Storm damage claim to ceilings partially denied as excluded (gradual deterioration / maintenance issues)
Text of the determination
Determination
|
Case number
|
12-24-107768
|
Financial firm
|
Auto & General Services Pty Ltd
Case number: 12-24-107768 15 April 2025
Determination overview
Complaint
The complainant holds a home building and contents insurance policy (policy) for listed events, including ‘storm’ with the financial firm (insurer). She lodged a claim on 4 April 2024 for storm damage to the dwelling that occurred on or around 26 December 2023.
The insurer assessed the damage. It partially accepts the claim for resultant internal water damage to the ceiling in the left-hand bedroom and play room. It denies the claim for ceiling damage to the remainder of the house.
This because it says the damage was not caused by an insured event. Rather, the damage is a result of the ceiling’s construction, age and maintenance issues with the roof tiles. It also says there is no evidence of a storm created opening in the roof. These are specifically excluded under the policy.
The insurer has offered to pay the complainant $3,780 plus a 20% uplift for the accepted damage. It has also offered $4,000 compensation for non-financial loss (NFL) in full and final settlement of the claim.
The complainant rejects the offer. She says the insurer mishandled the claim and wants the entire ceiling and associated electricals replaced based on her builder’s scope of works/quotes totalling $42,787.
Issues and key findings
Is the disputed damage caused by the storm event?
No. This is because the exchanged information shows, on the balance of probabilities, the disputed ceiling damage is a result of its construction, age and maintenance issues with the roof tiles.
Is the insurers NFL offer reasonable?
Yes. The insurer’s offer adequately compensates the complainant for any increased levels of stress and inconvenience caused by its claim handling.
Why is the outcome fair?
The outcome is fair because, on balance, the disputed ceiling damage is excluded under the policy. It would be unfair to require the insurer to accept this aspect of the claim. The exchanged information shows the insurers offer of $4,000 NFL fairly compensates the complainant for its claims handling. It would be unfair to require the insurer to pay more.
Determination
This determination is in favour of the insurer. Within 14 days of receiving notice the complainant accepts this offer the insurer is required to pay the complainant $4,536 plus $4,000 NFL in full and final settlement of the claim.
Reasons for determination
Is the disputed damage caused by the storm event?
No. This is because the exchanged information shows, on balance, the disputed ceiling damage is a result of its construction, age and maintenance issues with the roof tiles.
Complainant to show the damage claimed triggers cover under the policy
It is accepted insurance law that the complainant carries the initial onus to establish, on balance (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Only if the complainant can do this, will the onus shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
Policy covers insured events
The policy is an ‘insured events’ policy. This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one or more of the insured events occurring during the period of insurance and not subject to the exclusions, is covered.
One of the insured events listed under the policy is ‘storms and rainwater’. On 4 April 2024, the complainant lodged a claim for storm damage to the property. The date of loss is on or around 26 December 2023.
Accordingly, the onus is on the complainant to establish the damage to the property is the result of a storm or other insured event under the policy during the period of insurance.
The policy consists of the Certificate of Insurance (COI) and Product Disclosure Statement (PDS). The policy must be read as a whole to ascertain the level of cover provided.
Policy cover is subject to terms, conditions, and exclusions
The full terms and conditions of cover are set out in the PDS and COI . Relevant policy terms are included in section 3.2 below.
There is no dispute among the parties that the complainant received a copy of the policy documents. As such, the insurer is entitled to rely on the terms of the policy in assessing the claim.
Parties disagree on the cause and extent of damage
It is not in dispute a valid claim has been established under the ‘storm and rainwater’ event. The insurer accepts the ceiling in the left-hand bedroom and play room has suffered resultant water damage because of the claimed storm.
The parties disagree the ceiling to the remainder of the house has been storm damaged.
Insurer says roof not damaged by claimed storm event
The insurers builder (TG) called the complainant on 6 April 2024 to arrange a site visit. The exchanged claim notes show TG offered the complainant a make safe. The complainant declined the make safe based on the advice of a private trade she had inspect the property.
TG attended the property on 12 April 2024. It identified pre-existing maintenance issues to the concrete roof.
