Insurer denied liability for rectification of defective flood repair work by its appointed builder, and sought to recover a rent overpayment

FirmDefence Service Homes Insurance Scheme
Decided2026-04-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$15,490
Non-financial loss$3,500
Amount claimed—
SourceAFCA PDF

Summary

Complainants disputed the quality of flood repairs by the insurer's builder and the insurer's refusal to fund rectification. AFCA found 15 of 26 items needed rectification, awarded cash settlement and $3,500 non-financial loss, and set off a $43,180 rent overpayment, leaving $19,079.20 payable.

The policy requires new-for-old repair and the insurer is responsible for its appointed repairer's workmanship, so cash settlement of proven defects is fair, with the accidental rent overpayment offset.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Defence Service Homes Insurance Scheme determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-109176 | Financial firm | Defence Service Homes Insurance Scheme Case number: 12-24-109176 17 April 2026 1 Determination overview 1.1 Complaint The complainants have home buildings insurance with the financial firm (the insurer). The complainants lodged a claim with the insurer for a flood event which caused damage to their home on 28 February 2022. The insurer accepted the claim and engaged a builder (E) to undertake extensive repairs. The complainants are dissatisfied with the quality of the building repairs and of subsequent rectification work done by E. The insurer says it has met its obligations under the policy and that any rectifications still needed, are minor and should be done under the builder’s guarantee. The insurer has also expressed an intention to recover an overpayment of lost rent of $44,550.00 from the complainants. It says the overpayment was accidental. 1.2 Issues and key findings Was the insurer entitled to deny liability for the disputed rectification works? No. The complainants have established that 15 of the 26 building quality concerns raised by them are justified and require remediation. Given the time elapsed and prior experience with E, it would be unfair to force the complainants to rely on E for the rectifications needed. Is the insurer liable to compensate the complainants for non-financial loss? Yes. The claim has been mishandled with extensive delay and poor quality work by E. The insurer must pay non-financial loss compensation of $3,500. Is it fair for the insurer to deduct over payment of rent from its further liability? Yes. The insurer’s overpayment of rent was accidental and involved a significant amount of money. It is fair that it is set off against the amount the insurer is required to pay for rectifications. Why is the outcome fair? Yes, the complainants are entitled to have their house repaired on a new for old basis under the policy terms. Rectifications are required to meet that standard. It is also fair that the accidental overpayment of loss of rent by the insurer be taken into account. 1.3 Determination This recommendation is substantially in favour of the complainants. Within 14 days of being advised of the complainants’ acceptance of this determination, the insurer is to pay to the complainants the sum of $19,079.20. The calculation of that amount is set out in Section 2.4 below. 2 Reasons for determination 2.1 Is the insurer entitled to deny liability for the disputed rectification works? No. The complainants have established that 15 of the 26 building quality concerns raised by them are justified and require remediation. Given the time elapsed and prior experience with E, it would be unfair to force the complainants to rely on E for the rectifications needed. Policy provides for repair or rebuilding on a new for old basis The terms of the complainant’s home buildings policy are set out in the Product Disclosure Statement (PDS). Page 19 of the PDS states what the insurer will pay when repairing or rebuilding the insured home: We will pay the reasonable costs of repairing or rebuilding the home on a ‘new for old’ basis to a condition substantially the same as but not better than when new (My emphasis). Where possible, we will pay the reasonable costs of matching materials used in repairing or rebuilding with those originally used. But we do not promise to repair or rebuild the home to exactly as it was before the loss or damage occurred. We only pay the costs of repairing or rebuilding those parts of the home that are directly destroyed or damaged by an event. In the General Insurance Code of Practice (GICOP) insurers undertake that: 7.20 Where we have selected and directly authorised a repairer, we will: (a) accept responsibility for the quality of the workmanship and materials; and (b) handle any Complaint about the quality or timeliness of the work or conduct of the repairer under our Complaints process. Both parties rely on expert reports about whether further repairs are needed The insurer relies on the reports of its builder E and on the reports of a building consultant, (A), it employed part way through the repairs to oversee things. E undertook the repairs. After many delays, the property was handed over to the complainants on the basis all repairs were complete on 14 June 2024. The complainants raised a number of concerns with the quality and completeness of repairs. The