Insurer denied most of a storm/water damage claim for four units and common driveway as wear and tear; accepted only 10sqm of paving
Text of the determination
Determination
|
Case number
|
12-24-105515
|
Financial firm
|
RAA Insurance Limited
Case number: 12-24-105515 29 May 2025
Determination overview
Complaint
The complainant is a strata manager and lot owner representing a group of four separate unit owners in a strata plan (strata). The strata held a home building insurance policy with the financial firm (insurer) for the four units in the building at the common address.
A claim was lodged for damage to each of the four units and the common driveway at the premises. The complainant says this damage was caused by a stormwater blockage of the downpipes, causing physical damage to the building and the driveway.
The insurer accepted part of the damage, being 10sqm of the concrete perimeter paving to the north-western corner of the property. It has otherwise denied the claim on the basis the damage was caused by circumstances excluded by the policy.
The complainant disagrees with the decision. He wants the insurer to accept the claim in full.
Issues and key findings
Is the insurer required to accept all the claimed damage?
No. There is no persuasive evidence to show the claimable damage extends beyond the area the insurer agreed to cover. However, the insurer is required to reassess the cost of rectifying this damage as detailed below.
Why is the outcome fair?
The exchanged information shows the insurer fairly assessed its liability under the terms of the policy. Most of the claimed damage was caused by issues the insurer does not cover. For the accepted damage, it is fair that the insurer obtains a new quote to ascertain this cost.
Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to restrict cover to the damage it agreed to pay for. However, it must arrange for a new contractor to visit the site and prepare an actionable quote to address this covered damage. Upon obtaining an actionable quote, the insurer can either:
attend to the repairs, or
cash settle the claim based on the quote, together with a contingency uplift of 15%.
Noting the settlement will be based on an up-to-date and actionable quote with a contingency uplift, there is no need to include interest in the settlement.
The insurer is not required to take any further action.
Reasons for determination
The complainant is an authorised representative and member of the strata. The claim made against the insurer is on behalf of all four of the lot owners for individual and common property, who authorised the complainant to act on their behalf.
Is the insurer required to accept all the claimed damage?
No. There is no persuasive evidence to show the claimable damage extends beyond the area the insurer agreed to cover. However, the insurer is required to reassess the cost of rectifying this damage as detailed below.
Complainant seeks cover for damage to joint property and individual units
The strata has four units in a single building, separated by shared walls. The building was constructed in or about the 1970s. A singular shared concrete driveway services the respective units.
The complainant (also the owner of unit 3) lodged the claim on 4 December 2023. His description of the claimed damage to the insurer was recorded as:
[The complainant] mentioned cracks along driveway, along side of building containing the four units, and inside one unit on the ceiling. I [advised him] that this sounds like earth movement which is not covered, but have asked [MM] to take a look and further [advise] the [complainant] should a claim need to be lodged for an insured event.
Damage was identified to two of the units (including cracking and leaking gutters), as well as the common driveway. The insurer agreed to cover a section of the common driveway, but otherwise says the damage is not covered under the policy.
Onus on complainant to establish claimable loss
The complainant has the onus of establishing he (and/or the strata generally) suffered a loss from an event covered by the policy. For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
If the complainant can establish he and/or the strata suffered a claimable loss, the onus shifts to the insurer to show, on balance:
it is entitled to rely on an exclusion under the policy, or
it is otherwise entitled to reduce its liability or decline the claim.
Policy covers insured events subject to terms, conditions and exclusions
The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). There is no dispute the insurer sent these documents to the strata.
The policy covers loss or damage caused by an incident arising from one or more of the policy’s insured events. The PDS defines an ‘incident’ as:
an event or occurrence arising out of one action that gives rise to a right to claim under the Policy
An ‘insured event’ refers to the covered incidents described in the PDS. Amongst these insured events is cover for loss or damage caused by bursting, leaking, discharging or overflowing of water or liquid from:
drainage and sewerage systems At the Home;
…
pipes or plumbing apparatus fixed to pipes At the Home;
…
roof gutters and their down pipes At the Home…
Any cover provided under the policy is subject to its terms, conditions and exclusions.
Experts found damage substantially due to age, wear and tear issues
The insurer engaged builder MM to attend the property. MM attended on 8 December 2023. Its subsequent report of 3 January 2024 found:
there was internal and external cracking damage, a broken tap handle, a slow running galvanised tap at the rear and a rotten post and fascia in unit 3
unit 4 had cracking to the exterior eastern wall
the common driveway had long-term cracking and a blocked sump.
MM wrote that the damage was ‘related to wear and tear and the age of the property’. It noted the driveway sump was blocked and the complainant said it overflows and causes cracks to the concrete.
Engineer GP was then appointed to review the damage. GP attended the property and provided a report dated 21 March 2024. It noted:
the complainant believed cracking to the shared driveway was caused by a neighbour watering their lawn
for the damage to unit 3, the complainant admitted internal cracking had been previously patched but had reoccurred
some cracking was present to the external wall of unit 4
there was no persuasive evidence any of the claimed damage was caused by an event
the observed issues were ‘maintenance issues or inherent issues with the structure’s design/construction’
these were generally attributable to age, deterioration and construction factors
the southern end of the driveway was originally retained against the fence, which was replaced sometime prior to April 2013, with the new fence providing inadequate support
driveway cracking was not consistent with overwatering of the neighbouring property and more likely due to overflow from the complainant’s downpipe over time
wall cracks to the units were consistent with differential settlement of the footings
cracking in unit 3 and distortion of the roof was due to the methods used at the time of construction.
