Claim denied for basement wall water damage; insurer verbally authorised repairs and represented the claim would be covered
Text of the determination
Determination
|
Case number
|
12-24-119162
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-24-119162 24 April 2025
Determination overview
Complaint
The complainant holds an events-based home and contents insurance policy with the financial firm (the insurer) for his property which is located in the State of Queensland (the property). In April 2024, he lodged a claim for damage to a concrete basement wall in a dwelling at the property. The complainant says the damage was caused by an insured event, in particular, a series of storms over the rainy season.
The insurer investigated the circumstances of the loss and damage. It then denied the claim.
The insurer says the damage is not a result of a single insured event (or a series of related storms during a single weather event). Rather, the insurer says, the damage is a result of wear and tear, including gradual deterioration, over time. The insurer says that damage caused in this manner is not covered under the terms and conditions of the policy.
The complainant also says he received the insurer’s verbal authorisation to engage his builder to repair the property.
The complainant wants the insurer to cover the repair costs.
Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The exchanged material shows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim.
Did the insurer authorise the repairs?
Yes. In these particular circumstances, I am satisfied the insurer authorised the repairs and made representations to the complainant the claim for the damage that has been ‘caused by the rain’ would be accepted.
It follows the insurer is required to reimburse to the complainant the repair costs.
Why is the outcome fair?
The outcome is fair in all the circumstances because, whilst the proximate cause of the damage is not an insured event, in the circumstances of this complaint I am satisfied the insurer authorised the repairs and made representations to the complainant the claim for the damage that has been ‘caused by the rain’ would be accepted. The complainant relied upon those representations and incurred the repair costs.
It follows it is fair and reasonable in this particular instance for the insurer to reimburse to the complainant the repair costs.
Determination
This determination is in favour of the complainant.
Within 21 days’ notice that the complainant accepts this determination, and upon production of documentary evidence by the complainant which proves the repair costs, the insurer must reimburse to the complaint such costs.
Reasons for determination
Is the insurer entitled to deny the claim?
Yes. The exchanged material shows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim.
Complainant says insured event caused the damage
The property includes a double storey dwelling of timber construction with a pitched roof covered in corrugated iron. The dwelling contains a large basement with concrete walls and floor. According to the policy schedule, the dwelling was originally constructed in about 1998.
On 24 April 2024 the complainant lodged a claim after noticing the concrete wall at the rear of the property had lost its ability to prevent water ingress into the basement. The complainant also noticed missing external ground-level gravel next to the wall.
The insurer recorded the following:
There has been heavy rains throughout last year and this year and [the complainant] noticed his basement gets flooded. He called the builder who advised there are cracks formed on the wall and concrete floor of the basement due to which water floods in. They will be going on May 6th to do the repair work.
The date of loss was deemed to be 1 January 2024.
Following the claim lodgement, the insurer appointed JL, builder, to assess the property on 30 April 2024. JL reported, amongst other things, the concrete wall around the bottom of the property was leaking water through various cracks and holes. JL’s report written pursuant to its inspection of the property also includes helpful and illustrative photographs. The cracks and holes referred to by JL are clearly depicted in some of the photographs.
The complainant then provided the insurer with a quotation for repair works from IB, builder, dated 1 May 2024. The quotation was in the sum of $33,616, and included the following works:
1 Dig a trench to a depth of 1.5 m by hand.
2 Removing soil and stone.
3 Repair of walls and foundation slab, waterproofing the wall with sealant.
4 Installation of sheet plastic protective waterproofing coating.
5 Laying a socket Slotted corrugated drainage pipe.
6 Connecting the drainage to the stormwater system.
7 Protection of the trench with geotextiles, filling the trench with drainage gravel by hand.
8 [Landscaping] works.
The complainant also advised the insurer that IB recommended the damaged area should be repaired as soon as possible to prevent ‘serious construction damage in the future’.
In addition, the complainant says the insurer verbally authorised him to go ahead and repair the property before the insurer had made the decision to accept or deny the claim. The complainant says this authorisation was given to him during a telephone call with the insurer on 3 May 2024. This is discussed in detail below.
