Home / Suncorp Group / Determination 12-24-114233

Determination 12-24-114233

Denial of roof repair/replacement under wear and tear exclusion, inadequate make-safes, cash settlement without uplift

FirmSuncorp Group
Decided2025-06-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$20,608
Non-financial loss$6,300
Amount claimed$17,500
SourceAFCA PDF

Summary

Insurer accepted some storm damage but denied roof replacement as wear and tear; its make-safes caused further damage and took until January 2025. AFCA found for the complainants, ordering internal repair cash settlement with uplift and interest, $17,500 for the roof and $6,300 non-financial loss.

Wear and tear exclusion validly applied to the roof generally, but the insurer's inadequate make-safes and cash settlement without a risk uplift made it fair to award a cash settlement and non-financial loss.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-114233 | Financial firm | AAI Limited Case number: 12-24-114233 6 June 2025 Determination overview Complaint The complainants held a home and contents insurance policy for their home in New South Wales with the financial firm (insurer). The policy period was from 19 January 2023 to 19 January 2024. The building cover was $750,000. The complainants made a claim on 1 June 2023 for storm damage to their home which occurred on 26 May 2023. The claim was highly complex and protracted. The insurer partially accepted the claim but denied the complainants’ claim for the repair or replacement of their tiled roof based on the wear and tear exclusion under the policy. After the engagement of many specialists to conduct make-safes on the property and provide reports and the completion of some repairs (but not the repair or replacement of the roof), the insurer offered to cash settle the outstanding internal repairs. However, it did not include an uplift for the cash settlement. The complainants did not provide formal reports but the husband complainant was a former building inspector with 50 years’ experience in the building industry. The complainants experienced significant delays in the assessment of the damage and there were inadequacies in the insurer’s make-safe repairs which caused additional damage. The insurer offered a cash settlement for outstanding internal repairs. This is because the insurer’s repairers would not warrant the repairs due to maintenance to be performed to the roof by the complainants. Despite the complainants’ repeated requests, the insurer has refused either to repair or replace the roof or to cash settle (either in whole or in part) the repair or replacement of the roof. Issues and key findings Has the insurer correctly assessed the claim? No. Based on the information and the terms and conditions of the policy, the insurer was entitled to deny the complainants’ claim for the full repair and replacement of the tiled roof. However, the make-safe repairs performed by the insurer caused further damage to the roof and the insurer did not comply with its make-safe obligations. Further, the proposed cash settlement of internal repairs did not include an uplift. Are the complainants entitled to non-financial loss compensation? Yes. In the circumstances, an award of non-financial loss compensation is warranted. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation. Determination The determination is in favour of the complainant. Within 28 days of receiving notice of the complainants’ acceptance of the determination, the insurer shall: cash settle the internal repairs in the amount of $3,107.65 (being $2,589.71 plus an uplift of 20%) pay to the complainant interest on the $3,107.65 under section 57 of the Insurance Contracts Act 1984 (Cth) (the Act) from 3 May 2024 to the date the payment is paid by the insurer cash settle the claim in relation to the damage to the roof in the amount of $17,500 pay to the complainants $6,300 for non-financial loss Reasons for determination Has the insurer correctly assessed the claim? No. Based on the information and the terms and conditions of the policy, the insurer was entitled to deny the complainants’ claim for the full repair and replacement of the tiled roof. However, the make-safe repairs performed by the insurer caused further damage to the roof and the insurer did not comply with its make-safe obligations. Further, the proposed cash settlement of internal repairs did not include an uplift. Coverage of the policy The complainants’ home and contents insurance policy provided cover for loss or damage caused by insured events during the period of insurance. The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered. The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI) (together referred to as the policy). I am satisfied that the PDS and COI have been provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainants. Complainants have initial onus to establish a valid claim The initial onus is with the complainants to establish on the balance of probabilities (that is more likely than not) that the loss or damage claimed falls within the insuring provision of the policy. This is known as a ‘valid’ (or prima facie) claim. Once the complainants have established a valid claim, the onus shifts to the insurer to establish, on balance, the application of a policy exclusion or that it is otherwise entitled to decline or limit the claim under the policy. Proximate cause When establishing the cause of the damage to the complainants’ property, it is the proximate cause that must be established. The proximate cause is not necessarily the first or the last or the sole cause of the damage. It is the dominant or effective or operative cause. The proximate cause of the loss is a question of fact to be determined based on the circumstances. Where there are several causes operating, each must be considered to determine its impact on the resultant damage or loss. If one cause results in the loss or damage in any case, and the other would not without the first, the first is the proximate cause. A common-sense approach is taken to determine proximate cause. Policy covered loss or damage to building and contents caused by storm There is no dispute that the policy held by the complainants covered ‘loss or damage caused by a storm’ (page 44). Storm was defined (page 120) to mean ‘a single weather event being, a cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust.’ General exclusions under the policy Under the policy, the general exclusions excluded (page 34): Loss or damage to, or caused by, connected with or arising from, or liability caused by, connected with or arising from: Wear, tear and gradual deterioration any part of the home, unit or contents that has wear, tear, rust, fading, rising damp, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: • tiles and their adhesive or grouting breaking down; • weathering of roof tiles or roof ridge capping; Insurer responsible to make the complainants property safe Section 5 of the policy provided ‘Additional covers’ under the policy. Page 57 of the policy provided: We cover When you are covered for the costs of rebuilding or repairing damaged parts of the home, we will pay the reasonable and necessary costs: • of any temporary work required to make the damaged or destroyed home and insured address safe; There was a limit on the additional make-safe cover which was the ‘The most [the insurer] will pay for any one incident is 10% of the home sum insured’. Need to identify extent of roof damage, if any The policy made clear that there were limits to the extent of the repairs for which the insurer was responsible. Page 93 of the policy provided: When we settle the home claim we will not: • pay more than the relevant sum insured or policy limit; .. • pay extra to repair or rebuild the home to a better standard, specification or quality than it was before the loss of damage occurred, except as stated in the meaning of ‘new for old’ or unless stated otherwise in your policy; .. • pay extra to repair or rebuild undamaged parts (some limited cover is available in ‘Matching undamaged parts’ see page 82); • fix or pay to fix pre-existing damage (unless your policy provides otherwise) Page 94 of the policy provided a definition of the expression ‘New for old’: ‘New for old’ means: New materials, new items We rebuild, replace or repair with new items or new materials that are reasonably available at the time of replacement or repair from Australian suppliers. New for old, regardless of age We rebuild, replace or repair new for old regardless of age, with no allowance for depreciation ‘New for old’ does not: • mean of a better standard, specification or quality than when new; • include paying to replace or match undamaged parts or materials (some limited cover is available under ‘Matching undamaged parts’ see page 82). There was no dispute that there were ceramic tiles available to replace any damaged tiles on the complainants’ roof if the policy provided cover for their replacement. Page 96 of the policy provided: Repairing or rebuilding damaged parts We will only repair or rebuild the parts that are damaged in the incident covered by your policy. Apart from the limited circumstances where we will repair or rebuild undamaged parts (see ‘Matching undamaged parts’ on page 82) this policy does not cover you to replace undamaged parts, such as when: • .. • roof tiles are damaged we will only replace the damaged ones, not the undamaged tiles, even if the undamaged tiles are faded and do not match the new ones used for repairs. Insurer accepted some damage but said roof damage was not caused by storm There is no dispute that a storm occurred at the complainants’ home. The complainants built their own home (the complainant husband was a carpenter at the time) in 1989. In their complaint to the Australian Financial Complaints Authority (AFCA) on 11 July 2024 the complainants said that they wanted ‘damage to [their] roof repaired so that it is left in a reasonable condition and ceilings painted in affected areas bearing in mind problems only arose following [the] hailstorm’. The insurer accepted the claim for some storm damage but denied the claim for the entire repair and replacement of the roof. The nature and extent of the accepted storm damage was described in the report by K, a builder, who was engaged by the insurer to prepare a ‘Builder Assessment Report’ based on an inspection on 15 June 2023: On inspection of the dwelling, [K] noticed a large amount of damage to the Eastern side of the house. This consisted of a broken frosted glass window due to hail at the back of the property. Two dinted metal barges were seen to either end of the back porch, also a hail damaged fly screen to another window, Hail damaged garden shed which had dints on top as well as the sides and paint stripped of a PVC pipe which was leading into the water tank. Inspection around the detached garage revealed a hail damaged garage door which had the discolouration from hail marks on the door face. It was noted that there was a metal carport to the side of the garage area however no damages were found as per the roof report. Cash uplift should be paid on agreed internal repairs Based on the information, the insurer conducted certain repairs during 2023 and on 3 May 2024 (nearly a year after the claim) the insurer accepted the claim for outstanding internal repairs and offered a cash settlement of $2,589.71. However, when an insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. There may also be additional works identified once repairs begin. When the insurer settles a claim by paying the cost of repairs, it transfers these risks to the customer. Furthermore, the customer may find it more difficult and expensive to arrange repairs, because they do not have the insurer’s industry knowledge and bargaining power. AFCA considers that if an insurer cash settles a claim, it should generally pay an allowance for the transfer of risk. Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25% of the quoted cost of repairs. Based on the available information, a reasonable allowance for the transfer of risk was 20%. Accordingly, based on the information it is fair that the insurer should have paid $2,589.71 plus a 20% uplift, namely a total amount of $3,107.65 for the agreed internal repairs on 3 May 2024. Interest is payable under section 57 of the Insurance Contracts Act Section 57 of the ICA says that an insurer has to pay interest on a benefit: commencing on the day as from which it was unreasonable for the insurer to have withheld payment AFCA has a published an Approach to Awarding Interest in Insurance, which says: Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be: • the date the claim was denied • if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or • the date when the benefit was due to be paid under the policy (for example after the expiry of a waiting period in an income protection policy). AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm. The insurer should have cash settled the claim for the agreed internal repairs on 3 May 2024 together with an uplift. In the circumstances, it was unreasonable for the insurer to have withheld payment of the $3,107.65. Accordingly, the insurer should pay the complainant interest under section 57 of the Insurance Contracts Act (ICA) for the period from 3 May 2024 to the date the payment of $3,107.65 is paid by the insurer. Claim regarding damage to the roof should be resolved without further delay and on a fair and reasonable basis The claim relating to the damage to the roof was the main focus of the dispute between the complainants and the insurer. The claim has been outstanding since June 2023 and repairs have not been performed. It is fair and appropriate that the claim regarding damage to the roof should be resolved without further delay and on a fair and reasonable basis. In its denial of the claim based on the wear and tear exclusion, the insurer relied upon reports which had been prepared by experts it had engaged: N, a builder, (based on an inspection on 15 June 2023) AA, a roofer, (based on an inspection on 23 December 2023) M, an engineer, (based on an inspection on 6 March 2024) The complainant husband was a retired building inspector but he was unwell for a significant period of the claim. The complainant husband did provide responses to the insurer’s expert, particularly M’s report, when he was well enough to do so. Section 3.2 of this Determination sets out a very brief summary of the protracted communications between the complainants and the insurer regarding the claim for the repair or replacement of the tiled ceramic roof. The summary is in chronological order and it also includes a summary of the insurer’s reports by N, AA and M and of the complainants’ position. In overview, the claim was made on 1 June 2023 and make-safes were made (or attempted to be made) by the insurer’s representatives on numerous occasions, including as recently as 17 January 2025. The insurer’s engineer accidentally broke three roof tiles on 21 December 2023 which required further repairs. The complainants repeatedly sought updates regarding the status of the claim and advised the insurer of further damage occurring even after repairs had been performed. On 18 January 2024 the insurer recorded that had the condition of the roof been identified initially by it correctly, a cash settlement would have been recommended for internal ceiling repairs but that ‘this was not identified [by the insurer] and the internal damage has reoccurred’. On 19 January 2024 the insurer wrote to the complainants advising them that a new roof should be installed by them at their cost because the ‘tiles are at the end of their serviceable life’. On 7 February 2024 the insurer reviewed its position and advised the complainant that it would appoint an engineer to conduct a roof report. M conducted an inspection on 6 March 2024 and prepared a Report dated 13 March 2024 (approximately nine months after the claim). On 6 April 2024 the insurer recorded that the complainants said there was damage to the loungeroom ceiling which had occurred after heavy rain in the area of the bedroom ceiling where the engineer and the roofing contractor were looking at the roof. On 29 April 2024 H conducted further ceiling, living room and roof make-safes. On 3 May 2024 the insurer offered to cash settle the internal repairs for $2,589.71. This is because the insurer’s builders were unable to warrant the works due to the pre-existing condition of the roof. The cash settlement offer did not include an uplift. On 28 May 2024 the complainants said: the insurer should ‘bear the cost (either fully or partially) for the replacement of [their] roof to ensure that [their] home remains safe and insurable for [them] to live in for the remainder of [their] lives’ they had had a quote for ‘replacement of the roof in the vicinity of $70,000 for tiles’ The insurer confirmed its denial on 24 June 2024 and offered an ex gratia payment of $1,000 to resolve the claim. On 13 July 2024 the complainants rejected the insurer’s offer. On 1 August 2024 the insurer advised that it had cash settled the cost of the internal repairs. The insurer advised that it had denied the claim to repair or replace the roof and relied upon the exclusion for wear and tear. The insurer revised its offer and offered an ex-gratia payment of $5,000 to resolve the complainants’ claim and dispute. That amount was in addition to the cash settlement for