Home / Suncorp Group / Determination 12-24-115346
Determination 12-24-115346
Cash settlement amount for storm water damage repairs and compensation for claim handling
Summary
The complainant disputed the insurer's cash settlement of $2,529.78 for storm water damage to her home. AFCA required settlement based on her builder's quote (project management capped) and $3,000 non-financial loss compensation.
The insurer's builder's quote was outdated, incomplete and did not adequately cover covered repairs, and trust had broken down, so settlement on the complainant's builder's quote was fair, with compensation for overall claim handling.
Issues
- Claim amount dispute primary · upheld
“It is fair the insurer increases the cash settlement based on L's quote (except project management cost limited to $1,500)”
- Poor claim handling secondary · upheld
“The insurer's overall claims handling caused significant stress, inconvenience and frustration to the complainant.”
- Inadequate claim investigation secondary · upheld
“insurer has unreasonably removed items from the scope of works; AB's quote not complete”
- Poor communication secondary · upheld
“sharing redacted repair quotes from AB and its overall communication caused significant stress and inconvenience”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
|
Case number
|
12-24-115346
|
Financial firm
|
AAI Limited
Case number: 12-24-115346 18 December 2025
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under her home insurance policy. Heavy rains in May 2023 entered the property via the roof causing damage.
The insurer initially denied the claim. It subsequently accepted liability for the resultant internal damage to the property (resolved by a previous AFCA complaint). This complaint relates to the extent of the insurer’s liability under the claim including the settlement amount. The insurer offered to settle the claim based on its builder AB’s repair quote.
The complainant seeks the insurer to settle the claim based on her builder’s (L) quote amounting to over $20,000 and pay compensation for its claim handling.
1.2 Issues and key findings
Is the insurer’s settlement fair?
No. The property sustained water damage from the heavy rains. The exchanged information shows the walls and ceiling required removal because they sustained extensive water damage.
It is fair the insurer increases the cash settlement based on L’s quote (except project management cost limited to $1,500) because:
· AB’s quote is over two years old
· AB’s quote is not complete
· the insurer’s cash settlement did not adequately cover the repairs covered by the policy
· the complainant has lost confidence in AB and the insurer over the period because of the insurer’s claim handling resulting in the breakdown in relationship between the parties.
Is the insurer required to increase the compensation offer?
Yes. The insurer’s overall claims handling caused significant stress, inconvenience and frustration to the complainant.
Why is the outcome fair?
The parties are bound by the policy terms and conditions. It is fair the insurer’s cash settlement adequately covers the damage that falls within the scope of the policy. It should pay compensation for its overall claim handling.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to pay $16,218.58 towards repairs (less any advance payments made towards repairs, if any) and pay $3,000 non-financial loss compensation.
2 Reasons for determination
2.1 Is the insurer’s settlement fair?
No. The property sustained water damage from the heavy rains. The exchanged information shows the walls and ceiling required removal because they sustained extensive water damage.
It is fair the insurer increases the cash settlement based on L’s quote (except project management cost limited to $1,500) because:
· AB’s quote is over two years old
· AB’s quote is not complete
· the insurer’s cash settlement did not adequately cover the repairs covered by the policy
· the complainant has lost confidence in AB and the insurer over the period because of the insurer’s claim handling resulting in the breakdown in relationship between the parties.
Complainant must establish a claimable loss
When making a claim, the complainant has the initial onus of establishing she suffered a loss for which the insurance policy provides cover. The complainant must establish this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim.
Policy cover is subject to terms and conditions
The policy insured the property on a complete replacement basis. The most the insurer will pay for loss or damage to the building for any one incident is the assessed quote to either repair or rebuild the building on a ‘new for old’ basis, unless it says otherwise in the policy.
The policy covers loss or damage caused by a storm. It explains how the insurer will settle the claim:
How we settle building claims
We will aim to use a member of our supplier network to repair or rebuild the damage to the building. Sometimes, this is not always possible e.g. if there is pre-existing damage. This will determine how the building claim will be settled.
If your policy has Optional Complete Replacement Cover…We offer you the choice to have the building repaired or rebuilt (based on the recommendation of our builder). If you choose not to accept the offer
You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note: this amount to repair or rebuild may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network.
The policy explains ‘New for old’ as:
· rebuild or repair with new items or new materials that are reasonably or readily available at the time of replacement or repair from Australian suppliers
· rebuild or repair regardless of age, with no allowance for depreciation.
Parties provided different views on the settlement offer
The complainant says:
· there was a deliberate omission of repairs to a fully water-damaged wall and insulation
· the insurer excluded secondary damage (ceiling fan) which its own experts had acknowledged previously
· the insurer removed the replacement of a wall from the quote. AB denied requesting the insurer to make this change
· the insurer’s claims manager’s initial risk assessment of around $12,000 was much higher than its offer of $2,529
· the insurer should replace the walls where five holes were made by the insurer
· if the entire wall is water damaged, the cornice and an affected metal corner brace should be replaced. The insurer should plaster and paint the whole wall structure using mould-resistant Dulux paint to match the original finish
· she does not feel confident proceeding with the insurer’s network repairers given her claim experience during the assessment process.