Plumber LH also conducted an inspection and found breaks in the stormwater pipes and a blockage. GP considered this was not the cause of any substantive damage. However:
The only damage we believe was possibly caused by water escaping the underground pipework was a settlement of concrete perimeter paving at the northern side of Unit 4, where the leaks may have caused/contributed to the consolidation of the fill soils.
Based on GP’s report, the insurer agreed to cover this damage, situated on the northern side of unit 4 (approximately 10sqm). The insurer offered a cash settlement for this portion of the claim, being $1,658 ($2,058 less the $400 policy excess), based on a quote from MM.
Complainant wants additional settlement of damage from the insurer
The complainant acknowledges the boundary fence was replaced in 2010. He says the property sits on a higher incline than the neighbour’s home. He says periods of ‘excessive heavy rainfall’ would overflow the sump, flow over the edge and underneath the driveway.
One of the lot owners placed a concrete tile under the carport downpipe to direct water to the sump. The complainant considers the southeast driveway panel should be excavated to allow backwashed soil to be replaced and a new stormwater pipe connected to the sump. He acknowledges the strata would be liable for the installation of the pipe.
For the units, the complainant says all gutters were replaced in 2016. During one of the periods of ‘excessive’ rainfall in 2022, the complainant says rain overflowed the gutters in unit 4. Later inspection showed there was ‘sagging’ causing a low point at either end of the gutters, allowing rainwater to pool and overflow. The complainant wants the insurer to ‘restore the hip corners to their correct height’ and fix the gutters so rain no longer overflows.
He also considers the amount offered to repair the 10sqm of damaged concrete unreasonable, noting concrete excavation work in 2017 cost more than $14,000.
Satisfied the extent of claimable damage caused to property was limited
Outside of the limited cover it offered for damage to the driveway, I am not satisfied there is any persuasive evidence the balance of the damage should be covered by the insurer. On balance, I consider this other damage was not caused by one or more of the policy’s listed events. It is primarily due to the age and construction of the building and the driveway.
The complainant referred to a storm on an undisclosed date in 2022 and the insurer considered whether a bursting/overflowing water event(s) applied. I acknowledge water from storm activity likely overwhelmed the draining on one or two of the units, however I am not satisfied any damage was proximately caused by:
a storm event, or
bursting, leaking discharging or overflowing of water.
Damage can have more than one cause. The proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective, dominant or operative cause of the loss.
Whilst there was evidence of stormwater breakages and likely leaks, there is no persuasive evidence these leaks caused damage. The strata did not obtain any expert opinion on this issue.
I consider water overflowed the gutters and the drain during excess rainfall events due to inherent problems at the property. I acknowledge water leaked and discharged from the sump, the gutters and other areas of the home. However, I do not think this was the proximate cause of the claimed damage.
Policy excludes wear, tear and gradual deterioration
The PDS confirms the insurer does not cover:
Wear, tear or deterioration over a period of time
We will not Cover you for loss, damage or liability caused by wear, tear or deterioration over a period of time, mould, mildew, action of light, atmospheric or climatic conditions, rust corrosion, wet or dry rot.
In my view, most of the claimed damage was proximately caused by long-term deterioration, wear and tear. The policy does not cover this.
Whilst there might be issues with some of the building work (both at the time of construction and through maintenance), this is not the insurer’s responsibility to address. I am satisfied the insurer is not required to cover anything other than the scope of the work it has already agreed to.
Insurer must improve offer for covered damage
There is no dispute the insurer agreed to cover 10sqm of damaged concrete in the driveway.
It agreed to pay $2,068 based on MM’s quote from 15 April 2024, less the policy excess of $400. However, I am not satisfied this offer is fair. MM provided a quote marked:
DESKTOP QUOTE FOR CASH SETTLEMENT
It is apparent that MM did not re-attend the site to quote the damage and had no apparent intention of undertaking the required work for the complainant. This means the quote:
is not necessarily an accurate estimate of what is required to undertake it, and
cannot be relied upon by the complainant as it is for ‘cash settlement’ purposes only.
I therefore consider the quote is not actionable. It is not fair for the insurer to rely on it as a basis for settlement.
To resolve this aspect of the claim, the insurer must arrange for a new contractor to visit the site and prepare an actionable quote to address the accepted damage. An actionable quote is one provided for a retail customer, who can rely on the quoted amount to have the work done for the quoted price.
There is no suggestion the insurer is unable to attend to or complete the required work. Given this, upon obtaining an actionable quote to address the damage, the insurer can either:
attend to the repairs, or
cash settle based on the quote, together with a contingency uplift of 15%.
The contingency uplift is to compensate the complainant for the loss of the lifetime guarantee and the transfer of risk as he must oversee the required work.
Why is the outcome fair?
The exchanged information shows the insurer fairly assessed its liability under the terms of the policy. Most of the claimed damage was caused by issues the insurer does not cover. For the accepted damage, it is fair that the insurer obtains a new quote to ascertain this cost.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.