Defective repairs, inadequate cleaning and mishandling of a claim for hydraulic fluid spray damage
Text of the determination
Determination
|
Case number
|
12-24-108020
|
Financial firm
|
Sure Insurance Pty Ltd
Case number: 12-24-108020 28 May 2025
1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainants under their home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by an escape of hydraulic fluid from a cherry picker on the property next door
The insurer accepted the claim. It cash settled the contents as a total loss and and undertook repairs to the property. The complainants say the works are defective and their property remains contaminated with the hydraulic fluid. They say the insurer‘s failure to clean the hydraulic fluid property has caused additional damage to the property.
The complainants also say the insurer mishandled the claim and they are seeking compensation for their loss of income, temporary accommodation, professional fees and non-financial loss.
The insurer says all works are complete and the claim related damage has been rectified. It denies any further liability to the complainants under the claim.
1.2 Issues and key findings
Is the insurer responsible for further costs for cleaning of the property?
Yes, the information shows the insurer’s builder did not undertake the cleaning work detailed in the scope of work to an acceptable standard. The panel consider it fair for the insurer to pay the complainants the reasonable costs of cleaning the property.
Is the insurer liable for the remediation of defective repairs?
Yes, the insurer is responsible for the remediation of the non-compliant roofing repair work and the internal and external painting work.
Is the insurer liable for further accidental damage repairs not detailed in the BV SOW?
Yes. The panel is satisfied the complainants have established there is additional accidental damage to the property.
Are the complainants entitled to further payment for temporary accommodation?
The insurer and complainants settled the temporary accommodation benefit by allowing the complainants to purchase a caravan. The panel is not satisfied the complainants have established they have incurred further temporary accommodation costs.
Should there be any need for temporary accommodation during the remediation works, as determined by the independent building inspector, the panel is satisfied the insurer is liable to pay the reasonable costs of the complainants’ temporary accommodation for that period.
Are the complainants entitled to compensation for indirect financial loss?
Yes. The panel is satisfied payment of $5400 compensation for indirect loss is warranted in the circumstances.
Are the complainants entitled to compensation for non-financial loss?
Yes. The information shows the insurer mishandled the claim causing long delays in the resolution of the claim. The panel considers payment of $3500 compensation to each complainant is warranted in the circumstances.
Are the complainants entitled to reimbursement of their professional costs?
Yes. The complainants are entitled to be reimbursed for their professional fees up to $5000 in accordance with the AFCA rules.
Why is the outcome fair?
The outcome is fair because the insurer is entitled to rely on the terms and conditions of the policy regarding its obligations to the complainants.
Where the insurer has mismanaged the claim causing the complainants undue stress and delay, indirect financial loss and to incur professional fees, it is fair for the insurer to compensate the complainants for those losses and costs in accordance with the AFCA rules.
1.3 Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination, within 14 days of being notified of their acceptance, the insurer is to pay them the following amounts:
$5,400 for their indirect financial losses
$5,000 for their professional fees
$7,000 for their non-financial loss
Should the complainants accept this determination, within a reasonable time of being notified of their acceptance, the insurer is to:
provide the complainants with the names of three building consultants not previously involved in this claim. The complainants are to choose one of these building consultants to:
provide an actionable quote for the outstanding remedial painting work detailed in this determination, including rust treatment for all external steel
provide an actionable quote for the outstanding remedial roofing works detailed in this determination
provide an actionable quote for the repair or replacement of the steel window stays, bolt locks and hinges
provide an actionable quote for replacement of the stair treads
assess the oil spray related damage to the
> fences
> gates
> clothesline
and provide an actionable quote for repair (or if they cannot be repaired, replacement) of these items if the consultant is of the view these were damaged by the event
assess the need for temporary accommodation, if any, during the remediation works
pay the complainants a cash settlement based on the actionable quotes referred to in paragraph one plus 10% uplift to account for the transfer of the risk of repairs to the complainants.
pay the reasonable costs of the complainants‘ temporary accommodation, if any, for the period assessed by the building consultant
obtain an actionable quote from a cleaner with capacity and experience in cleaning spills of this nature for:
external cleaning of the property and pay the complainants the amount of the quote plus a 30% uplift to account for the transfer of the risk of the external cleaning work to the complainants
the work detailed in the complaints invoice for the cleaning of the interior of the property and pay the complainants the amount of the quote.
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address all issues.
This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable.
While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only.
Consideration of whether:
the insurer or its agents have breached any environmental laws or regulations regarding the hydraulic oil spill
the insurer or its agents have breached any work health and safety laws during the course of repairs at the property
either party or their agents have defamed the other or its agents is outside the scope of this determination and these issues have not been considered by the panel.
is outside the scope of this determination and these issues have not been considered by the panel.
Coverage of the policy
The complainants‘ home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainants.
The complainants‘ policy includes cover for accidental damage. Accident is defined in the policy as
An event or incident that causes loss or damage that you did not either intend or expect.
It is not in dispute between the parties that there was accidental damage to the property caused by the spray, however they disagree on the extent of the damage and whether the repairs have been completed to a reasonable standard or whether remedial work is required.
The policy excludes damage to soil, lawns, plants, trees and shrubs as well as agricultural equipment. It is not in dispute that damage to these are not covered by the policy.
It is accepted insurance law that the complainants carry the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainants have established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
On 24 August 2022 the owner of the property next door to the complainants engaged company M to undertake tree removal works using a cherry picker. At some stage the hydraulic hose in the cherry picker broke causing a spray of hydraulic fluid across the complainants‘ property.
The parties have different versions of what occurred and the extent of the oil spray.
The complainants each swore a statutory declaration on 25 October 2024 to the effect that when the hose broke off the basket it was waving around spraying hydraulic oil into the air under enormous pressure.
They say it sprayed under pressure for around 30 seconds until it turned into a dribble. They say the M company employees advised them at the time that the whole tank of hydraulic fluid had emptied which was about 200 litres.
They also say there was a moderate south easterly wind blowing all afternoon, which they have supported with information from the bureau of meteorology, and the spill left their entire property covered in hydraulic fluid. They say all the french doors and windows of the property were open causing contamination inside the property as well.
Similarly, two of the employees from M company provided statutory declarations, however these have not been executed. One was the machine operator and the other the ground observer whose role was to monitor the drop zone and to ensure the machine did not come into contact with a power or other service lines.
