Claim declined for subfloor and dining room damage attributed to inherent defects and gradual deterioration

FirmAllianz Australia
Decided2025-09-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for dining room floor subsidence and related costs, alleging a cracked stormwater pipe. AFCA found the insurer entitled to decline the claim and awarded nothing for accommodation, professional costs or non-financial loss.

The complainant did not establish an insured event; expert evidence showed the proximate cause was building defects and gradual deterioration, which the policy excludes.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-24-101643 | Financial firm | Allianz Australia Insurance Limited Case number: 12-24-101643 25 September 2025 1 Determination overview 1.1 Complaint The complainant holds a home and contents policy with the financial firm (the insurer). On 16 April 2024, he lodged a claim for damages to his property from an unknown event. He says that he observed the dining room floor sinking and believed that the damage is a result of a cracked pipe underground. The insurer says that there is no evidence that the damaged pipe has caused damage. The insurer says the proximate cause of the damage has been caused by defective and non-compliant construction and gradual deterioration issues. The insurer has declined the claim as the damage is not due to an insured event; it is a result of excluded causes. The complainant disagrees with the decision. He says that insurer should accept the claim, reimburse him make safe costs, temporary accommodation costs, professional costs and compensate him for the insurer’s poor claims handling. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The complainant has not established the damage was caused by an insured event. Instead, the proximate causes of the damage were inherent defects and gradual deterioration. Damage due to these causes is not covered by the policy. Is the complainant entitled to alternative accommodation costs? No. The policy does not provide for alternative accommodation costs unless the damage was caused by an insured event. Is the insurer required to pay professional costs? No. The professional reports have not assisted the complainant in establishing a claimable loss under the policy. Is the insurer required to pay non-financial loss compensation? No. The insurer has handled the claim reasonably well and I am not satisfied that a claim for non-financial loss compensation is warranted. Why is the outcome fair? The outcome is fair as the complainant has not established a claimable loss. It would be unfair to require the insurer to pay the claim when the policy does not require it to do so. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to this complaint or claim. 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The complainant has not established the damage was caused by an insured event. Instead, the proximate causes of the damage were inherent defects and gradual deterioration. Damage due to these causes is not covered by the policy. Onus on complainant to establish a claimable loss The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. The terms of the policy include the Certificate of Insurance (COI) and the Product Disclosure Statement (PDS). Subject to its conditions and exclusions, the policy provides cover for loss or damage caused by the insured evens listed in the PDS, one of which is water or other liquid damage. Amongst other things, the insured event covers damage directly caused by water leaking or discharging from fixed pipes, gutters or drainpipes. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. The proximate cause of damage must be determined Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. The complainant says that the damage was caused by a cracked pipe that has leaked, causing water to flow under the property causing damage. The insurer disputes that the leaking pipe caused the damage claimed. Further, the insurer says the proximate cause of the loss is the result of wear and tear including gradual deterioration and inherent defects including faulty design and poor workmanship, which are factors excluded under the policy. Complainant says that damage caused by broken pipe In the initial stages of the claim, the complainant engaged an engineer, AJ to provide a report in support of his claim following the initial denial of the claim by the insurer. AJ inspected the property on 10 July 2024 and provided a report dated 15 July 2024. An inspection of the sub floor found considerable water puddles throughout the floor. There were no holes or other possible water ingress points to the walls identified. AJ recommended further investigations, including a proper imaging camera operated plumbing inspection to rule out the possibility of any damaged water mains underneath the property, or any other sort of leakage. The complainant has provided a video of the water underneath the property. The complainant also provided an email from RG from late July 2024 which recommended that all plumbing, drainage and stormwater pipes were checked for leaks and blockages, and if required rectified. RG says that the property had experienced heave in the corner of the dining area to the upward scale of 25mm. RG recommended that a plumber further investigate the water egress issues and rectify. The complainant obtained a plumber’s report from JB dated 30 October 2024. In this report, JB