In their report dated 16 April 2024 TG found:
ceilings throughout the property display significant deflection signs, indicating a potential issue
when a load or force is applied to the primary structure, it deflects to some degree
in this case, the ceiling system is directly connected to the primary roof structure. The roof tiles have become porous due to their age
once the tile becomes porous, it takes on additional weight. The extra weight pushes down on the roofing structure and the ceiling structure
the damage to the roof is not related to the storm event.
TG recommends the roof tiles be sealed and cracked tiles replaced prior to the commencement of internal repairs. It also notes pre-existing peeling paint that was painted over before complainant purchased the property.
In addition, the insurer relies on the complainant’s pre-purchase inspection report dated 10 September 2021. It notes mould/moisture staining to parts of the eaves. It recommends a roofer be engaged to fix the upper roof to reduce the risks of water leaks and penetration into the building.
The insurer says the report shows a trend of ongoing leaks to the roof occurring over several years. These have not been caused by a one-off storm event; rather by a lack of identifying and rectifying the maintenance issues with the roof. These issues have contributed to the roof becoming porous and no longer watertight.
The insurer also says TG’s report shows water damage to the ceilings throughout the property. The report and annotated images show there is pre-existing water ingress and damage. This is because of the evidence of peeling paint having been painted over prior to purchase in 2021.
The insurer says the complainant would have been aware of the overall condition of the roof prior to the storm event.
Complainant says roof was in good condition prior to the storm
The complainant says the roof was in good condition when the storm occurred. She relies on a report from her builder (GD) dated 17 May 2024 which says:
Upon inspection in January 2024 of [location of property] we had noticed that the storm had done some significant damage to the tiled roof resulting in water damage to the internal plasterboard ceiling.
In our opinion the plasterboard ceiling has been damaged from the storm due to no breathable membrane between the roof tiles and trusses acting as a second line of defines to the weather if a tile is damaged.
She also relies on an undated letter and images from consultants 1K. 1K installed solar panels on the roof in August 2022. It says the roof was in good condition and not deteriorating in any way. She also supplied an invoice dated 4 March 2022 for a roof pressure clean, gutter clean and to replace broken roof tiles.
The insurer says the pre-purchase inspection report shows the condition of the roof in 2021. Nearmap images from October 2021, November 2022 and November 2023 show the roof remaining unchanged apart from the installation of solar panels in 2022.
I have carefully considered the exchanged information. I am not persuaded by GD’s report. This is because it lacks specificity:
GD’s findings are not supported by images demonstrating the tile dislodgement was directly linked to a storm created opening; nor the condition of the roof and cracked tiles was a direct result of the claimed storm event
GD does not quantify the extent of the ‘significant’ damage to roof tiles it says it observed.
I accept the complainant had the roof tiles cleaned, and broken tiles replaced in March 2022. However, the invoice does not specify the location and number of broken tiles reinstated.
In addition, Nearmap imagery shows the solar panels were installed on two sections of the roof. I do not consider 1K’s comment about the roof condition determinative.
This is because:
there is no evidence it completed a detailed assessment of the roof
it does not state whether it is referring to the condition of the specific location of the solar panel installation or the entire roof area
as 1K are solar installation consultants, they are arguably not qualified to comment on the condition of the roof tiles.
Give the above, I am not satisfied, on balance, the complainant has established the:
roof was in good condition prior to the storm
maintenance issues contained in the pre-purchase inspection report had been adequately addressed prior to the storm
storm damaged the roof and created an opening to allow water to enter the ceiling cavity.
As the roof was not storm damaged, the insurer is not obliged to repair the roof.
Complainant says disputed ceiling damage caused by the storm
The complainant says she has performed extensive preventative maintenance and renovations to the property since it was purchased in 2021. These include:
cleaning all gutters, installing gutter guards and new down pipes
installing solar panels on the roof
replacing all soffits, pressure cleaning the roof and replacing roof tiles as needed
converting the left side of the house into a baby’s room and playroom in 2022. She fully replaced the cornices and ceiling in that area, installed a new manhole and additional insulation.
She says supplied images from 2021, 2022 and 2023 show the ceiling and roof were in excellent condition. Current photos supplied document the claimed storm damage.
