Claim denied as flood damage; additional amounts for make safe works and non-financial loss
Text of the determination
Determination
|
Case number
|
12-24-117345
|
Financial firm
|
Allianz Australia General Insurance Limited
Case number: 12-24-117345 29 September 2025
1 Determination overview
1.1 Complaint
The complainant holds home building and contents insurance with the financial firm (insurer). She lodged a claim for water ingress damage following a severe storm on 6 April 2024.
The insurer’s make safe works included partial removal of internal walls and cabinetry. It also offered cash settlements for damaged carpet, a pool pump, and a gate motor. The insurer then denied the claim, saying the damage was caused by flood, which is not covered.
The complainant says the inundation was caused by stormwater runoff. She also says the insurer misled her to believe the claim was accepted, and relying on that, she disposed of contents items. She wants the insurer to cover the cost of repairing damage caused by the make safe works and for her contents, and to pay her compensation.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. It is more likely than not the damage claimed was caused by floodwater.
Is the insurer to pay amounts outside of the policy?
Yes. If it is yet to do so, the insurer is to pay the gate motor cash settlement. The insurer is to reimburse the cost to replace internal walls as it has not been shown their removal was unavoidable, as well as make safe electricity costs. The insurer is not liable for the cabinetry, electrical works or the contents losses as these were likely unavoidable.
Is non-financial loss compensation payable?
Yes. The insurer’s errors and poor claim handling have caused the complainant major stress and inconvenience. It is to pay her $4,000 in non-financial loss compensation.
Why is the outcome fair?
The damage claimed was on balance due to a flood which the policy does not cover, so the insurer’s decision to deny the claim was fair. However, it is fair that the insurer pays amounts outside the policy for the avoidable damage it caused. It is also fair that the insurer compensates the complainant for her stress and inconvenience.
1.3 Determination
This determination is substantially in favour of the complainant. Upon receiving notice from the complainant that she accepts this determination, the insurer is to pay her:
· in line with section 2.2 below, $9,256.28 for the wall repairs, plus interest under section 57 of the Insurance Contracts Act, 1984 (ICA) on each component from the date of payment
· within 14 days, $850.90 for electricity usage plus section 57 ICA interest from 1 May 2024
· if not already paid, a cash settlement for the gate motor in line with section 2.2 below
· within 14 days, $4,000.00 in non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Yes. It is more likely than not the damage claimed was caused by floodwater.
Complainant must show a claimable loss under the policy terms
The complainant is required to show on the balance of probabilities (that it is more likely than not), that she suffered a loss claimable under the policy. This means she must show the loss was caused by a risk for which she is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for loss or damage to her home and its contents caused by a listed insured event. Those events include ‘Storm, cyclone, rainwater or run-off’. However, the complainant did not have cover for ‘Flood’.
On 6 April 2024, the complainant notified the insurer that during a severe storm earlier that day water had inundated the lower level of her home and her external garage. She says the initial inundation involved a mixture of stormwater and sewerage.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Insurer denied the claim
The insurer appointed S on the day the claim was notified. S, in turn, engaged builder AB to review the damage and to attend to make safe work.
AB inspected the home on 9 April 2024, and reported to the insurer that:
· based on photos the complainant provided, the lower level of the home was inundated to about 300mm above floor level, and the garage to about a metre above floor level
· restorers had installed drying equipment and restoration work was ongoing
· the damage was consistent with flooding from the storm
· in the home there was damage to doors, skirting, architraves, built-in wardrobes, wall linings, kitchen and laundry joinery. The garage door and shelving had also been damaged
· the gate motor, pool plumbing, external air-conditioning unit and hot water tank required specialist review as they had all been submerged.
On 2 May 2024, S offered the complainant $4,586.40 as a cash settlement for damaged carpet. On 24 May 2024, S offered $2,050.00 as a cash settlement for the damaged pool pump. Around that time, S also discussed with the complainant a cash settlement for the damaged gate motor.
On 30 May 2024, S asked the insurer if the complainant had flood cover. After being advised she did not, hydrologist P was engaged to prepare a causation report.
After inspecting the home on 3 June 2024, P reported that:
· the home was higher than the road, was 0.69m Australian Height Datum (AHD) above ground level at the back and 0.55mAHD above ground level at the front. The ground level at the front was 2.50mAHD, so the level at which the home would flood internally was 3.05mAHD
· F Creek was on the other side of the road, about 30m east of the home
· F Creek’s bank facing the home was at 2.39mAHD
· there was minimal stormwater drainage present along the road
· the road would overflow into F Creek when flows exceeded the kerb/verge, prior to flowing towards the home. This means pooling storm water would likely not impact the home without the influence of other water sources, such as F Creek overtopping
· the complainant said at 5.30am on 6 April 2024, the road was flooded. The water level continued to rise and flooded the home at 6.30am. At its peak it was about 0.45m deep, equating to 3.50mAHD
· the complainant said the floodwater was level across the road, all the way to F Creek
· the complainant said road inlets and sewer manholes outside the home had been surcharging during the storm, and the water that entered the home was ‘muddy’
· the closest rainfall gauge was 3km from the home. The gauge recorded that 141.5mm of rain fell on 6 April 2024. The peak 2-hour rainfall intensity occurred between 4am and 6am, which would generate slightly over an 2% annual exceedance probability (AEP)
· no water course level data was available
· flood mapping for the area indicated a 2% AEP event would generate flooding at the property at between 1-1.5m deep, which equates to 3.50-4.00mAHD
· ‘…it is concluded that the water entering the property most likely originated from [F] Creek. The water entering the property is therefore classified ‘flooding’’.
