The complainant's claim for ensuite water damage was declined by the insurer as pre-existing defect and gradual deterioration. AFCA found the decline fair but required the insurer to reimburse up to $5,000 of the engineer's costs plus interest.
Engineering evidence showed a long-standing hot water system defect causing gradual damage before inception, excluded under the policy, with section 46 inapplicable; the engineer's report was useful so costs are reimbursable under AFCA Rules.
Issues
- Claim denial primary · not upheld
“it is fair for the insurer to decline cover for this loss and damage”
- Inadequate claim investigation secondary · upheld
“insurer's consultant report did not assist in identifying the cause of damage; insurer to reimburse EM's costs”
- Product terms interpretation secondary · not upheld
“section 46 does not assist the complainant; exclusions are blanket and not temporal”
Subjects and remedies
home or building damagethird party authoritypay compensationpay interest
Text of the determination
Determination
|
Case number
|
12-24-105685
|
Financial firm
|
Defence Service Homes Insurance Scheme
Case number: 12-24-105685 29 May 2025
Determination overview
Complaint
The complainant holds a home insurance policy (policy) with the financial firm (insurer), incepted on 12 May 2023. On 15 January 2024, a claim was lodged for water damage to the insured building, said to have been noticed on 9 January 2024. The insurer has partially accepted the claim.
The insurer has declined to cover damage to the bedroom one ensuite. The insurer says the damage to the ensuite is not covered under the policy. The complainant disputes this and says the insurer is obliged to cover the cost to fully renovate the ensuite under the policy.
The complainant is represented in this complaint by ‘D’. Reference to the complainant in this determination includes D, unless specified otherwise.
Issues and key findings
Is the insurer’s decision to limits its liability under the policy fair?
Yes. The available information shows it is more likely than not that the damage to the ensuite and the cause for this damage are issues that existed from before the policy was incepted. Alternatively, the damage is due circumstances clearly excluded under the policy.
Therefore, it is fair for the insurer to decline cover for this loss and damage.
Is the complainant entitled to reimbursement of professional costs?
Yes. The report from engineering consultant ‘EM’ has been very helpful in considering this complaint and in coming to an informed view. It is fair that the insurer be required to reimburse the complainant for professional costs in line with this determination.
Why is the outcome fair?
The outcome is fair because it is based on the information from the parties and the policy. The exchanged information shows extensive long-term damage to the ensuite due to a long term pre-existing defect/issue. The policy was incepted around eight months before the claimed date of loss. On balance, the defect and damage had been occurring from before the policy was incepted. It would be unfair to require the insurer to accept liability for such damage. EM’s investigation and report have been the most persuasive, and so it is fair the insurer cover the complainant for EM’s costs.
Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to decline cover for the ensuite damage. However, it is to reimburse the complainant for professional costs in line section 2.2 of this determination.
Reasons for determination
Is the insurer’s decision to limit its liability fair?
Yes. The available information shows it is more likely than not that the damage to the ensuite and the cause for this damage are issues that existed from before the policy was incepted. Alternatively, the damage is due circumstances clearly excluded under the policy.
The policy is an insured events contract of insurance
The insurer provided the complainant with the relevant policy documentation including the product disclosure statement (PDS) and certificate of insurance (COI). I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim.
The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including ‘Escape of liquid’. The policy includes cover for accidental loss or damage, limited to $5,000. Cover under the policy is subject to the conditions, limitations and exclusions specified in the PDS.
The complainant is first required to show, it is more likely than not, that the loss or damage claimed triggers cover under the policy. Only if the complainant can do this, will the duty shift to the insurer to show, on balance, it is entitled to decline cover in line with the policy wording or otherwise.
This means that not all loss and damage is automatically covered. Rather, only loss or damage caused by one of the insured events or accidental damage (up to $5,000) that occurs during the period of insurance is covered.
The complainant has shown some damage that triggers cover under the policy
There is no dispute the insurer has accepted to cover the complainant for some damage to bedroom one, based on a repair quote from building consultants’ CC in the amount of $1,6722.44.
The complainant however disputes the insurer’s assessment of its liability. The complainant is of the opinion that the insurer is required to repair/cover all the damage including the ensuite, which he says requires a full renovation due to the extent of water damage.
The insurer however has declined cover for the cost to repair the damage in the ensuite on the basis it is not covered under the policy.
Both parties have provided information from appointed consultants
The insurer appointed ‘CC’ to attend the insured property to investigate the cause and extent of the damage. CC has provided a report dated 19 January 2024 and says the damage claimed is not consistent with the complainant’s view that rainwater had tracked from the external ground level causing the water damage. Rather, that the damage is more likely due to a leaking vanity unit which had recently been replaced by the complainant.