The operator says shortly after starting work at 2.00 pm the hydraulic line to the platform burst. He says he immediately pressed the emergency stop button on his platform, within about 2-3 seconds of the event occurring. He says he came down without re starting the machine and the travelled to a local hardware store to obtain cleaning products, including degreasers and heavy-duty truck wash. When he returned, he and his crew assisted the complainants clean their property and they returned the following day to continue cleaning.
The observer says at around 2.00 pm he heard a hissing sound and observed a haze of spray coming from the side of the machine. He immediately reached inside the cab and turned off its engine, which also stopped the hydraulic system; in his opinion he did so within 5 seconds of hearing the oil escape.
The fire service and local authorities attended the property the day of the event and advised on the clean-up.
The complainants also cleaned the deck and stairs with a gurney but it would not remove the oil.
Complainants lodged a claim with the insurer
The complainants lodged a claim with the insurer on the day of the event, being 24 August 2022.
On receipt of the claim the insurer engaged assessor CF who attended the property on 25 August 2022, the day after the event.
CF noted the following damage to the building and contents:
all elevations of the building have been sprayed with the hydraulic fluid including the open areas underneath the house (concreted), metal poles, guttering, roof, external blinds, timber floors, wooden stairs/balustrades and fencing
all contents located in the direct vicinity of the located cherry picker as well as contents located underneath the house have also been affected together with agricultural equipment.
CF said the machine operator provided it with the data safety sheet for the oil and the complainants also provided advice from the oil manufacturer stating that the oil spill:
posed no serious health implications
could be cleaned with a degreaser that is water-based, environmental, biodegradable. The truck wash (used by the machine crew immediately after the event) was not suitable
it will cause corrosion and paint damage if not removed
all surfaces must also be sanded back after washing and re-painted.
The assessor arranged for restorer SM to attend the property on 13 September 2022. SM noted there was hydraulic fluid was present on the majority of the external part of the structure, but that the internal part of the house was not affected.
SM recommended a structural wash down process for the outside of the house as follows
apply flooring protection to concrete floor
install water run off drums to down pipes
apply biodegradable cleaner and wash down all surfaces from the top down as required
after the house structure is cleaned remove the flooring protection and apply biodegradable cleaner and wash down concrete areas as required
SM returned to the property with a cleaner to test a degreaser on the painted steel posts and determined they could remove 80 – 90% of the residue.
SM noted it was unable to guarantee that all fluid will be able to be removed from all contents and structure, or that once contents and structure have been cleaned that further longer term damage will not occur.
The complainants say after the SM report the insurer did not take any action to clean the property until it engaged builder BV for both the cleanup and repairs.
The information shows the complainants made repeated requests of the insurer to expedite the clean up as they were concerned the failure to clean the was doing further damage and it was too big a job for them to handle on their own.
The complainants say the oxidising effect of the oil was evident on steel, painted finishes, plastic and rubber, and everything was greasy to touch. On 26 September 2022 they prepared a basic SOW of items they said needed to be replaced or repaired. Their SOW was much more extensive than the BV SOW and it was based on the complainants’ observations of the damage only. It included:
remove external contents to storage container
seal over Ableflex at post bases
clean underside of house
paint all steelwork under house
scaffold exterior
wash down exterior of house, incl fascia and gables
remove external fixtures, wiring, a/c pipes, irrigation, security cameras etc
remove internal contents to storage container
remove kitchen, ceiling fans, lighting, smoke detectors, a/c
soft wash clean interior incl, ceilings, walls, doors, floors, etc
sand and paint interior
build new roofline over stairs
sand and paint exterior timbers, incl under house
new battens, roof, gutters and downpipes
remove scaffold
build new walls in Utility room and replace stair treads
install new HWS
install new kitchen
install new a/c, fans, lights, smoke detectors
install new external wiring, a/c pipes and compressors, security cameras, lighting, fans, blinds,
clothesline, etc
return internal contents
clean concrete
return external contents.
BV provided a statement of work (SOW) on 5 October 2022. The SOW included an amount for cleaning and the following:
replacement of the entire roof, gutters, downpipes and solar hot water system,
sanding and repainting the entire external area of the house,
replacement of the external blinds and
sand and pain internal areas of the house that were affected by the hydraulic fluid spray.
The complainants were concerned that the SOW did not include all the damage. They say they were assured it could be varied as the repairs progressed, but the insurer wanted to get the work started. They say it was on that basis they agreed to the commencement of works by BV pursuant to the BV SOW.
The complainants signed the building contract on 29 November 2022 and the completion date for works was anticipated as being 31 January 2023.
The work commenced, however the complainants became concerned with the standard of BV‘s work, and that the cleaning was not being done properly.
The male complainant says he was at the property when the cleaners arrived on 24 January 2023. He says they told him they intended to use the usual product they use before a painting job, and they had not been informed there was an oil spill at the property.
The complainants provided a photograph of the product which states it is designed for cleaning soap scum and general dirty from tiles and porcelain and vinyl. The complainants say the cleaners advised them they had only cleaned the deck and not the internal areas.
Complainants sought legal advice
The complainants felt the insurer was not adequately addressing their concerns about the cleaning and the standard of BV's building work, and they engaged a solicitor. On 8 February 2023 solicitor WG wrote to the insurer requesting the following:
engagement of a specialised chemist or toxicologist to advise on
> the health risks at the property
> correct cleanup procedures and
> whether the property posed an environmental risk for which the complainants could be held liable
that the repairs already completed and the unrepaired damage be assessed by an independent building consultant
that defective works be remedied in accordance with the report
that the insurer pays the complainants temporary accommodation costs
Insurer engaged an independent building consultant and undertook chemical testing
The insurer engaged an independent building consultant JB to assess the progress of work at the property and scientist VA to test the property for chemical contamination. The information shows the insurer engaged JB in January 2023, prior to receiving WG’s letter.
JB inspected the property and provided a report dated 13 February 2023. Both complainants were present at JB’s inspection and instructed him 200 litres of hydraulic fluid had sprayed over their property.
JB noted that the building and cleaning work was incomplete, and recommended testing for the presence of hydraulic fluid.
