Insurer reversed acceptance and declined further payment for landslide damage; dispute over scope of damage, land stabilisation, excess and additional benefits
Text of the determination
Determination
|
Case number
|
12-24-100089
|
Financial firm
|
Allianz Australia Insurance Limited
Case number: 12-24-100089 21 July 2025
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer) and lodged a claim for damage to his property on 19 July 2022. He says his property was subjected to 2 landslides in May 2022 which caused damage.
The insurer assessed the claim and paid the complainant $118,982.80. It has since informed the complainant its original decision to accept the claim was incorrect and that it will not consider any further payments under the claim.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. The damage was caused accidentally which is an insured event under the policy. The insurer has not shown it is entitled to rely on a policy exclusion to deny the claim.
Is the insurer’s assessment of the damage reasonable?
No. The insurer’s assessment of the damage is not reasonable. The damage to the driveway should include remediating that part of the driveway which has rotated and subsided. The costs of remediating the driveway should also extend to stabilising the land, as that is fundamental to the required repairs.
Is the insurer entitled to charge an excess?
Yes. The insurer is entitled to charge an excess as the complainant has not shown an exception applies.
Is the insurer required to pay an amount exceeding the building sum insured?
Yes. The policy includes certain amounts which are payable outside the building sum insured. Some of the amounts raised by the complainant would fall within those categories. It would be fair for the insurer to pay those additional amounts once further assessment is completed.
Is the insurer required to reimburse costs and pay compensation?
Yes. The complainant has been unduly inconvenienced by the length and handling of this complaint by the insurer. In view of this, the insurer must pay $4,000 non-financial loss compensation.
The complainant has also incurred expert fees while responding to the insurer’s submissions and to support this complaint. As this was of assistance to AFCA and the costs are reasonable, it is fair the insurer reimburses these costs.
Why is the outcome fair?
The complainant has shown the damage was caused accidentally, which is an insured event under the policy. The insurer has not shown the damage is excluded under the policy terms. It is therefore fair that it covers the claim.
It is also fair that the complainant is reimbursed for his costs of dealing with the insurer and compensated in accordance with this determination’s terms.
1.3 Determination
The determination is in favour of the complainant.
Once notified of the complainant’s acceptance of this determination, the insurer must:
· Within 14 days, pay the complainant $405,594.14, less any applicable excess, plus interest in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) from 8 March 2024 to the date payment is issued.
· Within 14 days, pay the complainant $27,776.50 being for reimbursement of his expert fees and for the non-financial loss compensation.
· Within 21 days contact the complainant with an offer to cash settle the additional amounts which are payable by the insurer outside the building sum insured in accordance with section 2.4 of this determination.
If the insurer requires further documentation or inspections to facilitate this, the complainant is to co-operate with any reasonable requests.
The insurer must include a 15% uplift to reflect transfer of risk, variability in pricing (as the insurer will not be conducting those works) and loss of lifetime guarantee when cash-settling these additional amounts.
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
No. The damage was caused accidentally which is an insured event under the policy. The insurer has not shown it is entitled to rely on a policy exclusion to deny the claim.
Complainant seeks cover for damage caused by landslide
The property is comprised of a single storey residence which is connected to an asphalt driveway, bordered by two embankments. Embankment 1 borders T Road which is a public road. Embankment 2 is located within the property boundary and borders the internal face of the property driveway.
The complainant says that following a period of intense rainfall between 10 and 13 May 2022 (the Period), there were two landslides at the property. BOM records show total rainfall recorded over this 4-day period was 61mm.
Landslide 1 (LS1) originated on the verge of T Road, while Landslide 2 (LS2) occurring afterwards, originated on the verge of the property driveway to the opposite side of LS1.
The complainant says the landslides caused damage to:
· the driveway which has cracked, shifted and subsided
· a private pole which is leaning
· boundary fencing which has moved and shifted
· a cracked storm catch drain
· embankment 2 and surrounding landscaping, which is continuing to shift
The complainant says because of this damage, he is entitled under the policy to be indemnified for the cost of the repairs, including the cost of stabilising the now unstable area. He says this exceeds the policy sum insured of $536,527.00, and maintains he should be paid $840,134 comprised of:
· $574,134 being an indexation of the sum insured, which he says he is entitled to due to settlement delays
· $339,000 over and above the sum insured based on extra entitlements under the policy
Complainant must establish a valid claim
The complainant carries the initial onus to show, on the balance of probabilities, he has suffered a loss caused by a risk insured under the policy. This is commonly known as a ‘valid’ claim.
Once this is established, the onus shifts to the insurer to show, on the balance of probabilities, a policy exclusion applies or that it is otherwise entitled to decline the claim.
