Home / Hollard / Determination 12-24-119116

Determination 12-24-119116

Denial of earthquake damage claim relying on wear and tear and earth movement exclusions

FirmHollard
Decided2025-08-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for home damage from a September 2021 earthquake; the insurer denied it relying on wear and tear and earth movement exclusions. AFCA found the insurer had not discharged its onus and required it to cash settle the claim based on an agreed scope of works and quote plus 15% contingency.

The insurer bore the onus of proving the exclusions and its engineer's report did not consider site drainage evidence, so the complainant's expert's earthquake causation conclusion was preferred.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-119116 | Financial firm | Hollard Insurance Partners Limited Case number: 12-24-119116 22 July 2025 1 Determination overview 1.1 Complaint This complaint relates to a claim by the complainant under his home insurance policy held with the financial firm (insurer), for damage to the insured property caused by earthquake. The insurer has denied the claim and says that the complainant has not established a loss which is covered by the policy. Alternatively, the insurer says that the cause of the damage is excluded from cover under the terms of the policy. 1.2 Issues and key findings Is the insurer entitled to deny the complainant’s claim? No. The insurer is not entitled to deny the complainant’s claim. Why is the outcome fair? The outcome is fair as it is based upon the exchanged information and the terms and conditions of the policy. 1.3 Determination This determination is in favour of the complainant. The insurer is required to pay the complainant’s claim under the terms and conditions of the policy and in accordance with the provisions of this determination. 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address all issues. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Is the insurer entitled to deny the complainant’s claim? Coverage of the policy The complainant’s home insurance policy details that the building and/or contents are covered for loss or damage caused by an insured event if it occurs during the period of insurance. Insured events include “Earthquake”. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI). I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant. The PDS confirms that general exclusions apply to all relevant sections of the policy. It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy. Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim. Circumstances of the loss and claim The complainant lodged his claim with the insurer on 5 September 2023, advising of damage to the home, said to have occurred because of an earthquake on 22 September 2021. The insurer recorded the loss date as 22/9/21 at 12.00 am. The insurer confirms that Geoscience Australia recorded a 4.1 (Mw) Magnitude earthquake at approximately 11.33pm on 21 September 2021 and then a 5.9 (Mw) Magnitude earthquake at approximately 9.15am on 22 September 2021. Several pre and aftershocks were recorded in the same region in the weeks before and after the above two earthquakes; all less than 3.5 (Mw) Magnitude Based upon the report from the insurer’s builder (FB), who attended onsite on 6 September 2023, I am satisfied that the complainant has established a valid claim: .... The earthquake may have exacerbated pre-existing weaknesses however it is not the primary cause for the damage that now exists. .... The onus now transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely to deny or limit its obligations to the complainant regarding the claim. Page 54 of the PDS details: .... Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: .... 4. Wear and tear, rust, corrosion and or deterioration....but we will only apply this exclusion if the loss or damage is directly caused by one or more of these factors; .... 10. The vibration, settling, shrinking or expanding of earth by any building foundation, wall, pavement or path (except under a ‘Lightning’, ‘Earthquake’, ‘Explosion’ or ‘Sudden Impact’ claim); .... The insurer seeks to rely upon these exclusions to deny the claim. Experts At FBs recommendation, the insurer engaged an engineer (SE), who attended onsite on 4 October 2023. In its report dated 6 October 2023, SE concluded: The damage to the dwelling has not been caused by the Rawson earthquake event of September 2021, nor by any single or definable event. The proximate cause of the cracking to the wall and ceiling lining of the dwelling is differential ground movement, due to long-term and on-going variations in the moisture content of the underlying reactive soils caused by the factors outlined in paragraph 6.6 and 6.7.This has been contributed to by thermal expansion and contraction of different building materials, and inadequate repair works undertaken to the subfloor framing. Paragraphs 6.6 detail the causes of long term and ongoing differential moisture content variations as: · Tree root drying effect, · Seasonal moisture content variations, · Differential permeability of the ground surface and upper (top) soil layers causing non-uniform penetration of moisture and · Inadequate site drainage. Paragraph 6.7 says: The perimeter of the dwelling is exposed to rainwater and surface runoff however, the centre of the dwelling is fully covered against rainwater and becomes relatively dry compared to the perimeter of the dwelling. This has caused the centre of the dwelling to settle relative to the perimeter of the dwelling and caused cracking damage to the interior of the dwelling. This is consistent with the pattern of fall towards the centre of the dwelling in the floor level survey. SE says that the complainant’s property is approximately 103km from the epicentre of the earthquake and the earthquake event was not strong enough to cause the damage claimed. By referring to the earthquake and the earthquake event, I presume SE is referencing the two earthquakes and the pre and aftershocks that occurred in the same region. The complainant challenges the conclusions of SE and says, amongst