In addition to 1K’s letter and GD’s quote dated 17 May 2024 she also relies on a subsequent report from GD dated 12 December 2024. It says:
the condition of the ceilings, cornices and the overall structure has significantly deteriorated over the past 8-9 months
visible mould and water damage extend across multiple rooms
water damaged trusses directly under where it was exposed to the elements for an extended period. These need to be replaced.
moisture spots and mould on the ceiling are becoming more prominent
water damaged ceilings and cornices observed to kitchen, living room, dining room that appear consistent with water infiltration and likely exacerbated by strong winds and prolonged exposure to rain during previously reported roof breach
severe mould has reappeared in the baby’s room and play room. The ceiling boards show visible water damage that cannot be attributed to natural deterioration within the ceilings less than two-year lifespan.
GD says:
the damage is directly linked to the prior roof exposure during severe weather events where strong winds carried water across the ceiling structure
the conditions have become unsuitable for habitation, particularly for a family with young children with immediate replacement of affected areas critical.
Insurer says disputed ceiling damage is excluded
Following TG’s attendance, the insurer appointed TD to complete a roof report. In its report dated 13 May 2024 TD confirmed:
the complainant’s builder inspected the roof following the discovery of the internal damage and found some tiles broken and displaced. This issue has been rectified
minor mould growth on bedroom three with other damage to the property being flaking paint /sagging ceilings
no evidence of mould in the roof cavity above bedroom three; only water marks visible
the area was HEPA vacuumed and treated with an antimicrobial solution.
The insurer accepts the damage contained in TG’s scope of works (SOW) dated 16 April 2024. TG’s SOW is limited to preparing and painting internal ceilings in:
bedrooms 1, 2 and 3
laundry
bathroom
entrance
kitchen
dining room.
The insurer has offered to cash settle the complainant in the amount of $3,780 plus a 20% uplift based on TG’s SOW and quote. It says it has identified some painting in the SOW that is not event related however will honour the SOW as a sign of good faith.
It also obtained a ceiling damage report dated 2 December 2024 from an engineer (KM), a roof plumbing report dated 2 December 2024 from NP and a hygienist report dated 6 December 2024 from VA.
Relevantly, KM’s report found:
the roof tiles either need to be recoated or removed and replaced. This is a maintenance issue
the ceiling to the left-hand bedroom and playroom needs to be adequately treated for assumed mould and then the ceiling in both rooms repainted. Until the roof tiles are repaired/replaced it cannot be guaranteed mould will not return to these areas
wet ceiling insulation in this area needs to be replaced
the wavy nature of the ceiling is a construction issue (i.e. ceiling fixed directly to roof trusses without back blocking as required by AS2589.1 1997 Gypsum linings in residential and light commercial construction – Application and finishing and age). It is not related to any insurable event
to rectify this the ceiling is to be removed and replaced with ceiling battens. This is a maintenance issue
damage and assumed mould to the ceilings in the main living area, bedroom three and the bathroom are all because of the maintenance issue with the roof tiles.
NP’s roof report identified maintenance issues with the home and a requirement to replace broken roof tiles. VA confirmed there is no abnormal mould within the property and no requirement for remediation. Images in the hygienist report taken in May 2016 (from Realestate.com) shows the pillowing/deflection of the ceiling pre-dates the insured event.
On balance, disputed ceiling damage is excluded
I have considered all the exchanged information, particularly the reports submitted by both parties. I am not satisfied, on balance, the complainant has established the disputed ceiling damage has been caused by the claimed storm event.
I accept the complainant has performed extensive renovations and preventative maintenance work to the property since it was purchased in 2021. I also accept the ceilings and soffits in the accepted area of damage were replaced in 2022.
The exchanged information shows the complainant has repaired or replaced localised cracked and missing tiles. However, there is no proof she has engaged a roofer to fix the upper roof as recommended in the pre-purchase inspection report to reduce the risks of water leaks and penetration into the building.
This is confirmed by NP who notes previous attempts to fix cracked and broken tiles. NP reports there are cracked and broken tiles requiring repair supported by images. KM also confirms roof tiles need to be repaired or replaced to prevent mould returning.
While sarking is not a requirement; the need for back blocking when fixing the plasterboard ceilings to roof trusses was required at the time of construction. There is no evidence the complainant was aware of this requirement. However, it has arguably caused or contributed to the ceiling deflection.
Both TG and KM attribute a combination of the ceiling construction and the weight of porous cement roof tiles as the cause of the ceiling deflection. Based on the foregoing it is more likely than not the ceiling deflection noted in the disputed areas was apparent in 2016.
