Determination 12-24-116320
Denial of flood damage claim for house building and cash settlement of rear shed without uplift
Summary
The complainant claimed for flood damage to his house and rear shed; the insurer cash settled the shed and denied the house. AFCA upheld the denial of the house claim but required a 25% uplift on the shed settlement and $500 non-financial loss.
Expert engineering evidence showed the house damage came from pre-existing foundation movement excluded by the policy, while cash settlements should include an allowance for transferred repair risk.
Issues
- Claim denial primary · not upheld“the insurer was entitled to deny the claim due to the exclusion... damage was caused by pre-existing foundation movement”
- Claim amount dispute secondary · upheld“cash settlement regarding the rear shed should have included an uplift; 25% uplift”
- Poor claim handling secondary · upheld“failure to include an uplift in the accepted cash settlement for the rear shed was not appropriate”
Subjects and remedies
broker or intermediaryhome or building damagenatural disasterpay claimpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-24-116320
|
Financial firm
|
The Hollard Insurance Company Pty Ltd
Case number: 12-24-116320 4 April 2025
Determination overview
Complaint
The complainant holds a home building and contents insurance policy for his home in New South Wales with the financial firm (insurer). The policy period was from 30 June 2022 to 30 June 2023. The home building cover was $262,650 with an excess of $500.
The complainant authorised his insurance broker on his behalf regarding his complaint to the Australian Financial Complaints Authority (AFCA). In this Determination, the complainant and his broker are referred to as the complainant.
The complainant made a claim on 31 October 2022 for flood damage to the complainant’s home which the complainant said occurred on 23 October 2022. The claim related to two buildings at the complainant’s home – a rear shed and the house building.
The insurer accepted the claim regarding the rear shed and offered a cash settlement.
The insurer denied the claim regarding the house building.
The complainant disputed the insurer’s denial of the claim regarding the main building and sought compensation for non-financial loss.
Issues and key findings
Has the insurer correctly assessed the claim?
The insurer’s cash settlement regarding the rear shed should have included an uplift. The insurer has correctly denied the claim regarding the house building.
Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is not warranted.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for the insurer to pay the complainant an uplift on the rear shed claim and an amount of non-financial loss compensation.
Determination
The determination is in favour of the insurer.
Within 14 days of receiving notice of the complainant’s acceptance of the determination, the insurer shall pay to the complainant:
$17,949.53 as a cash settlement for the rear shed repairs (being the amount of the SOW dated 7 November 2023 in the amount of $14,359.62 plus a 25% uplift ($3,589.91)). If the insurer has already paid $14,359.62, it should pay a 25% uplift on that amount - $3,589.91
$500 for non-financial loss compensation
Reasons for determination
Has the insurer correctly assessed the claim?
The insurer’s cash settlement regarding the rear shed should have included an uplift. The insurer has correctly denied the claim regarding the house building.
Coverage of the policy
The complainant’s home and contents insurance policy provided cover for loss or damage caused by insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Policy Schedule (together referred to as the policy).
I am satisfied that the PDS and Policy Schedule have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant
Complainant has initial onus to establish a valid claim
The initial onus is with the complainant to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim.
Once the complainant has established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy.
Proximate cause
When establishing the cause of the damage to the complainant’s property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause.
Policy covered loss or damage to building and contents caused by storm subject to exclusions
The policy covered the complainant’s buildings and contents ‘if they are accidentally destroyed, accidentally lost or accidentally damaged’ (page 17).
The policy provided that ‘some instances of destruction, loss and damage are only covered under specific conditions set out in the policy’, including:
Landslide or subsidence
The cover for landslide or subsidence only applies if the loss or damage occurs within 168 hours of, and as a direct result of, one of the following:
- storm, flood ..
This does not prevent a claim being made for destruction, loss or damage caused by landslide or subsidence sustained after the first 168 hours, if the Policy covers that as a separate event.
The policy stated (page 18):
What we will not pay for
We will not pay for Your Buildings and Contents which are destroyed, lost or damaged by:
Landslide or subsidence, except as described above.
Settling, shrinkage or any movement of earth.
Accordingly, the complainant’s cover for landslide or subsidence only applied if the loss or damage occurred within 168 hours of, and as a direct result of, storm or flood. Further, the insurer was not obliged to pay for settling, shrinkage or any movement of earth.
Insurer accepted the claim to the rear shed but should have included an uplift
The insurer accepted the claim to the rear shed and offered a cash settlement of $14,359.62 on 7 November 2023 based on a Statement of Works prepared by A, builder. The insurer offered a cash settlement because the insurer could not warrant its repairs due to building defects and outstanding owner maintenance.