said: · there are two areas of the stormwater drain where it is blocked · one is the down pipe on the left side of the house which is blocked by dirt · the other drain is upstream from the pit in front of the pool house which is blocked by dirt and children’s toys · there was a break observed on the side of a 45 degree bend in a pipe at a depth of 210mm · there were areas of drain with insufficient grade or failing backwards · the damage to the property was not caused by the drainage issues · the drain along the back part of the property holds water · to confirm this drainage does not have any leaks, it was recommended to bring an IS to surface near the area holding water to gain access to the drain with a commercial wet vac to suck water out to use CCTV to check drain for leaks · no issues were found with the sewer. JB re-attended to clear the blockages on 16 January 2025 and provided a further report. JB noted that after cleaning the blockage, a break in the top of the stormwater pipe was located, around 1 metre downstream from where the break protruding pipe was located. The complainant says that this supports his claim that the broken pipe has caused the damage which the insurer should accept. The complainant has also provided numerous photographs showing areas of damage including the pavers around the pool, doors with gaps and gaps between pavers and the wall. Insurer obtained expert reports Following the lodgement of the claim, the insurer appointed a plumber (TP) to complete a leak detection test and arranged for make safe works to be undertaken by a builder (TB). TP reported that it had limited access to the stormwater drain due to a blockage and was unable to inspect the below ground services in the area of concern. A subfloor inspection identified moisture which it says was due to insufficient external ground catchment. TP advised that for access to the rest of the drain, the stormwater would need to be cleared, and invasive holes drilled into the downpipes. TB attended on 26 April 2024 and reported a gap under the skirting board, with adjacent tile grouting being displaced. The dining room tiled floor was noted to have subsided with the external walls adjacent to the dining area severely cracked. TB advised that the complainant should have the drains cleared to allow for access to the stormwater drainage. The insurer appointed an engineer (CR) who inspected the property and provided a report dated 22 May 2024. CR noted: · the property was constructed in 2001 and has been maintained in a satisfactory condition with regard to is age and method of construction · the property was situated on relatively flat land · the flooring around the dining area had subsided approximately 200mm towards the rear elevation · the dining room floor was constructed with timber joists, bearers and brick piers · following removal of some loose tiles, the timber framing was exposed which was decayed due to long-term exposure to high levels of moisture · there was a lack of surface drainage provisions around the building · ground surfaces were sloping towards the building · the subfloor space was a similar height or lower than the surrounding ground level which allows run-off to enter the subfloor space · the subfloor was damp throughout but no evidence of water ponding. CR noted that it was unable to inspect the subfloor directly beneath the affected section due to restricted height clearance but says that it was able to visualise the area following the removal of the tiles. CR says that it is likely that the timber support (bearer) underneath the supporting joist has also decayed/rotted. CR concluded that the cause of the damage was due to: · defective and non-compliant construction, including inadequate grading of the subfloor surface · inadequate surface water drainage; and · inadequate subfloor ventilation- it was only installed on the left side of the property. CR says that these defects do not comply with the National Construction Code (NCC). CR provided a supplementary response providing additional evidence in support that the relevant NCC at the time of construction had not been complied with. CR says that the damage is unrelated to any one-off event. CR provided a further supplementary report dated 3 December 2024 following a review of the reports from TP and AJ and the drain inspection report from JB. CR noted that the blockages identified by JB were located away from the area of concern. CR also noted that the underground drainage pipe near the dining area does not pass through the subfloor and therefore cannot be introducing moisture into the subfloor space. CR says that the stormwater pipe holding water is suggestive that it is not leaking. Otherwise, it would not be retaining any water. CR says that evidence of puddles within the subfloor space as noted by AJ is consistent with the inadequate grading of the subfloor space. CR says: · the incorrect grading of the external finished surfaces sloping towards the property had allowed surface water run-off to pond against the dwelling · water has then entered the subfloor space through the gap between the pavement and the dwelling · this has exposed the timber to frequent moisture, causing decay · this process takes several years to occur. A leak detection test was obtained from NL dated 13 February 2025. NL conducted a spray test to the back door and window frame. NL concluded that the water ingress to the subfloor and under the