There is no evidence a storm created opening allowed water to enter the roof cavity. I am satisfied the complainant was reasonably aware of the roof maintenance issues prior to the storm event as they were identified in the pre purchase inspection report.
I do not find the complainant builder (GD) reports persuasive. This is because:
GD has not provided images to support its assertion the roof tiles were dislodged or cracked as a direct result of the storm event
the language used in its 12 December 2024 report is not definitive; rather it uses the terms ‘appear’ and ‘likely’ when describing the damage and causation
GD is a builder; not an engineer or hygienist. Its observations in relation to the extent and cause of the mould damage is unqualified and directly contradicted by the insurers engineer (KM) and hygienist (VA).
Give the above, I am satisfied, on balance, the proximate cause of disputed ceiling damage is pre-existing maintenance issues and not a one-off storm event. It is more likely than not water would not have entered the property had the issues with the roof been addressed.
It is also apparent the identified deterioration of the property after the storm is due to the ongoing maintenance issues with the roof.
The complainant says the roof trusses and joists are storm damaged and need to be replaced. She relies on the report from GD dated 12 December 2024, a subsequent report/quote from a carpenter (JC) dated 25 February 2025 and several images of the trusses and joists to support her claim.
I am not satisfied GD’s comment about the roof trusses, JC’s report nor the images are sufficient to establish the trusses and joists were damaged because of the claimed storm and not due to the ongoing maintenance issues with the tiled roof. This is because:
In relation the GD’s report:
no persuasive evidence has been provided by GD to show the claimed storm event caused the alleged damage to the trusses
while GD says the trusses are water damaged and need to be replaced, there is no clear sign of water damage to the trusses in the images it has provided with its report.
In relation to JC’s quote:
in its ’initial assessment” JC’ says
Due to one (or more?) concrete roof tiles having been missing or damaged 3 rafters ad 3 joists were drenched for a number of days (possibly weeks?). Together with high winds the rafters have become partially distorted. Further there is mould on the rafters, joists, insultation and the top of the ceiling.
I have taken a number of photos from inside the roof cavity, some of which are to dark to see properly
I am not persuaded by JC’s comments. They are not determinative in establishing the damage was caused by the claimed storm event that occurred in December 2023.
This is because:
the language used in its ‘initial assessment’ about the cause of the damage is not definitive
it does not establish a causal link between the damage and the claimed storm event that occurred in December 2023
the quote/report was obtained 15 months after the claimed storm event occurred. It is not contemporaneous to the date of loss. As such, the comments cannot be relied upon to prove the damage to the trusses and joists occurred as claimed.
In addition, neither KM or NP reported any water or wind damage to the trusses and joists following their inspections of the ceiling cavity in December 2024.
Within 14 days of receiving notice the complainant accepts this offer the insurer is required to pay the complainant $4,536 in full and final settlement of the claim.
Is the insurers NFL offer reasonable?
Yes. This is because the exchanged information shows the insurers offer adequately compensates the complainant for any increased levels stress and inconvenience caused by its claim handling.
AFCA approach to non-financial loss
Under the AFCA Rules, AFCA can award up to $6,300 compensation for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled the claim.
We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if the loss was partially caused by the complainant’s actions or by factors outside the insurer’s control.
Insurers offer of $4,000 NFL is reasonable
The complainant says she has experienced increased levels of stress and inconvenience because of the insurers claims handing and breach of the General Insurance Code of Practice.
This is because:
she had to wait four weeks for the assessment report from TG
the claim was not adequately assessed. The assessor did not sign off on the report as he was no longer employed by TG
the insurer continued to rely on the 2021 pre-purchase inspection report despite receiving proof of significant renovations to the property that should have been considered
she experienced delays in communication by the insurer during the AFCA process
the insurer failed to support a vulnerable customer who could not afford the out-of-pocket cost being imposed on her. She says she was pressured to accept a cash settlement to which she did not agree.
The insurer has offered the complainant $4,000 in compensation for its handling of the claim. The complainant rejects this offer.