The complainant’s policy provides accidental damage cover for building and contents as follows:
What is covered
Your buildings and/ or your contents as set our in your schedule are covered if they are destroyed, lost or damaged. They are covered only if you own them or are liable for them.
…
We will cover your building and contents for accidental loss or accidental damage. There is some loss or damage we will only cover under specific conditions. This is accidental damage caused by:
Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours of, and as a direct result of, one of the following:
-Storm, tsunami, rainwater, hail, snow or wind
The policy also contains the following general exclusions which the insurer has raised:
What we will not pay for
We will not cover your buildings and contents for any accidental loss or accidental damage caused by:
Landslide or subsident except as described on pages 18 to 19
Settling, shrinkage or any movement of earth
Erosion
Rust, corrosion, gradual deterioration, depreciation, wear or tear
A defect in an item, faulty workmanship, structural defects or faulty design
The policy does not define ‘accidental’, however, consistent with accepted insurance law, the panel takes it to mean, unintended and unexpected.
There is no dispute that there were 2 landslides on the property in May 2022 which caused damage to the property. To that extent, the exclusion concerning landslides applies. However, the policy says there is an exception to the exclusion where the complainant can show the landslides occurred ‘accidentally’ and:
within 72 hours of storm, tsunami, hail, snow or wind; and
was as a ‘direct’ result of any of the above events.
There is no information to show that the landslides were anything but unintended and unexpected and as such were accidental.
Further, it is not disputed that there was rainfall between the Period, followed by the landslides, which the panel is satisfied occurred within 72 hours of that rainfall.
The question that remains is whether the damage was directly the result of storm or rainwater and if so, how much of the damage identified is covered under the policy, having regard to the policy exclusions and definitions.
Complainant says damage was directly the result of storm or rainwater
The complainant says the damage was directly the result of storm or rainwater, specifically the rain events over the Period. He says this has led to foundational support damage to the driveway, the embankments facing either side of the driveway, landscaping, fencing and the service pole.
The insurer has paid to date $138,682.36 on the claim. This comprises:
· DP Report Fee of $2,117.50
· Syscon power pole repairs of $4,950
· KE drainage upgrades of $5,632.00
· Fence Repairs of $7,000
· $118,982.86 related to 6m2 of driveway, 6 m2 of contiguous micropiles and 37 lm of drainage upgrades.
While the insurer says these payments were made in error, it also states that it does not intend to seek recovery of those amounts. Therefore, those aspects regarding the fencing and service pole have been resolved and do not form part of this complaint.
The complainant appointed a geo technical engineer, DP who attended the site on 18 and 24 May 2022. DP provided a report dated 3 June 2022.
In summary, DP said:
· Two rotational failures observed, one originating in T Road and one within driveway of T Road.
· Landslides occurred as a result of saturation of the slopes. LS1 predates LS2, which is backed up by the presence of relatively recent asphalt resurfacing near where LS1 occurred
· Poor stormwater management within T Road resulted in the channelling of stormwater over the pavement fill batter and saturation of the batter slope. Formation of tension cracks within T Road allowed stormwater to more readily penetrate the fill batter and further saturate the subsurface soils. The full extent of saturation is unknown, but it is considered likely that such saturation could extend to LS2.
· It is understood that the current and proposed future use of the area of Landslide 2 is a gravel driveway. At present, the movement observed could be managed by on-going maintenance of the gravel driveway, relaying of the gravel surface following minor slumping and settlement. However, monitoring of the landslides should be implemented. This should include on-going geotechnical inspections, after 20 mm of rain and monthly, along with the installation of survey points in and around each landslide.
· Should excessive or continuous movement occur then the need for more rigorous remediation should be reassessed. Detailed intrusive investigation would be required to better understand the dynamics and interactions of each slide and to assist in design of remediation measures. Future remediation may include significant earthworks to excavate displaced soil, reinstatement of the landslip area, installation of retaining structures and installation of drainage.
· Displacement of driveway of 0.1 to 0.2m.
The complainant supplied photographs predating and following the landslides, which show the condition of T Road and nearby embankment and driveway in comparison over the Period.
The complainant says the landslides were a direct result of the rainfall, given the timeline of the observed damage, BOM data, expert commentary and the photographs.
Insurer says landslides not the direct result of storm or rainfall
The insurer appointed a forensic engineer, S to attend site on 2 December 2022. S provided a report dated 9 January 2023, which in summary said:
· A Google street view image dated May 2015 shows the shoulder of T Road adjacent to embankment 1 at the property was showing signs of cracking and early signs of failure.
· This has been cracking and subsiding over a long period based on the google street view image.