The insurer says:
· it had initially denied the complainant’s claim. The claim was subsequently accepted after a review by its external customer relations team
· it obtained a scope of works and quotes from AB to repair the resultant storm damage to the property amounting to $3,930.27.
· following assessment by an engineer and various adjustments to the scope of works, it determined the fair and reasonable cost to repair the claim related damages less the applicable excess was $2,529.78 (which includes a 20% uplift for contingencies and loss of the lifetime repair guarantee offered by the policy). This was current and complete at the time
· there is no convincing evidence showing the complainant will be unable to undertake the repairs of the claim related damages for the amounts quoted
· the complainant did not want the insurer to appoint AB to complete the repairs
· the complainant’s builder’s quote has not been adequately broken down/itemised and includes allowances to repair items unrelated to and not consistent with the claimed event.
Insurer’s settlement offer
The insurer provided the details of its cash settlement offer:
AB’s initial estimated repair cost - $3,930.27
+ $355.74 positive variation for electrical fan and light in the toilet
+ $355.74 positive variation for electrical fan and light in the bathroom
+ $112.42 positive variation for patch repair after wall and ceiling replacement was removed from AB’s original quote
+ $504.96 20% contingency payment
- $2,229.35 negative variation for removing plaster and ceiling replacement
- $500 excess
= $2,529.78
Experts provided their opinion on the extent of damage to the property
The insurer’s builder PP attended the property on 31 May 2023 and observed:
· Bathroom
> very minor drip marks were sighted to the extraction fan above the toilet suite
> no other damage was sighted
· Ensuite
> 3sqm of the wall separating the toilet and shower was significantly bubbly and delaminated
> drip marks were also sighted to 1 downlight fitting as well as the window architrave above the toilet suite
> no other damage was sighted.
PP recommended the insurer to appoint an engineer for further assessment if the claim was approved. It also recommended that a section of the wall plaster be removed to assess the condition of the stud wall separating the toilet and shower.
Roof plumber CM’s report dated 7 June 2023 states:
Access was gained to the roof cavity. Inspection of the roof cavity over the reported damage revealed the insulation is wet in this area and over the ensuite wall cavity. There is mould on the insulation and the upper side of the ceiling plaster. We believe water ingress has occurred down the wall cavity too. We recommend the ceiling insulation and mould damaged plaster to be removed during repair works. We believe water has run across the ceiling plaster to the bathroom ceiling light fitting.
CM’s report dated 17 June 2023 states:
We removed mouldy insulation and covered the 3 broken tiles over the ensuite with plastic as requested.
Report from FE emergency services dated 30 June 2023 states:
· the complainant had someone inspect the damage and found a broken roof tile that was held together by silicone and was allowing water to enter and go into the ensuite – this has affected the wall paint, causing it to bubble and the wall to bow
· the walls in the ensuite had bowed and the metal rail in the wall has become exposed
· the skirting boards became swollen too and have started to crack along the edges.
Given the above, it appears FE may have not seen the mould during the inspection because it was removed by CM during its visit on 17 June 2023.
Ceiling and wall sustained water damage requiring replacement
I prefer PP and FE’s findings over AB’s findings. This is because AB only inspected the property in November 2023. PP and FE attended the property within a reasonable period after the claimed event caused damage to the property.
The insurer’s engineer HC on 6 November 2023 confirmed there was no structural damage to the residence from the reported water entry event. HC also said there was only minimal damage to the plasterboard. It is unclear if HC was aware of PP’s and FE’s earlier findings and the remediation actions they had undertaken before HC’s visit. HC did not specifically mention the repair method suitable for the damaged walls. HC says the complainant did not allow entry to the roof space during its visit.
The complainant’s various video footages and photos of the damage plus PP’s and FE’s observations show the water damaged ceiling, insulation and wall require replacement.
While the assessor indicates that AB recommended the plaster walls and ceilings to be repaired as they only sustained minor damage, AB’s initial quote recommended the insurer to replace the plasterboard walls and ceiling.
The invasive investigations for internal water ingress within the wall cavity and mould caused further damage to the walls. While no further issues within the wall cavity were found, these were damaged because of the claimed event and the insurer’s subsequent investigations.
Given the above, I am satisfied the insurer should replace the damaged plaster wall(s) and ceiling and not target repair and plaster patch them as per AB’s subsequent variation.
Insurer’s cash settlement should be fair
The complainant initially submitted two quotes from her builders which did not include line by line costing for comparison purposes:
· builder R’s quote was 16,637.50 (inclusive of GST)
· builder P’s quote was $17,336 (inclusive of GST).
The complainant’s builder L provided a detailed quote mostly based on AB’s scope of works. For this reason, I have selected L’s quote and AB’s quote in assessing if the insurer’s cash settlement offer is fair.
The policy allows the insurer to appoint one of its panel repairers to repair the damaged property. If the complainant does not prefer its repairer, the policy allows the insurer to cash settle the claim based on its builder’s quote.
Given the trust between the parties has broken down during the claim and complaint process and the insurer has unreasonably removed items from the scope of works, I am satisfied it is fair the parties have decided to cash settle the claim.
