1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under her home and contents insurance policy held with the financial firm (insurer), for damage to the insured property.
The complainant says the damage to the property has been caused by the faulty workmanship of the insurer’s trades when they repaired damage pursuant to a claim in 2021.
The insurer has denied the claim and says that the complainant has not established a loss which is covered by the policy.
Alternatively, the insurer says that the cause of the damage is excluded from cover under the terms of the policy.
1.2 Issues and key findings
Is the insurer liable for the costs of repairing the bathroom damage?
Yes. Given the exchanged material I am satisfied the damage to the property was caused by faulty workmanship during the 2021 repairs, and that these repairs were guaranteed by the insurer. Therefore, the insurer is liable for the costs of repairing the damage.
Is the complainant entitled to be reimbursed for the costs of her professional fees?
Yes. The complainant was required to obtain expert reports to establish her claim, and she is entitled to be reimbursed for these costs under the AFCA Rules.
Why is the outcome fair?
The insurer offers a lifetime guarantee on the repairs under the policy, and it is fair to require the insurer to rectify the faulty workmanship pursuant to the guarantee.
Where it was necessary for the complainant to obtain professional reports to resolve the complaint it is fair to require the insurer to contribute to these costs in accordance with the AFCA Rules.
1.3 Determination
This determination is in favour of the complainant.
Should the complainant accept this determination, the insurer is to:
· assess the damage to the bathroom and ensuite and settle the claim in accordance with the terms and conditions of the policy within a reasonable time of being notified of her acceptance;
· pay the complainant $2,315.00 to reimburse her for her professional costs within 14 days of receiving invoices for these costs.
2 Reasons for determination
2.1 Is the insurer liable for the costs of repairing the bathroom damage?
Yes. Given the exchanged material I am satisfied the damage to the property was caused by faulty workmanship during the 2021 repairs, and that these repairs were guaranteed by the insurer. Therefore, the insurer is liable for the costs of repairing the damage.
Coverage of the policy
The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The policy also provides a lifetime guarantee on works done to repair damage covered by the policy.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant.
Page 87 of the PDS details the lifetime guarantee on building works:
Lifetime guarantee on home repairs
When we repair or rebuild your home, we guarantee the quality of materials and workmanship of that work for the lifetime of the home if we:
• authorise;
• arrange; and
• pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. It is a condition of our guarantee that we decide who will undertake the rectification work – it can be the original builder.
...
The parties agree that the lifetime guarantee applies to the two bathrooms. However, the insurer says the cause of damage is not the faulty workmanship from the 2021 claim, but rather earth movement was the cause.
The policy has a general exclusion for damage caused by ground movement, detailed at page 64 of the PDS as follows:
General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves:
...
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of:
• storm;
• flood;
• earthquake and tsunami; or
• explosion
and not because of erosion over time, structural fault or design fault.
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
On 14 May 2021, the complainant lodged a claim after noticing water pooling in the bathroom at the property. The insurer’s emergency repair team attended the property to locate the leak and assess the damage.
The insurer agreed that both the main bathroom and the ensuite would have to be fully renovated as tiles had been removed as part of the exploratory works
The insurer's builder A provided the insurer with a scope of works on 3 June 2021 and completed the works between 13 July 2021 and 15 September 2021.
The complainant contacted the insurer on 22 September 2023 advising that she had noticed the bathroom tiles were cracking and there was a squeaking sound and movement in the shower base which she believed to be the result of A's poor workmanship during the 2021 repairs.
The insurer arranged for A to return to the property to complete a CCTV leak detection test. A noted there was liquid escaping from separations from the sewage system but said that further investigations were required to determine if this was the cause of the damage observed by the complainant.
The insurer‘s assessor conducted a desktop assessment on 18 December 2023. It says due to the time that had passed since the repair completion, the observable damage may be due to a new issue unrelated to the 2021 event or repairs. The assessor recommended an engineer be engaged to provide an opinion.
The insurer then engaged engineer GD to assess the property. GD attended the property on 3 January 2024 and says:
· cracking in the plasterboard that is very slight to slight and therefore considered as being a normal part of household maintenance.
