Text of the determination
Determination
|
Case number
|
12-24-103596
|
Financial firm
|
AAI Limited
Case number: 12-24-103596 22 May 2025
Determination overview
Complaint
The complainant held strata insurance with the financial firm (insurer), covering its apartment building. The complainant lodged a claim after the building was fire damaged in July 2023.
The insurer accepted the claim but said it could not attend to repairs as there was non-claim related damage present. It offered to cash settle for $88,526.42, being the amount its builder AB quoted based on a scope of works (SOW) for claim related repairs prepared by building consultant QT, less the $500 policy excess. It also offered payment for loss of rent (LOR).
The complainant says AB’s quote was too low and QT’s SOW does not reasonably reflect the extent of claim related repairs. It seeks a cash settlement of $533,000 based on a quote by builder MD, less the excess. It also seeks more for LOR than the insurer offered.
The complainant is represented by its director, AL. For brevity’s sake, the complainant and AL are referred to below as ‘the complainant’, unless context requires otherwise.
Issues and key findings
Can the claim be cash settled yet?
No. I am not satisfied that either party has shown their cash settlement position is fair and reasonable. The SOWs and quotes they each rely on vary very significantly and it is not possible to conclude one set better reflects the reasonable cost of claim related repairs. A SOW from an engineer and quotes from builders not previously involved should be obtained.
Is the insurer to pay more for LOR?
Yes. The building has been vacant for an extended period and the insurer has materially contributed to the delays experienced in finalising the claim. It is required to pay the complainant the full 52-week LOR entitlement available under the policy.
Why is the outcome fair?
The outcome establishes a way in which a fair cash settlement amount can be assessed. It also fairly compensates the complainant for LOR to which the insurer’s delays have contributed.
Determination
This determination is substantially in favour of the complainant.
If the complainant accepts this determination:
the parties are to take the steps outlined in section 2.1 to enable a fair cash settlement to be paid, and
the insurer is to pay the complainant for 52 weeks of LOR.
Reasons for determination
All amounts referred to below are GST inclusive.
Can the claim be cash settled yet?
No. I am not satisfied that either party has shown their cash settlement position is fair and reasonable. The SOWs and quotes they each rely on vary very significantly and it is not possible to conclude one set better reflects the reasonable cost of claim related repairs.
Complainant has shown claimable loss under the policy
The complainant is required to show, on the balance of probabilities (that it is more likely than not), that it suffered a claimable loss under the policy. This means it must show the loss was caused by a risk for which it is insured.
Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers the complainant for loss or damage to the insured building caused accidentally or by a listed insured event. One of those events is ‘Fire’.
The insured premises are comprised of two buildings, each with two storeys, with four units on each level (16 in total). On 8 July 2023, a fire started on the first floor of one of the buildings. Firefighters attended, forced their way in and worked throughout that building to extinguish the blaze. The other building was not affected.
The insurer accepted the resulting fire damage claim. The complainant has established a claimable loss under the fire insured event.
Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition.
Policy confirms building claims may be cash settled
The PDS states on page 65 that when the insurer’s trades are unable to complete covered repairs, the insurer will ask the insured to engage a builder to provide a SOW and quote on the cost to repair on a ‘new for old’ basis. The insurer will assess the reasonableness of the quote and pay the insured the assessed amount. This is known as a cash settlement.
‘New for old’ is defined on page 66 of the PDS as rebuilding, replacing or repairing with new items/materials, and regardless of age, with no allowance for depreciation. However, ‘new for old’ does not mean of a better standard, specification or quality than when new.
The PDS includes several additional benefits, including ‘Other repair/rebuilding costs’, set out on page 49 of the PDS. Under that additional benefit, the insurer will pay the reasonable and necessary costs to make the damaged building components comply with current building regulations and laws if they complied with applicable regulations at the time of construction.
Parties disagree on extent of claim related damage and repair costs
The insurer’s building consultant QT inspected the building on 14 July 2023 and reported that:
Units 13, 14, 15 and 16 on the first floor were partially fire damaged
the most significant damage was to the external stairwell and landing area of the first floor accessing units 13-16. The ceiling lining, roof frame and entrance doors had been significantly fire damaged, and the concrete floor and masonry walls were smoke stained
the rest of the building was to varying degrees affected by soot and smoke
mould growth was present, particularly on the wall and ceiling linings in units 13 and 14. This was a maintenance issue
elements throughout the building were deteriorated and showed signs of wear and tear
the stairwell handrail adjacent to units 13-16 did not comply with building regulations.