internal result of damage of $2,589.71 which it had previously offered to the complainants. The insurer said that offer was made to resolve the claim and dispute at that stage of the AFCA process and that it would be withdrawn if it was not accepted by the complainants at that stage. The complainants did not accept the ex gratia offer. On 4 October 2024 the insurer advised the complainant that the make safe tarp could stay in place until the repairs were actioned but that it maintained its denial. On 19 and 26 October 2024 the complainant husband provided responses to M’s report. On 19 October 2024 the complainants said that there had been further damage due to partial damage to the tarpaulin as a result of high winds. The complainants provided a quote dated 13 November 2024 from L for ‘roof conversion’ for Colorbond roofing and guttering in the amount of $58,986 for the main roof and guttering. The quote also included a separate quote for roof conversion for the shed roof and guttering in the amount of $11,110. The cost of a full replacement of the complainants’ roof with a Colorbond roof was $70,000 (rounded). On 26 November 2024 the complainants said that they believed the insurer should be responsible for a minimum of 50% of the replacement cost with Colorbond (i.e. 50% of $70,000). On 3 December 2024 (and 14 January 2025) the insurer maintained its denial of the complainants’ claim for replacement or repair to the ceramic tile roof. On 17 January 2025 the insurer engaged E to conduct a further make-safe because the ‘preexisting tarpaulin ha[d] blown off into ocean due to strong winds’. E removed ‘damaged tiles and replaced them with new ones found on-site’ and said that the ‘roof [was] now sealed and watertight’. On 31 March 2025 the complainant said the insurer was ‘at the minimum responsible for 25% of the cost of the replacement of [their] roof in view of the reduced lifespan of our tiled roof owing to the “event” and damage by other means’. Based on the information and after nearly two years since the storm, the expression by the complainants that damage had occurred ‘owing to the ‘event’ [the storm] and damage by other means’ was a well-chosen one. The complainants said that damage had occurred due to the storm (on 26 May 2023) and due to ‘other means’ (e.g. by the insurer’s engineer accidentally breaking some tiles and from the inadequacy of make-safes by the insurer since June 2023). Based on the information, I am satisfied that the complainants have established that tiles were broken by the storm and by the insurer’s representative and that inadequate make-safes by the insurer had caused further damage. By contrast, the insurer’s experts’ opinions were, in effect, that the ceramic tiles were affected by wear and tear or beyond their useful life or that the storm alone did not cause damage which required their replacement or repair. The insurer’s reports however overlooked, or understated, that: the storm had damaged many tiles which had been cleared by the complainants shortly after the storm event (together with clearing the gutters of debris at their cost) the insurer’s engineer damaged some tiles which led to further damage and make-safes the insurer’s numerous make-safes were inadequate and exposed the roof to, and caused, further damage the insurer’s initial assessment of the state or condition of the roof was inadequate and led it to conduct non-permanent make-safes which did not improve the condition of the roof it was only on 17 January 2025 that the insurer said the roof was ‘sealed and watertight’ and, even on that occasion, the insurer’s representative removed damage tiles and replaced them with new ones found on site Based on those matters, the insurer (having covered the costs of repairing damaged parts of the home) should have paid the reasonable and necessary costs ‘of any temporary work required to make the damaged or destroyed home and insured address safe’. The insurer did not do so properly, or in accordance with its obligations under the policy, until 17 January 2025. The insurer’s highest offer (now withdrawn) was an ex gratia offer of $5,000 on 1 August 2024. The complainants’ initial position when it made the complainant to AFCA was for a repair to the roof to ensure it was in reasonable condition. During the course of the claim they sought the cost of a full roof replacement. On 31 March 2025 they sought a minimum of 25% of the cost of the replacement of the roof with a Colorbond roof ($70,000). In practical terms, the complainants sought, at a minimum, a cash settlement of $17,500. Based on the information, the insurer’s position in August 2024 was inadequate in relation to damage to the roof from the storm and the insurer’s own inadequate make-safes and damage caused by its representatives. The insurer’s position did not sufficiently recognise the obligations it had under the policy to make-safe the property at or about the time of the claim being made (in June 2023). The make-safes were not ‘sealed and watertight’ until 17 January 2025. The complainants’ position on 31 March 2025 also reflected an express acknowledgement that they had performed repairs previously (prior to the storm) due to the rusting of nails. I have given consideration to whether to require the insurer to engage an independent contractor and a mould remediation specialist to: inspect the property, provide an updated quote for repairs to the roof tiles which were damaged, and to inspect the internal roof frames to confirm whether or not there was further damage by the failure of the make-safes. The difficulty with that process is that it is now two years since the storm event and the insurer’s representatives have already undertaken many inspections and repairs. There has also been further damage from the inadequate make-safes and damage by the