The complainant, on the insurer’s advice, appointed a plumbing consultant ‘SK’ as well as an engineer EM. SK has provided a report dated 7 March 2024 which states flood testing of the shower recess found the waterproofing had failed allowing water to track along the void in the rear wall escaping into the bedroom. SK concludes this to be cause for the damage and recommends a full bathroom renovation. SK also refers to a small chance that the hot and cold water pipes from the hot water system (HWS) could be installed within the wall cavity, but this would need to be confirmed once repairs commence.
EM attended the insured property on 13 May 2024 and has provided a report dated 23 May 2024. EM noted the bedroom one wall had two instances of water damage, the first was also noted in the pre-purchase report by ‘IM’ dated 24 April 2023. The second instance relates to further damage to the wall of bedroom one, carpet and ensuite. With respect to investigating the source of water entry, EM notes:
EM in conjunction with the complainant conducted external leak testing of the western wall of the house by running sprinklers on the wall for several hours and eventually discovering the leak
water entered through the wall and commenced to run along the skirting from the corner of the bedroom one ensuite
as most of the potential leaks from other sources had been eliminated the only remaining possibility was the HWS and its services
EM and the complainant put a small cut in the electrical conduit (plastic pipe covering the HWS electrical wiring) as this was the last possible means of water access to the house
once cut water began to flow out of the conduit
the water flowed for a short time and then stopped and the source of the water entering the house was discovered to be the HWS conduit.
EM noted the HWS wiring connection point has a polystyrene compartment. This compartment is sealed to the wiring conduit. During rain events the compartment filled with water and became a rain head that elevated the water to above the level of the wall access point, thereby allowing water to flow into the house.
EM confirms the ensuite waterproofing membrane had failed and that this was due to constant wetting of the wall battens, plasterboard and water based polyurethane-acrylic membrane (WPM). EM concludes that the HWS had been the source of water leaking into the ensuite western wall cavity since its installation. It had remained undetected and over time had destroyed the ensuite. EM says it is a leak that is reasonable to consider as a pre-existing defect or imperfection that a reasonable person in the circumstances would not be expected to be aware of.
EM says the proximate cause of damage is water intrusion during heavy rainfall and is considered an escape of liquid from a pipe. EM also notes, as a minor contributing factor, the existing defects (site drainage issues) that were identified in IM’s pre-purchase report resulting in minor moisture plaster and skirting damage.
Information from EM is more persuasive
I have carefully considered all the information from the parties. I am not satisfied the report from CC assists in coming to an informed decision or that it was successful in identifying the source of water entry and associated damage to the ensuite. This is because whilst CC concludes the cause for the damage was a leaking vanity unit, it has not provided any supporting or compelling information to establish this opinion.
The report from SK assists in confirming a failure of the ensuite shower waterproofing membrane. However, the report does not expand on the cause and extent of the failure which limits the value of the view in determining cover under the policy. Further, SK having investigated and tested the HWS found that this was not the cause of water ingress into the ensuite and associated damage, which is not correct.
I find the information from EM to be more qualified and persuasive. This is because EM’s investigations and testing were successful in locating and identifying the mechanism by which water was entering the ensuite. EM has clearly mapped out the steps taken in this regard with a clear and compelling explanation establishing how rainwater was entering the ensuite via the HWS electrical conduit.
The available information confirms since these issues were rectified there has been no further water ingress into the ensuite. This only further supports EM’s findings with regards to the proximate cause of damage to the ensuite. I acknowledge EM has gone further in providing his opinion on policy coverage based on his findings. However, I accept the insurer’s position that this not for EM to comment and policy response is a matter for the insurer to consider based on the available information.
Damage to the ensuite is not covered under the policy
I am satisfied that it is fair to accept that the available information shows that is more likely than not that:
water ingress into the ensuite via the HWS electrical conduit was not a constant and ongoing leak. Rather, it was limited to instances of heavy rainfall in the area
the extent of damage to the ensuite is extensive and consistent with having occurred over an extended period of time
the dominant and therefore proximate cause for the water ingress into the ensuite was a pre-existing defect or imperfection relating to the HWS
this defect or imperfection had existed since installation of the HWS i.e. had been causing water ingress into the ensuite gradually causing significant damage over time.
I note the complainant appears to have purchased the property between April and May 2023, with the policy having been incepted on 12 May 2023. This being not long before the claimed date of loss for the damage noted as 9 January 2024. Given the extent of deterioration and destruction of the ensuite, I am satisfied it is fair to accept that the damage is not consistent with occurring on or within a brief period before 9 January 2024.
Rather, it is most likely the damage had been occurring from before inception of the policy given EM’s opinion that the HWS defect or imperfection had existed from installation. This means water was most likely entering repeatedly over an extended period during periods of heavy rainfall and gradually causing damage from the time the HWS was installed. This most likely would be from before inception of the policy and therefore falls outside the period of insurance.
