Insurer overturned its acceptance of a movement damage claim and denied it relying on exclusions; complainants also sought reimbursement of stormwater repair costs
Text of the determination
Determination
|
Case number
|
12-24-116162
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-24-116162 5 June 2025
Determination overview
Complaint
The complainants hold home building and contents insurance issued by the financial firm (insurer). In May 2022, they lodged a claim for movement damage which they attributed to significant rainfall over the preceding months.
The insurer initially accepted the claim on the basis the damage was due to escape of liquid (EOL) from the complainants’ stormwater system. It said before completing claim related repairs, the complainants would need to rectify the issues with the stormwater system, followed by a 12-month drying period.
The complainants completed the required repairs in March 2023. Following reinspection of the property in 2024, the insurer overturned its initial decision and denied the claim. It says the reinspection showed the damage was not due to a risk covered by the policy but was from excluded causes, including long term earth movement and structural defects.
The complainants maintain that the insurer should accept the claim. At the very least, they want the insurer to reimburse the cost of repairing the stormwater system because it directed them to attend to that work.
Issues and key findings
Is the insurer entitled to deny the claim?
No. The complainants have established a claimable loss under the policy terms and the insurer has not shown the exclusions it relies on apply.
Must the insurer reimburse the stormwater repair costs?
No. The policy excludes cover for the cost of repair or replacement of:
a defective part that causes EOL damage
any broken pipe.
Why is the outcome fair?
The outcome fairly reflects the parties’ rights and obligations under the policy as they apply to the circumstances demonstrated as most likely by the exchanged information.
Determination
This determination is substantially in favour of the complainants.
If the complainants accept this determination, the insurer is required to accept the claim subject to the policy terms and conditions, and to take the steps outlined in section 2.1 of this determination.
The insurer is not required to reimburse the stormwater repair costs.
Reasons for determination
Is the insurer entitled to deny the claim?
No. The complainants have established a claimable loss under the policy terms and the insurer has not shown the exclusions it relies on apply.
Complainants must establish a claimable loss under the policy
The complainants are required to show, on the balance of probabilities (that it is more likely than not), that they suffered a claimable loss under the policy. This means they must show the loss was caused by a risk for which it is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainants for loss or damage to their home or contents caused by a listed insured event. Those events include ‘Storm, cyclone, rainwater or run-off’ (Storm insured event), and ‘Water or other liquid damage’ (EOL insured event).
On 26 May 2022, the complainants lodged a claim for movement damage in the kitchen and loungeroom of their home. They said that had noticed the damage after a period of significant rainfall since January 2022. It appears they had noticed minor cracking in October 2021, which they had repaired, but which had reopened and worsened.
Once the complainants establish the existence of a claimable loss, the insurer is liable unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Insurer accepted then denied claim
The insurer engaged engineer CR to prepare a causation report. CR inspected the home on 6 July 2022. It also arranged for plumber OB to undertake a CCTV inspection of the stormwater and sewer, and to pressure test the water lines.
OB attended the home on 21 July 2022, and reported that:
there were two sections of stormwater pipe installed at ground level to drain water away from the home, which could indicate a pre-existing issue with run-off drainage
the sewer and grey water systems were intact with no breaks or blockages
the stormwater system could not be camera inspected due to access issues
there was no existing provision for expansion/contraction of the sections of stormwater pipe installed at or above ground level, via rubber ring joints or expansion sockets
pressure testing of the water lines at operating pressure did not identify any concerns
further investigation would require invasive work to be undertaken.
On 29 August 2022, CR reported to the insurer that:
Bureau of Meteorology (BOM) data obtained from a weather station 5km from the complainants’ home showed 127mm of rainfall for October 2021. While above average, that was not unexpected for the area.
231.2mm was recorded from 25 to 27 February 2022, with 99.4 on the first day. While relatively high, it was also not unexpected for the area, as 127mm fell on 11 January 2011
while formal soil testing was not undertaken, its research indicated the site was likely founded on highly reactive clay soils, Class H1 to H2
it considered that the damage to the home was the result of differential footing movement
the differential footing movement was caused by normal seasonal variations in the moisture content of highly reactive founding soils, exacerbated by abnormal moisture conditions from:
> a leak or leaks in the charged stormwater system
> inadequate drainage to direct surface rainwater away from the home
the presence of a construction joint in the floor slab further increased the likelihood of differential footing movement due to the lack of continuity
although the location of the stormwater leak(s) had not been identified, it was considered to be the primary cause of the footing movement
it recommended the complainants repair the leaks, after which a 12-month drying period be allowed, after which a reassessment be undertaken of the damage and formulation of a remedial scope of works (SOW).
On 26 September 2022, the insurer accepted the claim under the EOL insured event, subject to CR’s recommendations. It also noted that no cover was available for repair of the defective plumbing or for the work required to direct moisture away from the footings.
The complainants completed the necessary repairs in early March 2023.