insurer itself. Further, the complainants have not sought that form of resolution but have sought a cash settlement and, in any event, further inspections and quotes would likely lead to additional unnecessary delays. Accordingly, based on the information, I am satisfied that the proposal for 25% of the cost of the Colorbond replacement ($70,000) (based on a quote from a repairer that the complainants are prepared to engage) is fair and reasonable i.e. $17,500 as a cash settlement. The engagement of such a repairer by the complainants at their cost would also address their obligations under the policy to maintain their property by the installation of a new roof by a roofing specialist (as requested by the insurer). The complainants should advise the insurer in writing within 14 days of the completion of the replacement of the roof by the roofer to be engaged by them at their cost. Are the complainants entitled to non-financial loss compensation? Yes. In the circumstances, an award of non-financial loss compensation is warranted. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. AFCA takes a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Non-financial loss compensation is payable by the insurer Based on the information, the complainants have experienced an unusual degree of stress, delay and inconvenience in the insurer’s handling of the claim. The claim has been under consideration by the insurer since June 2023 and remains unresolved, despite the attendance of specialists engaged on behalf of the insurer, including an engineer. Based on the exchanged information, I am satisfied the complainants (who are retired) experienced an unusual degree of stress and delay due the insurer’s claims handling which warrants the award of non-financial loss compensation. The complainant husband experienced ill health during the course of the claim. This was known to the insurer and the complainant wife provided information and submissions in support of the claim until the complainant husband was able to provide responses to the insurer’s engineer’s report. In the circumstances of the complaint, it is not productive, and not fair to the parties, to traverse each aspect of the protracted claims history and the extensive number of communications (some of which are recorded in the 321 pages of insurer claim notes from 1 June 2023). It is fair and appropriate to seek to progress the resolution of the complaint and the claim, including a fair assessment of non-financial loss compensation. The complainants have experienced extensive inconvenience due to the insurer’s claims handling, the damage caused during the make-safes and the repeated repairs and make-safes. They will also experience further inconvenience during the period in which the further works are conducted. In the circumstances it is fair that the insurer pay the complainants $6,300 compensation for non-financial loss. Why is the outcome fair? The outcome is fair because the insurer is entitled to rely upon the exchanged material and the terms and conditions of the policy to determine its obligations regarding the claim. It is fair that there is an award of non-financial loss compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Brief summary of complainants’ and insurer’s positions regarding the roof damage N, a builder, (based on an inspection on 15 June 2023, 9 pages) concluded in its Report dated 15 June 2023: The dwelling is a single storey with terracotta roof tiles and ridge caps. There are no solar panels present on the roof. On inspection of the roof, [N] found the roof tiles to be in an aged fair condition and medium underfoot, with no broken tiles found throughout the inspection however approximately 100 tiles have been replace[d] in the past by a previous contractor, sarking was seen under the tile. Bedding and pointing is in a fair condition, with minor cracking evident. Gutters are clean and clear of debris. After discussions with the [complainants], he raised concerns of hail impact to the timber barrages of the dwelling, after carrying out a full roof inspection we can confirm that there were no storm related damages to any part of the roofing area nor timber barrages that we can see we would recommend a carpenter/painter to assess. On 2 and 3 November 2023 the insurer’s repairer, M, completed a repair and recorded in its report and invoice that it had: replaced three broken roof tiles and repointed two tile collars broken from the recent wind. Please note all tiles have salt rot and will continue to break and leak unless a re-roof happens. On 6 November 2023 the insurer’s repairer completed a repair on 3 December 2023 and recorded in its report and invoice: Make Safe Site Attendance "Make-safe to silicone 10-15 roof tiles and replace 6 that were beyond repair. On 29 November 2023 M prepared an estimate of repairs which included ‘Item 3.1’ for: Remove damaged Terracotta roof tiles - small area (less than 250 tiles), supply and install to best match existing including all materials approximately 25 tiles. PSUM (Provisional Sum) On 3 December 2023 N further reported to the insurer that maintenance repairs were required: Maintenance required – Reroof as the whole roof is comprised (sic, compromised) from salt rot and very brittle Addressing the maintenance issues at [complainant’s address], specifically the salt rot affecting all tiles, is crucial not only to prevent ongoing breakage and leaks but also to fortify the property against potential new damages from future events. Without prompt action, the tiles' brittleness poses a significant risk of water ingress, and the longer this maintenance is delayed, the more vulnerable the structure becomes to water-related issues. By prioritising the re-roofing project now, you not only mitigate the current concerns but also establish a robust defense