to expect these works will have left the building watertight, at least temporarily for the short term. Therefore, if the insurer suggests the mould is due to subsequent water ingress events, then either the insurer did not arrange the claimed make safe works or the make safe works were poor and have allowed further stormwater ingress. In any of these scenarios, I accept it would be fair to require the complainant to bear the cost of the resultant mould infestation. Subject to proof of payment, the insurer is to reimburse the complainant for any professional fees she may have had to pay in obtaining IE’s report. The insurer is to pay interest on this amount in line with section 57 of the Insurance Contracts Act 1984 (Act), from the date of payment of the invoice to the date on which the insurer issues payment to the complainant. Insurer to ensure its settlement for the damaged flooring is fair There is no dispute the stormwater ingress event in December 2023 has resulted in damage to the flooring. The insurer has accepted this and, in its SOW, R2 has allowed for replacement of 10sqm of damaged flooring with vinyl plank flooring in the front living room at an estimated cost of $900. W3, in its SOW and quote, has allowed for complete floor replacement in the living room as well as the dining room (95sqm). W3 says there would be no way of matching the existing timber flooring. W3 has estimated the cost of these works at $16,950. The complainant has raised the concern that the current flooring is Italian Strand Woven Bamboo flooring (bamboo flooring) whilst the insurer is quoting for vinyl planks. I agree with the complainant that if this is the case, which appears to be so based on the photos, that the insurer’s quote is not fair and reasonable. The insurer is obliged to cover replacement like for like where possible and if not available then the nearest available equivalent. I am not of the opinion that vinyl plank flooring would reasonably be considered the nearest equivalent match to bamboo flooring. I am also not satisfied, unless the exact matching flooring is available, that it would be fair or consistent with the commercial intention of the policy to allow the insurer to limit its liability to 10sqm. In the absence of the exact matching flooring, I am satisfied it is fair that the insurer be required to at the least cover the cost to replace the flooring in the front living room. I have not been provided with a copy of the building’s floorplan. Therefore, I am not in a position to determine whether the flooring from the front living room flows into the dining room. This is relevant because if replacing the front living room flooring will result in damage to the dining room flooring, then the insurer should cover the dining room flooring as well. I accept the policy seeks to limit cover to the damaged part of the insured building. The PDS provides that with respect to floor coverings, repair or replacement is limited to the room, hall or passage where the damage occurs. In this instance, this is the front living room. Therefore, at the very least, replacement of the front living flooring is covered. As the PDS does not define the term ‘room’, it is fair to rely on its ordinary meaning as provided in the Macquarie Dictionary: ‘a portion of space within a building or other structure, separated by walls or partitions from other parts…’ As noted, I have not been provided with the building’s floorplan so to be able to come to an informed decision as to whether the front living area and dining area are separated by walls or partitions. If they are not, and the flooring flows across both areas, I am satisfied it would be fair that the insurer be required to cover replacement of the flooring across both areas as one room. Alternatively, if the areas are separated by walls or partitions, it is fair to assess them as separate rooms for the purpose of the policy. Insurer is to include the front door and surrounds in its reassessment The complainant is seeking cover for replacement of the front door and surrounds. She says the water damage has left them swollen and beyond repair. W3 has quoted the cost to complete these works at $4,565. The insurer however believes the front door and surrounds are repairable and do not require complete replacement. R2 has quoted the repairs at $900. This includes the preparation, seal and painting of the front doorframe, doors and architrave. There is an absence of persuasive information from either party in this regard. However, I do note some photos indicate the front door is swollen due to the water damage and in my view would require more than simply repainting it. Given this, I am not satisfied the insurer’s current assessment of its liability in this regard is fair. Equally, I feel the quoted costs by W3 are not reasonable. The insurer is to include a reassessment of the damaged front door area as part of its final reassessment of the building. Claim is to be settled as set out below In line with the matters discussed above, where the complainant accepts this determination: · the complainant is to reasonably cooperate with the insurer and allow access to the building · within 21 days of receiving notice of the complainant’s decision to permit the insurer access to the building, the insurer is to: > complete a final assessment of the building damage to determine the fair extent of its liability under the policy and this determination > arrange for a suitably qualified expert to assess and provide a fair SOW and quote for the required mould remediation works · these assessments and associated SOW’s and repair quotes are to be completed by consultants who have had no prior involvement with the claim · where the insurer elects to cash settle the complainant, it is to increase the final claim settlement payment(s) by a further 15% to allow for contingencies · subject to be being provided with proof of payment, the insurer is to reimburse the complainant for expenses incurred in sourcing the reports, SOW and repair quote from W3 and IE up to a maximum of $3,000. The insurer is to pay interest on these settlement amounts in line with the Act from the date of payment of the expense to the date on which the insurer issues payment to the complainant. 2.2 Why is the outcome fair? The outcome is fair because it is based on the exchanged information and the policy. The insurer’s claim settlement offer does not reasonably include cover for mould remediation, replacement of the correct type and area of flooring and possibly some additional water ingress damage to the insured building. However, the insurer has not been given fair opportunity by the complainant to complete a further assessment to determine its liability under the policy. It would be unfair to require the insurer to increase its final claim settlement offer without first permitting it to complete a final assessment. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy wording Buildings claims If we agree to cover your claim for loss of or damage to your buildings, we will pay the reasonable cost of repairing or rebuilding the damaged part of your buildings to the same condition as when it was new. … …When it is not possible to use original materials during the repair or rebuilding process, we will make best efforts to use the nearest available equivalent to the original materials. Special items These items have additional settlement conditions: • … • Fixed wall, floor and ceiling coverings: repair or replacement is limited to the room, hall or passage in which the loss or damage actually occurred. When repairing or replacing the fixed wall, floor or ceiling coverings, we will make best efforts to use the nearest available equivalent to the original materials or items.