Home / IAG / Determination 12-24-115856

Determination 12-24-115856

Insurer's liability for roof rectification after earlier hail damage repairs

FirmIAG
Decided2025-10-17
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata corporation claimed the insurer's 2009 hail-damage roof repairs were defective and caused continuing water ingress, and sought rectification and compensation. AFCA found the complainant had not shown the repairs were defective and decided in favour of the insurer.

The complainant bore the onus of proof and none of the expert reports showed the insurer's works were defective or that the insurer owed or breached a duty to identify gutter and drainage issues.

Issues

Subjects and remedies

home or building damageno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-115856 | Financial firm | Insurance Australia Limited Case number: 12-24-115856 17 October 2025 1 Determination overview 1.1 Complaint This complaint relates to the complainant seeking rectification and other compensation under a commercial strata insurance policy underwritten by the financial firm (insurer). The complainant, being the strata corporation, says following the insurer’s roof repairs to the property for a hail damage claim in 2007, the roof has been subject to continued water ingress when it rains. The complainant is seeking rectification to the roof and other compensation. The insurer says the current damage does not arise from the roof works it completed for the previous claim in 2007. 1.2 Issues and key findings Is the insurer liable for any rectification to the roof? The exchanged information does not show the insurer’s roof repairs were defective or that it breached any obligations owed to the complainant. As such, it is not fair for the complainant to obtain the outcomes sought given it has not substantiated its allegations. 1.3 Determination This determination is in favour of the insurer. The insurer is not responsible for any roof rectification or liable for any of the remedies the complainant is seeking. The insurer is not required to take any further action. 2 Reasons for determination 2.1 Is the insurer liable for any rectification to the roof? Complainant has onus to establish a valid claim The complainant has made various allegations. This includes the following: · the insurer failed to complete the previous repairs completely · in doing the previous repairs, the insurer should have brought to the complainant’s attention various maintenance or compliance issues – this is mainly to do with the gutters and drainage As the complainant is making these allegations, it must prove them on the balance of probabilities. Previous claim for repairs The building is a multistorey structure. In 2007, the building sustained damage from significant hail. The insurer authorised roof sheeting replacement works. These were completed around 2009 by the insurer’s panel builder O. Building consultant DO was also involved. The original reinstatement works necessitated DO attending the building multiple times. During this, DO identified various issues with the works and directed O to rectify this. Most, if not all, of this was done. Complainant seeks cover for rectification The complainant says water continued to enter the property after this work was done. The complainant says the roof works were non-compliant and required correction. The complainant has provided reports in support. One was provided by EP dated 12 April 2022. As this has been exchanged, I do not propose to summarise it in detail. EP provided a fairly detailed report that identified various issues with the roof. This included poorly installed flashings, poor roof design, apron flashings not installed to best practice, various compliance issues with the box gutters, rusted roof fixings and foot traffic on roof. EP concluded the internal damage has occurred due to numerous maintenance issues regarding the roof covering following the weather event in March 2022. This has allowed water to ingress to the internals of the property. The complainant also provided a report from MR dated 22 November 2022, which says: The existing box gutter sumps, outlets or overflows are either not sized to standard or were non-existent. Therefore, the box gutters would still leak internally as they are non-compliant. … In my opinion the existing box gutters, sumps, outlets and overflows should have been hydraulicly designed and installed when the roofs were replaced back in 2007. It says that in not doing this, the insurer left the building in a non-compliant state for the complainant, without their knowledge. The complainant has provided a roof drainage installation review from G dated 17 February 2023. The report considered the relevant standard at the time of the roof works, being AS3500.3 2003. In doing so, it found that several items were non-compliant, being: · undersized gutters and downpipes · box gutters without sumps · box gutters without overflows · box gutters spreading onto lower areas which have inadequate size · box gutters with inadequate overflows. G provided a further report dated 7 April 2025. In this report, G says ‘little evidence to refute the findings contained in this report by [Q] that the recent water ingress was generally from poor maintenance’. G says the roofing contractor should have alerted the complainant that much of the roof drainage system was non-compliant. The complainant says it has since been advised that the works must be removed and rectified. The complainant considers the insurer was negligent in