against potential water damage in the future. Timely intervention is essential to preserve the property's integrity and minimize the risk of further complications, ensuring a safer and more resilient structure In a Building Report dated 19 December 2023 the insurer reinspected the property on 19 December 2023 and recorded: these damages have been caused by the aged wear & tear of the tiled roof which requires a complete roof replacement. The tiles which [have] been mentioned during the make safe have salt rot and the water ingress to these rooms will continue to happen overtime due to the state of the roof, the roof & ceiling damages are not caused by the hail storm event in May 2023. During my re-inspection [the insurer requested] another roof report on the complete roof of the property to determine what is maintenance required to be carried out or what was damaged from the hail storm event. On 21 December 2023 in an estimate the insurer’s builder, M, recorded: Please attend site and carry out a Makesafe to silicone 10-15 roof tiles and replace 6 that were beyond repair and provide all details upon completion. Ensure you provide before and after photos with your invoice. "On site Engineer accidentally broke three roof tiles while on site meeting was taking place, we taped up breaks while on site to prevent water ingress”. AA, a roofer, (based on an inspection on 23 December 2023) concluded in its Report dated 27 December 2023: Inspection of terracotta tiled roof found the roof tiles to be in poor condition as a result of exposure to salt air which is causing the tiles to frett and break. [AA] found the water entry to kitchen and lounge room ceiling to be a result of broken tiles which have been caused by the nail used to secure tiles to battens have rusted causing them to expand in nail hole of tiles which has eventually broken the tile horizontally… [AA] noticed there to be a large number of fretted tiles in every elevation. [AA] recommended that a new toll (sic, tile) roof should be installed as tiles are at the end of their serviceable life. On 16 January 2024 the insurer’s claim notes recorded that the complainant said: Are you please able to let us know what is happening re our roof, which has been leaking in several places since the hailstorm in May [2023]. All other repairs have been completed, but the roof is still outstanding. The kitchen ceiling is marked again in the same place where the roof was supposedly fixed. On 18 January 2024 the insurer’s Desktop Report dated 18 January 2024 recorded: The broken tiles have now been replaced; however the non-claim related roof repair is extensive, and ongoing reoccurrence is likely as the tiles will continue to fret and nails will continue to rust and expand. The current outstanding event related damage to the property is the water staining to the ceilings. Had the condition of the roof been identified initially, cash settlement would have been recommended for internal ceiling repairs. This was not identified and the internal damage has reoccurred. On 19 January 2024 the insurer wrote to the complainants: You are required to attend to the non-claim related damage, repair, or replacement below as soon as possible to enable our repairer/supplier to commence insurable repairs: • New roof should be installed as tiles are at the end of their serviceable life. .. We recommend engaging a licensed tradesperson as soon as possible to attend to the non-claim related damage, repair, or replacement required at your property On 7 February 2024 the insurer reviewed its position and advised the complainant that it would appoint an engineer to conduct a roof report. M, an engineer, (based on an inspection on 6 March 2024) concluded in its Report dated 13 March 2024: 7.3. The water damage in the Kitchen, Dining and Lounge ceiling was caused by water leakage from the severely fretted upper and side drainage channels of the terracotta roof tiles. The upper drainage channel was fretted and disintegrated and was not able to properly channel the rainwater down slope… 7.4 Due to the severity of the fretting and disintegration on the drainage channels at the upper edge of the roof tiles, water leakage will continue to occur unless all of the damaged roof tiles are replaced. 7.5. All of the roof tiles [M] lifted and inspected on all sides of the roof had some extent of fretting and based on this observation, [M’s opinion was] that most of the roof tiles are affected by fretting. Fretting of the terracotta tiles occurs gradually over a long period of time and based on the severity of the fretting observed on the north and east facing roof indicates this has occurred over several (4-5) years’ period. 7.6 The fretting has made the roof tiles more fragile and easier to crack/break. The corner cracks were mostly on the upper right corner of the roof tile which was not properly seated due to fretting on the left corner. This caused the tiles to easily crack when stepped on. 7.7. The fretting was under the tile overlaps and not on the surface hence is not caused directly by the hailstorm. 7.8. Most of the chipping on the roof surface was along the lower edge of the tiles and mostly on the side grooves but not in the two middle water courses. The chipped areas had fretted or rough surface rather than solid break. Whilst some of the chip damage may have been caused by hail, the pattern of the damage does not coincide with general hail damage pattern where the whole roof tile would be subjected to the damage rather than just along the lower edge or only on the side grooves. Hence, most of the chips are caused by fretting rather than damaged directly by hail. 7.9. The damage to the roof tiles is not directly caused by a single storm event. 7.10 Due to the severity of the fretting and disintegration on the drainage channels at the upper edge of the roof tiles, all of the roof tiles are recommended to be replaced. 