Determination 12-24-107410

Partial denial and undervaluation of storm damage and mould claim, failed make safe works, temporary accommodation and delay

FirmHollard
Decided2025-04-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$6,300
Amount claimed—
SourceAFCA PDF

Summary

Complainant's home was damaged in a storm and the insurer partially accepted the claim and offered a $65,779.10 cash settlement. AFCA upheld the complaint significantly in the complainant's favour, rejecting roof cover but requiring independent mould remediation and repair scoping, a cash settlement with a 20% contingency, extended temporary accommodation and $6,300 non-financial loss.

The insurer's assessment of storm and mould liability was unfair and its poor make safe and claim handling worsened the damage, but the roof was at the end of its life and the total loss claim was unsubstantiated, so fresh independent scopes were ordered.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterpay claimpay compensationpay non financial lossreassess claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-107410 | Financial firm | Hollard Insurance Partners Limited Case number: 12-24-107410 26 March 2025 Determination overview Complaint The complainant holds home building and contents insurance with the financial firm (insurer). She lodged a claim for damage to her home following a storm on 5 December 2023. The insurer has partially accepted the claim limiting cover to damage it has assessed to be consistent with the storm event and associated mould. The complainant disputes the insurer’s assessment of the damage. The complainant says the insurer’s failed make safe works and poor management of the claim have resulted in significant additional damage. This is due to further instances of water ingress and mould having spread to all areas of the building. The complainant says the insurer’s negligent claim handling has resulted in the destruction of her home, such that it now requires demolition and a complete rebuild (total loss). The insurer refutes the complainant’s position and says its final cash settlement of $65,779.10 fulfils its obligations under the policy. The complainant is also seeking further cover for temporary accommodation (TA) expenses until such time as the home is made liveable. The complainant says the insurer’s management of her claim and undue delays experienced has caused stress, anxiety and has impacted her mental health. She seeks the maximum compensation available under the AFCA Rules. Issues and key findings Is the insurer obliged to cover the cost to repair/replace the roof? No. The exchanged information supports that it is more likely than not that the roof was in a poor condition and at the end of its serviceable life before the storm and subsequent make safe repairs. It would not be fair to require the insurer to cover and/or contribute towards the cost to repair/replace the roof. Is the insurer’s final claim settlement offer fair? No. The exchanged information does not show the insurer’s assessment of its liability for the damage to the insured building, including the required mould remediation, is fair. It is more likely than not that that there exists a greater extent of stormwater ingress damage and in particular mould remediation works that the insurer is obliged to accept under the policy. Is the insurer required to provide further TA cover? Yes. The insurer is required to cover the complainant for additional TA in line with this determination. Is the complainant entitled to non-financial loss compensation (NFL)? Yes. The insurer’s claim’s handling has resulted in undue delays and caused the complainant to experience unreasonable levels of stress, anxiety and physical inconvenience. The insurer is to pay the complainant $6,300 in NFL, this being the maximum award for NFL in line with the AFCA Rules. Why is the outcome fair? The panel considers the outcome is fair because it is based on the exchanged information and the policy. The panel has considered the parties’ positions and is not satisfied either parties supporting information allows the panel to come to an informed position on what a fair final claim settlement should be under the policy. The panel is satisfied it is fair to accept the insurer’s assessment of its liability is not reasonable and also that the complainant’s claimed level of indemnity appears excessive. Given this, the panel is satisfied it is fair that the parties be required to co-operate to source fresh, actionable, fair and reasonable scopes of works and repair costs based on which the claim is to be finalised in line with this determination. The panel is also satisfied it is fair that the insurer covers the complainant for additional TA expenses as well as pay her NFL. Determination This determination is significantly in favour of the complainant. In line with this determination:  within 14 days of receiving notice of the complainant’s acceptance of this determination: > insurer is to pay the complainant $6,300 in NFL > provide the complainant with the names of three mould remediation experts (who have had no prior involvement with this claim) > provide the complainant with the names of three independent building experts (who have had no prior involvement with this claim)  within 14 days of being provided this information, the complainant is to inform the insurer of her preferred mould remediation consultant and preferred building expert from the details provided by the insurer  within 7 days of being informed of the complainant’s chosen mould remediation expert, the insurer is to arrange for them to attend the insured property  the expert is to complete a detailed assessment and provide a SOW and quote for remediation of all required areas of the insured building. This is to include details of all surfaces and materials that need to be replaced/disposed due to mould damage/contamination. This includes but is not limited to the roof cavity, air-conditioning/ducting, fixtures and fitting, floors