· Nearmap image dated 14 April 2020 shows remedial works have been undertaken to embankment 2 in the past.
· Soil has collapsed at the shoulder of T Road and embankment 1
· Soil has collapsed at embankment 2 and around the posts of Fence 2. A row of trees are translating towards the collapsed soil of embankment 2.
· Portion of driveway was not re-surfaced. The asphalt surfacing has deteriorated and is not consistent across the driveway at this location.
· The presence of a catch drain indicates there has been long-term history of water flowing from T Road across embankment 1 and the property and onto embankment 2. The catch drain at the bottom of the embankment 1 has been installed in the past to capture and redivert water seepage from embankment 1 to prevent damage
· LS 1 has caused Fence 1 to move out of vertical alignment with potential exacerbation/ worsening of a pre-existing lean to original service pole
· LS2 has caused northerly translation of landscaping (row of trees), deep and wide cracking to the driveway at the top of embankment 2 based on photo of 16 May 2022. The driveway was re-levelled at the time of inspection.
· Fence 2 to fall out of vertical alignment and lose support of surrounding soil.
· Closest weather station to the property was approximately 5 km away, which station recorded 65.44 mm of rainfall between 10 May 2022 to 16 May 2022. Intensity of rainfall considered to be a very frequent occurrence.
· Does not consider the extent of rainfall under normal circumstances to have caused the landslides, where the embankments had no history of distress.
· Although landslides at shoulder of T Road/ embankment 1 and embankment 2 have occurred following rainfall between 6 May 2022 and 16 May 2022, the shoulder of T Road has been failing over a long period and there has been a long history of water flowing from T Road across embankment 1 and the property and onto embankment 2.
· An investigation of the top of the insured’s driveway coming off T Road that was not resurfaced shows the driveway is deteriorated and has not been maintained. Furthermore, the asphalt surfacing thickness does not appear to be the 30 mm as required for Class A, S or M foundations for typical asphalt pavement specifications for residential applications under Light Traffic in accordance with AS3727-1993.
· Driveway is approximately 47 years old and in S’s opinion had reached the end of its design life.
· There will be ongoing problems with landslides if drainage improvements are not undertaken to T Road.
The insurer then engaged a geotechnical engineer, W, to provide further comment. W delivered a report dated 29 June 2023. The report said:
· May 13th storm initiated the movement. The movement has continued since.
· Owner informed W the fill for the road was placed in 1974
· Movement observed primarily confined to the filled areas of the road and driveway.
· Visible sections revealed additional tension cracks that run roughly parallel to the slope contours, particularly near the toe of the embankment.
· Notable displacement was observed at the NE end if the driveway. This displacement approximately aligns with the NE scarp on the road embankment upslope, indicating it may represent a partially filled-in head scrap resulting from the movement in the driveway, The displacement was in the order of approximately 0.3m.
· The heavily saturated soil profile greatly reduces the cohesive strength of the soil/fill. Once the fill has moved initially, subsequent rainfall events do not need to be as intense to cause further slumping and downhill movement.
· Previous one-off rainfall events of similar intensity (to the 13th of May event) had not triggered the failure because the ground conditions were comparatively dry and had the capacity to absorb moisture. The persistent rainfall in the preceding months to the failure had already fully saturated the soil profile (multiple La Nina, Negative Indian Ocean Dipole and Positive Southern Annular Mode), leaving little capacity for additional moisture absorption during the extreme rainfall event. Consequently, unprecedented volumes of surface and subsurface flows under and through the fill resulting in the movement.
· Recommended stabilisation works is on both Council and the complainant’s land. If stabilisation works aren’t carried out on the Council land further movement around T Road could impact the property that is immediately downslope.
· Recommended work on Council land involving one surface/subsurface cut off drain on the uphill side of the driveway, one row of piles immediately below the driveway
· Recommended work involving one surface/subsurface cut off drain on the uphill side of the driveway, one row of piles immediately below the driveway
· Movement to fence is a direct consequence of the landslide and ongoing movement.
· Notable displacement was observed at the NE end of the driveway. This displacement approximately aligns with the NE scarp on the road embankment upslope, indicating it may represent a partially filled-in head scrap resulting from the movement in the driveway, The displacement was in the order of approximately 0.3m.
W delivered a supplementary report dated 26 December 2023 saying:
· Slope failure is likely to be triggered during heavy rainfall periods considering the slope angle is not too steep
· Micro Piles to 8m depth provide satisfactory factor of safety for a permanent slope.
· Suitable water management is critical for slope stability. Installing drainage systems, such as surface drains or subsurface drains, helps control the flow of water and prevents excess water from accumulating, which can contribute to soil saturation and instability. Proper grading and redirecting water away from the slope are also essential components of effective water management.