CR provided a report dated 9 August 2023 after receiving a soil testing report by DD for the property dated 2 November 2004, as well as structural engineering and architectural drawings dated February 2005. Each document was prepared before the home was built. CR said:
DD classified the soil as H, which is the equivalent of H2 under the current standards, being highly reactive
the site was filled at the front right corner and cut towards the rear left
based on the structural engineering drawings, the home had a modified strip footing system tied to a floor slab, effectively a stiffened raft system
the footing system appeared to be designed in compliance with the then current standards assuming adequate compaction of fill material, and included additional strengthening and stiffening measures
it had spoken to HC, the plumber who replaced the stormwater pipework in February 2023. HC said the pipework had already been excavated and had been damaged as a result so the leak location could not be established. However, there had been no flexible joints
based on its floor level survey, it suspected the primary leak had been outside the dining room between the garage and alfresco area at the rear of the home
its view on causation remained unchanged.
On 12 March 2024, plumber DK undertook CCTV inspection of the stormwater and sewer drainage. Split and broken stormwater pipework was identified at the front left of the home, close to the septic tank. It was not in the vicinity of the subsidence and movement damage. The sewer pipework had no defects or blockages.
Engineer PE undertook a geotechnical investigation in April 2024 and reported that:
given the depth of high plasticity clay encountered, the soil classification should strictly be E – extremely reactive, although it conceded that a site class of H2 could be derived
it was likely that soil cut from the property’s rear had been used as fill for the front, so there would be increased depth of high plasticity clay fill towards the front half of the home
the most suitable foundation system would likely comprise high level pad and strip footings supported on natural soils or controlled fill. The founding strata should be the same across the whole foundation eg all footings in controlled fill or all footings in natural soils
‘It is likely that the ensuing years of the Millenium drought and reduced rainfall of that period meant that no issues were encountered with the original assessment and design for the early period of the life of the building’
the damaged stormwater pipe discovered in July 2022 combined with heavy rainfall at times would have created abnormal moisture conditions
the soil swelling under the home as inferred from the floor level survey seems to have been worse on the side where deeper soils were found
further, the crack across the slab’s middle lines up with both the deeper soil and the side of the home where the broken plumbing was deduced to be
‘That supports the hypothesis that the leaking stormwater pipe was a significant factor in the damage experienced in the house slab’.
In a further report dated 4 June 2024, CR said despite replacement of the stormwater drainage system in early 2023, the slab continued to retain a domed profile, and the cracking remained unchanged. It concluded that the footing system installed was inadequate.
In a clarification letter dated 12 June 2024, CR said:
if the leaking pipework was the primary cause of damage, its replacement would have resulted in a reduction of soil moisture content and therefore soil volume, leading to reduced slab deformation
the insignificant changes between its floor level surveys undertaken in July 2022 and February 2024 indicates an alternative mechanism was generating the deformation
‘under-design of the slab for Class E conditions, is the proximate cause of the slab displacement and that water escape from the stormwater pipework is a result of this movement not the cause’
neither the water leak nor the poor surface water drainage contributed to the movement
the footing system movement had occurred over the long term but given its incremental nature, damage would not have been immediately apparent
‘a building foundation designed and constructed to AS2870 (1996) and the appropriate site
classification should be able to tolerate a normal range of site conditions without incurring damage beyond [fine cracks which do not need repair]’.
In a letter dated 17 July 2024, the insurer informed the complainants that their claim was no longer accepted.
The insurer says the claimed damage was not from an insured event but was instead caused by inherent design and construction defects and historical soil movement. It says the damage is therefore excluded because the PDS:
confirms on page 17 that the Storm insured event only covers loss or damage arising from soil movement if it is caused directly by and occurs within 72 hours of a storm
states on pages 53 and 54 that there is no cover for loss or damage as a result of, caused by or arising from:
> wear and tear, gradual deterioration, or lack of maintenance
> inherent defects including faulty design, structural defects or poor workmanship
> soil movement unless it is caused directly by and occurs within 72 hours of a storm.
The insurer also submits that the complainants contributed to the damage. It says they were aware of the damage occurring and worsening between October 2021 and 26 May 2022, but did not take reasonable steps to prevent it.
Complainants say claim should be accepted
The complainants disagree with the insurer’s overturn of its claim acceptance. They say:
DD confirmed the soil was Class H. The reason it changed was oversaturation by the leaking stormwater as supported by PE
provided images taken in 2019, 2020, and mid 2021 show no movement damage
the appearance of the damage aligns with periods of above average rainfall
PE’s soil testing results are invalid because the test sites were in the area that had been excavated the year before to replace the defective stormwater system.
The complainants refer to the BOM data CR included in its first report. They say that the 231.2mm that fell between 25 and 27 February 2022 was significant and submit that volume of rainfall when combined with the leaking stormwater pipe caused the damage.