The insurer says P’s report establishes that the home was inundated by floodwater or combined floodwater and stormwater. Therefore, it is entitled to deny the claim because the complainant has not shown a claimable loss. Further, that the policy excludes loss or damage caused by or arising from flood unless optional flood cover has been added to the policy.
Complainant says insurer should accept the claim
The complainant maintains that the home was inundated by stormwater runoff and sewerage. She submits that:
· F Creek is a tidal waterway that supports wildlife
· as the water that entered her home was classified Category 3 – grossly contaminated, it could not have come from F Creek
· the storm event generated intense rainfall which came down from the escarpment to the west of her home and could not disperse through the road’s minimal stormwater drains
· F Creek did not break its banks, it was exceeded by the pooled stormwater
· even if F Creek was not nearby, the home would have been inundated due to the huge volume of stormwater that was trapped
· ‘The water was not escaping its natural confinements to flood the street, the storm water coming down from the escarpment simply could not get away fast enough, it was like hitting a brick wall & the rainwater backed up’.
The complainant has provided several photos and videos in support of her position. These include photos of fencing running along F Creek which had been bent towards the creek. She says this shows the water in the vicinity on 6 April 2024 had been stormwater flowing towards the creek rather than water flowing out of the creek.
The complainant has also provided a letter dated 7 November 2024 from her local council. She says the letter confirms that ‘stormwater drains are designed to infiltrate the sewage system when overloaded, resulting in Category 3 water spewing from pipes, residential drains & over land’.
Insurer is entitled to deny the claim
Based on the exchanged information, the panel is satisfied that it is more likely than not the damage claimed was caused by floodwater. This is because:
· P’s report is detailed, well-reasoned, references scientific data and measurements, and contains supporting images. In the absence of a contrary expert opinion the panel finds P’s opinion persuasive
· on a reasonable reading of the letter dated 7 November 2024, the local council considered what occurred on 6 April 2024 to have been a flood event
· bent fencing photos are consistent with P’s view that the stormwater ran down the road into F Creek, causing F Creek to overtop and for water to then flow back up the road
· the mixing of the stormwater/sewerage with the creek water would have rendered the creek water Category 3
· it is a well-established principle of insurance law that once floodwater mixes with stormwater, it is all regarded as floodwater.
As the complainant did not have ‘Flood’ cover, the insurer is entitled to deny the claim.
2.2 Is the insurer to pay amounts outside of the policy?
Yes. If it is yet to do so, the insurer is to pay the gate motor cash settlement. The insurer is to reimburse the cost to replace internal walls as it has not been shown their removal was unavoidable, as well as make safe electricity costs. The insurer is not liable for the cabinetry, electrical works or the contents losses as these were likely unavoidable.
Insurer agreed to honour cash settlement offers
The insurer agreed to honour its offers to cash settle the complainant for the damaged carpet, pool pump, and gate motor. In July 2024, it paid the complainant the relevant amounts for the carpet and pool pumps and requested that the complainant provide supporting documents to enable payment for the gate motor.
It is unclear from the exchanged information whether the insurer has paid the gate motor cash settlement. If it has not, it is to pay the relevant amount within fourteen days of receiving a supporting quote or invoice from the complainant.
Parties disagree on whether insurer should pay more outside the policy
The complainant says when she lodged the claim on 6 April 2024, the insurer informed her that the claim would be accepted, that there was no need to retain damaged contents and photos would be sufficient proof of loss.
She also says that her understanding that she would be covered for the losses she sustained was reinforced by the insurer attending to make safe work, and S’s cash settlement offers.
The complainant says if the insurer is permitted to deny the claim, as it subsequently did, the matters set out above were misleading and deceptive conduct upon which she relied to her detriment. She says had she known of the possibility the claim could be denied she would not have:
· allowed the AB to use her electricity while attempting to dry walls
· permitted AB to partially remove walls and cabinetry
· disposed of contents items but instead would have treated and restored them.
The complainant also submits that the partial removal of the walls was avoidable. She says if that step was inevitable from the outset, the insurer would not have spent so much time and electricity trying to dry the walls.
She also relies on an undated letter from plasterer T, who quoted to undertake rectification work, but whom she did not use for the job. T said:
I attended the property at [complainant’s address], in my opinion the gyprock wall did not need to be removed.
The complainant has quantified her losses as follows:
· cost of wall rectification - $9,256.28, comprised of:
> gyprock and plaster - $4,350
> painting - $3,200
> skirting boards - $1,706.28
· cabinetry replacement - $2,007.50
· electrical work (power point replacement, repair faulty wiring) - $2,018.50
· contents - $27,652.70
· electricity use - $850.90.