Further, the policy’s general exclusion provisions, relevant to this complaint, exclude from cover loss or damage that is caused by:
defects in works done or materials used on the home
gradual deterioration or process.
I am satisfied the exchanged information shows it is most likely that the damage to the ensuite, and excluded by the insurer, is due to pre-existing defect or imperfection relating to the HWS installed at the insured property. Also, that the damage in question has occurred through gradual deterioration or process over an extended period.
Therefore, for these reasons, I accept it is fair that the insurer be allowed to decline cover for the damage to the ensuite under the claim.
Section 46 of the Insurance Contracts Act 1984 does not assist the complaint
I note D in his letter dated 14 March 2025 to AFCA seeks to rely on section 46 of the Insurance Contracts Act 1984 (Act) to say the insurer is required to cover the ensuite damage. D says:
Whilst the policy does provide exclusions relating to defects and liquid gradually escaping because of something other than a sudden burst, leak, discharge or overflow, it is abundantly clear that the ‘defect’ in this instance was both pre-existing and not able to be identified by a reasonable person. Therefore, the provisions of Section 46 of the Act would operate to prevent the insurer from enlivening the aforementioned exclusions in this instance.
D acknowledges the damage is the result of a defect as well as the policy exclusions relating to damage due to defects and/or through gradual deterioration or process. However, he is of the opinion the insurer is prevented from relying on the policy exclusions to decline the claim through the operation of section 46 of the Act. This is based on the defect being both pre-existing and not identifiable by a reasonable person (in this case the complainant).
I acknowledge D’s view. However, I do not agree because I am satisfied that section 46 prevents an insurer from relying on an exclusion clause that refers to the condition of a thing before the contract was entered into, if the complainant (or a reasonable person) was not aware of the defect or condition which wholly or partly caused the damage claimed for.
Case law states that section 46 of the Act does not apply to an exclusion of an event which makes no reference to when the event occurs. Therefore, only exclusions which refer to a condition existing before entry into the contract of insurance are affected by section 46.
In this complaint, the exclusion provisions apply generally (blanket exclusions) and are not temporal in nature. The exclusion clauses are not directed to defects which pre-existed the commencement of the policy. Only exclusions which refer to a condition existing before entry into the contract are affected by sections 46, which is not the case in this instance. Accordingly, section 46 does not assist the complainant in these circumstances.
Is the complainant entitled to reimbursement of professional costs?
Yes. The report from EM has been very helpful in the consideration of this complaint and in coming to an informed view.
AFCA can require the insurer to contribute to complainant’s professional costs
Under the AFCA Rules a decision maker may decide that the insurer is to contribute to the legal or other professional costs or travel costs incurred by the complainant during the complaint. Unless special circumstances apply, AFCA will not require the insurer to contribute more than $5,000 to these costs.
Insurer is to contribute $5,000 towards the complainant’s professional costs
I note the insurer has refused the complainant’s request to be reimbursed for professional costs he has incurred in sourcing the EM’s report in support of the claim. The insurer says this information sourced by the complainant did not impact on the claim or assist the complainant and therefore it will not be contributing or reimbursing these costs.
I am not satisfied this is a fair position. This is because the reports and information from the insurer’s appointed consultants did not assist in identifying the cause of damage. Rather, it is EM’s investigations and report that has been the most helpful and persuasive in coming to an informed decision. It may well be that the outcome does not favour the complainant. However, this does not detract from the value of EM’s professional services for the purpose of the fair resolution of this complaint.
Therefore, I am satisfied it is fair that the insurer be required to contribute and reimburse EM’s professional costs incurred by the complainant up to $5,000. This is to be paid to the complainant within 14 days of the insurer receiving notice of the complainant’s acceptance of this determination.
The insurer is to also pay interest on this settlement in line with section 57 of the Act from the date the complainant paid this cost to the day on which the insurer issues payment to the complainant.
Why is the outcome fair?
The outcome is fair because it is based on the information from the parties and the policy. The exchanged information shows extensive long-term damage to the ensuite due to a long term pre-existing defect/issue. The policy was incepted around eight months before the claimed date of loss. On balance, the defect and damage had been occurring from before the policy was incepted. It would be unfair to require the insurer to accept liability for such damage. EM’s investigation and report have been the most persuasive, and so it is fair the insurer cover the complainant for EM’s costs.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Other matters
The complainant has raised concern about having to lodge a new claim for contents damage based on the insurer’s instruction and paying an additional $500 excess. I am not satisfied there is adequate information from either of the parties relating to this concern for an informed decision to be provided. Given this relates to a separate claim, the complainant is entitled to seek his own independent advice in this regard including lodging a new complaint for AFCA’s consideration.