On 22 March 2023 scientists VA attended the property and took 23 samples from various locations in the property. VA noted the difficulty with the task of taking and analysing samples given the type of testing carried out is usually done with bulk soil and water samples rather than discrete surface sampling.
VA says:
Based on the currently available information and laboratory analysis results of the collected samples, it is the opinion of [VA] that the home does not present with evidence of residual contamination from the hydraulic oil release event
VA noted there was oil type spotting to some internal walls of the property, but samples collected did not indicate the presence of hydraulic fluid. VA cleared the property for habitation and recommended final repairs be completed at the property.
The complainants raised several questions regarding the VA report. They were concerned as to why the surface of the interior had an oily residue in places. VA disagreed that the surfaces appeared and felt oily.
VA also clarified that the recommended ’hold time’ of 14 days referred to the time of collection of the sample to the analysis being performed. He noted testing for hydrocarbons (the marker for hydraulic oil) often occurred where leaks are several years old.
Complainants refer builder BV to state regulator
The complainants were contacted by builder BV on 3 April 2023 who advised he was ready to resume work at the property. He said he was told to pause works by the building consultant JP to allow VA to collect samples at the property.
After the resumption of work by BV the complainants, who are both builders and run a building business, remained concerned with BV’s work, particularly the roofing work and painting.
The complainants complained to the building industry regulator in their state (regulator) who attended the property and inspected the repairs.
The regulator provided a report dated 16 June 2023 noted the cleaning was not complete and they observed evidence of oil residue on the external and internal surfaces of the dwelling.
Further, the regulator‘s report found that there was evidence of substandard painting work and they also noted there were defects regarding the roof repair.
Following receipt of the regulator’s report BV engaged the complainants themselves, who run a building company, to undertake the roof remediation and complete the roofing works in accordance with the BV SOW.
Insurer says repairs at the property are complete
BV and the insurer consider building works complete at the property. There were some items the insurer says could not be completed, including the stair treads changed out by the complainants. BV said they were old and had signs of rot and they could not warrant the painting of them.
The complainants remain dissatisfied with the building works; they say they are defective and incomplete.
The complainants have provided several reports regarding the current state of repairs at the property. They have also provided quotes for the remediation of BV’s building works and repairs they say were not included in the original SOW. The complainants provided the following reports:
CB report 5 April 2024
The complainants instructed builder CB that the leak drained the hydraulic oil reservoir via the burst hose, resulting in oil being sprayed all over the entirety of the property, both externally and internally.
In their report, CB observed visible failure of paint adhesion to the steel and timber surfaces of the building. CB concluded that the painting of the property had failed due to poor preparation and a failure to properly clean off the oily residue. They also noted poor workmanship on the roof gutters undertaken by BV.
CB recommended:
all external timber and steel surfaces to be adequately cleaned and sanded back to facilitate a new paint system to ensure warranty against future failure.
replacement of the decking boards may be required due to the reduction in thickness of the boards when sanded back, resulting in non-compliance to the structural obligations of AS1684.3 2021 Residential Timber Framed Construction
the timber deck at the top of the rear stairs was unsealed at the time of the incident and due to the visible oil ingress, the paint application has failed. The timber decking boards at this location and cedar cladding (weatherboards) to the west elevation will require full replacement as successful adhesion of paint cannot be guaranteed
the steel window door stays, hinges and locks / handles require replacement due to pitting, corrosion and staining damage from hydraulic oil residue
BB report 13 May 2024
The complainants engaged builder BB to conduct an inspection of the property to review the building work for compliance with the National Construction Code.
BB inspected the property on 13th May 2024, and made the following observations:
defective gutter and downpipe installation.
defective wall cladding installation
defective apron flashing installation
the gaps between the stair treads are greater than 125mm.
hydraulic fluid appears to have etched into the paint on the steel beams and posts, it is unclear if this has affected the galvanized coatings protecting the steel, this would need to be investigated before the structure could be approved
paint bubbling on weatherboards and decking
BB says if the cleaning doesn't remove the hydraulic fluid, the structural integrity of the decking will need to be considered it the sanding of the boards reduces the thickness of the boards to less than what is allowed for the span between the joists.
During the inspection, BB noticed that there is a rainbow coloured film to the glazing, this appears to have been caused by the hydraulic fluid spreading in the rain indicating that oil residue was on the glass and therefore likely on the cladding.
Engineer RE report 13 February 2023
The complainants engaged engineer RE who inspected the property with the complainants on 13 February 2023.
RE was instructed by the complainants that 200 litres or oil was released onto the property. RE stated due to the pressure and volume of oil it was likely a large area outside the immediate area was affected, and they noted the moderate south easterly winds blowing at the time of the event.
At the property, RE observed
visual discolouration and residue on window glass, timber and concrete surfaces
discolouration and residue on painted timbers and steel members under the house kitchen benchtop, laundry benchtop and timber floors, pipework, ceiling fans, furnishings, fixtures and fittings
corrosion and discoloration on steel window bays, stays/locks, bolts/hinges and door locks, handles and hinges
corroding and lifting decking fixtures
spongy timbers on landing deck
It was RE’s view that the remediation was either incomplete or ineffective as staining and ingrain residue was in the sealants, coatings and materials inspected throughout the site. They recommended more thorough cleaning and treatment and in some instances replacement.
RE does not specify which materials need replacement but recommends further assessment by trades.
SL toxicology report 31 March 2023
The complainants engaged toxicologists SL. SL did not inspect the property but advised on hydraulic oil spills generally. DL says that surfaces made of metal, plastics, laminates and coatings may be damaged and may need replacement, and recommended the following:
any remaining hydraulic fluid should be cleaned immediately
the cleaning should be rigorous and may require strong detergents
the level of rigour may be difficult to achieve, and any cleaning already undertaken may need to be repeated
a thorough inspection of all surfaces should be made after the final cleaning had been completed
all damaged surfaces (if any) should be identified, and necessary rectifications made
exposure to residual chemicals should be limited
IT chemist report 25 January 2024
The complainants engaged chemist IT to review the VA report and three reports from PH who was engaged by the third-party insurer for company M to report on the contamination at the property.
IT did not inspect the property. The complainants instructed IT that the hydraulic oil reservoir had emptied onto the property.
IT noted that the insurer via its builder BV engaged a general cleaner to pressure wash the exterior cladding on the house in December 2022 using a household cleaning product.