other things, SE did not seek access to building specifications, approved building plans, drainage plans, as-constructed building and drainage details, nor ask any supplementary questions nor commission additional technical investigations to properly inform a thorough forensic structural investigation. Further, the complainant says that SE has grossly under-reported the locations, extent and width of easily identifiable internal and external damage and incorrectly assumed evidence of previous repairs to the kitchen wall lining and two minor moisture stains. The complainant says a simple comparison of photographs taken by the various experts, confirms this. The complainant acknowledges the existence of pre-existing hairline cracks (approximately 1mm) at plaster cornice joints and external brickwork at various points and pre-existing moderate (approximately 3mm) in cornice, plaster ceiling and wall sheets and external brickwork at/near the junction of the original house and northern extension built in 1998. The complainant confirms he is not making a claim for these items. On the other hand, the complainant seeks the insurer to cover: · Cracking of the cornice, plaster ceiling and wall sheets and external brickwork to the extent in number, size and locations which increased significantly after the earthquake, · New cracking of cornice, wall and ceiling plaster sheets in both lounge/dining and master bedroom, · Cracking and dislodgement of grout in hallway slate flooring and · Dislodgement and damage of eave lining above the garage roof. The complainant says these items of damage did not exist prior to the earthquake. The complainant refers to a report dated 5 December 2024, from a design consulting group (VA), which was prepared following several site visits, including one on 20 August 2024. VA concluded that there was recent damage the result of earthquake actions and damage that pre-dated the earthquake. All submissions and the expert’s reports have been exchanged between the parties, with each having the opportunity to respond, which SE did in a supplementary report dated 10 February 2025. Save for what I have quoted above, due to the amount of content, I do not propose to repeat all that content here. It goes without saying that the experts are not in agreement as to the cause of damage at the complainant’s home. I do not regarding this as either surprising or unusual. In addition, I do not adduce a bias on the part of any of the experts. I simply say that each expert has used their skills to reach a conclusion based upon what evidence has been placed before them, including the respective site visits. My job is not to say that one is right, and one is wrong, but rather to carefully analyse all the exchanged information and reach a conclusion, based on the balance of probabilities, as to the proximate cause of the damage being claimed by the complainant. The proximate cause is the dominant, effective or operative cause of the damage. Simply put, the complainant says it was the earthquake, whereas the insurer says it was not the earthquake, but rather several other causes which I have referred to above. As stated, SE says that the proximate cause is differential ground movement, due to long term and on-going variations in the moisture content of the underlying reactive soils, caused by, including but not limited to, inadequate site surface drainage. In my view SE’s statement regarding inadequate site surface drainage is central to its conclusion regarding the proximate cause of the damage. The three other factors referred to in paragraph 6.6 of SE’s report and above, all relate to moisture levels and variations in moisture levels. I am satisfied, based upon the exchanged material, that site drainage is a critical issue in determining moisture levels and their variation. In the absence of site drainage, there is likely to be an increase in moisture levels, as the obvious purpose of the drainage is to remove moisture. The complainant says that SE did not record any observations regarding the extent of surface and subsurface drainage around the property; no questions were asked regarding the site drainage, and no requests were made to access or view as-built drainage plans. On the other hand, the exchanged information confirms that VA requested and was provided with information, including but not limited to, drainage plans and as-constructed drainage details. Given the insurer has the onus to establish the application of its exclusion, it is required to obtain the evidence to meet that onus. In my view, this would include, amongst other things, the evidence of as-built drainage plans. In those circumstances I prefer the conclusions detailed by VA, to those expressed by SE. As a result I am not satisfied that the insurer has met its onus to establish it is entitled to rely upon its policy exclusions to deny the complainant’s claim. I am satisfied that the insurer is required to pay the claim for the damage caused by earthquake as detailed in VA’s report and confirmed by the complainant in his submissions and above. There is insufficient information to reach a monetary conclusion as to the insurer’s obligations to the complainant and under the policy. Within 14 days of the insurer receiving notice the complainant has accepted this determination, the insurer is to engage a suitable qualified expert, who has not previously been involved in this complaint, to prepare a Scope of Works (SOW) and actionable quotation for the cost to repair the damage referred to above. The parties are to work together through this process and the complainant is to allow the expert’s attendance on site if required. Once the SOW and actionable quotation have been agreed between the parties, the insurer is to cash settle the complaint for the agreed actionable quotation, together with an uplift of 15% for contingencies. If the parties cannot agree on the SOW or settlement amount, they may return to AFCA. 2.2 Why is the outcome fair? The outcome is fair as it is based upon the exchanged information and terms and conditions of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.