insurer accepted at least some of these concerns and that rectifications, costed by E at over $19,000 were needed. On 26 August 2024, the insurer offered to cash settle these by paying the complainants $20,000. The complainants rejected the cash settlement and rectification works were undertaken by E between 3 September 2024 and 19 September 2024. When the complainants still had concerns about the repairs, the insurer suggested that they needed to get their own expert report at their own expense. The complainants then obtained a report from a building consultant, (N) which outlines rectifications works it believes are required to put the home back into the condition it was before the flood event. N attended the property on 8 November 2024 and 14 March 2025. N’s 20 March 2025 report lists 26 items that require rectification due to E not completing works to standard (note the items are listed and numbered from 1 to 27, but there is no item numbered 22). It is these 26 items that are the focus of the ongoing dispute. General comments on the quality of the expert reports N has produced 3 reports, dated 19 November 2024, 20 March 2025 and 7 April 2025. These have generally been detailed and provide the reasoning behind the conclusions reached as well as photos. E’s main report is the handover report after the initial rectifications and dated 19 September 2024. E also emailed its views on some of the complainants’ concerns to A on 25 January 2025. Essentially in those emails E is defending criticisms of its own work. The insurer has acknowledged concerns with the performance of E in the repair project. In a letter to the complainants dated 28 February 2025, the insurer’s assistant manager of claims stated that in light of these concerns a review had been done of E’s performance. Further that as a result of the review: · a number of people involved were no longer working at E; · that the insurer applied performance penalties to E; and · that the insurer ceased using E in NSW for an extended period of time until E was able to demonstrate that the issues involved were isolated. The insurer has not provided any more detail on the findings of the review. Weight must still be given to the views of E on the work done. Nevertheless, I have taken these matters into account in weighing the differing views expressed across the expert reports. The reports of A are expressed to have been prepared in consultation with E. On reading them it is clear that they involve accepting assertions from E as to how work was done, for example that stair rails were thoroughly sanded and prepared for painting before being painted. This raises the same proviso as noted above. In addition, on a number of issues, A’s report involves an assertion, which whilst presumably based on expertise and experience, is not backed up by any detailed reasoning. A’s reports also include statements questioning the qualifications of N and questioning the motives of the complainants. I found these parts of the reports unhelpful. I note that whilst not currently licenced to do building work, N has significant qualifications and experience and does not need to be licensed for its current work. The insurer has now conceded seven of the items raised by N Up until AFCA’s preliminary assessment in this matter the insurer had disputed all 26 items raised by N. It said that any rectification work needed is minor and could be done as maintenance or under the builder’s guarantee. AFCA’s preliminary assessment (PA) found that 10 items raised by N were justified. In its response to the PA the insurer has conceded seven of those 10 items. N in its reports has provided an estimated costing of each item. In conceding them, the insurer says that for each of them the work should be done and absorbed by the claim. Presumably this involves the work being done by E. In relation to some of the seven items, the insurer says that the cost suggested by N is excessive. This is also repeated in the views of A which are quoted in the insurers’ response. However, neither A nor the insurer explain why N’s costs are excessive. Nor do they provide alternative cost estimates. Given the very long history of the matter, the concerns about E and the insurer’s earlier complete denial of any liability, I think it is too late for the insurer to insist on being allowed to arrange further work. Given their experience to date, it would be unfair to compel the complainants to again rely on the work of E. It is fair that the complainants be provided a cash settlement. I note the same reasoning applies to the further items that remain contested and where I have found that rectification is needed below. Six of the seven items conceded by the insurer, should be paid at the cost estimate provided by N. These are: · front door latching problem $465 · eastern gate and fence $965 · timber trims to external walls $1455 · gaps to window trims $675 · front Gate $198; and · dining room floor joists $405. In relation to the seventh item where the insurer has conceded work needs to be done, there is a more detailed dispute as to what work is needed and the appropriate cost. That relates to the PVC cladding on the house, where the cost in dispute is more significant. I will deal with that below. The PVC cladding should be replaced N says there has been poor workmanship in the fitting of the