IT says:
In summary, quick cleanup/response of hydraulic oil spills is crucial to prevent lasting damage to surfaces and the environment. Prompt removal mitigates the oil's penetration into porous materials, reducing stains, discoloration, and structural harm. Cleaning products suitable for oil spill cleanup include absorbent materials like clay-based absorbents or specialised oil absorbent pads to soak up the oil.
Additionally, detergent-based cleaners with degreasing properties can effectively break down and remove oil residues from surfaces. Biodegradable cleaners are preferable to minimise environmental impact.
IT reviewed the VA report and the three PH reports. Both VA and PH reported that there was no residual contamination at the property based on their analyses of samples taken at the property.
IT stated it was concerned regarding the timing of the samples taken, noting the initial incident happened on 24th August 2022 and 23 surface samples were taken by VA on the 22 March 2023 and PH took another 36 swab samples on 21st July 2023.
IT says:
Surface sampling of a hydraulic oil after this significant time lapse from the incident poses several problems due to environmental changes and degradation processes. Over time, exposure to elements such as sunlight, moisture, and microbial actvity can alter the oil's composition, affecting its chemical integrity. This degradation can lead to the breakdown of certain components, making them harder to detect accurately. Additionally, surface sampling may not represent the entire oil spill area due to uneven distribution or absorption into substrates, resulting in a biased or incomplete assessment of the spill's impact. Residual oil can undergo evaporation, volalization, or weathering, further complicating the sampling process, and skewing the analysis.
Therefore, delayed surface sampling runs the risk of providing an incomplete or inaccurate portrayal of the original spill's composition and extent, hampering effective remediation or assessment strategies.
Builder TB SOW and quote 20 June 2024
The complainants engaged builders TB to prepare a SOW and quote.
TB quoted for the following:
$86, 507 for internal repairs
> replace damaged/residue/stained timber kitchen cabinets, benchtop, sink and oven plus
> furniture removal and storage
> replace residue/stained timber laundry benchtop
> sand residue/stained internal timber floors, and re-coat
$40,583 for repairs to windows and doors
> replace all damaged steel door locks, handles and hinges
> replace residue/stained crimsafe mesh, security doors and flyscreen window frames
> replace all damaged steel window stays, bolt locks and hinges
$15, 114 for waste removal
$216,046 for external works
> Remove and replace residue/stained concrete. Includes disposal at licensed facility.
> Replace non-compliant, temporary stair treads
> Replace damaged/residue clothesline
> Replace residue/stained Colourbond fencing (warranty void by manufacturer)
> Replace residue/stained front fence and gates (beyond cost effective repair)
> Replace residue/stained hardwood deck over septic tank
> Replace residue/stained west wall cladding, and landing bearers and joists.
$56,100 for preparation and painting the steel
> Cleaning of residue/stains, and application of rust
> treatment and protective coatings to all steelwork in
> accordance with NCC protective coatings for structural steel
$57985 for electrical works
> Replace failed/failing security cameras
> Replace damaged/failed/failing electrical equipment
> Replace all damaged/failed air conditioning units
Builder FN quote 27 June 2024
The complainants also provided a quote from builders FN based in the TB quote for the remedial works at the property. The total of the FN quote is $446,133.13
2.1 Is the insurer responsible for further costs for cleaning of the property?
Yes, the information shows the insurer’s builder did not undertake the cleaning work detailed in the scope of work to an acceptable standard. The panel consider it fair for the insurer to pay the complainants the reasonable costs of cleaning the property.
The Panel is satisfied, on balance, that the insurer failed to properly clean the property
The panel is satisfied, on balance, the insurer failed to properly clean the property following the hydraulic fluid spill.
The information shows the insurer delayed in cleaning the property, effectively disregarding the opinion of its assessor CF who attended the day after the event and its restorer who attended within two weeks, that the cleaning was a necessary prerequisite for the restoration works and should be done straight away.
The information shows the complainants sent numerous emails to try to get the cleaning started as soon as possible. They followed this up with the insurer, yet the insurer failed to action their requests.
When BV was appointed to undertake works the information shows he failed to use appropriate cleaning methods and materials for the hydraulic oil spill.
The panel accepts that by the time BV did arrange cleaning the complainants became concerned with the method of cleaning work being employed and turned the cleaners away, however the fact remains the external cleaning had not been properly completed.
The panel considers the building regulator’s report is an independent record of the remedial work needed at the property.
The regulator found evidence of oil residue on the external and internal surfaces
The reported dated 16 June 2023 found that there was evidence of oil residue on the external and internal surfaces of the dwelling including:
downpipes
deck fan
the down bolt
western wall
steel bearer
exposed aggregate concrete
bedroom 2 walls
bedroom 3 walls
living room wall
study room wall
upper roof area, fascia, gables, cladding and eave surfaces.
The complainants undertook the internal cleaning themselves in around 10 October 2023, and are seeking $32,945.50 for those cleaning costs. They have provided an invoice for this work from their own business.
The panel accepts that the complaints undertook this work and considers it fair to require the insurer compensate the them for the internal house cleaning and to clean the external areas identified as displaying oil residue by the regulator. However, the panel considers the invoice to be excessive and notes the invoice is not itemised.
Complainants say they should be compensated for the possibility decking boards are compromised
The complainants say they want to be compensated for replacement of the timber decking boards in case the cleaning fails to remove the oil residue and the boards need to be sanded prior to painting to the extent they become structurally unsound and non-compliant with building codes.
The panel is not satisfied the complainants have established this damage has occurred to the boards. The fact that the builders note it as a possibility is not, in the panels view, proof on the balance of probabilities that the damage has occurred or will occur. As stated, this is the onus the complainants bear in establishing their claim.
The complainants seek a cash settlement, they are not seeking that cleaning or repairs be undertaken by the insurer. In doing so they accept the risk of repairs. Given this risk has been identified by the builders, the panel consider it fair for an uplift of 30% to be applied to the cash settlement for the external cleaning of the property.