There is no dispute about the amount of the Statement of Works for the damage to the rear shed. However, when an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. Further, if additional works are identified, the insurer will include those. Therefore, when the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. The location of the complainant’s home was in regional New South Wales.
AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for this transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs.
Based on the available information, a reasonable allowance for the transfer of risk is 25% to allow also for the regional location of the complainant’s home and the fact that the insurer’s SOW was dated 7 November 2023.
Accordingly, based on the information it is fair that the insurer should pay $14,359.62 plus a 25% uplift, namely $17,949.53 for the rear shed. As it is not clear from the information provided if the insurer has already paid the SOW amount as a cash settlement, if the insurer has already paid the $14,359.62 then it should pay the uplift of $3,589.91.
Complainant made a claim for flood damage to the house building
The complainant said that the flood water rose to just under the floor level of the house building. In his claim on 31 October 2022 the complainant said:
Please describe how it happened – Flood damage – 15” of water through back shed, unknown damage. Flood has also eroded around the pier of the house. Water heater has been immersed.
The complainant acknowledged that there had been ‘historical movement associated with normal seasonal movements due to moisture variations’ and did not claim for this damage. The complainant sought repairs to damage, which he said was caused by the flood, for:
the rotation of some stumps
some disturbance of the packing, blocks
separation of the sunroom (or summer room) from the main dwelling
The complainant said that this damage to the home building was not present prior to the October 2022 flood event.
Insurer engaged an expert engineer and denied the claim for damage to the house building
The insurer engaged E, an engineer, to assess the complainant’s property on 7 November 2022. E prepared a report dated 20 November 2022 (20 pages with supporting photographs) based on a site visit by one of E’s engineers. The report was also reviewed and signed by its registered professional engineer. E conducted a hydraulic floor survey.
In E’s Report, E concluded:
the inspection and level survey results completed around the dwelling’s internals and externals identified evidence of old cracking damage and past repairs, along with locations of isolated stump replacement, indicating historic foundation movements to the property
the building had been experiencing seasonal foundation movements over its lifespan
the foundation movement generated stresses in the cladding elements that were relieved through cracks
the extent of foundation movement and cracking damage was aged and could not be attributed to a recent or isolated event
E recommended:
homeowner maintenance, including replacing damaged stumps and repairing cladding elements
flexible articulation joints be installed above window and door openings to reduce the extent of ongoing cracking damage as the dwelling continues to react to seasonal moisture variations of the founding soils
In E’s Report, E summarised its conclusions:
An inspection of the property identified evidence of old cracking damages, past repairs and stump replacement, indicating past foundation issues to the dwelling. No significant recent damage was observed. A level survey was completed, which identified floor level differentials across the dwelling’s internals. The extent of level differentials and cracking damage has been classified as slight in accordance with AS2870 performance classifications. The evidence indicated the dwelling has been experiencing seasonal foundation movements over its lifespan, which has resulted in cracking damage to much of the internal linings. The evidence of past repairs indicates the extent of damage was present prior to the flooding event. The extent of movement and damage cannot be attributed to an isolated event
Insurer reviewed the damage to the house building on 24 July 2023
At the complainant’s request, on 24 July 2023 the insurer’s builder, A, attended the property and prepared a ‘Builder’s Assessment Report’ (3 pages in length). A concluded:
during flood peak the water levels reach below the floor bearers
further inspection under the dwelling identified evidence of past repairs and re-stumping
the evidence indicated that the dwelling has been experiencing seasonal foundation movements over its lifespan
that E’s report concluded that the extent of movement and damage cannot be attributed to an isolated event
Based on the information, the conclusions reached by A did not add to the more detailed conclusions and analysis contained in E’s report.
Insurer denied the claim on 25 August 2023 and confirmed its denial
On 25 August 2023 the insurer declined the claim to the house building based on the conclusions in E’s report. The insurer said that the claim was excluded.
On 1 November 2023 the insurer confirmed its denial of the claim to the house building and said that:
the condition of the accidental damage cover was not fulfilled because it said:
> E’s report ‘clearly and unambiguously identified that the damages observed were NOT directly caused by the flood event, but rather due to seasonal foundation movements over its lifespan. The evidence of past repairs indicates the extent of damage was present prior to the flooding event, and the extent of movement and damage cannot be attributed to an isolated event’
the policy exclusion on page 18 applied because it said:
> the policy wording is very clear in that any damage to your building as a result of settling, shrinkage or any earth movement is expressly excluded from cover.
Complainants provided a building report from I dated 12 January 2024
The complainant provided a report by a building consultant, I, dated 12 January 2024 (17 pages, including supporting photographs). I concluded in relation to damage at the following locations:
Subfloor - Finding: Damaged piers
> Some of the brick piers appear to have been damaged, cracked and/or have shifted from their original position. This damage is consistent with damage caused by flooding.