cladding, resulting in · poor fitment of corner trims · failure to secure end trims · planks cut too short; and · surface variations indicative of stretching of planks and partial detachment of planks from the wall. The parties agree that a portion of the new cladding was displaced in a storm subsequent to its installation. N says this is strongly indicative of it not having been installed properly. He says to remedy these problems the cladding should be removed and replaced. The complainants say in addition that the cladding installed by E is of a lesser quality and have queried what brand and model was used. E has declined to reveal the cladding used and said that it guarantees its quality. A says the issue of cladding which came off in the subsequent storm is being dealt with through a separate claim. Further, that the cladding was installed correctly pursuant to the manufacturer’s instructions and that defective workmanship is denied. A says that he has been told (presumably by E) that the cladding used is of the same quality as the original. The insurer accepts that some work needs to be done on the cladding but says it is minor and has provided a quote by E to do the work for $1544.62. N has alleged specific defects in the cladding installation. Neither E or A has addressed these specifics. They have just made a blanket denial and broad claims about following the manufacturer’s instructions. Clearly A is reliant on E who has declined to even reveal the cladding used. I am more persuaded by N’s report and accept N’s conclusion that the cladding needs to be replaced. The complainants have provided a quote for the replacement of the cladding in the sum of $30,580. The insurer has said that the cladding under the eaves and the gabled roof was not affected by the flood and is not part of the claim. It says it is only liable for the areas damaged but does provide cover of up to $500 extra for cosmetic matching. The insurer has not provided an alternative quote because it did not accept the need to replace the cladding. It has not provided any detail on what proportion of the cladding does not need to be replaced. Taking these matters into account, I am allowing an amount of $27,080 for replacement of cladding. This is based on the quote of $30,580, less four thousand as an estimate for the amount of cladding left undamaged by the flood, but plus $500 as the allowance for cosmetic matching. Most of the items listed by N remain in dispute Nineteen of the items identified by N remain in dispute. I will deal with each of the larger items, where N’s estimate of the remediation cost is over $1,000, in a separate section below. I will address the lower cost items more briefly in one section. Bedroom built in wardrobes require replacement The complainants say that the wardrobes which were installed in the bedroom to replace the pre-existing ones are of a lesser quality and that they have had problems with the sliding doors falling out. N says that the units are not robust and that the doors do come out very easily. He also says that they have been poorly installed with the high-profile skirting boards and architraves cut and removed when they should have been left in place with the gap with the wall infilled. A says the wardrobes were installed after ‘consultation’ with the complainants who expressed a preference for sliding doors. A also says the wardrobes replaced were poorly constructed timber framed units consistent with construction techniques in the 1950’s. Further that the complainants acknowledged the selection made and that defective workmanship is denied. I prefer the views of N on this issue. Neither A nor the insurer have addressed the specifics of N’s concerns in terms of the units not being robust, the doors readily coming out and the manner of installation. The fact that the complainants were consulted to some degree does not make the complainants responsible for ensuring an adequate replacement for the wardrobes. It is not clear if A saw the original robes or is relying on E in relation to their quality. The complainants say they provided E with photos of the originals and details of where the complainants purchased them. It is not clear where A got the idea that they were manufactured in the 1950s. The originals were robust enough to last, in use, from installation to the recent flood. The wardrobes should be replaced. N puts the cost for this at $4,710. Insurer is not liable for further work on the dining room floorboards Prior to the flood, the dining room floor was timber boards covered by Masonite and vinyl. The complainants wanted to have polished boards in the repair. The complainants say that some of the existing boards were unsuitable and that they wanted them replaced. The complainants wanted to proceed with polished boards although the insurer was not willing to replace the existing boards. The complainants are unhappy with the outcome. N says that a 10 square metre section of boards needs to be replaced at a projected cost of $5,630. The insurer has provided a report from the flooring company, F, that did the work, dated 15 January 2025. That report is detailed and convincing. It outlines that: · the restoration of the boards was always going to be difficult due to the age and quality of the boards and that they had gone through three prior floods with the impact of that