Should the complainants accept this determination, within a reasonable time of being notified of their acceptance, the insurer is to:
obtain an actionable quote from a cleaner with capacity and experience in cleaning spills of this nature for external cleaning of the property and pay the complainants that amount plus 30%
obtain an actionable quote from the cleaner for the work detailed in the complaints invoice for the cleaning of the interior of the property and pay the complainants that amount
2.2 Is the insurer liable for remediation of defective repairs?
Yes, the insurer is responsible for the rectification of the non-compliant roofing repair work and the internal and external painting work.
Infromation shows preparation for painting was inadequate
The information shows the painting done pursuant to the BV quote was substandard. The expert reports show the paint was bubbling and peeling soon after being done. The reports also shows that the casement windows and french doors were overpainted.
The defective paintwork was noted by the regulator and builders BB and CB. The complainants provided photographs showing the paint peeling and bubbling.
BV says the complainants used a high-pressure cleaner on the freshly painted deck causing it to lift paint off the deck, however the insurer has not provided any further evidence regarding this as a cause of peeling paint on the deck.
Given the paint is peeling in other locations at the property the panel is not persuaded the insurer has established the complainants’ use of a high pressure cleaner is the operative cause of paint peeing on the deck.
The panel considers the regulator’s report is an independent record of the remedial work needed at the property, and they found defective painting work at the property. Regarding the painting, the regulator found:
there was evidence of patches of paint delaminating from the substrate on the decking and windows due to poor preparation.
there was evidence of over-painting on the casement windows.
the builder was responsible for rectifying the painting work on surfaces on the northern front bedroom wall and three deck areas.
there was evidence of defective paintwork in the kitchen, dining and living area.
The complainants say the painting work by the insurer’s builder is defective due to poor preparation before painting and failure to clean the oil patches. The complainants say:
the new paintwork is bubbling, not fully cured, and requires sanding, cleaning, or replacement
oil needs to be removed to allow the paint to adhere
galvanized coatings protecting the structural steel beams and posts have been affected by the oil residue, requiring further investigation for building approval certification
a rainbow-colored film visible on the glazing indicates the presence of oil residue on the cladding
The complainants’ quote allowed:
$137,500 for external painting and preparation
$93,850.17 for preparation and painting of all timber surfaces
$56,100 for preparation and painting of all steelworks.
The panel is satisfied the information shows the paint work is defective, however the panel considers the complainants’ quote for remediation of the paintwork is excessive,
The BV estimate for external painting was $21,875 and internal painting was $11,450. While the panel acknowledges there may be additional preparation requirements as part of the remediation for the defective paintwork, there is a large difference between these two amounts.
Further, the complainants’ quote is not itemised, and it includes an allowance for preparatory cleaning which the panel has determined the insurer is liable for as a separate component of the cash settlement.
Therefore, the panel considers it is unreasonable to require the insurer to cash settle the remedial painting works based on the quote provided by the complainants’ builder.
Given the complaints have provided information to show hydraulic oil residue can cause corrosion, and photographs demonstrating light corrosion to the external steel, the paint preparation quotes are to include rust treatment for all external steel.
Information shows other defective repair work
The complainants say the rectification work completed by the insurer’s builder BV is not compliant with National Construction Code (NCC) standards because:
there are no continuous overflow measures on the new guttering system, which has insufficient fall to the downpipes.
the incorrectly installed gutter spikes have affected the structural integrity of the fascia.
downpipes have not been fixed and sealed to the gutters.
there is cracked, damaged, and incorrectly installed wall cladding above the lower deck roof.
the apron flashings are incorrectly installed and flow back towards the building.
Additionally, the complainants say BV did not obtain building approval before re-roofing and did not have a roof frame inspection by an assessing certifier.
The complainants’ quote has allowed $68,727.21 for these rectification works.
The regulator found the builder is responsible for some repairs
The report said that while some of the repairs were satisfactory, that BV is responsible for the rectification of the following items due to defective work:
gutter spikes fascia
VJ MDF wall panelling
ceiling staining due to water ingress
flashing above the main bedroom/ensuite
apron flashings on the upper roof
silicone on the flashings, gutter joins
The complainants’ builder BB notes additional defects, and the complainants, who undertook some of the roofing repairs, also list additional defects regarding the roof.
The regulator’s report identifies the defective work related to roof repairs and is thorough, logical and supported by helpful photographs. The panel is also satisifed that BB is appropriately qualified to identify building defects and considers their report persuasive, although notes the stair tread gap issue is not event related.
The panel notes that the complainants’ quote is not itemised. Therefore, it is unreasonable for the insurer to cash settle the complainants based on the quote provided by the complainants’ builder.
Within a reasonable time of the complainants accepting the determination, the insurer must provide the complainants with the names of three building consultants not previously involved in this claim.
The complainants are to choose one of these building consultants to:
provide an actionable quote for the outstanding remedial roofing works detailed in the regulators report of 16 June 2023 and the BB report 13 May 2024
provide an actionable quote for the outstanding remedial painting work detailed in the regulators report of 16 June 2023 and rust treatment for all external steel
and pay the complainants the quote amounts plus 10% uplift to account for the transfer of risk to the complainants.
2.3 Is the insurer liable for further accidental damage repairs not detailed in the BV SOW
Yes. The panel is satisfied the complainants have established there is additional accidental damage to the property.
Complainants claim additional work is required to rectify damage
The complainants have provided a quote from their builder for additional work to repair the accidental damage caused by the oil spray. They say the insurer’s initial scope of work did not include these works.
The complainants also request replacement rather than repair of some items as the most economical option due to the level of contamination; they say this is the most economical way to address the damage.
These items include:
cleaning of residue/stains, and application of rust treatment and protective coatings to all steelwork in accordance with NCC protective coatings for structural steel
removing internal furniture and storage
remove and replace residue/stained concrete. Includes disposal at licensed facility.
replace damaged/residue clothesline
replace residue/stained Colourbond fencing (warranty void by manufacturer)
replace residue/stained front fence and gates (beyond cost effective repair)
replace residue/stained hardwood deck over septic tank
replace residue/stained west wall cladding, and landing bearers and joists.Cleaning of residue/stains, and application of rust treatment and protective coatings to all steelwork in accordance with NCC protective coatings for structural steel
replace failed/failing security cameras
replace damaged/failed/failing electrical equipment (Inspection and quote from Last Frontier Electrical)
replace all damaged/failed air conditioning units (Inspection and quote from Mossman Electrical Services)
furniture removal and storage
replace residue/stained timber laundry benchtop
sand residue/stained internal timber floors, and re-coat
replace residue/stained crimsafe mesh, security doors and flyscreen window frames
replace all damaged steel window stays, bolt locks and hinges
disposal of all contaminated materials to licensed facility in Sprint Mount. 8 x 8m3 bins
Panel is not satisfied, on balance, complainants have established the spray volume was 200 litres
As stated, the parties have different versions of what occurred regarding the oil spray.