where necessary  within 7 days of receiving the SOW and mould remediation quote from the mould remediation expert, the insurer is to authorise the mould remediation works  within 7 days of receiving the post remediation verification certificate the insurer is to arrange for the chosen building expert to assess the insured building and determine the extent of all remaining water ingress and mould damage. The building expert is to provide a detailed SOW and repair quote (including and having regard to any building works recommended by the mould remediation consultant)  within 14 days of receiving the building expert’s SOW and repair quote, the insurer is to cash settle the complainant based on this repair quote  the cash settlement is to be increased by a further 20% to allow for contingencies. The insurer is to cover the complainant for additional TA in line with section 2.3 of this determination. Reasons for determination This determination follows consideration of all the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. For the purposes of this determination, commentary is restricted to only those issues considered relevant. There is no dispute the insurer has accepted the complainant’s contents loss and damage on the basis they were a total loss. The insurer has cash settled the complainant for this aspect of her claim based on the contents sum insured of $330,100. The panel is satisfied this aspect of the claim is no longer in dispute between the parties. Is the insurer obliged to cover replacement of the roof? No. The exchanged information supports it is more likely than not the roof was in a poor condition and at the end of its serviceable life before the storm and subsequent make safe repairs. It would not be fair to require the insurer to cover and/or contribute towards the cost to repair/replace the roof. Parties differ on their opinions regarding the roof The complainant is of the opinion the insurer should be required to cover the cost to replace the roof of the building. The complainant says there was no evidence of the roof leaking before the storm event or even after the insurer’s first make safe works on 8 February 2024. The complainant says the roof was damaged and began to leak after the insurer’s subsequent make safe repair attempts. The insurer refutes the complainant’s position and says the roof was in a poor condition prior to the storm event in December 2023 and the make safe works. The insurer says the roof was found to be at the end of its serviceable life. This was due to its age, lack of maintenance and installation issues, all of which existed from before the storm in December 2023 and any make safe works authorised under the claim. Parties have provided conflicting supporting information The panel has carefully considered all the information from the parties relating to the dispute regarding the roof. This includes all the consultants’ reports, the parties’ observations, opinions and the many photos of the roof and the building. The complainant relies on her own views of the roof and information from her preferred building consultants’ ‘NC’, who have provided comments in a letter regarding its observations of the roof. NC confirms having inspected the building and roof on or about 7 March 2024, and says at the time the roof was observed as being watertight. Further, that the roof’s construction was noted as being consistent with standard building practices (except for the back room) in place at the time of construction. NC says it was the excessive storm event that caused the initial water ingress damage and not the existing condition of the roof. NC says there were no active leaks or significant damage to the roof at the time or that would compromise the roof’s integrity. NC says it observed the make safe team engaged by the insurer attempting make safe works to the roof. NC says that these workers demonstrated little care or concern for the roof condition causing additional damage to the roof. On returning to the property in April 2024, after the insurer’s attempts to make safe the roof, NC says the condition of the roof had dramatically changed due to the works and associated damage caused by the insurer’s trades. This included foot traffic damage and sheeting alterations which is damage that was not present previously. In NC’s opinion the damage noted was caused by the activities of the insurer’s make safe team and which left the roof no longer watertight requiring re-sheeting. The insurer has declined cover for the roof and maintains the roof was at the end of its serviceable life and in poor condition from before the storm event. The insurer relies on the assessments and reports from make safe consultants’ ‘CD’, building consultants’ ‘W’ and a roof report from ‘RR’. CD completed the several make safe works having first attended the property on or about 8 February 2024. CD’s reports confirm having found multiple water ingress points such as missing screw holes, sheet creases that had torn and sheeting falling the wrong way holding water. Further, that the overall condition of the roof was poor. W attended the site on 6 February 2024 and has provided a report dated 4 March 2024. W says in its opinion the water ingress damage noted was due to the poor quality of the roof including penetrations, incorrect pitched roof sheets and inadequate drainage. W notes a roof report would be required, and for which RR was engaged. RR inspected the roof and has provided a report dated 14 February 2024. The panel notes this is from before the second make safe attendance by CD, this being from when the complainant claims the roof was damaged by CD. In its report RR states/notes:  widespread heavy foot traffic on the roof sheets and the presence of previous deteriorated repair attempts using silicone which is only a temporary repair method and breaks down over time  the lounge roof has been covered over by a non-professional instalment of a veranda roof  anti-capillary features to the roof sheet laps