QT prepared a detailed SOW for claim related repairs. Based on that SOW, the insurer obtained the following quotes:
dated 28 July 2023 from builder JL for $81,282.01
dated 31 July 2023 from builder AB for $78,160.07.
AB estimated repairs would take 17 weeks but was not prepared to do the work due to the presence of non-claim related damage. On 9 August 2023, the insurer advised that it intended to cash settle the claim based on AB’s quoted amount.
Following queries made by the complainant, the insurer agreed that the doors to units 9-11 that had been damaged by firefighters should be replaced with fire rated doors to meet current regulations, and hot water units were to be included. The insurer obtained an updated quote dated 21 August 2023 from AB totalling $89,026.42.
On 24 August 2023, the insurer provided AB’s updated quote to the complainant and said it would cash settle the claim based on the increased amount quoted. After the complainant expressed concerns about the adequacy of the quote, the insurer invited it to obtain its own quote based on QT’s SOW.
On 4 February 2024, the complainant submitted the following quotes to the insurer:
dated 22 January 2024 from builder CS for $440,000 (rough estimate only)
dated 30 January 2024 from builder MD for $423,500
dated 2 February 2024 from builder BC for $480,700.
The insurer advised the complainant those quotes were unacceptable as they were not sufficiently itemised and were not based on QT’s SOW.
On 7 April 2024, the complainant provided to the insurer a report and SOW dated 28 March 2024 from building consultant AN, and an updated quote dated 7 April 2024 from MD for $533,500 based on AN’s SOW.
AN’s report said:
AB’s quote was extremely low and underquoted
AB’s quote included a notable calculation error. It allowed supervision at $82.50/hour for 40 hours (1 week), totalling $3,300. However, AB estimated a 17-week repair period, and a supervisor would need to be present for the duration. This means the supervision allowance should be $56,500. Even with that amount AB’s quote was insufficient
the claim related repairs included:
> replacement of plasterboard and metal roofing
> cleaning walls and floors for water (from fire extinguishment) and smoke damage
> first floor ceilings, common area stairs and laundries roofing and linings replacement
> a mould inspection given the water damage and conditions for mould growth
> an electrical survey
> replacement of all electrical and gas lines given risk of fire or water damage
> replacement of gas heating with electrical heating to comply with current regulations
it estimated repair costs would be $534,536.33, inclusive of a 30% builder’s mark up (AB had allowed 15%).
On 23 April 2024, the insurer’s employed assessor and building co-ordinator reinspected the building. They concluded that AN’s SOW non claim related repairs and MD’s quote was excessive. They maintained that QT’s SOW was correct, and AB’s quote was reasonable. The complainant was informed of those views and told if it wanted to press for a further review, it should provide an itemised builder’s quote based on QT’s SOW.
QT provided a further report dated 13 December 2024 which included a comparison between its SOW and that of MD/AN. It also said:
a full comparison was difficult to provide as MD’s quote was unclear and did not include detailed measurements for quantities
there were several items included in MD’s quote that were not fire damaged, as well as a items considered excessive in quantity
given the nine-month period between its inspection and MD’s quote, it was likely the damage had worsened due to water ingress, mould growth and deterioration
the resultant fire damage repair work cannot be carried out without also rectifying the pre-existing maintenance, mould and building compliance issues it had identified
there was no evidence to show how much water was used in extinguishing the fire and how much entered each unit. However, there was evidence of pre-existing, long term water and mould damage
substitution from gas to electric heating was not required as the regulation only relates to new homes that require planning approval
it maintained that its SOW was appropriate to deal with claim related damage.
On 14 January 2025, the complainant provided a further quote from MD, itemised in the format the insurer uses. The quote included a 20% builder’s mark up and totalled $530,031.46.
Further steps are required to be taken to enable fair cash settlement
The complainant’s preferred position is that the insurer attends to the repairs. However, it says if the insurer is permitted to cash settle, the appropriate amount to be paid is $533,500 as quoted by MD on 7 April 2024.
The insurer says it is entitled under the policy to pay a cash settlement because of the presence of non-claim related damage.
I agree with the insurer that such damage is present. I am also mindful that the relationship between the parties has become strained, meaning it is likely that further extended interactions between them will result in additional disputes.