The complainants say the spray went on for about 30 seconds until the reservoir on the cherry picker emptied, saying 200 litres of oil was sprayed on the property.
The female complainant says both complainants were covered in oil, however this is inconsistent with the CCTV footage from soon before and soon after the event which show neither of the complainants were covered in oil.
The machinery operators say they noticed the issue straight away and hit the emergency stop button within seconds, and only a small amount of oil sprayed over the property.
The complainants have provided an undated report from mechanical fitter ST trained in hydraulics. ST says it is unlikely the leak of hydraulic fluid was noticed immediately by the crew and more likely it went on for some time spraying fluid.
Given ST was not present when the incident occurred, and the crew has provided statutory declarations regarding what occurred, the panel prefers the crew’s version of events over ST’s version.
The PH contamination report obtained by the third-party insurer says:
It is unclear how the estimated amount of 200L was arrived at. Considering that the pump flow rate is at 22.7L/min, that is (22.7 / 60) 0.38L/s, if the shutdown took three to five (5) seconds, it would calculate to an amount of 1.9L. At ten (10) seconds, this would only be 3.8L.
For the proposed 200L to be expelled, the tank would have to be refilled three (3) times for this to occur. The time for this to occur would also have taken, excluding the refill time, a minimum of 8.81 minutes (200L / 22.7 = 8.81).
Although the complainants have cover for accidental damage under their policy and therefore do not need to establish the event caused damage, they do need to establish there is damage which is accidental.
As stated, the complainants bear the onus of establishing their claim and proving, on balance, the property sustained accidental damage.
While it is not in dispute there was damage from the oil spray, the extent of the damage is one of the issues in dispute in the complaint.
Given the above, the panel cannot be satisfied the complainants have shown, on balance, there was 200 litres of oil deposited in the property from the spray event.
The panel notes the complainants instructed their experts, and independent building consultant JB, that the spray volume was 200 litres or the whole hydraulic fluid reservoir and their reports are premised on these instructions.
Panel is not satisfied additional internal areas of the house were damaged by the event apart from
The panel is not satisfied, on balance, there is additional damage to the internal areas of the house caused by the oil spray, apart from steel window stays, bolt locks and hinges.
The assessor CF and restorer SM both noted the oil spray to the external areas of the property, but CF does not refer to internal damage and SM specifically stated there is no oil spray inside the house.
Further, the sampling of the property did not find the presence of hydraulic acid in the house.
While the panel acknowledges the complainants' chemist IT is critical of the methods used by VA and PH who made these findings, the complainants have not provided any compelling evidence to show there was hydraulic oil contamination to the internal areas of the property.
As stated, the complainants bear the onus of proving, on balance, there was accidental damage to the property.
The panel accepts there was some oil residue identified by the regulator to the walls of bedrooms 2 and 3, the living room and the study; however, the panel is not satisfied the complainants have established the oil contaminated the inside of the property to the extent they have claimed.
The VA report notes some oil residue to the fan and other places, but VA’s view is that this is not hydraulic oil. The panel does not consider the presence of oil residue amounts to damage that the insurer must show is excluded to avoid liability for.
The panel notes the brief report from MP appliances centre contained in an email of 25 January 2025 about the damage to the air conditions. The panel finds MP’s report that the air conditioners were covered in oil to be inconsistent with other evidence, and they recommend replacing the units because of ‘expected’ damage and ‘in case of’ a risk of fire. There is no information to show the air conditioners are damaged.
Similarly, the panel is not persuaded that the complainants have established there is damage to electricals, floorboards, kitchen, oven, laundry and other internal items. This is because the panel is persuaded by the evidence provided by CF, restorer SM, the regulator, VA and BV which are consistent regarding the extent of the internal damage.
The complainants have provided photos showing rust damage to the screen door, however the repairs for that item are included in the complainants’ cleaning invoice from October 2023.
The panel is satisfied the information shows there is damage to the steel window stays, bolt locks and hinges. There are photos which clearly show these items are damaged, and the insurer has not provided any submissions suggesting the damage is from an excluded cause.
Apart from these items, the panel is not satisfied the complainants have established damage occurred to the internal area of the house.
Therefore, the insurer is not liable for further repairs to the internal area of the house not identified in the original BV SOW, apart from replacement of the steel window stays, bolt locks and hinges.
Insurer liable for some external items not included in BV in SOW
The complainants say there were parts of the external property consisting of unpainted timbers which are porous and because it absorbs the oil it causes stains that cannot be removed, and it is not possible for paint to bond to the oil.
The complainants say the following areas were damaged and need replacing:
Landing deck joists and bearers
The complainants say the decking boards, joists, and bearers at the top of the stair landing were unsealed and therefore they have more absorbed oil and need replacing rather than cleaning.
Given the cleaning has not yet been undertaken, the panel is not satisfied the complainants have established this damage. As discussed above, the complainants are seeking a cash settlement as a resolution for their complaint, and in doing so they agree to a transfer of the risk of repairs. The panel has awarded a 30% uplift for the external cleaning component of the cash settlement to account for the risk.
The panel is not satisfied the complainants have shown, on balance, that the landing decking boards joists and bearers require replacement due to the damage caused by the oil spray.
Stair treads
The assessor CF noted in their report that the complainants asked via email on 29 August 2022, to change the stair treads as a temporary measure to help stop oil contamination upstairs.
The complainants provided and invoice dated 6 September 2022 showing the complainants replaced treads. The invoice says:
Remove stair treads contaminated by oil and replace with used hardwood stair treads (temporary repair)
The sanding and painting of the treads was initially included on the BV SOW, but because the SOW allowed for painting the treads, BV was unable to warrant the work and submitted a negative variation for the treads to the insurer.
The panel is satisfied the stair treads were damaged by the event, and that they were replaced with used treads as a temporary make safe measure to prevent further damage occurring.