· a cracked tile in the ensuite, possibly damaged by impact
· tiles surrounding the window were not plumb
· a 32mm variation in floor level.
GD says the shower base squeaking indicated a void in the area beneath, and if it were immediately present after the 2021 repairs, would be due to poor workmanship, but if it occurred after some time, it would indicate footing movement.
GD did not consider the cause of damage was poor workmanship or ground movement. It says:
Although the evidence suggests movement is not the cause of damage, the following factors/conditions are present on this site and are not conducive to good footing performance, which should still be considered to prevent future damage from occurring
...
However, in the conclusion section of the report GD says:
After reviewing the available documentation and standards, to that which was accessible onsite, there are no signs or indications that there has been poor workmanship in relation to the tiles.
The available evidence indicates that the cracking in the tiles and the separation in the plaster joins are due to the movement of the site and rotation of the external wall.
...
GD also provided a supplementary report on 27 February 2024 providing an opinion regarding the impact of the 2021 water leak on the damage observed in 2023.
GD says the quantity and duration of the leak is unknown, however:
if the degree of the leak was significant and for an extended period of time this might have seeped into the founding soils. Statements from the original leak detection companies and plumbers would be beneficial in determining the size and length of the leak.
GD noted the timeline of the 2021 claim, being that the leak was found on 14 May 2021 and being fixed within a week. On 13 July 2021 demolition works occurred in the bathrooms. Repairs were completed on 1 September 2021.
GD concluded
Based on the above information the available evidence indicates that the water leaking from the claimed event did not contribute to the movement measured and therefore no drying period would be required.
However, it would be prudent to further investigate the quantity and duration of the leak. As the length and quantity of the leak is unknown, statements from the original leak detection companies and plumbers would be beneficial in determining the size and length of the leak.
The complainant engaged her own experts
The complainant engaged a plumber and an engineer to report on the cause of damage.
Engineer BA attended the property and provided a report dated 16 April 2024. BA was engaged to
· review the insurers findings from a water leak reported in May 2021
· inspect the dwelling in its current state and comment on the tiled wall in the bathroom, and the shower base in the same bathroom
· inspect the repair to the pressurised water supply to the dwelling, previously carried out to repair the water leak
· review the reports prepared by the insurer’s experts
· provide an opinion on the cause of damage.
BA agreed with the floor level survey conducted by GD, but says that trees, poor surface site drainage, or droughts have not caused the slab movement. BA considered the cause is the water leak from the main supply in 2021, and that a drying period should have been recommended before the 2021 repairs were undertaken.
BA explained that the fact that the water consumption for the dwelling showed no noticeable sign of a sudden increase clearly indicates that the leak was gradual and has seeped into the founding soils. BA says:
With the continuous drying out of the founding soils, the slab has moved by heaving and the grout has become separated from the underside of the shower base.
Regarding GD’s view that damage to the tiled wall had been caused by the wall rotating outwards, BA noted that the wall tiles are cracked vertically on one side of the bathroom wall only. The other side of the wall is in the second bathroom which is not affected and plumb, suggesting that the cement sheet which the tiles are fixed to was not packed out correctly, and the slight movement in this area has led to the tiles cracking.
BA says if the wall had rotated, as GD suggests, signs of distress would be visible on the other side of the wall which is also tiled.
Insurer engaged an expert to take soil samples
In response to the BA report, the insurer engaged geotechnical consultant HC to conduct a field investigation at the property and carry out relevant soil tests and moisture content readings on 1 July 2024.
HC says the laboratory results reveal that the soils at the site are reactive clay soils that undergo volumetric changes due to changes in moisture content. It says the soil samples indicated the soils in the areas investigated are no longer affected by moisture ingress from the leaking septic pipe or leaking water pipe.
Based on its reports, the insurer says the current damage to the bathroom and ensuite are not due to poor workmanship during the previous repairs, rather, it says the cause of damage is ground movement which is excluded from cover.