The complainant then arranged for the repair works to be undertaken and completed in about the middle of May 2024.
Subsequently, IB formally inspected the property on 7 July 2024 and provided a report. IB’s report contains the following observations and conclusions:
heavy rains, and consequent floods, destroyed the level of gravel around the exterior basement of the property and damaged the waterproofing membrane
this caused water to leak into the basement, leading to more damage
the property needs to be repaired urgently to prevent further ‘destruction’ of the property.
The insurer advised the complainant on 8 July 2024 it would like to arrange for an engineer to inspect the property. The insurer asked the complainant:
On review of your report [that is, IB’s report] I would like to engage an engineer to review - can you confirm if the works have been carried out to repair this as yet prior to my appointment.
By way of return email the same day, the complainant advised the insurer:
All the works has been carried out and finalised in May 2024 by the local builder. Before the beginning of works I've got the permission for that from one of your representatives over the phone and now it's all done.
Upon receipt of this news, the insurer did not arrange for an engineer to inspect the property. In subsequent correspondence it advised that, because repairs had already been undertaken, the claimed damage was no longer present for inspection. This would render the engineer’s inspection pointless.
Finally, on 12 July 2024, the insurer emailed the complainant to advise it had decided to deny the claim.
The insurer stated it was unable to accept the claim because:
JL concluded the water ingress appears to be because of age-related issues with the concrete wall
JL noted that the waterproof lining has broken down over time and would have been visible to the complainant
the damage was caused by wear and tear over time, including depreciation, gradual deterioration and lack of maintenance. Damage caused in this manner is not covered under the terms of the policy
the damage was not caused by a one-off, single insured event.
The insurer also says it did not authorise the complainant to complete the repairs.
To resolve this complaint, the complainant wants the insurer to pay for the cost of the completed repairs.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy that occurred during the period of insurance. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim (or part of it) or is otherwise entitled to decline the claim because, for example, the damage occurred outside the period of insurance.
Policy covers damage caused by ‘Storm, cyclone, rainwater or run-off’
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Policy Schedule (PS). The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy.
The policy covers damage caused by a number of insured events, including damage caused by ‘Storm, cyclone, rainwater or run-off’. Page 6 of the PDS states:
What you’re covered for
Whilst there are some things we don’t cover (see the exclusions within each insured event and General exclusions on pages 53 to 56), we’ll cover you for damage to your insured property as a result of any of these insured events:
[…]
Storm, cyclone, rainwater or run-off [emphasis added].
Generally, an ‘insured event’ is a single, one-off event, such as a theft or a cyclone. However, a series of related events, such as a number of storms caused by the same weather system, may be classed as one insured event.
In relation to the insured event ‘Storm, cyclone, rainwater or run-off’, page 17 of the PDS states:
What’s covered?
Buildings and/or contents
✔ Loss or damage caused by:
• storm
• cyclone*
• rainwater
• run-off.
[…]
✔ Loss or damage caused by or arising from:
• soil movement, including erosion
• landslide
• mudslide, or
• subsidence
if it is caused directly by and occurs within 72 hours of a storm.
Cover provided by policy is subject to exclusions and limitations
The cover provided by the policy is subject to limitations and exclusions. For instance, page 17 of the PDS also includes the following specific policy exclusions applicable to the insured event ‘Storms, cyclone and rainwater run-off’:
What’s not covered?
Buildings and/or contents
✘ Loss or damage caused by:
[…]
• rainwater, run-off, hail, wind or water that enters your buildings through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone…
[…]
✘ Loss or damage to:
[…]
• retaining walls
[…]
• the external paintwork or other exterior coatings of the buildings caused by rainwater.
In addition, pages 53 to 56 of the PDS sets out the general policy exclusions that apply to all cover provided by the policy, including cover for damage caused by ‘Storms, cyclone and rainwater run-off’. These general policy exclusions include:
General exclusions
Things we won’t cover
We want to be clear about what you’re covered and not covered for. In addition to any other exclusions listed for an event or cover section – here’s a list of things we won’t cover under any section of the policy.