9.2. Damage has occurred gradually over a period of time and mainly due to fretting of the terracotta roof tiles. On 6 April 2024 the insurer’s claim notes recorded that the complainants said there was damage to the loungeroom ceiling which had: happened overnight during the heavy rain and is in the area where [the insurer’s] engineer [M] and the roofing contractor who came with him were looking at the roof. [The complainants] noticed after they were here there seemed to be some silver paper sticking out from the tiles in a couple of places where the worst leaks are now happening. This is getting extremely stressful for [the complainants], and although [the complainants] appreciate that the other work on [their] home has been attended to, [the complainants] cannot understand what the problem is now. [The complainants] would assume, owing to the fact that there are now drops of water hanging from the ceiling, that the pink batts are absolutely drenched. If this keeps going [the complainants were] afraid the ceiling may collapse into the loungeroom creating a lot of havoc. [The complainants] would assume also that this may cause mould in the ceiling. On 29 April 2024 H invoiced the insurer for make-safes: Ceiling Make-Safe - Inspect roof cavity for soaked or wet insulation. Insulation was found to be dry throughout. Peel back insulation to allow for living room ceiling to receive airflow to try and dryout. Inspected living room ceiling – all plasterboard was found to be structurally sound and did not require removal. Living room Make-Safe – Applied anti-microbial treatment to affected areas to ensure all materials are free of fungal and bacterial growth by using appropriate PPE, supply and install drying equipment to prevent further damage. Monitor moisture levels and drying process and remove equipment. Remove and clear site from work associated debris. Vacuumed throughout the affected area removing potential settled mould spores/fragments. 1 AFDs used while conducting the make safe. Roof Make-Safe - Supplied and installed tarp over the affected areas of roof On 3 May 2024 the insurer offered to cash settle the internal repairs for $2,589.71 because the builders were unable to warrant the works due to the pre-existing condition of the roof. The insurer’s cash settlement was based on an ‘estimate/ invoice format’ from M to the insurer dated 5 April 2024 for that amount. The invoice did not include an uplift. Further on 8 May 2024 the insurer’s claim notes recorded: If this is going to take too long, would it not be feasible to cover the roof with a tarp to prevent further damage, which personally [the complainants] feel should have been done much earlier rather than prolonging matters. The water stain has spread on our loungeroom ceiling and there are now black dots on it as well (presumably because the pink batts are saturated). [The complainants are] very concerned that the integrity of the ceiling is now compromised. On 28 May 2024 the complainants said that after the inspection by M: that the excessive leakage occurred in an otherwise unaffected area of the loungeroom ceiling. [The complainants assumed] that this was caused by that inspection, the roof tiles being lifted and replaced and two men walking over the roof in that section. It was so bad that [the complainants] thought the ceiling may collapse when [they] saw water bubbles appearing on the paint and also on the nail holes for the gyprock. [The complainants] contacted [the insurer] several times via the website before [being] contacted. Thankfully, someone came and lifted the wet pink batts and driers were used in the lounge room. Another person came and placed a small cover (approximately 2m x 2m) over that section of the roof, which is still in place. On 28 May 2024 the complainants also said: they appreciated the repairs already completed by the insurer the insurer should ‘bear the cost (either fully or partially) for the replacement of [their] roof to ensure that [their] home remains safe and insurable for [them] to live in for the remainder of [their] lives they had had a quote for ‘replacement of the roof in the vicinity of $70,000 for tiles’ The insurer confirmed its denial on 24 June 2024. In the confirmation of its denial on 24 June 2024 the insurer offered an ex gratia payment of $1,000 to resolve the claim. On 13 July 2024 the complainants rejected the insurer’s offer. The complainants said that: The majority of tiles are not so affected (as indicated by [the complainants’ previous photographs), but do show chipping which indicates the ferocity of the storm. [They complainants] had the gutters cleaned after the storm owing to a huge Norfolk Island pine tree two doors down blowing long fronds into our gutter, and [they were] concerned about the gutter being blocked and causing further damage as [the complainant husband] was critically ill in hospital and [he] could not climb a ladder to look. There were also tile chips and broken pieces of tile in the gutters along with the pine fronds at that time. There were also chips and broken pieces in the strainer on [their] water tank. On 1 August 2024 the insurer advised that it had cash settled the cost of the internal repairs. The insurer advised that it had denied the claim to repair or replace the roof and relied upon the exclusion for wear and tear. The insurer revised its offer and offered an ex-gratia payment of $5,000 to resolve the complainants’ claim and dispute. That amount was in addition to the cash settlement for internal result of damage of $2,589.71 previously offered to the complainants. The insurer said that that offer was made to resolve the claim and dispute at that stage of the AFCA process and would be withdrawn if it was not accepted by the