have been compromised and are non-compliant  roof sheets are showing evidence of ponding resulting from insufficient roof pitch  roof sheets have not been turned into the gutter per the manufacturer’s instructions  flashing connections are not undersealed and have insufficient fasteners with gaps present. This traps moisture and debris under the flashings leading to corrosion and further ingress  the roof sheets at the transition point to the hips have been end-lapped. This reduces longevity as moisture from condensation gets trapped between the sheets leading to corrosion  previous non-professional installation using silicone to seal the whirlybirds, skylights and vents to the roof sheets does not comply with the manufacturer’s instructions  all cable penetrations are heavily reliant on silicone which has no longevity and breaks down under the sun’s UV rays  fasteners throughout the roof have reached the end of their serviceable lifespan, over tensioned and under-fastened roof screens/split neoprene washes are heavily corroded which has spread to the roof sheets and flashings below and requires replacement to prevent the spread of corrosion  presence of hail damage to the whirlybird and vent penetration throughout  numerous roof sheets and their components have reached the end of their serviceable lifespan. RR concludes that the issues with the roof are maintenance related, aggravated by recent weather events and that the roof is beyond repair recommending complete replacement. The complainant sourced a roof repair quote from ‘CB’ in the amount of $57,871.00 dated 23 March 2024. The panel notes this quote does not provide any information that could reasonably assist in considering the condition of the roof or the cause and extent of damage. The quote is for the replacement of the roof sheets, flashings, ridge caps, valleys, aprons, screws and fixings etc. The complainant says she was prepared to arrange these works on receiving the above information from the insurer. However, she changed her mind after the damage caused to the roof by CD in subsequent make safe works. In her opinion this now requires the insurer to cover or at the very least contribute to the cost to replace the roof. Information supports the insurer’s position regarding condition of the roof The panel has carefully considered the information provided by the parties, together with the policy wording. The panel is satisfied it is fair to accept that the information from the insurer with respect to the condition of the roof both prior to the storm and make safe works, is more persuasive. The panel notes the complainant also acknowledges that the roof was more likely than not at the end of its serviceable life before the storm event. However, that she feels that the insurer should be held liable for damage to the roof caused during make safe works. The panel acknowledges her position but is not of the same opinion. This is because, regardless of any possible additional damage to the roof caused in the make safe works, this does not impact on the fact the roof was at end of its serviceable life and in need of replacement (or major restoration works) before the storm and make safe works. The panel acknowledges the failed attempts to make safe the roof have more likely than not resulted in further internal water ingress and associated damage and mould. However, this does not show it would be fair to require the insurer to cover the cost to replace the external roof. The impact of further internal water ingress and associated damage and mould will be considered in more detail under section 2.2 below. As noted, the panel is more persuaded by the reports, opinions and supporting information from the insurer. The panel is satisfied, on balance, that the roof was in a poor condition prior to the storm and make safe works due to issues relating to its age, construction, fixings, drainage, lack of maintenance and which left it vulnerable to significant wind and rain events. Further, that it was at the end of its serviceable life and in need of replacement with no evidence of storm damage. The insurer is entitled to decline cover for the roof For the above reasons, and in the absence of persuasive information to the contrary, the panel is not satisfied it would be fair to require the insurer to repair and/or replace the roof under the policy. This responsibility rests with the complainant as part of her obligation to maintain the insured property. Is the insurer’s final claim settlement offer fair? No. The exchanged information does not show the insurer’s assessment of its liability for the damage to the insured building, including necessary mould remediation works, is fair. No dispute the insured building presents with storm and mould damage There is no dispute that the insured building suffered internal water ingress damage from the storm, as well as additional water ingress damage due to failed make safe works. It is also not disputed that the building presented with limited mould due to the original stormwater ingress and which has then spread to all areas of the building. This has resulted in significant mould damage to the building and contents supported by the fact the insurer has paid the complainant the full contents sum insured of $330,100. The parties however are in dispute regarding the extent of the internal damage to the building and associated mould remediation requirements to restore the building to its pre-loss condition. The insurer maintains that having assessed its liability under the policy and based on the information from its consultants, a cash settlement of $65,779.10 fulfils its policy obligations towards the building loss and damage. The panel notes the cash settlement offer is based on:  W’s building SOW and repair quote dated 7 June 2024 in the amount of $38,919.50  W’s SOW and mould remediation quote dated 5 June 2024 of $11,679.81; and  a 30% contingency payment of $15,179.79 The complainant remains dissatisfied with the insurer’s assessment