I am satisfied, on balance, damage is covered by lifetime guarantee under the policy
I am satisfied that the report from the complainant's engineer BA is thorough, logical, compelling, and supported by helpful photographs, and that the reasoning and analysis in that report is more persuasive regarding the cause of damage than the report from GD.
GD agrees that if the degree of the 2021 leak was significant and for an extended period, this might have seeped into the founding soils but says a drying period was not required after the claimed event. I am not persuaded by GD ’s conclusion that no drying period was required after the 2021 event, as it is made without any information about the quantity or duration of the leak.
BA explained that the water consumption for the dwelling showed no noticeable sign of a sudden increase during the period prior to the discovery of the leak in 2021, which indicates that the leak was occurring gradually for some time before it was noticed and that it would have caused soil saturation.
BA also says that in 2021 there was no exploration of the founding soils, and had there been, they would have been saturated. BA says the heave of the slab likely occurred after the mains water supply was fixed in 2021. As the drying out of the founding soils continued, it caused the shower base to dislodge from the slab beneath it.
Further, the soil samples taken in July 2024 indicate that the soils at the site are reactive clay soils that undergo volumetric changes due to changes in moisture content, and that at the time of the sampling the soil was not affected by moisture. These findings are consistent with BA’s opinion that the damage was caused, in part, by a failure of the insurer’s repairer to allow adequate drying time before commencing repairs in 2021.
I am also not persuaded by GD’s opinion regarding the cause of the cracking to the tiles in the bathroom being the rotation of the wall. The bathroom and ensuite share a wall, and as stated in the BA report, the adjacent tiled wall in the second bathroom shows no signs of distress, which would be expected if the wall was rotating.
Further, the GD report says that the evidence observed at the site does not point to ground movement being the cause of the damage, but that ground movement caused the rotation of the wall.
I consider the explanation provided by BA, that the cement sheet which the tiles are fixed to was not packed out correctly, and the slight movement in this area, has led to the tiles cracking, to be persuasive and more consistent with the observed damage than GD’s opinion.
Given the above, I am satisfied the information shows the 2021 leak likely saturated the reactive clay soil, and that the resultant heave of the soil as it dried, together with the incorrect packing out of the cement sheeting prior to tiling, has caused the damage.
I consider both the failure to allow the soil to dry before commencing repairs and the failure to properly pack out the cement sheeting amounts to faulty workmanship and therefore the damage caused is covered by the lifetime guarantee under the policy.
The result is that the insurer is liable to repair the damage to the bathrooms at the complainant's property in accordance with the terms and conditions of the policy.
2.2 Is the complainant entitled to be reimbursed for the costs of her professional fees?
Yes. The complainant was required to obtain expert reports to establish her claim and she is entitled to be reimbursed for these costs under the AFCA Rules.
I am satisfied it is fair to require insurer to pay complainant’s professional costs
The complainant seeks payment towards her costs in pursuing this complaint.
Paragraph D.5 of the AFCA Rules provides that we may determine an insurer should contribute up to $5,000 towards a complainant’s professional costs in pursuing a complaint.
AFCA aims to provide a dispute resolution process which is accessible to complainants, without the need for professional advisors. Accordingly, professional costs will only be reimbursed where external advice is reasonably required, given the nature of the dispute.
The complainant obtained and provided an expert opinion (and report) from both a plumber and engineer to assess the cause of damage, and to also review the reports provided by the insurer’s experts.
I am satisfied the reports obtained by the complainant were reasonably required to resolve the complaint, and I consider it fair for the insurer to reimburse the complainant for these costs.
Should the complainant accept this determination, within 14 days of receiving a copy of the invoice for these costs, the insurer is to pay the complainant $2,315.00 comprised of the following amounts:
· $350.00 for the MJ plumbing inspection and report
· $1,569.00 for the BA inspection and report
· $396.00 for the BA supplementary report.
2.3 Why is the outcome fair?
The insurer offers a lifetime guarantee on the repairs under the policy, and it is fair to require the insurer to rectify the faulty workmanship pursuant to the guarantee.
Where it was necessary for the complainant to obtain professional reports to resolve the complaint it is fair to require the insurer to contribute to these costs in accordance with the AFCA Rules.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.