uncertain · it advised both E and the complainants of these challenges but the complainants insisted they wanted to proceed with polished boards · it had gone to great lengths, including three additional visits to the property to try and get the best outcome possible; and · that outcome is the best that could be achieved given the boards involved. The insurer’s records also show that the complainants were advised on a number of occasions that they could opt for replacement of the Masonite and vinyl which would be more effective given the quality of the existing boards. The insurer and its trades have done all that is required of them and the insurer has no further liability. Window Awnings require further work N says that on a number of window awnings reinstalled after the works, the wall channel trim has been left off, or in some cases not fixed tightly enough, and sealing has been inadequate. There are gaps between the awning and the wall. The gaps are visible in photographs. N says that photos of the house taken prior to the flood show the wall channel trims in place and functioning. A says all installation is consistent with the manufacturer’s instructions and no rectification works are required. A does acknowledge that prior to the flood some additional flashing may have been in place. On this basis the insurer denies further liability. The insurer’s position has not addressed the gaps which are visible between the awnings and the walls. It is not sufficient to say the manufacturer’s instructions have been followed if the outcome is not functionally effective. This is particularly true if pre-flood there were extra measures in place to achieve the outcome. N says those extra measures were proper installation of the wall channel trim plus flexible sealant. N acknowledges that there may have been additional flashing on some of them. I note also in this context the new for old promise in the policy terms. Further work is required on the awnings. N puts this cost at $1580 and I accept that sum. Bathroom wall tiling requires remediation The complainants are concerned there are hairline cracks in the bathroom wall around the east window. N says the probable cause is the use of rigid rather than flexible adhesives in the installation of the tiles. He says this requires remediation at an estimated cost of $1,455. In A’s report dated 25 March 2025, A said the cracking is more likely due to the elevated nature of the house and the inherent nature of the soil such that soil movement has occurred and caused the cracking. A denied defective workmanship. A’s reference to soil movement as the cause appears speculative and no material has been provided to support that proposition. In addition, the insurer, in its 26 November 2025 response to the preliminary assessment, quotes further views from A. In these A concedes that for the wall where the cracking has occurred further clearance should have been provided and flexible sealant used. He then says this can be remediated without completely stripping the bathroom. Thus, A’s views now appear to be consistent with N’s view on causation. I note also that N had not proposed a complete strip out of the bathroom, but rather removal of the affected tiles and remediation of the waterproofing. The insurer is liable for the work proposed by N, at a cost of $1,455. Cladding of the sub floor space requires rectification N says that in installing the cladding around the sub floor space, E: · has used 50mm screws which project through the cladding and wall into the interior space creating an injury risk · should have used 35mm screws which are readily available; and · attached the screws through the crests rather than the valleys of the cladding as recommended by the manufacturer. A says that the screws do not project beyond the timber battens and timber framing around them, reducing the risk of contact. A also notes that whilst the manufacturer recommends fixing through the valleys, it acknowledges that crest fixing is possible. Photos show the screws projecting significantly. There are large numbers of them, and this is clearly an injury risk. The manufacturer’s recommendations, cited by N, state three reasons for valley fixing. One of those is appearance as they “don’t break up the aesthetic lines of the cladding and are less conspicuous. A second is that there is less risk of the profile being deformed as the cladding is fixed at the point it is in touch with the wall. Given the choice, it is hard to see that anyone would choose to have the cladding fixed in the manner E has chosen. Between that and the injury risk, I accept N’s view that the cladding requires replacement and reinstallation. N estimates the cost at $9,465. Other smaller items in dispute The complainants say there is minor damage to the corner of the trim board at the top of the front steps. The insurer says this was not the case at handover and has happened subsequently. The complainants say this was done by the E on a later visit. I am not satisfied that the complainants have established that this is damage is caused by an event covered by the policy. N says that the complainants advised that the metal handrails on the front and rear stairs were not sanded prior to painting, resulting in surface imperfections and some chipped or peeling paint. A says that the rails were sanded adequately