The complainants have provided a scope of works (SOW) dated 13 September 2024 from RI foundation construction expert. The SOW includes the following comments:
the home was constructed on a concrete strip footing with a semi-engaged slab showing signs of subsidence in multiple locations
the subsidence could be due to:
> inadequate subsurface drainage, stormwater run-off, or leaking pipes
> under-compacted fill beneath the foundation and/or reactive soils
> long-term settlement and/or adjacent tree roots
the ‘principal aim would be to consolidate the ground, improving the load bearing capacity, and minimising the risk of future movement’.
The complainants submit that:
As there was no conversation regarding exclusions, apart from replacing the storm water pipe; [insurer] have not been upfront and honest with us during this process. In the process they accepted our claim stating that it was a leaking storm water system. We have been upfront and honest the entire time with [the insurer] but we believe they have gone against the Duty of Utmost Good Faith.
Insurer is not entitled to deny the claim
It is not in dispute that the stormwater system was leaking or that a large volume of rainfall fell over three days in February 2022. The insurer originally accepted the claim on the basis that EOL from the stormwater system caused the movement damage.
The insurer changed its position in light of the commentary CR provided in June 2024, which was based on PE’s soil classification findings, and a comparison of its 2022 and 2024 floor level surveys. Specifically, CR said:
DD had incorrectly classified the foundation soils as Class H instead of E, meaning the footings system design was insufficient, and
if the leak in the stormwater system was the primary cause of damage, its rectification in early 2023 should have by early 2024 resulted in a decrease in the slab’s upward deformation but that had not occurred.
However, PE:
conceded it was possible to derive a H2 soil classification
acknowledged it was likely that no issues were encountered with the original assessment and design for some years due to drought/reduced rainfall
said the damaged stormwater pipe combined with high levels of rainfall would have created abnormal moisture conditions
noted the floor level survey results and damage pattern supported ‘the hypothesis the leaking stormwater pipe was a significant factor in the damage experienced in the…slab’
only took samples from two boreholes, whereas DD took samples from at least five
PE’s testing and conclusions were based on AS 2870-2011 which is not relevant as the home was built in 2005, whereas DD’s testing and conclusions was based on AS 2870-1996, which was applicable when the home was built, and informed its construction plans.
In relation to the lack of material change in the CR floor level survey results between 2022 and 2024 despite the stormwater system rectification in 2023:
the 2022 floor level survey CR submitted with its 29 August 2022 report is considerably more detailed than the 2024 floor level survey CR submitted with its 4 June 2024 report
the 2024 survey does record reduced floor levels when compared with the 2022 survey.
I also note that:
CR concluded that foundations ‘designed and constructed to AS2870 (1996) and the appropriate site classification should be able to tolerate a normal range of site conditions without incurring damage beyond [fine cracks which do not need repair]’
the rainfall from 25 to 27 February 2022 was significant and would have created abnormal site conditions
I do not accept that the fact that 127mm fell on a single day 11 years earlier establishes that level of rainfall was not unexpected for the area
the exchanged information suggests the damage’s appearance aligns with the periods of unusual rainfall (above average in October 2021, then very heavy over a three-day period in February 2022)
while it seems the stormwater pipework lacked provision for expansion/contraction, there is no information confirming that was the cause of the leak
the complainants did take steps to prevent the damage including by undertaking repairs at some stage after the cracks appeared in October 2021, monitoring the situation, then reporting the matter to the insurer when the damage reappeared in late February 2022 and continued to worsen.
I am therefore satisfied the complainants have shown a claimable loss under the policy terms. The insurer has not established the exclusions its seeks to rely on apply. The insurer is therefore required to accept the claim subject to the terms and conditions of the policy.
The insurer may attend to repairs or pay the complainants a cash settlement. If the insurer chooses to cash settle, its payment must be based on an actionable quote reflecting current retail prices and must include a 15% uplift to allow for contingencies and loss of the lifetime guarantee that applies to repairs undertaken by an insurer.
The actionability of the quote may be subject to any maintenance-related changes the repairer deems necessary to be undertaken prior to the claim related repairs.
If complainants have attended to any claim related repairs, subject to provision of proof of payment, the insurer is to reimburse them and pay interest under section 57 of the Insurance Contracts Act, 1984 on each amount from the date it was paid until the reimbursement is provided. Only the principal amount may be deducted from a cash settlement.
Must the insurer reimburse the stormwater repair costs?
No. The policy excludes cover for the cost of repair or replacement of:
a defective part that causes EOL damage
any broken pipe.
Insurer is not required to reimburse the stormwater repair costs
The complainants want the insurer to reimburse them approximately $12,000 they incurred in replacing the stormwater system.
However, the PDS confirms on page 18 that the EOL insured event does not cover the cost of repair or replacement of:
a defective part that causes EOL damage
any broken pipe.
Accordingly, the insurer is not required to reimburse the stormwater repair costs.
Why is the outcome fair?
The outcome fairly reflects the parties’ rights and obligations under the policy as they apply to the circumstances demonstrated as most likely by the exchanged information.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.