Always excluded
Loss, damage, injury… or legal liability as a result or, caused by or arising from:
[…]
Wear and tear:
Including depreciation, gradual deterioration, wear and tear or lack of Maintenance.
Proximate cause of damage needs to be assessed
Damage can have more than one cause. For instance, in this matter the complainant says the damage was caused by the insured event ‘Storm, cyclone, rainwater or run-off’. In contrast, the insurer says the damage was caused by a combination of factors, such as wear and tear and gradual deterioration over time, all of which are excluded from cover under the terms and conditions of the policy.
In deciding whether the policy responds, it is necessary to identify the proximate cause of damage. The proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.
Complainant has not established a valid claim
In all the circumstances, I am not satisfied the complainant has established a valid claim for the damage. Indeed, I am of the opinion the insurer is entitled to deny the claim because the damage was not caused by an insured event. This is because of the following considerations.
First, following its inspection of the property in April 2024, JL concluded, amongst other things:
the water ingress into the basement appears to be due to age-related issues with the concrete wall around the back of the property
ground movement ‘over the years’ has potentially caused the concrete wall to crack in some areas
the waterproofing membrane in the wall has potentially broken down over time
the concrete wall is leaking water through various cracks and holes.
As mentioned, the extent of deterioration in the concrete wall, both externally and internally, is clearly evident in some of the photographs attached to JL’s report. Moreover, the internal deterioration is also evident in the photograph and video provided by the complainant in February 2024.
Second, in its report written pursuant to its inspection of the property on 7 July 2024, IB concludes:
In my professional opinion, damage to the waterproofing of the foundation of the house is associated with natural phenomena such as floods or tropical downpours during the rainy season.
This evidence is consistent with the insurer’s submission that the damage was not caused by a single storm (or a single weather event which may have involved several related storms). Rather, IB’s evidence is consistent with the contention that the damage is a result of wear and tear, including gradual deterioration over time. As mentioned, damage caused in this way is excluded from cover under the terms of the policy.
Third, the complainant has not identified the insured event (the storm) which, in his opinion, caused the damage. Instead, the complaint advised the insurer the damage was likely caused by ‘heavy rains throughout last year and this year’ and ‘the wet season’. This is consistent with JL’s conclusion that the damage appears to have been occurring ‘for about 12 months’.
In conclusion, I am satisfied the nature of the claimed damage is more consistent with long-term wear and tear and deterioration which has occurred over a prolonged period, rather than a single storm or weather event. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny the claim.
Did the insurer authorise the repairs?
Yes. In these particular circumstances, I am satisfied the insurer authorised the repairs and made representations to the complainant the claim for the damage that has been ‘caused by the rain’ would be accepted.
It follows the insurer is required to reimburse to the complainant the repair costs.
Telephone recording supports complainant’s submission
The complainant says the insurer verbally authorised him to proceed with the repairs before the insurer had decided to accept or deny the claim. The complainant says this authorisation was given by a representative of the insurer during a telephone call on 3 May 2024. He says he called the insurer to ask whether he is ‘entitled’ to arrange for his builder to commence urgent repair works at the property before the insurer has made a decision to accept or deny the claim.
I listened to a recording of the telephone call. It was a little over eight minutes in length. It is clear the main reason for the call by the complainant was to learn whether he could engage his builders to complete the repairs before a claim decision is made by the insurer.
During the call the insurer’s representative (IR) informed the complainant about the following:
the assessment report had not yet been received
upon receipt of the assessment report, the insurer would decide whether to accept or deny the claim
it was the complainant’s discretion to proceed with the repairs
if the claim is accepted the insurer would reimburse the complaint for the cost of the repairs
the insurer would need an itemised scope of works
if the damage does not fall within the terms of the policy cover, or the claim is rejected, the insurer would not be able to cover any costs.
A file note in the insurer’s records about the telephone call on 3 May 2024 also states the following:
[The complainant] advised assessor attended two days ago.
He advised I have two quotes from local builders.