door itself in the dining room was due to gaps around the back door and window frame caused by house movement. NL also undertook a CCTV inspection of the sewer and stormwater pipes. NL noted: · the sewer was found to be in good condition and free of debris · a crack was found at the 45o bend near the downpipe at the front of the house which would only be allowing some water to leak into the soil and is unlikely to be causing any movement or contributing to the water pooling under the house · the drain at the back of the house was holding water due to low points in the drain and was unlikely to be causing any issues · blockage of the stormwater drain running from the pit in front of the pool house would not have caused water to pool under the house as it was only affecting the small section of drain running from the pit to the main line. The insurer obtained a further engineer’s report from CE following a site inspection. The report is dated 23 February 2025. CE notes: · movement and damage along the pool coping · multiple cracks in the step risers to the living room and steps to the dining room · partial separation and sealant deterioration at the step-wall junction · multiple cracks including in the grout between the pavers and vertical cracks in the cladding with previous repairs · external pavers fall towards the dining room · hairline cracks in the cladding at the sub-wall, control joints and a window opening on the southern elevation · internal cracking was observed to the study at a skirting board joint, floor tiles in bathroom · separated skirting boards and floor tiles noted in the bathroom, loungeroom, living room, dining room · some tiles in dining room were loose with moisture damaged timber beneath. CE says that the property is situated on Chromosol soils which are moderately reactive soils. A floor level survey found a difference of 23mm. This exceeded the normal tolerances and shows a non-uniform settlement towards the northwest, southwest and southeast corners of the dwelling and general undulations throughout. CE concluded that: · the moisture damage is consistent with long-term ingress beneath the external door, resulting from building movement and inadequate or failed waterproofing · the abnormal moisture conditions of the subfloor are consistent with general groundwater and surface water ingress which has been exacerbated by issues with surface water control, subfloor drainage, and ventilation · the crack damage is from differential foundation movement, consistent with areas of poor surface drainage at the footing line and likely exacerbated by abnormal moisture conditions in the subfloor. Insurer says damage is due to gradual deterioration and inherent defects The insurer says that based on the reports that it has obtained, the complainant has not established a claimable loss. It says that the damage is not the result of a listed insured event but is due to gradual deterioration and inherent defects including faulty design and poor workmanship which are excluded perils. The insurer has declined the claim on this basis. Complainant says a claimable loss has been established The complainant disputes this and says that failure of the waterproofing under the door is an insured event. He says the fact that it failed indicates that it is a one-off event which is an insurable event. He compares it to his other previous insurance claims accepted by the insurer which he says related to failed waterproofing. These claims were for storm damage to his pool shed and damage to his laundry ceiling from the upstairs bathroom. The complainant says that if the damage as caused by long term water ingress, the entire floor would have caved in. Further, there are no signs of moss, or water damage to the paint work that is suggestive of gradual deterioration. The complainant also says that the doorway which CE says is leaking is an old access door that is not used. He therefore says that no wear and tear has occurred. The complainant maintains that the underground cracked stormwater pipe in the northwest corner of the property is a source of liquid escape and therefore he has established a claimable loss under the insured event of water damage. He says that this has caused the heaving of the concrete pavers and the house because of the reactive soils, causing the ground to fall towards the house. The complainant refers to the comment made by CE that noted: 6.4.10 As the rot damage to the dining room floor structure is isolated to one location despite the more general abnormal moisture in the subfloor, additional contributing factors must be considered. He says that this contributing factor is the failed waterproofing. Complainant has not established a claimable loss for damage Based on the information submitted by the parties, I am not satisfied that the complainant has established a claimable loss. I accept that there was a broken pipe at the property. However, there is no evidence the cracked pipe caused any direct or indirect damage to the property. This is confirmed by the CCTV and report from NL. The pipe is some distance away from the property and does not pass under the subfloor. I also note the comments from CR who noted that while the stormwater pipe was not visualised in the area of concern, the likelihood of it leaking is low given that it was holding water. I am satisfied that the engineering reports from CR and CE support that the damage is not related to any