Accordingly, it is reasonable that the claim be cash settled. A cash settlement must be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift is then typically applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee that applies to insurer approved repairs.
I am not satisfied that either party has shown their cash settlement position is fair and reasonable. The SOWs and quotes they each rely on vary very significantly, and there is no independent expert evidence before me to establish one party’s SOW and quote should be preferred over the others. Both QT and AN raise concerns about the other’s SOW and it is possible they are both, to a degree, right.
I note that amongst other things, MD’s quote includes supervision for the entire 17 weeks and I agree with the insurer that is unlikely to be necessary. On the other hand, AB’s quote was prepared 20 months ago and so will not reflect current prices.
Further, it is troubling that AB increased its quoted amount on the basis its original quote missed some claim related repairs, while MD reduced its quoted amount on 14 January 2025 for reasons that are unclear.
In the circumstances, if the complainant accepts this determination, the parties are to take the following steps to enable a fair and reasonable cash settlement of the building damage claim:
within 21 days, the insurer is to appoint an engineer not previously associated with the claim to prepare a SOW for the claim related repairs based on the policy terms and conditions. In doing so, the insurer is to provide the engineer with the SOWs and reports by QT and AN, and the quotes by AB and MD
the engineer is permitted to appoint any other experts it considers are reasonably required to enable a SOW to be prepared
the parties are to work co-operatively to find a date on which the engineer and any other expert it has appointed to inspect the building
once the SOW is received from the engineer (and from any other experts it appointed), the parties are each to engage a builder not previously associated with the claim to prepare a quote based on current retail prices
within 14 days of both quotes being received, the insurer is to pay the complainant the average of the quoted amounts less the excess, plus a contingencies uplift of 20%.
Is the insurer to pay more for LOR?
Yes. The building has been vacant for an extended period and the insurer has materially contributed to the delays experienced in finalising the claim. It is required to pay the complainant the full 52-week LOR entitlement available under the policy.
Policy covers LOR in specified circumstances
The PDS sets out the cover for LOR on page 51:
If following an incident covered by this policy a tenanted unit in the building cannot be lived in or cannot be re-leased, we will pay the unit owner the weekly rental amount for the time it should take to repair or rebuild the building or unit so that it can be lived in or re-leased.
The maximum payable is 10% of the building sum insured (which amounts to $258,790) and the longest period that can be claimed for is 52 weeks.
Insurer is required to pay more for LOR
On 20 November 2023, the insurer offered the complainant $33,170.04 for LOR, based on:
|
For
|
Period
|
Amount
|
Unit 10
|
3 weeks
|
$1,054.52
|
Unit 11
|
3 weeks, 3 days
|
$794.23
|
Unit 12
|
6 weeks, 3 days
|
$1,460.23
|
Unit 13
|
5 weeks, 6 days
|
$1,282.83
|
Unit 14
|
7 weeks, 6 days
|
$1,915.41
|
Unit 15
|
7 weeks, 6 days
|
$1,377.59
|
Unit 16
|
3 weeks, 6 days
|
$720.74
|
Repair period
|
17 weeks
|
$24,564.49
The complainant says it was willing to accept the LOR offer at the time it was made pending finalisation of the building claim. It says the insurer has not paid the offered amount and the building has remained vacant. The complainant says the insurer should now pay LOR for the maximum 52-week period due to its delay in either proceeding with the repairs or paying a reasonable cash settlement.
The insurer says payment of LOR for 52 weeks:
is not warranted in the circumstances nor pursuant to the policy terms. As noted in the claim file and NOR, the Insurer has been in a position to settle the claim (based on its quote from [AB]) since 24 August 2023.
However, as noted above, I am not satisfied that AB’s quote was a reasonable basis for a cash settlement. Further, the insurer’s failure to include a contingency uplift meant even if AB’s quote was reasonable, the offer made was not.
The building has been vacant for well over 52 weeks and it appears that the period to complete repairs will be at least 17 weeks. Both parties have materially contributed to the delays experienced in finalising the claim.
In the circumstances, I am satisfied that a fair outcome is for the insurer to pay LOR for 52 weeks (only). The parties are to work co-operatively together to calculate the amount payable, which is to be subject to the maximum $258,790 cap.
Why is the outcome fair?
The outcome establishes a way in which a fair cash settlement amount can be assessed. It also fairly compensates the complainant for LOR to which the insurer’s delays have contributed.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.