I consider the insurer’s offer of $4,000 NFL reasonable in all the circumstances. This is because:
the exchanged claim notes show there was a delay in providing the complainant with TG’s report
while the assessor had left the employ of TG there is no evidence the claim was not adequately assessed
the 2021 pre-purchase inspection report confirmed pre-existing maintenance issues with the tiled roof. The renovations have no bearing on the finding the disputed ceiling damage was caused by excluded perils and not by a one-off storm event
response times during the AFCA process were impacted by the insurer obtaining engineer, roof plumber and hygienist reports. I consider this reasonable in the circumstances
the disputed ceiling damage is denied, and the complainant is obliged to mitigate her loss. These costs would have been necessarily incurred to rectify and prevent further damage.
Within 14 days of receiving notice the complainant accepts this offer the insurer is required to pay the complainant $4,000 NFL.
Why is the outcome fair?
The outcome is fair because, on balance, the disputed ceiling damage is excluded under the policy. It would be unfair to require the insurer to accept this aspect of the claim.
The exchanged information shows the insurers offer of $4,000 NFL fairly compensates the complainant for its claims handling. It would be unfair to require the insurer to pay more.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Policy Terms
|
Page
|
Description
|
26-40
|
The ten events your home and contents are insured for
In this section, you’ll find the events your home and contents are covered for at your insured address. Some conditions and exclusions may apply.
..
5. Storms and rainwater
…
|
37
|
You are covered for
Loss or damage caused by storms and rainwater, including from:
earth movement that occurs within 72 hours of a storm or heavy rain, and as a result of that storm or heavy rain
surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm or heavy rain
the escape of rainwater from any water pipe, drain, or gutter
wind damage caused by storms or heavy rain.
You are not covered for Loss or damage caused by:
…
rain, hail, wind, snow, or dust due to:
> an opening that was not created by the storm or any other insured event
> defects in design, structure, materials, workmanship, or construction that you knew about or should reasonably have known about
> the home not being in good condition, including guttering and drainpipes. See conditions of your cover on page 15. …
|
61-63
|
General Exclusions: What this policy will never cover
Some events and causes are never covered by this policy. These are known as ‘General Exclusions’ and apply to the whole policy. You are not covered for any loss, damage, or legal liability you incur resulting directly or indirectly from events and causes listed below.
…
Consequential Loss
You are not covered for consequential or indirect loss, inconvenience or expense, including things like:
costs arising from any business interruption
cost of any water loss
loss of business records
loss of profit or loss of income the intellectual or sentimental value of an item.
…
Gradual deterioration
You are not covered for loss or damage caused by any gradual deterioration to the extent that the gradual deterioration contributed to or caused the loss or damage. Some examples of gradual deterioration are things like rust, corrosion, rot, mould, rising damp, mildew, wear, tear, or fading.
When your claim involves gradual deterioration
We will not repair or replace parts of your home or contents that have suffered loss or damage as a result of gradual deterioration. In the instance where there are multiple causes or areas of loss or damage to your home or contents, we will cover the part of the loss or damage caused by an insured event or optional cover.
|
19-21
|
How we settle your claim
If we have accepted a claim for loss or damage to your home, we will aim to repair or rebuild using builders or suppliers in our network. We will cover repair and rebuilding costs up to the limits state in your Certificate and this PDS.
In some circumstances, we may be unable to repair or rebuild all or part of the home, and this can impact how we settle the claim – see page 20 When we cannot repair or rebuild.
…
If you request a cash settlement
If we are able to repair or rebuild, but we agree to your request to pay you a cash settlement, we will pay you the amount it would have cost us to repair or rebuild, plus any applicable Additional Benefits stated in this PDS.
…
When we cannot repair or rebuild
We may not always be able to repair or rebuild the damage to your home. This may happen when:
our supplier’s capacity will result in extensive delays, or
our supplier is unable to provide a warranty for the works, or
pre-existing damage, maintenance issues, or building defects impact our ability to repair or rebuild,
or
it would be unsafe for our supplier to attend the property.
If this is the case, we will pay you the reasonable amount it would cost you to repair or rebuild the accepted loss or damage to your home to the same standard specification, or quality – see page 21 How we calculate the reasonable amount.
…
How we calculate the reasonable amount
When we calculate the reasonable amount it would cost to repair, rebuild, or replace, we will do either or both of the following:
arrange for one of our assessors, builders, or suppliers to assess the damage, or
assess any quote you provide, including reviewing the repair method, labour, and material costs.
Any assessment we do will consider current industry costs and internal and external cost databases.
We will also consider any applicable additional benefits available to you.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.