> Recommend consulting a qualified engineer, builder or house leveller for an inspection, a scope of works and cost of repairs
Exterior - Finding: Exterior cladding gap
> There is a gap in the exterior cladding. It could not be determined if the gap was directly caused by the flooding but flooding can cause movement to foundations which can lead to gaps and separation of exterior walls.
> Recommend consulting a qualified engineer, builder or house leveller for an inspection, a scope of works and cost of repairs
All Internal Areas - Finding: Wall cracks
> Some cracks were observed in the wall sheets throughout the house. It could not be determined if the cracks were directly caused by the flooding but flooding can cause movement to foundations which can lead to cracks appearing in wall sheets. Monitor.
> Recommend consulting a qualified plasterer and/or painter for a scope of works and cost of repairs if concerned or condition worsens
All Internal Areas - Finding: Doors rubbing/out of level
> Some of the doors are out of level or are rubbing on the frames. It could not be determined if the movement was directly caused by the flooding but flooding can cause movement to foundations.
> Recommend consulting a qualified builder for a scope of works and cost of repairs.
Subfloor - Finding: Springy floors
> The floor from the hallway into the front entry room moves when walked on. This could be caused by movement to the foundations, missing pier packing and/or separation of the subfloor structure. It could not be determined if the movement was directly caused by the flooding but flooding can cause movement to foundations.
> Recommend consulting a qualified engineer, builder or house leveller for an inspection, a scope of works and cost of repairs
I concluded:
Additional comments. The inspection conducted was primarily to assess any potential damage caused by flood water flowing under the building.
Conclusion. Building consultant's summary [the complainant’s home] is a three bedroom, one bathroom, timber weatherboard house. Sub-floor ventilation appears to be adequate. Overall the house appears to be structurally sound and is reasonably presented. There are signs that flood water has previously flowed under the house.
Based on I’s Report, the conclusions reached by I were tentative. In relation to the claimed damage to the home building:
the conclusion was that some of the brick piers ‘appeared’ to have been damaged, cracked and/or have shifted from their original position which was ‘consistent with damage caused by flooding’. However, this conclusion does not establish that the damage was caused by the flood in October 2022. Using the policy wording, I am not satisfied that this conclusion established that the damage was as a direct result of storm or flood. Further, the recommendation that a qualified engineer be engaged (for an inspection, a scope of works and cost of repairs) was an appropriate, but deferential, recommendation to determine the cause of the damage.
the conclusion that there was gap in the exterior cladding but that it could ‘not be determined if the gap was directly caused by the flooding but flooding can cause movement to foundations which can lead to gaps and separation of exterior walls’ was inconclusive – i.e. it could not be determined. Again, I’s recommendation was that a qualified engineer be engaged. Again, this was an appropriate, but deferential, recommendation that a qualified engineer be engaged to determine the cause of the damage.
Based on I’s Report, the complainant has not established that the claimed damage to the house building was caused by the flood in October 2022.
Supplementary Report from E dated 29 July 2024
The insurer requested that E prepare a supplementary report. E’s Supplementary Report prepared by E’s Director and engineer dated 29 July 2024 (14 pages together with supporting photographs) stated that it was important to assess and consider the condition of the home building to understand the earlier conclusion in E’s Report that the ‘foundation movement and internal cracking are both old damage and not attributable to the event’. By reference to the photographs (not reproduced in this Determination) E stated:
the internal walls presented many locations of cracking. The cracks extend from wall openings in a diagonal direction. This type of cracking is consistent with damage that occurs due to structural movement from foundation level. As the support is reduced in one area, the wall cracks diagonally from a weak location or opening in the wall. The inspection of the cracking noted that each cracked location has been previously filled and painted over. In the time since the repairs were attempted to these locations, the walls have re-cracked. This indicates that the cracking occurred prior to recent events, and that the issue remains ongoing. Given that the dwelling has sustained widespread pre-existing cracking throughout the internal walls and given that the issue that caused the cracking remains ongoing, it is then necessary to determine the cause of the cracking and whether the dwelling contains an underlying foundation movement issue causing the continued cracking and long-term deterioration of the structure.
E also emphasised that an inspection of the home building’s subfloor and damage was conducted. E concluded in E’s Supplementary Report:
The inspection observed the rotated condition of the brick stumps. Close inspection of the cracking to the brickwork mortar joints noted that the cracks presented smoothed and stained edges consistent with cracks that occurred many years prior to recent events and have since weathered. The observations indicate that the stumps have sustained movement and rotation that has caused them to crack prior to recent events. The inspection of the subfloor noted that there were many different types of stumps supporting the dwelling. In addition to brick stumps, the inspection observed masonry blocks, timber blocks and steel posts. The supports appeared to have been improvised and as such would not provide a long-term solution in relation to the support of the floor frame. Many blocks are resting on the ground surface rather than receiving the support of a concrete footing. Furthermore, wooden offcuts had been used to pack the gapping that had occurred between the underside of the structural timber bearer and the top of each stump. The packing was noted to be widespread throughout the subfloor. The packing also appeared to be an improvised attempt at re-levelling the dwelling. These observations indicates that significant repair attempts have been previously made throughout the subfloor to both re-stump the house and re-level the floor frame.