The panel considers the insurer is liable for replacement of the temporary stair treads.
Replacement of concrete under house
The complainants say the concrete under the house is stained and needs to be pulled up and re-laid. The concrete was three weeks old when the spray occurred and had not yet cured, and a second section was prepared for pouring which was planned in the days after the incident. The complainants say they were to treat the concrete with sealant which is now not possible due to the oil stains in the concrete.
The CCTVE footage shows the concrete was cleaned in the aftermath of the incident by the crew using degreasers. It also shows it contains aggregate and is therefore patterned and not a continuous colour.
The complainants have not provided any compelling evidence to show the penetrable sealer would not stick to the concrete in its current state. Further, the final cleaning has not yet been completed to the external areas of the property.
Given this, the panel does not consider the complainants have established concrete has been damaged by the event to the extent that it needs to be replaced.
The policy does not define damage. The Macquarie Dictionary defines it to be
injury or harm that impairs value or usefulness
Even if some residual staining remains on the concrete, the panel is not persuaded the value or usefulness of the slab will be impacted. This is because the slab sits in an outdoor area and is exposed to weather, contains aggregate and is not therefore uniform in appearance and there is no evidence to suggest the integrity of the concrete will be impacted by staining.
The panel is not satisfied the insurer is liable to replace the concrete slab; however, the insurer must wash the slab in accordance with this determination.
Replacement of cedar cladding on western wall
The complainants are claiming for the replacement of the cedar cladding on the western wall of the property. This was noted in the BV SOW as impacted by the oil spray and pursuant to the SOW he was to clean and sand and paint, however the wall is in its natural state and the complainants say because of this it is porous and needs replacing.
The complainant has not provided any compelling evidence to show the wall cannot be repaired by washing and sanding as outlined in the VB SOW, and the cleaning works to the external areas of the property have not yet been undertaken.
The panel is not satisfied, on balance, the complainants have provided any compelling evidence to establish that the cedar cladding of the western wall is damaged to the extent it must be replaced.
Decking over septic system
Similarly, the complainants say the decking over their septic tank needs to be replaced
The complainants have not provided any compelling evidence to show the decking cannot be repaired by washing and sanding, which again, has not yet occurred to the outdoor areas.
The panel is not satisfied, on balance, the complainants have provided any compelling evidence to establish that his decking is damaged to the extent it must be replaced.
Fences, gates and clothesline
The complainants say the external fencing, gate and clothesline need replacing as they are uneconomical to repair.
The panel accepts the information shows these were impacted by the oil spray, however the panel is not satisfied the complainants have established these must be fully replaced.
The complainants say the fence manufacturer has revoked its warranty for the fencing material; however, the panel has not been provided with any information to show how this decision was reached by the manufacturer or the information the complainants provided.
The panel consider the damage to these items requires further assessment.
Should the complainants accept this determination, within a reasonable time of being notified of their acceptance, the insurer must provide the complainants with the names of three building consultants not previously involved in this claim.
The complainants are to choose one of these building consultants to:
provide an actionable quote for the repair or replacement of the steel window stays, bolt locks and hinges
provide an actionable quote for replacement of the stair treads
assess the oil spray related damage to the
> fences
> gates
> clothesline
and provide an actionable quote for repair (or if they cannot be repaired, replacement) of these items if the consultant is of the view these were damaged by the event
The insurer is to pay the complainants a cash settlement based upon the actionable quote plus 10% uplift to account for the transfer of the risk of repairs to the complainants.
2.4 Is the insurer liable for further temporary accommodation costs?
The insurer and complainants settled the temporary accommodation benefit by allowing the complainants to purchase a caravan. The panel is not satisfied the complainants have established they have incurred further temporary accommodation costs.
Should there be any need for temporary accommodation during the remediation works, as determined by the independent building inspector, the panel is satisfied the insurer is liable to pay the reasonable costs of the complainants’ temporary accommodation for that period.
Policy has additional benefit for temporary accommodation
The policy covers temporary accommodation where the home is unfit to live in due to an insured event. The benefit is for:
the reasonable cost of temporary accommodation for you and any person who was permanently residing in the home at the date of the insured event and is covered by the policy:
- until the home or contents are replaced or repaired; or
- until the home is fit to live in;
We will cover you for temporary accommodation for up to 18 months to a maximum of 10% of the sum insured for any one event
The complainants are seeking the temporary accommodation allowance for not being able to live in the house until it was cleaned. They say that the insurer should pay them a total $116,955.00 which is calculates as 345 days from 3 September 2022 to 13 August 2023 at a rate of $339.00 per day. They are seeking $63,900.00 to account for the $53,055.00 already paid.
They are also seeking a further amount to compensate them for the temporary accommodation they will need during the remediation works.
The insurer says the house was habitable from 23 December 2022. It says although there were still some repair works being undertaken, they did not impact the house’s habitability. The outstanding items at that time were the motorised blinds, minor roof defect and minor touch ups around the property.
The complainants disagree. They say the following issues at the property meant at was not habitable:
no safe food preparation area
oil not yet cleaned from inside house
no hot water
they were usure of the electrical safety
roof leaks
external house concrete not yet cleaned
no TV aerial, clothesline, air conditioning and malfunctioning ceiling fans
Panel considers property was habitable from date of receipt of VA report
The panel considers the property was habitable from the time it was cleared by VA as not being contaminated by the hydraulic fluid.
The information shows the VA report was received by the insurer on 3 May 2023 and sent to the complainants on 11 May 2023. From that time the panel considers both parties were aware the property was safe for habitation.
Panel is not satisfied complainants have shown they are entitled to further temporary accommodation benefit
The claim notes show that the insurer paid for temporary accommodation for the complainants initially and in the short term at a rate of $1200 per night which was due to the availability in the area at the time.
The insurer has provided a claim note from 5 September 2022 showing the complainants advised the insurer they were offered the use of a friend’s holiday house who agreed to let them stay for free in return for a donation to a charity they were involved in. Both parties agreed to the arrangement.
The insurer provided a claim note from 23 September 2022 showing the complainants had found a caravan for sale some distance away in a capital city. The complainants said it was convenient for them to collect it as they were spending about three weeks away visiting family and they could collect it on her way home from the visit.
The complainants indicated this was their preferred option and they would make up any shortfall between the benefit and the cost of the caravan.
