Determination 12-24-106345

Extent of insurer's liability for fence damage from vehicle impact and cash settlement amount

FirmAllianz Australia
Decided2025-05-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,092
Non-financial loss—
Amount claimed$45,980
SourceAFCA PDF

Summary

The insurer accepted a claim for a fence damaged by a vehicle but limited its liability to the impacted section, offering a cash settlement of $10,462.19. AFCA found the limitation reasonable but required a 20% increase to $12,554.62 and payment of council fees if supported.

Expert evidence showed pre-existing damage to the rest of the fence, which the policy excludes, so liability is limited to the impact damage, with a 20% uplift for contingencies and cost increases.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay claimrefund fees or charges

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-106345 | Financial firm | RAA Insurance Limited Case number: 12-24-106345 30 April 2025 Determination overview Complaint The complainant holds a home building insurance policy (policy) with the financial firm (insurer). On 10 January 2024, a claim was lodged for damage to the front masonry fence (fence) and a colourbond dividing fence (dividing fence) caused by impact from a third-party vehicle. The insurer has accepted the claim. However, the insurer has limited cover to repairs it has assessed to be adequate to repair the damage caused by the impact and consistent with its policy obligations. The complainant is dissatisfied with the insurer’s assessment of its liability and associated claim settlement payment of $10,462.19. The complainant believes the insurer should be required to cover the cost to replace the entire fence as opposed to limiting its liability to the section of the fence impacted by the vehicle. In the alternative, the complainant says the insurer’s proposed scope of works and associated claim settlement payment is not based on adequately qualified expert opinion. Further, that the offer does not account for additional expenses in the form of council fees and an increase in the cost of labour and materials since the insurer obtained its preferred repair quote. Issues and key findings Is the insurer’s assessment of its liability under the policy reasonable? Yes. The exchange information shows it is more likely than not that the insurer’s assessment of its liability is consistent with the expert evidence and its policy obligations. However, the insurer is to increase its final claim settlement by a further 20% to allow for contingencies, the transfer of risk and the potential increase in repair costs. Subject to being provided with supporting information of there being necessary council fees relating to the repairs, the insurer is to cover the complainant for these expenses. Why is the outcome fair? The outcome is fair because it is based on the information from the parties and the policy provisions. The insurer has shown it is entitled to limit its liability to the damaged section of the fence and dividing fence. It would be unfair to require the insurer to cover the cost to replace the entire fence in these circumstances. Determination This determination is substantially in favour of the insurer. The insurer is entitled to limit its liability. However, the insurer is to increase its claim settlement to $12,554.62 to allow for contingencies, the transfer of risk and the potential increases in cost of repairs. Subject to being provided with supporting information of there being necessary council fees relating to the repairs, the insurer is to cover the complainant for these expenses. Reasons for determination Is the insurer’s assessment of its liability reasonable? Yes. The exchanged information shows it is more likely than not that the insurer’s assessment of its liability is consistent with the expert evidence and its policy obligations. The policy is an insured events contract of insurance The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Impact’. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS. The complainant has shown damage that triggers cover under the policy There is no dispute the insured property has suffered damage to the fence and dividing fence due to impact by a motor vehicle, this being an event that triggers cover under the policy. The damage to the dividing fence and associated repairs is not in dispute. The insurer however maintains that it is entitled to limit its liability to only the pier and eastern fence panel (up to the next pier) of the fence actually damaged by the impact event. In seeking to limit its liability the insurer relies on reports from its appointed builders’ ‘CR’, ‘AB’ and forensic structural engineer ‘G’. The relevant policy provisions have been provided in section 3 of this determination and the expert reports are discussed in more detail below. The complainant has provided a scope of works and repair quote dated 6 June 2024 from building consultant ‘IN’ in the amount $45,980, which covers the complete replacement of the fence and damage to the dividing fence. The quote says that given more than 20% of the fence has been damaged and the need to make it compliant with current building standards, it is not repairable and needs to be completely replaced. Further, that the extent of damage to the fence foundation cannot be determined and repairs will need to be determined by an engineer and development approval obtained from the relevant council. IN’s quote lacks persuasive details or supporting information regarding its opinions that: 20% damage to the fence makes it irreparable the fence does not meet current standards what the current standards are; and why the experts relied on by the insurer are incorrect in their assessments. Information from the insurer is more persuasive The insurer appointed CR who attended the insured property to complete an assessment and after which it has provided a report dated 16 January 2024, six days after the date of loss. CR confirms the impact damage to the end pier and section of the fence estimated to be approximately 3.7l/m. CR notes the entirety of the fence presented with pre-existing movement cracking damage, with evidence of previous attempts to repair the damage. CR says given the pre-existing damage it would not be able to complete the repairs to be covered under the claim and recommends the claim be cash settled. CR provided a scope of works and associated repair quote for the cost to repair the impact damage to the fence and dividing fence in the amount of $8,564.14 dated 30 January 2024. I note this was subsequently increased to $10,462.19 on the recommendation of additional repairs to be added to the scope of works by forensic structural engineer G. The insurer has provided a repair quote from building consultants’ AB dated 4 March 2024 in the amount of $9,626.25. However, this quote provides no comment or information that assists the review of the parties’ positions under this complaint. The insurer has provided a report from G dated 5 April 2024, prepared by a forensic structural engineer after having visited the insured property. I note the complainant has raised concern regarding G not having the necessary qualifications to complete the assessment. However, in