As the complainant seeks the insurer to increase the cash settlement offer for the repairs, she must be able to show the insurer’s offer is insufficient. She can do this by showing one of the following:
· the scope of works does not cover the claimed event related repairs
· AB’s repair quote is underpriced.
I acknowledge that L’s quote being higher than AB’s quote does not necessarily mean AB’s quote is incorrect or inadequate. The claim however should be settled in a fair manner. I have considered the parties’ submissions, including the insurer’s assessor’s recent comments about L’s quote, in determining if the insurer’s cash settlement is fair.
Insurer should increase the settlement offer
I have reviewed the quotes from AB and L. The assessor says the reasonable labour rate for an electrician is between $85 and $130. AB’s rate was $85/hour, and L’s rate was $180/hour.
Most of the items listed by the assessor as unnecessary from L’s quote are items from AB’s initial quote and scope of works. These were subsequently removed from AB’s quote by the assessor as he believed the damage could be target repaired.
Given I am satisfied the ceiling and wall require replacement, it is fair the insurer is liable for the following:
· removal of the damaged wall
· replacement of the damaged wall
· square set corners
· removal and replacement of cornice
· damaged metal corner bead is replaced given it was identified as damaged during FE’s attendance (not included in AB’s quote)
The complainant raised concerns about the amounts quoted for plastering, ceiling and insulation works and believes the amounts quoted were below market rates.
L quoted for the removal and replacement of the water damaged wall measured as 5.7m2. AB’s quote for removal and plastering the damaged wall was measured at 4m2. I do not accept AB’s quote fairly covers the works and costs involved in replacing the damaged wall.
In response to the complainant’s request for mould resistant paint, the insurer requires her to provide proof this was the original damaged paint. The insurer’s experts visited the property several times during the claims process. They could have assessed the type of paint, including the insulation at these times, if the type of material used was a concern.
While parties have disagreed on the type of insulation at the property, I note L had quoted the same type of insulation as AB.
The assessor agreed the reasonable cost of the filtration device would be $150/day and AB had charged $110/day.
I acknowledge the insurer says AB was willing to complete the works for the amount quoted. I am however not satisfied AB’s quote was complete, current and actionable for the reasons explained above. It is fair the complainant refused to accept the insurer’s cash settlement as it did not reasonably cover the works involved in repairing the claimed damage.
However, I accept the assessor’s comments about L’s charge for project management (over $5,700) which appears excessive and lacks details. I consider it fair the cost of project management is limited to $1,500 (inclusive of builder’s margin and GST).
Given the above and because AB’s quote is over two years old and the complainant has lost confidence over the period with the insurer’s claim handling, I am satisfied it is fair in all circumstances the insurer’s cash settlement is based on L’s quote. It should increase the cash settlement to $16,718.58 less $500 excess (cost of project management limited as explained above).
I also consider this amount to be fair given the complainant’s other builders’ (P and R) quotes are similar to the above cash settlement.
While the insurer offered a 20% uplift to the cost of repairs for transfer of risk and contingencies, given the cash settlement is based on L’s recent quote, the insurer is not obliged to add any uplift to the revised cash settlement.
2.2 Is the insurer required to increase the compensation offer?
Yes. The insurer’s overall claims handling caused significant stress, inconvenience and frustration to the complainant.
AFCA may award compensation in certain circumstances
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss where the insurer’s actions have caused an unusual amount of:
· physical inconvenience
· time taken to resolve the situation
· interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim. When considering non-financial loss compensation, AFCA looks at what is reasonable and fair in all the circumstances. In considering what is fair in all the circumstances, it is appropriate to factor the overall claims experience, rather than focusing on specific individual events.
Insurer not obliged to increase the non-financial loss compensation offer
The complainant says the insurer’s unacceptable handling of her claim caused significant distress, wasted her time, and negatively impacted her employment.
The complainant raised concerns about the insurer’s assessors’ conduct during phone calls made directly to her. These phone calls were not recorded by the insurer.
I accept the insurer could have managed the overall claim better.
The insurer acknowledges its initial claim decline and subsequent claim acceptance created a period of uncertainty which caused the complainant unnecessary confusion and frustration. It accepts the claim process has taken some time and that it could have potentially progressed it in a timelier manner.
The insurer accepted the complainant experienced service issues and offered $1,000 as compensation.
While the insurer says it proactively addressed the complainant’s concerns over the course of the claim, given my findings above, the insurer’s assistance did not resolve the issues raised but caused frustration and inconvenience to the complainant.
The insurer removing various items from the cash settlement offer, sharing redacted repair quotes from AB and its overall communication caused significant stress and inconvenience to the complainant.
While I accept the insurer’s claim handling disrupted the complainant’s life, I am not satisfied the changes she experienced at her work were caused by the insurer’s claim handling.
Given the above, it is fair the insurer increases its compensation offer for non-financial loss to $3,000.
2.3 Why is the outcome fair?
The parties are bound by the policy terms and conditions. It is fair the insurer’s cash settlement adequately covers the damage that falls within the scope of the policy. It should pay compensation for its overall claim handling.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.