The complainants and insurer agreed to settle the benefit by way of cash payment to the complainants for the purchase of a caravan, at the complainants’ request.
The complainants have not provided any information to show they incurred further costs for temporary accommodation. Therefore, the panel is not satisfied the insurer is liable for further temporary accommodation benefits regarding the work already undertaken to the property.
The panel considers it unlikely the complainants will need temporary accommodation during the remediation works given the work required inside the property consists largely of painting three rooms, which will not make the property uninhabitable.
Should there be any need for temporary accommodation during the remediation works, as determined by the independent building inspector, the panel is satisfied the insurer is liable to pay the reasonable costs of the complainants’ temporary accommodation for that period.
2.5 Are the complainants entitled to compensation for non-financial loss?
Yes. The information shows the insurer mishandled the claim causing long delays in the resolution of the claim. The panel considers payment of $3500 compensation to each complainant is warranted in the circumstances.
AFCA can award up to $5,400 compensation for non-financial loss
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 for complaints lodged before 1 January 2024) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear a normal degree of inconvenience during a claim.
Complainants say insurer delayed cleanup and failed to properly repair the property
The complainants are seeking compensation for non-financial loss in the amount of $5,400 each as joint policy holders.
They say the insurer created unnecessary delays and failed to perform repair work in a timely manner and to a reasonable standard depriving them of the ability to live in their house and conduct their home-based business.
The complainants say they suffered a significant amount of physical inconvenience having spent 11 months camping with basic living conditions in uncomfortably hot, humid, and wet weather conditions. They say they have had little income and suffered from anxiety and mental health conditions and lost all usual enjoyment of life and their property.
Panel considers payment of compensation for non-financial loss is warranted in the circumstances
The panel is satisfied the information shows the insurer mishandled the claim. The insurer delayed cleaning despite its assessor and restorer advising this should be done straight away.
The insurer’s builder BV then failed to properly clean the property before painting, causing the paint to fail and the whole repair process to need to be re done.
BV’s repairs to the roof were also substandard causing further delays and time taken for the claim to resolve.
The panel accepts these delays were very stressful for the complainants and that it took a toll on their mental health.
The panel consider payment of $3500 compensation for non-financial loss to each complainant is warranted in the circumstances.
2.6 Are the complainants entitled to compensation for indirect financial loss?
Yes. The panel is satisfied payment of $5400 compensation for indirect loss is warranted in the circumstances.
AFCA can award up to $5,400 compensation for indirect financial loss
Under paragraph D.3 AFCA can award compensation for indirect financial loss. This is capped at $5,400 per claim for claims lodged before 1 January 2024.
The complainants have the onus to show, on balance, an indirect financial loss exists and the amount of the loss.
The panel is satisfied, on balance, complainants suffered indirect loss
Indirect losses are the subsequent or secondary results of the initial loss or damage. The complainants say because their property was damaged, the suffered the secondary loss of being unable to conduct their business from the property.
It is generally accepted that indirect loss is generally a loss that either arose naturally for the breach of the contract or that could be supposed to have been in contemplation of both parties, at the time of entering the contract, as the probable result of the breach.
The policy excludes cover for loss of income. Page 40 of the PDS details the exclusion as follows:
Business activity
Any loss, damage or legal liability arising when part of the home or contents insured is used for any business activity, except where a business activity has been previously agreed to by us.
The complainants are seeking compensation under the AFCA rules for their loss of business income caused by the claim mismanagement and resulting significant delays they say left them displaced and unable to trade. They are not seeking the compensation pursuant to the policy.
The complainants have provided profit and loss information from their business showing a reduction in profit in the year following the event
The panel is satisfied the insurer’s mismanagement of the claim has caused these indirect losses for the complainants. They delay in cleaning the property and the mismanaged repairs led to disruptions for the complainants regarding the use of their property which had the secondary effect of reducing their ability to run their business.
The complainants are also seeking $290.73 for electrical make safe works conducted prior to them undertaking cleaning of the property after the event.
The panel is satisfied the insurer is liable for this indirect financial loss, which arose naturally from the damage to the complainants’ property.
Should the complainants accept this determination the insurer is to pay the complainants $5400 for their indirect financial losses in accordance with the AFCA rules.
2.7 Are the complainants entitled to be reimbursed for their professional costs?
Yes. The Panel considers it fair for the insurer to contribute $5000 towards the complainants’ professions costs in accordance with our rules.
AFCA can require the insurer to contribute to complainants’ professional costs
Paragraph D.5 of the AFCA Rules provides that we may determine an insurer should contribute up to $5,000 towards a complainant’s professional costs in pursuing a complaint.
Although there is no automatic right to legal costs, we can decide that the insurer should contribute to the complainant’s legal costs.
We can also require the insurer to contribute to the costs of other professionals engaged by the complainant. These costs are, however, usually capped at a total of $5,000 per complaint, regardless of the number of claims or issues raised in it or the types of costs incurred.
When considering whether to require the insurer to make a costs contribution, we take into account the complexity of the complaint and whether the complainants needed to incur the costs to understand or establish their claim.
Complainants seeking reimbursement of legal and other professional costs
As stated, the complainants engaged a solicitor and sought opinions from several consultants regarding the contamination and damage to the property. They incurred the following costs:
$9,072.73 for legal fees
$22,526.25 for expert report fees
The reason, for the most part, that the complainants engaged a solicitor and other professionals was the insurer‘s failure to progress the claim in accordance with its experts‘ reports regarding the urgency of cleaning the property and the substandard work of the insurer’s builder.
The complainants engaged several experts to identify the remediation work and the repairs at the property they considered to have been overlooked by the insurer.
The panel considers it fair to require the insurer to contribute $5,000 towards the complainants‘ costs. This is because the insurer mishandled the claim necessitating the complainants’ engagement of their own experts.
Should the complainants accept this determination, the insurer is to pay the complainants $5000 towards their total professional costs in accordance with the AFCA rules.
2.8 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainants, regarding the claim.
Where the insurer has mismanaged the claim causing the complainants undue stress and delay, indirect financial loss and to incur professional fees, it is fair for the insurer to compensate the complainants for those losses and costs in accordance with the AFCA rules.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer advocacy
a member with extensive experience in the insurance industry
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.