of its liability for the storm damage as well as its failure to adequately acknowledge and take responsibility for the significant mould infestation of the building. In addition to relying on information present in the insurer’s consultants’ reports, the complainant has obtained her own repair quotes, reports and opinions from her preferred consultants. The panel notes over the course of this complaint the complainant’s expectations of indemnity under the policy have changed. She originally accepted the view that the building was repairable, however, at a significantly higher cost, but now is of the view that the building is a total loss requiring demolishing and a rebuild. The complainant has sourced several building quotes, these being:  a new home estimate from consultants’ ‘HH’ dated 11 June 2024 totalling $545,881  a new home estimate from consultants’ ‘CH’ dated 16 June 2024 totalling $601,296.38  a building repair and mould remediation quote from NC dated 30 August 2024 totalling $491,439.62, which does not include the roof. With respect to the extent of mould remediation works, the complainant prefers the evidence from fire, water and mould restoration experts ‘NL’ (appointed by the insurer). NL has provided a mould and moisture impact assessment report dated 24 February 2024 and a mould remediation quote dated 23 February 2024 in the amount of $111,089. However, the panel notes that the remediation quote includes works to both building and contents. Given the contents have been covered under a total loss settlement, the panel accepts consideration of NL’s mould remediation quote is to be limited to the building remediation costs only ($56,166.00). The insurer, in calculating its final claim settlement offer, relies on a post mould remediation verification assessment report dated 31 May 2024 from consultants’ ‘RI’. It also relies on comments from W and a mould remediation SOW and quote from W dated 5 June 2024 in the amount of $11,679.81. The panel notes the parties’ positions are significantly different with the insurer calculating its liability for the building damage and mould remediation at $65,779.10 (inclusive of a 30% uplift). The complainant on the other hand says the only solution now is for the building to be demolished and rebuilt, which the panel accepts is more likely than not expected to cost approximately $600,000 if not more. Insurer’s management and assessment of its liability has been poor The panel is satisfied that from the very early stages of the claim it was clear that the building had begun to present with mould, and that the complainant was allergic to mould. The panel accepts the exchanged information shows the building continued to experience water ingress and associated additional damage due to the insurer’s failed make safe works. The panel is satisfied that the insurer’s poor management of the claim, make safe works and associated delays are the reason for additional water damage and mould spreading to all areas of the building. The panel accepts the complainant’s concern that the insurer failed to accept and act on the findings and recommendations that its appointed mould remediation experts NL provided in the report dated 24 February 2024. This report from NL confirmed all sections of the home were deemed Condition 2 and Condition 3 with respect to mould i.e. very high to extremely high levels of mould. In this report NL confirms this level of mould infestation coupled with the identified species of mould presents as a health risk. NL provides a detailed list of close to 20 recommended mould remediation steps coupled with the methodology to be actioned by the insurer to address the mould infestation. NL also identifies the relevant appliable and required professional standards that apply to completing the recommended mould remediation works. The panel is not satisfied the insurer has provided any persuasive information to show:  what mould remediation works were completed at the property  how and whether these works were consistent with the steps recommended by NL  in what areas of the building were the remediation works completed  whether the remediation works were consistent with and met the required professional standards  if the remediation works were completed by suitably qualified and trained consultants. There is no explanation from the insurer as to why it appears to have preferred to appoint a different mould remediation consultant in RI to complete the post mould remediation verification assessment, as opposed to NL. It is only through reviewing the report from RI that the panel gets some indication that it is possible that the insurer had arranged some degree of mould remediation work. This would be the only reasonable cause for the insurer to appoint RI to complete a ‘post’ remediation assessment. The panel notes that this post remediation assessment from RI confirms that the insured building had not been completely remediated from mould with several areas and materials still requiring attention. RI did not issue a post remediation verification certificate, given the need to arrange additional mould remediation works, which the panel notes were not arranged by the insurer. Rather, it seeks to cash settle the complainant for these works based on a SOW and quote from W in the amount of $11,679.81. The panel is not satisfied it has been shown that W is adequately qualified or licensed to complete and therefore provide a quote for mould remediation works. Further, there is an absence of any allowance for a post remediation assessment in W’s proposed quote. The panel notes the complainant’s concern that the insurer has refused to include mould remediation within the ceiling cavity. The panel notes this is based on W’s position that the ceiling cavity is not a habitable space and as such is treated differently to the internal living space. W says it is not normal practice to complete treatments within the ceiling cavity or other voids. The panel finds this concerning, first