the absence of compelling information to the contrary, I am satisfied it is fair to accept G, as a forensic structural engineer, is adequately qualified to complete the assessment and provide its expert opinion. G notes the fence is constructed of single leaf masonry (90mm concrete block) with engaged ‘stack bonded’ piers spaced equally along its length (at approximately 3.6m centres). The fence is supported by a concrete strip footing with no vertical reinforcement between the footings and the fence superstructure. G notes that CR has allowed to replace the end pier and entire eastern fence panel which G agrees reflects the damage caused by the impact from the vehicle. However, G recommended that CS update its quote to include replacement of the footings to the length of 3.7l/m and adjacent concrete paving to 3sqm. CR has added these works to its scope of works and updated the repair quote. G’s report includes persuasive current and historical photos of the fence from as far back as 2009, with compelling explanation. I am satisfied this information confirms that it more likely than not the fence presented with pre-existing cracking damage to every panel along the length of the fence. The cracking presented with previous repair attempts consistent with long term ongoing differential movement damage. Further, that this damage to the entire length of the fence remained unchanged after the vehicle impact event. The information confirms the entire length of the fence presented with an overall rotation to the south (towards the home) from before the impact event. Also, that there was no distress at the height of the footings between the adjacent surfaces to suggest this rotation was recent. G concludes that in its opinion the impact damage is limited to the eastern pier and eastern fence panel only. There was no evidence of recent movement damage to the remaining sections of the fence and no noticeable difference to the fence’s condition (other than the damage to the eastern pier and eastern fence panel) from prior to the impact event. G says if there had been a sufficient transfer of force from the impact event to cause movement of the remaining sections of the fence, this would be apparent, and which it was not. Insurer is not required to replace the entire fence I am satisfied the information from the insurer is more persuasive. This is because the reports from the CR and G are consistent in identifying the extent of damage from the impact event as well as the pre-existing damage and issues with the entire length of the fence. I accept both CR and G have provided compelling explanations and information, including photos, in support of their assessments. I am satisfied this information shows it is more likely than not that the entire length of the fence presented with long term foundational ground movement damage in the form of cracks to every section as well as overall rotation towards the home from before the impact event giving rise to the claim. I am satisfied that the information shows, other than the clear impact damage to the eastern section of the fence, the condition of the remaining sections of the fence remained unchanged from before the impact event. Given the noted pre-existing damage and concerns with the entire length of the fence, I accept it is fair and consistent with the insurer’s entitlements under the policy for the claim to be settled by way of a cash settlement. Also, that the insurer is entitled to limit its liability to the impact damaged section of the fence only. There is no provision in the policy which requires the insurer to cover any additional costs associated with bringing the fence to current building standards or committing it to repairing pre-existing damage i.e. damage not caused by the insured event giving rise to a claim. I acknowledge the complainant’s concerns that builders may be reluctant to commit to repairing the damaged section only and recommend complete replacement of the fence. However, this does not place the obligation on the insurer to cover works which are otherwise excluded under the policy and are more likely consistent with maintenance works. Given the above, I am not satisfied it would be fair to require the insurer to cover the cost to replace the entire length of the fence. Rather, it is fair and consistent with the policy, that the insurer limits its liability to the damaged caused by the impact event only. Insurer is to increase its final claim settlement I am satisfied it is fair that the insurer be required to increase its cash settlement by 20% to allow for contingencies, the transfer of risk in arranging the repairs and potential increase in the cost of repairs since last quoted by CR. Further, I note reference to the possibility that repairs to the fence may be subject to council approval and associated expenses in obtaining such approval. I have not been provided with any information to show the extent of such expenses, if any. Therefore, subject to being provided with supporting information by the complainant of any such council fees relating to the repairs, the insurer is to cover the complainant for these expenses. Why is the outcome fair? The outcome is fair because it is based on the information from the parties and the policy provisions. The insurer has shown it is entitled to limit its liability to the damage section of the fence and dividing fence. It would be unfair to require the insurer to cover the cost to replace the entire fence in these circumstances. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Relevant policy provisions 10. Impact What we provide Cover for loss or damage to the Insured Property as a result of impact At the Home caused by: • … • a vehicle (includes caravan and Watercraft); … … General Exclusions In addition to the specific exclusions set out in the explanation of what is covered by this Policy, we may not Cover you for any claim, or may reduce the amount we will pay you for a claim, to the extent the loss, damage or liability caused by, contributed to or arising from any one or more of the following: Earth movement We will not Cover you for loss, damage or liability caused by or arising out of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement other than in connection with an Insured Event. Existing Damage We will not Cover you for the Cost of repairing Damage or poor repairs that existed before the Incident occurred. Matching materials We do not cover the Cost of replacing undamaged parts of Insured Property to create a uniform appearance other than the repair or replacement of paint, wallpaper, internal blinds, carpets or permanently fixed floor coverings in the Room, hallway or passageway where the damage occurred. … Making a claim … Step 3 – Settling your claim When repair or replacement is not available If: • … • we determine the safety, quality or reliability of repairs may be affected by the condition of the Insured Property before the Incident or damage to the Insured Property that arose before the Incident; • … We will pay you in cash or vouchers: • the amount it will Cost to repair the Insured Property with new materials which are available in Australia and are the nearest equivalent materials at the date of loss; or • ….