authorising the roof works. The complainant says that prior to the roof works, the insurer’s loss adjuster and experts should have determined whether the roof structure was compliant and advised the complainant accordingly. The complainant says that while it is aware that the rectification of the defective structure is its responsibility, the requirement for the removal and replacement of the roof sheeting again would not be required had the insurer identified the defects in 2009. Insurer says new damage is unrelated to previous claim in 2007 The insurer also engaged several experts regarding this. I do not propose to summarise all of them in detail given they have been exchanged. Instead, I will refer to various relevant aspects. One was a ‘roof drainage report’ by N prepared on 15 February 2024. N identified various issues with the box gutters. This was relatively consistent with G’s findings. N did say the roof gutters and drainage form part of one Australian Standards whereas the roof sheets were installed under another Australian Standard. These were regarded as separate components and replacement of one does not require replacement of another. N did not identify any defects in the insurer’s previous works. Q, building consultants, also inspected the complainant’s building around this time. Q says it inspected the roof area, together with N. Q did not observe any hail dents in the gutters. Evidence does not show previous repairs were defective I have carefully considered the above, as well as all the exchanged information, and note the following. It is clear the recent water ingress did not occur whilst the insurer was on risk. Therefore, the insurer could only potentially be liable for this if the complainant can show it was due to its defective works or related to the 2007 accepted claim. Q’s inspection shows no hail denting to the box gutters. This does not support the complainant’s position the gutters/drainage system to the roof needed to be replaced as part of the original repairs. There is no information to refute the insurer’s expert which said the roof and gutter/drainage system are separate components and replacement of one does not necessitate the replacement of the other. For instance, DO’s report makes no mention that both should have been replaced. Neither does G. I note G says gutter/drainage issues should have been identified and brought to the complainant’s attention. I also acknowledge this is one of the complainant’s main arguments. On this though, I note the following: · there is no specific obligation or reference to say that when an insurer assesses a claim or completes claim related repairs, it is obliged to identify all possible maintenance or other issues related to the insured property – whilst the complainant refers to a duty of care, he has not pointed to any specific duty or legal principle that supports this · there is nothing to show the insurer was aware of these issues at the time of the claim related repairs In addition, it is unclear why this was never brought to the complainant’s attention by its own contractors who it engaged to maintain the roof either before or after. This appears inconsistent to the complainant’s position that these issues should have been identified by commercial roof contractors Whilst G said the insurer’s contractor should have alerted the complainant of these issues. G pointed to no standard or industry practice. Given all this, I am not persuaded by this argument. None of the expert reports exchanged specifically say the actual works done by the insurer were defective. EP’s report does identify various issues with some flashings and sealing but then in their conclusion, refers to everything as maintenance issues. This may be due to EP’s report being done around 13 years after the claim related repairs and the difficulty in distinguishing the works done by the insurer or by any contractors engaged by the complainant in the intervening period. There are also clearly wear and tear issues identified, such as rust present in flashings, deteriorated silicone and so forth, that were plainly not related to the insurer’s works. It is also not clear whether EP reviewed the scope of works done by the insurer’s contractor to determine what aspects, if any, were defective. I acknowledge the complainant has relied on EP’s report to allege the insurer’s works were defective. However, EP’s report does not say this and I am not prepared to make that finding in the absence of this conclusion and noting the points above. Insurer not liable for rectification or outcomes sought In light of all the above, I note the following: · I am not satisfied the exchanged information shows the insurer’s works were defective or that the insurer should have done any works to the gutter/drainage, and · there is no basis to conclude the insurer should have identified the issues with the gutter/drainage and brought this to the complainant’s attention – particularly when there is nothing to indicate the insurer, or its contractors, were aware of this or should have been aware of it. Given this, I am not persuaded the complainant has established its position or is entitled to the outcomes being sought. 2.2 Why is the outcome fair? The exchanged information does not show the insurer’s roof repairs were defective or that it breached any obligations owed to the complainant. As such, it is not fair for the complainant to obtain the outcomes sought given it has not substantiated its allegations. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.