He advised is it ok to go ahead and start the repairs as your builder already attended.
He advised his builder can start the job on the 6th of May.
Advised will need to review reports to determine the acceptance – [the complainant] understood.
Advised decision to proceed with repairs by your builder is your decision and it is ok if you do proceed, however we will review report and RD and then we will determine the coverage.
Asked about the amount of the quotes as was unable to access.
[The complainant] advised $30,000 & $33,000.
Advised this will require further review once reports received
[The complainant] understood, thanked me - call ended.
However, importantly, the following discussions also took place during the call:
at about the 3.50 minute mark, the complainant and the IR discussed whether the claim would be accepted. The complainant stated he believed the claim would be accepted because the insurer’s assessor [that is, presumably, JL]… “had a look” and “he actually accepts it’s damage done by nature” and “by heavy rains”. The IR replied, “Yes”
at about the 4.10 minute mark, the complainant clearly reiterated his question, “Am I entitled to arrange the builders before the decision would be made by the insurance company?”
the IR replied, “It’s completely up to you to go ahead and start with those repairs…If you do start it, and it’s accepted, we’ll just reimburse you that amount… As long as our assessor [that is, I presume, JL] has attended and taken photos… there’s not any issues for you. If your builders are free that’s all good to go, but just keep in mind we do require the reports to make a decision and move into the next steps”
the complainant then replied that he understood what the IR was saying
at about the 5.10 minute mark, the complainant stated, “In general, I’m entitled to let the builders start working on the sixth of May”. The IR replied, “That’s correct”
at about the 5.25 minute mark, the complainant asked, “And the sum that could be reimbursed would be based on the quotes that I have provided. Am I right?”. The IR replied, “Yes, and we need to just confirm with the builder what the resulting damages are actually…”
at about the 6.00 minute mark, the complainant confirms the damage in question is damage to the basement of the property. He says the concrete wall and floor in the basement have been damaged by “the heavy rains”. The IR Replied, “Yes, that’s what’s actually going to be covered… so you actually have a good understanding of the policy – so that’s exactly what will be covered – what’s actually damaged by the rain.”
At about the 6.30 minute mark, a conversation ensues about whether further documents (in addition to the quotations already supplied by the complainant) need to be provided by the builder. At about the 7.50 minute mark the IR stated that an itemised scope of works “will do the job”.
Finally, the call ended with the compliant saying that he had received an answer to his questions (that is, presumably, the questions about whether he was entitled to engage his builder on 6 May 2024 to commence the repairs and whether his builder, in doing so, would need to provide additional documentation to the insurer).
Indeed, after listening to the recording in its entirety, I am of the opinion that, at the conclusion of the telephone call, the complainant was left with the understanding and belief he was ‘entitled’ to engage his builder to commence work on 6 May 2024 and that the insurer would ‘cover’ all damage ‘caused by the rain’.
In light of the matters set out above, I am satisfied that, during the telephone call:
the IR informed the complainant he could proceed with repairs if he chose to do so
the IR authorised the repair works before a claim decision was delivered by the insurer; and
the IR did make representations to the complainant that the claim for the damage that had been ‘caused by the rain’ would be accepted and that the insurer would cover the costs of the works to repair such damage.
Consequently, the complainant relied upon the representations made by the IR and incurred the repair costs.
It follows it is fair and reasonable in this particular instance that the insurer should be required to reimburse to the complainant the cost of the repairs.
Within 21 days’ notice that the complainant accepts this determination, and upon production of the necessary documentary evidence by the complainant which proves the repair costs, the insurer must reimburse to the complaint such costs.
Why is the outcome fair?
Insurer authorised the repairs
The outcome is fair in all the circumstances because, whilst the proximate cause of the damage is not an insured event, in the circumstances of this complaint I am satisfied the insurer authorised the repairs and made representations to the complainant the claim for the damage that has been ‘caused by the rain’ would be accepted. The complainant relied upon those representations and incurred the repair costs.
It follows it is fair and reasonable in this particular instance for the insurer to reimburse to the complainant the repair costs.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.