The repair attempts have been undertaken by owners previously and are not consistent with an engineered solution. The attempted rectification of the movement-related damage to the stumps indicates that the foundation has incurred movement for which causation was not determined nor adequately rectified.
The available evidence indicates that the cracking to the interior has occurred due to foundation movement and the cause of foundation movement was not rectified. Recent re-cracking to pre-existing damages indicates that the widespread movement to the structure remains an ongoing, underlying concern unrelated to recent events.
In summary, E concluded that due to ‘many pre-existing foundation movement issues and damages, pre-existing repair attempts, ongoing damages and evidence of causation due to long-term factors, there [was] insufficient evidence to directly correlate the effects of the recent flooding event with the damages identified’. E’s Supplementary Report was consistent with E’s Report dated 20 November 2022 and provided a more detailed substantiation of the basis for the conclusions reached by the engineer.
Complainant’s pre-purchase report did not assist the complainant.
On 26 November 2024, at AFCA’s request, the complainant provided a Pre-Purchase ‘Visual Building Inspection Report’ from H dated 17 May 2021 (7 pages, no photographs). In the Pre-Purchase Report, H concluded:
Foundations /Subfloor; The foundations are a mixed bunch, some steel, some wood stumps and some are brick. All have been packed up to maintain some sort of a level floor inside. The place is not too bad at the moment but I would assume that this levelling process is ongoing. The sub floor appears to consist of 75mmx75mm bearers supported at1.800/ 2.100mm centres. The joists appear to be 125mmx50mm cypress. The bearers appear to be very light to me but they have stood the test of time. There is tongue and groove flooring on top. ..
INTERIOR CONDITION REPORT
Ceilings; There are a couple of small cracks here and there in the ceilings and some loose and cracked cornice in some rooms but overall for age the ceilings are reasonably sound. Walls; The walls have quite a few repaired cracks present mainly in the bedrooms and some not repaired cracks. .. Some doors will not close due to foundation movement. The concertina doors on the bathroom are jammed solid. One other door is dragging on the floor.
Summary; There will be on going foundation movement problems with this old house just as there is around half of the town. The structure appears to be solid enough although the underfloor and roof structure appears to be a tad light but as I have already said the proof is in the pudding. The house is still standing and will remain so for years.
The pre-inspection report from fifteen months prior to the October 2022 flood was not an engineering report and did not assist the complainant’s claim. It noted that ‘the foundations had all been packed up to maintain some sort of a level floor inside’ which would be ongoing from May 2021. This does not establish that the damage in October 2022 was as a direct result of storm or flood. By contrast, it supported E’s conclusion of ‘many pre-existing foundation movement issues and damages’.
Insurer was entitled to deny the claim regarding the house building
Based on the information provided, the insurer was entitled to deny the claim regarding the house building.
Based on I’s building Report and H’s pre-purchase inspection report, the complainant has not established that the claimed damage to the house building was caused by the flood in October 2022.
Further, the insurer’s reports by E, its engineer, (set out in detail above, principally E’s Report and supplemented by E’s Supplementary Report) are persuasive in relation to the conclusions reached. Based on the information, the insurer was entitled to deny the claim due to the exclusion in the complainant’s policy as the damage was caused by pre-existing foundation movement i.e. settling, shrinkage or any movement of earth.
Is the complainant entitled to non-financial loss compensation?
Yes. In the circumstances, an award of non-financial loss compensation is warranted.
AFCA can award compensation for non-financial loss
Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience.
AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim.
Non-financial loss compensation is payable by the insurer
The complainant sought non-financial loss compensation for poor claims handling and delays by the insurer regarding its denial of the claim for the main building on 25 August 2023. The insurer did prepare expert’s reports, including a supplementary report. The complainant did not provide his own expert’s report until 12 January 2024 and did not provide the pre-purchase report until 26 November 2024. Based on the information (including the insurer’s claim notes), the insurer’s denial of the home building claim was of frustration to the complainant. However, the insurer was entitled to deny the home building claim. The insurer’s failure to include an uplift in the accepted cash settlement for the claim for the rear shed was not appropriate. In the circumstances, it is fair that the insurer pay to the complainant $500 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. It is fair for the insurer to pay the complainant an uplift on the rear shed claim and an amount of non-financial loss compensation.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established..