due to the fact that neither the insurer nor W have provided any supporting information to show mould remediation of a home does not include areas such as the ceiling cavity. This is especially concerning considering testing arranged by NL confirms the presence of mould in the ceiling cavity and the complainant is allergic to mould. Secondly, based on the reports and the panel’s previous experience in reviewing many mould related complaints, the panel is aware that mould spreads from mould i.e. unless all areas affected by mould are remediated, there exists a strong potential for the mould to re-appear and spread throughout the building. Given this, the panel is not satisfied that the insurer’s assessment of and associated proposed mould remediation works are fair, reasonable or meet its policy obligations. The panel accepts the complainant’s position that the insurer has failed to fulfil its policy obligations with respect to the matter of mould remediation. Further, that this has resulted in significant additional damage to the property and associated undue delays in bring this claim to conclusion. The panel accepts it fair to accept that the building has remained unsafe to live in for this entire period due to the health risks associated with mould. Positions of both parties at opposite extremes and remain unsubstantiated The panel is not satisfied the insurer’s assessment of its liability for the building damage is fair or adequate in the circumstances. The panel is not satisfied the insurer can fairly be in a position to produce a final building repair SOW until such time that the building is completed cleared of mould. This is because it is not unusual that mould remediation works result in and/or require additional building works such as stripping and disposing of building materials. Therefore, until such time that the building is free of mould and a post mould remediation verification certificate issued, there is no way of finalising what building repairs are to be accepted under the policy. In saying that, the panel is also not satisfied the information from the complainant is adequate or compelling in terms of establishing the building is beyond repair, needs to be demolished and rebuilt. The panel has considered the SOW and quotes provided by the complainant. However, these do not include any persuasive information, opinion or supporting information that can fairly be relied on to conclude the building is beyond repair or is a total loss. The panel acknowledges the complainant’s reference to advice received from the local Council. However, AFCA has not been provided with any information from the Council in support of the complainant’s position or otherwise. In the absence of persuasive supporting information, the panel finds it is more likely than not that the complainant’s expectations, proposed SOW and associated building repair/replacement quotes are excessive in the circumstances. The panel is satisfied that the positions of both parties are at opposite extremes and for which neither party has provided reasonably persuasive supporting information. The panel is not satisfied it would be fair to accept either of the parties’ positions as a reasonable claim settlement option or that would be considered consistent with the policy provisions. Parties to co-operate and complete the following to bring finality to the claim For the above reasons, the panel in not in a position to come to an informed decision on a fair, reasonable and final position to bring the claim and complaint to conclusion. It is clear that further assessments and steps must first be completed so as to determine the parties’ obligations and entitlements under the policy. Therefore, the panel has below set out the steps to be completed and based on which the claim is to then be settled under the policy. These are:  within 14 days of receiving notice of the complainant’s acceptance of this determination: > provide the complainant with the names of three mould remediation experts (who have had no prior involvement with this claim) > provide the complainant with the names of three independent building experts (who have had no prior involvement with this claim)  within 14 days of being provided this information, the complainant is to inform the insurer of her preferred mould remediation consultant and preferred building expert from the details provided by the insurer  within 7 days of being informed of the complainant’s chosen mould remediation expert, the insurer is to arrange for them to attend the insured property  the expert is to complete a detailed assessment and provide a SOW and quote for remediation of all required areas of the insured building. This is to include details of all surfaces and materials that need to be replaced/disposed due to mould damage/contamination. This includes but is not limited to areas such as the roof cavity, air-conditioning/ducting, fixtures and fitting, floors where necessary  within 7 days of receiving the SOW and mould remediation quote from the mould remediation expert, the insurer is to authorise the mould remediation works  within 7 days of receiving the post remediation verification certificate the insurer is to arrange for the chosen building expert to assess the insured building and determine the extent of all remaining water ingress and mould damage. The building expert is to provide a detailed SOW and repair quote (including and having regard to any building works recommended by the mould remediation consultant)  within 14 days of receiving the building expert’s SOW and repair quote, the insurer is to cash settle the complainant based on this repair quote  the cash settlement is to be increased by a further 20% to allow for contingencies. Is the insurer required to provide further TA cover? Yes. The insurer is required to cover the complainant for additional TA in line with this determination. Insurer is to cover additional TA costs There is no dispute the building remains uninhabitable in its current