The insurer says that during the claim lodgement call the complainant was told that the policy covered storm damage and that storm damage would be accepted.
However, it acknowledges that it should have emphasised that the claim had not yet been accepted and that there was no cover for damage caused by flood. It also recognises that a hydrologist should have been appointed much earlier, and that S should not have made the cash settlement offers. It says it has addressed those errors by honouring the offers.
The insurer maintains that the strip out works undertaken as a make safe and the disposal of contents were necessary to prevent further damage, and that the complainant would have had to take those steps in any event. Accordingly, she has not been disadvantaged.
In support of its position, the insurer has provided a document said to contain commentary from S as follows:
· the complainant had followed up on the strip out works as mould was beginning to form on the plasterboard
· before the strip out works, she signed a waiver dated 7 April 2024, confirming she was aware if the claim was not covered, she would be responsible for replacement/restoration
· contents disposal was required in any event due to Category 3 water ingress
· the strip out works were required in any event to avoid significant mould issues within the wall cavities and given the recommendation for plasterboard after Category 3 water exposure is complete removal and replacement.
The insurer submits that T’s letter is not persuasive because it does not include any reasoning or evidence to support the opinion expressed.
Insurer is to pay more outside the policy terms
The panel is satisfied that it is reasonable to require the insurer to reimburse the $9,256.28 the complainant paid in total for wall rectification. This is because:
· the partial wall removal involved significant destruction of the complainant’s property
· the insurer has not explained why it undertook lengthy attempts at drying the walls if their removal was inevitable
· while T’s letter is brief, it sets out a clear opinion from an identifiable and appropriately qualified person
· the panel does not find the commentary said to have been provided by S persuasive as:
> as the entity that authorised and arranged the partial wall removal, S cannot reasonably be considered as independent
> the individual providing the commentary is not identified and their qualifications are not specified so whether they can be regarded as an expert cannot be established
> the assertion there would have been a significant mould issue in the wall cavities is not supported by evidence such as images or moisture readings
> the source for the recommendation relating to plasterboard exposed to Category 3 water has not been identified
· the waiver was signed only a day after the claim lodgement by which time the insurer had made representations about claim acceptance
· the waiver only gave permission to ‘conduct structural exploratory work where approval provided’, and the acknowledgement of potential responsibility the complainant provided was limited to ‘replacement or restoration costs of [her] items/carpet’.
In addition to reimbursing the $9,256.28, the insurer is to pay interest under section 57 of the ICA on each component part from the date of each applicable invoice for payment issued to the complainant. The complainant is to provide the insurer with those invoices.
The insurer has not responded to the complainant’s indication that due to AB’s drying works, she incurred $850.90 more in electricity costs for the period 7 to 26 April 2024 than she normally would have done. The panel is satisfied that it is reasonable to require the insurer to reimburse the complainant the $850.90 and pay section 57 ICA interest from 1 May 2024.
The panel is not satisfied there is any persuasive evidence to establish that removal of the cabinetry could have been avoided given the height of inundation. Further, and for the same reason, it is more likely than not that the power point replacement and faulty wiring repairs were unavoidable.
That numerous contents items were disposed of is unfortunate. However, it is more likely than not that was also inevitable, noting many were electrical items exposed to a large volume of water. It is also relevant to note that porous items such as mattresses and sofas were soaked in Category 3 water contaminated with sewerage. The panel is also not satisfied that the insurer represented to the complainant that she should dispose of the contents.
Therefore, the insurer is not liable for the cabinetry, electrical works or the contents losses as these were likely unavoidable.
2.3 Is non-financial loss compensation payable?
Yes. The insurer’s errors and poor claim handling have caused the complainant major stress and inconvenience. It is to pay her $4,000 in non-financial loss compensation.
AFCA can award compensation for poor claim handling
Under paragraph D.3.3 of its Rules, AFCA may award up to $6,300 in compensation for non-financial loss where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation for non-financial loss. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
Insurer is to pay non-financial loss compensation
The complainant says that the insurer’s misrepresentations, delays, and the additional damage it caused to her home have produced major stress and inconvenience for her entire family. She refers to the emotional and mental toll of the insurer’s conduct and emphasises the impact on her daughter who was in her HSC year in 2024.
The insurer accepts that it made errors and should have handled the claim better. It says it has adequately compensated the complaint through honouring the cash settlement offers. Further, at one stage it was prepared to pay an additional $1,000 in non-financial loss compensation.
Having carefully reviewed the exchanged information, including the insurer’s claim notes, the panel is satisfied that the insurer’s errors and poor claim handling caused the complainant major stress and inconvenience. That the insurer gave the complainant false hope the devastating effects of the claim event on her home would be covered, only to later deny the claim was clearly very upsetting for her.
The panel considers that $4,000 is a fair compensation amount in the circumstances.
2.4 Why is the outcome fair?
The damage claimed was on balance due to a flood which the policy does not cover, so the insurer’s decision to deny the claim was fair. However, it is fair that the insurer pays amounts outside the policy for the avoidable damage it caused. It is also fair that the insurer compensates the complainant for her stress and inconvenience.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.