complainants at that stage. The complainants did not accept the ex gratia offer. On 4 October 2024 the insurer advised the complainants that the make safe tarp could stay in place until the repairs were actioned but that it maintained its denial. On 19 and 26 October 2024 the complainant husband provided responses to M’s report. The complainants said: In relation to the conclusion in para 7.8 of M’s Report: > that M did not take ‘into account that the worst affected broken tiles had already been replaced some months earlier’ [after the hailstorm]’ > ‘all the badly broken tiles were taken away when prior repairs [were] carried out’ > ‘the gutters had to be cleaned of debris from broken tile pieces and leaves following the hailstorm [which was done at the complainants’ expense] In relation the conclusion in para 7.3 regarding the water damage repaired in the kitchen, damage and lounge: > ‘These repairs in the kitchen area had to be re-done after [the] roof leaked again in [the] same place and it was observed by [the complainant husband] that a ridge tile above where repairs were carried out was not in place following the second attempt to repair same. This had obviously occurred when the previous repairs were being carried out. This was repaired.’ On 19 October 2024 the complainants said that they had further damage due to partial damage to the tarpaulin as a result of high winds. The complainants said they had: had 16 months of unnecessary sleepless nights with exposure to stormwater penetration which continues to saturate our gyprock ceilings and [the insurer] should not have hesitated soon after 26 May 2023 as a duty of care to cover the whole of the existing terra cotta roof with tarpaulins so as to provide protection from weather events. .. [the insurer] should replace [their roof immediately]. After 16 months of wet weather exposure, the radiata pine structural timbers in the dwelling, including roof trusses, insulation batts, studs, bearers and joists may be affected. One quote has been received, together with other quotes pending. Expenses could amount to $80,000. [The complainants had] received a quotation for Colorbond for the house and shed for $71,000. The complainants provided a quote dated 13 November 2024 from LVR for ‘roof conversion’ for Colorbond roofing and guttering in the amount of $58,986 for the main roof and guttering. The quote also included a separate quote for roof conversion for the shed roof and guttering in the amount of $11,110. The quotation from LVR did not provide any information or opinion regarding the cause of the damage to the complainants’ roof. On 26 November 2024 the complainants said that they believed the insurer should be responsible for a minimum of 50% of the replacement cost with Colorbond (i.e. 50% of $70,000). On 3 December 2024 the insurer maintained its denial of the complainants’ claim for replacement or repair to the ceramic tile roof. The complainants said on 7 January 2025: they disputed the conclusion that 100 tiles had been replaced in the past they were advised by one of the contractors from the insurer to have the gutters cleaned so as to ensure no further damage by overflow should they get another storm and the insurer may refuse any further damage because of the gutters being full of leaves, broken tiles etc. H did the work at the complainants’ expense ($100), with the balance subsidised they did have a few tiles replaced about 5-6 years ago (which the complainants subsequently confirmed was in about August or September 2021) due to rusty nails causing cracking of the tiles. At that time, the tiler advised us that the remainder of the roof was OK. There were approximately 8,000 terracotta tiles on their dwelling and shed they had chosen Colorbond because it was more economical than re-roofing with tiles they said that the insurer ignored their duty of care to cover the whole roof after the storm after 19 months and still with a tarpaulin on the tiles over their loungeroom, they were ‘living in fear of further damage’. On 14 January 2025 the insurer maintained its denial and said the roof needed replacement due to the severity of the fretting and disintegration of the tiles not due to an insured event. On 17 January 2025 the insurer engaged E to conduct a further make-safe. In its report dated 24 January 2025 (8 pages) E reported: We attended the site to inspect the damage on the roof. Upon inspection, we found that the preexisting tarpaulin has blown off into ocean due to strong winds. After the inspection, we removed the old tarpaulin mounts but were unable to install a new tarp due to strong winds. Instead, we removed the damaged tiles and replaced them with new ones found on-site. The roof is now sealed and watertight. On 17 February 2025 the complainants: acknowledged the insurer’s offer for internal repairs/painting and hoped they were able to come to some sort of compromise in relation to the roof to finalise the matter acknowledged they had renewed their insurance with the insurer for a further 12 months to 19 January 2026 and that they would like to have some confirmation as to coverage should another ‘event of significance’ occur On 4 March 2025 the insurer said the insurer has not attended to repairs on the roof but that it had attended a number of times to provide make-safe remediation to the roof and that the insurer’s make-safes were ‘not in the nature of permanent solutions, but rather have been temporary steps taken to ameliorate the poor condition of the roof generally’ On 31 March 2025 the complainant said they were ‘firmly of the opinion that the insurer is at the minimum responsible for 25% of the cost of the replacement of our roof in view of the reduced lifespan of our tiled roof owing to the “event” and damage by other means’

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.