water leak but is the result of gradual deterioration caused by inherent building defects, including inadequate stormwater drainage, subfloor ventilation and inadequate grading of the subfloor. The reports, particularly from CE, are comprehensive and are supported by sound reasoning and photographs. Both CE and CR have confirmed that these issues are not compliant with the relevant NCC at the time the property was constructed. As such, I am satisfied that they represent a building defect. Damage caused by building defects is excluded under the policy terms. The complainant’s submission about the property complying with the relevant building standards are not persuasive given the findings from CE and CR. Further, the complainant has not provided any evidence in support of his claim that the subfloor was altered by water damage. I accept the complainant’s submission that the failed waterproofing of the door has contributed to the observed damage in the dining room area. However, I am not satisfied that such damage is from a one-off event. CE confirms that such damage has occurred over a period of years. Further, the waterproofing failure is the result of general building movement which has been caused by the inherent building defects as described by CR and CE. This is also consistent with the observed cracking elsewhere in the property and the historic repairs to some cracks. This confirms the long term nature of the damage. Insurer is entitled to decline the claim Given the matters set out above, I am satisfied that the insurer is entitled to decline the claim. This means, that the insurer did not wrongfully refuse to cover the claim. As a result, the complainant is not entitled under the policy terms to be reimbursed for any make safe works undertaken or for costs incurred in undertaking explorative costs to locate the source of the leak in the absence of a claimable loss. 2.2 Is the complainant entitled to alternative accommodation costs No. The policy does not provide for temporary accommodation costs unless the damage was caused by an insured event. Policy limits alternative accommodation costs to when claim has been accepted The policy provides for alternative accommodation costs for the insured and their family if the home building is damaged by an insured event and cannot be lived in. The complainant says that he moved with his family to alternative accommodation for a period of two months. He says this cost $7,000 and for which he seeks reimbursement from the insurer. I am satisfied that the insurer is not required to reimburse the complainant for alternative accommodation costs. This is because the complainant has not established a claim under the policy. Further, there is no information to support that the property was unable to be lived in during this period. The insurer had conducted make safe works which limited access to the subsided dining room. 2.3 Is the insurer required to pay professional costs? No. The professional reports have not assisted the complainant in establishing a claimable loss under the policy. AFCA may require insurer to contribute to a complainant’s professional costs The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA considers the complexity of the complaint and whether the particular complainant needed to incur costs to understand or establish their claim. Reports have not assisted the complainant The complainant’s engineering report from AJ and his plumber’s report from JB have not assisted the complainant in establishing his claim. Given this, it would not be fair to require the insure to reimburse the complainant’s claimed professional costs. 2.4 Is the complainant entitled to non-financial loss compensation? No. The insurer has handled the claim reasonably well and I am not satisfied that a claim for non-financial loss compensation is warranted. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainant says that insurer’s claims handling was poor The complainant says that the insurer has poorly managed the claim. He says that the insurer’s communication was poor and that it failed to return his calls. He says that the insurer also failed to adequately investigate the complaint, which meant that the property continued to deteriorate. He was concerned for the family’s safety as he did not believe that the insurer appropriately performed a make safe. He resided in temporary accommodation for two months. Complainant is not entitled to compensation While the complainant says that the insurer failed to adequately investigate the claim, the onus was on the complainant to establish a claimable loss. This included investigating the possible source of the leak. Both JB and RG advised the complainant that removal of debris was required to investigate the stormwater pipes for a possible leak. I note that following the complainant advising the insurer that the debris had been removed, the insurer paid for a CCTV inspection of the pipes. The insurer appointed appropriately qualified experts to assess the damage soon after the claim was lodged. This has included two engineers. Having reviewed the exchanged information, I am satisfied that the insurer has reasonably handled the claim. 2.5 Why is the outcome fair? The outcome is fair as the complainant has not established a claimable loss. It would be unfair to require the insurer to pay the claim when the policy does not require it to do so. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.