but that the build-up of paint over the years means that a perfect finish is not possible. N does not appear to have expressed an independent view on causation on this issue but rather just recited what the complainants said. I am not satisfied that the complainants have established that this requires remediation under the policy. The complainants say that there should be packing behind the cladding where the brackets supporting the air conditioning unit and this requires remediation. N supports this. A says there was no packing prior to the flood and the reinstallation of the brackets is consistent with what was there before. A’s argument is not that packing is not needed. Rather, A is saying that because there was no packing previously it was not necessary to put packing in place when the cladding was installed post flood. The claim required replacement of the cladding and reinstallation of the air conditioner support brackets. That should have been done consistent with current good practice. The insurer is required to cover the rectification of this at N’s estimated cost of $760. The complainants have expressed concern about inadequate cleaning of the sub-floor space and the bedroom carpets. E has said these were cleaned and A has noted this was not an issue at handover. There is uncertainty as to whether the cleaning was adequate. It is now a long time since handover. The complainants have not established that there was a failure requiring rectification at this time. There is a dispute as to whether a key was provided for the rear external door. I am not satisfied that the complainants have established a failure in this regard. N reported that one of the four tiles around the floor waste in the WC is low and that this is causing ponding. A said that the ponding may be due to surface tension, that the issue requires review and without further examination defective work is denied. The insurer has continued to deny liability, but no further review or examination has occurred. N has reiterated that it is not due to surface tension. The insurer is liable for remediation of this problem at N’s estimated cost of $295. N reports that the complainants advised that there had been a white residue apparent on the floor tiles in the WC but that this had resolved over time with foot traffic and cleaning. N does not appear to have expressed a separate opinion on this, just reporting what the complainants said. N did not express an opinion on the cause. N has also said it has resolved. The insurer has no further liability on this issue. N reports that the complainants advised him that the pull handle on the bathroom door installed by E had failed and that they had remediated the situation by replacing the handle. However, N says whilst the complainants have patched the holes from the handle E installed, they are still visible and the door should be replaced. The insurer and A say that the original was properly installed and that the replacement used by the complainants is of a different type. The complainants have not established that there was any problem with E’s installation. The insurer has no further liability on this issue. N reports that there is ponding of water in the area adjacent to the bathroom floor waste. Further, that this is caused by the edge of the floor waste being higher than the surrounding tiles. A says that this requires further review and defective work is not acknowledged until there is further examination (report 25 March 2025). The insurer has continued to deny liability but there has been no further review or examination. I accept N’s view that there is a problem that needs to be remediated. The insurer is liable for the cost estimated by N, which is $535. N says the end panel to the fridge space has not been adequately secured allowing too much lateral movement. Further, that it is 2200mm tall but has only been secured at two points and that two or three more brackets are needed, which would cost $105. A says it has been installed in the normal accepted manner but that more brackets can be used at the discretion of the builder. A suggests the lateral movement must have been caused by the complainants. I accept N’s views on this. The insurer is required to remediate the problem at a cost of $105. The insurer is liable to reimburse the cost of N’s report After the initial round of remediations, the insurer suggested to the complainants that if they were concerned about quality of the repairs done by E they should, at their own cost, obtain an experts report. They then obtained the report from N at a cost of $1089. N’s report has been central to determining liability in the dispute. Whilst I have not accepted all issues raised by N, I have preferred N’s views to those of E or A on a range of issues. The insurer is liable to compensate the complainants for the cost of $1089. 2.2 Is the insurer liable to compensate the complainants for non-financial loss Yes. The claim has been mishandled with extensive delay and poor-quality work by E. The insurer must pay non-financial loss compensation of $3,500. AFCA has power to award compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss. This is where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind due to the insurer’s conduct. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. The claim has been mishandled The insurer’s management of the repair process fell below the expected standard due to the following reasons: · the insurer delayed settling the claim · the insurer unreasonably denied completing further rectification works · the insurer’s builder, E, did not provide good service or manage repairs well with poor quality repair work and very significant delay; and · the insurer took eight months to complete make safe works following flood. All of this has caused very significant delay and frustration for the complainants. E was not engaged on the repairs until 15 months after the flood in June 2023. At that time the projected completion date for the work was 30 October 2023. The work is still not complete. I accept that it was a major flood event and that this puts stress on availability of trades. However, the delays and quality issues go well beyond what this justifies. The insurer has acknowledged that its own review of this matter resulted in a number of people no longer being employed at E. Given this, it is fair the complainants be paid $3,500 in non-financial loss compensation. 2.3 Is it fair for insurer to set off its accidental overpayment of rent against its further liability on the claim? Yes. I am satisfied that the insurer accidentally overpaid loss of rent cover and it is would be unfair to require the insurer to pay its further liability on the claim without taking this into account. The insurer accidentally overpaid loss of rent The insurer says that it accidentally overpaid loss of rent and that the complainants owe it the sum of $44,500. The history is that: · the policy terms provide a maximum of 12 months loss of rent cover · at the time of the flood, the property was let for $330 per week · because of the significant delays, the insurer eventually agreed to pay 24 months lost rent · on 13 June 2024, when making the last six month payment to take the total payments up to 24 months, the insurer paid $51,480 instead of the correct payment of $8,580. I am satisfied that the overpayment was an accident. The correspondence by email at the time of the overpayment said it was a payment of a further six months of loss of rent. There was no intention to pay a larger amount. The overpayment is slightly less than that calculated by the insurer The insurer says the overpayment is $44,500. It calculates that figure by subtracting 104 weeks at $330 per week ($34,320) from the total amount of lost rent it has paid to the complainants ($78,870). However, this overlooks an undertaking given by the insurer at the time of making the third 6 month period of loss of rent payment. In making that payment, on 23 December 2023, the insurer’s Assistant Manager Claims wrote to the complainants noting that in making the first two payments the insurer had accidentally overpaid the complainants 4 weeks rent ($1,320). The Assistant Manager went on to say that the insurer would absorb and not seek to recover that 4 week overpayment. That undertaking was clear and deliberate. It would be unfair on the complainants not to take it into account in calculating the amount that has been overpaid. I calculate the fair and correct amount to be $43,180. The overpayment should be set off against the insurer’s further liability under the policy There has been a significant overpayment. The complainants say that they were not aware of it at the time but that they have retained the overpaid amount in a bank account. It would be unfair on the insurer to ignore the overpayment in assessing any further liability it has on the claim. 2.4 Calculation of amount payable by the insurer I have included the list of rectification items and their cost in the Section 3. The total for the 15 items of rectification that I have found are needed is $50,148. That is based on N’s estimates of the costs involved and the specific quote for cladding which I have adjusted as explained above. N’s estimates were made in his report dated 25 March 2025. Given the time that has elapsed since then and changing building costs, an allowance of 15% for contingencies should be added. That is $7,622.20. In addition, the amount for the cost of N’s report ($1,089) and the compensation for non-financial loss ($3,500) should be added, making a total of $62,259.20. From that total, the loss of rent overpayment ($43,180) should be deducted. That leaves an amount of $19,079.20 to be paid by the insurer to the complainants. 2.5 Why is the outcome fair? This outcome is fair. The complainants are entitled to have their house repaired on a new for old basis under the policy terms. Rectifications are required to meet that standard. It is also fair that the accidental overpayment of loss of rent by the insurer be taken into account. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 List of rectifications needed and estimated costs | Rectification | Cost Estimate | | | Front door latch | 465 | Eastern Gate and Fence | 965 | Timber Trim to External Walls | 1455 | Gaps to window frames | 675 | Front Gate | 198 | Dining Room Floor Joists | 405 | Cladding | 27,080 | Bedroom Wardrobes | 4,710 | Window Awnings | 1,580 | Bathroom Wall tiling | 1,455 | Cladding sub-floor space | 9,465 | Packing air conditioner supports | 760 | WC floor tiling | 295 | Bathroom Floor tiles | 535 | Fridge panel brackets | 105 | TOTAL | 50,148

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.