state. The insurer must therefore provide TA for the complainant and her family for the time it takes to make the building safe and liveable again. Such accommodation must include suitable arrangements for the complainant, her family and any animals at the home. The panel notes the policy provides that the insurer will pay for reasonable TA costs for the complainant and any family member living with her at the time of the insured event. This cover extends to the time it will take to repair or rebuild the building to a liveable condition. This is in addition to the home or contents sum insured. For clarity, the panel is satisfied it would not be fair in these circumstances to permit the insurer to restrict any benefit provided based on the prior TA costs paid. These costs were not incurred whilst the insurer was conducting work at the property. The benefit serves to cover the complainant ‘while your home is being repaired or rebuilt’. The insurer was doing neither of these things. Further, the panel is also satisfied it would not be fair to deprive the complainant of this policy benefit due to the insurer’s poor management of the claim and associated delays. The panel is satisfied it is fair that the insurer continues to cover the complainant for TA until such time that the building is made liveable again. The panel acknowledges the relevant benefit is based on a time limit of 12 months or 10% of building sum insured. However, for the reasons discussed above, the panel is not satisfied it would be fair or reasonable to permit the insurer to apply this policy limit in the circumstances. As such, the panel considers it is fair that the insurer covers (reimburses) TA costs till date and is to continue to cover these costs for the estimated repair period for the property. This to then be extended by one additional month to allow the complainant and her family a reasonable opportunity to move back into the building. In the interest of clarity, the panel notes the complainant has provided information relating to steps she has taken to setting up TA at the property. This includes payments towards the purchase of a structure for TA, its relocation and site preparation. These arrangements were not made with the consent of the insurer nor are they consistent with what the insurer would reasonably be required to cover under the policy. Given this, the panel is not satisfied it would be fair to require the insurer to cover these expenses. The panel is satisfied that the insurer’s obligation under the policy is limited to providing TA that is reasonably suitable to accommodate the complainant, her family and any animals at the home. The insurer is however obliged to reimburse the complainant for the reasonable TA expenses the complainant has and/or will have been responsible to continue paying for since the insurer stopped payment in or around November 2024. Is the complainant entitled to NFL? Yes. The insurer is to pay the complainant $6,300 in NFL in line with the AFCA Rules. The complainant is entitled to compensation for non-financial loss Under the AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The panel is satisfied, in line with the matters discussed above, that it is fair to accept the complainant has experienced unreasonable levels of stress, anxiety, physical inconvenience and delays over the life of the claim. This has been due to the insurer’s poor management of the claim. The exchanged information shows the complainant repeatedly raised concerns with the insurer over her poor experiences. These included her concerns relating to the lack of progress to the claim, issues with the make safes, remediation and scope of repairs. The insurer acknowledges the claim handling process did not meet the complainant’s expectations. The exchange information also shows there have been instances of a failure to communicate by the insurer as well as a failure to provide the complainant with requested information relevant to the assessments completed over the life of the claim. This is all whilst the insurer was reasonably aware the complainant was a vulnerable customer. The panel also notes the insurer’s poor management of the TA resulting in a lack of stability for the complainant and her family, in already difficult circumstances. The insurer’s assessments and poor management of the mould has resulted in the loss of and damage to personal contents items, which was avoidable. Although the complainant has been financially covered for such loss, she will not be able to replace these personal items which as noted was completely avoidable. Insurer is to pay $6,300 in compensation The panel is satisfied that the insurer’s poor claims handling has caused the complainant to experience significant and unreasonable levels of stress, anxiety, loss, physical inconvenience and delays. The panel is satisfied that it is fair that the insurer pays the complainant $6,300 in NFL, this being the maximum amount AFCA can award. Why is the outcome fair? The panel considers the outcome is fair because it is based on the exchanged information and the policy. The panel has considered the parties’ positions and is not satisfied either parties supporting information allows the panel to come to an informed position on what a fair final claim settlement should be under the policy. The panel is satisfied it is fair to accept the insurer’s assessment of its liability is not reasonable and also that the complainant’s claimed level of indemnity appears excessive. Given this, the panel is satisfied it is fair that the parties be required to co-operate to source fresh, actionable, fair and reasonable scopes of works and repair costs based on which the claim is to be finalised in line with this determination. The panel is also satisfied it is fair that the insurer covers the complainant for additional TA expenses as well as pay her NFL. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as an industry representative. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.