The insurer says the experts’ findings show it is not required to cover the damage. It says this is because the landslides were not caused by any single event. Rather, it says they were a result of inadequate stormwater management of T Road causing prolonged saturation and destabilisation of the soil during multiple instances of rainfall throughout 2021 and 2022. It says this means that the damage claimed was not caused directly by storm or rainwater.
Landslides were directly caused by rainwater
Having considered the information of both parties, the panel is satisfied, on balance, the landslides were directly caused by rainwater:
In reaching that position, the panel notes:
· There is no reason not to accept the complainant’s photographs predating the rainfall of the Period as representative of the property conditions. While those photographs do show some minor surface cracking to T Road, it does not show that any landslide had occurred.
· All experts agree the landslides occurred due to rainwater falling over the Period which has then initiated the landslides.
· While the condition, design and type of drainage on the public land may have played a part in contributing to the soil conditions leading to the landslide, it was the presence of the rainwater which triggered the landslides, in the absence of which the landslides would not have occurred.
This being the case, as the panel is satisfied the landslides were directly the result of rainwater and that the landslides occurred within 72 hours of the fall of the rainwater, the insurer is not entitled to rely on the landslide exclusion to deny the claim.
Insurer has not shown other exclusions apply
The policy excludes cover for damage caused by:
Settling, shrinkage or any movement of earth
Erosion
Rust, corrosion, gradual deteriorations, depreciation, wear or tear
A defect in an item, faulty workmanship, structural defects or faulty design
The onus is on the insurer to show exclusions apply to decline cover for the claim. The panel is not satisfied on the balance of probabilities that the insurer has established the damage is excluded.
In considering whether these exclusions apply, the panel has considered:
· The earth movement exclusion does not apply, as the exclusion can only be interpreted to apply to earth movement not caused by storm or rainwater. There would be an inherent contradiction to interpret the exclusion otherwise, given the policy provides cover for landslides caused by those events.
· The damage was not caused by erosion. Erosion is the process by which the surface of the earth is worn away. The landslides involved both above surface but largely subsurface flows which eventually led to a loss of cohesion in the soil and the landslides.
· The insurer says the exclusions for gradual deterioration and defect should be triggered because of the combination of the inadequate drainage and the deterioration of the soil condition over time (because of the loss of capacity of the soil to retain water). The panel does not accept this reasoning because the information shows the rainfall over the Period initiated the movement. Further, while drainage on site may not have been sufficient to meet the requirements for this specific event, the insurer has not shown there was any faulty design or defect in the drainage itself.
This means the insurer is not entitled to decline the claim based on the exclusions it has raised.
2.2 Is the insurer’s assessment of the damage reasonable?
No. The insurer’s assessment of the damage is not reasonable. The damage to the driveway should include remediating that part of the driveway which has rotated and subsided. The costs of remediating the driveway should extend to stabilising the land, as that is fundamental to the required repairs.
Parties disagree as to extent of cover
The policy covers the complainant’s building and contents where they are:
Destroyed, lost or damaged
Damage is not defined under the policy. Where a term is not defined, we apply its reasonable and ordinary meaning. One source of guidance as to a word’s reasonable and ordinary meaning is the Macquarie Dictionary. The Macquarie Dictionary defines damage as:
Injury or harm that impairs value or usefulness
The complainant says that because of LS2 damage was caused to the driveway, landscaping and constructed embankment. The complainant says the extent of damage to the driveway involved:
· Surface cracks along portions of the driveway; and
· A northerly translation and drop of the driveway initially by 150 – 200 mm (it is reported that the drop now is in the vicinity of 500mm)
· There is now a noticeable crossfall of 13.5% from a previous 4%
The complainant says that the increased driveway crossfall has resulted in damage flowing from:
· Loss of site stability and safety as the steeper slope creates a higher velocity of rainwater runoff- resulting in pavement surface erosion damage and consequent contamination of adjacent landscaped area with pavement aggregate creating a mowing safety hazard
· Loss of site safety by creating added difficulty and fall-danger to vehicle occupants accessing or egressing a vehicle in this vicinity
· Potential damage to vehicle chassis and body panelling due to the forced severe body-twisting motion
· Loss of ability for heavy vehicles to safely access the property. Loaded heavy vehicles risk potential chassis damage, side-slippage of loads and/or vehicles. Or excessive tyre or suspension load damage.
· Loss of stability for high vehicles with potential for vehicle over-turning.
· Visual damage to the property’s aesthetic and smooth entry by introducing a severe and unnecessary ‘roller-caster twist’ and ‘speed -hump’
· Potential total loss of vehicular access to the residence if significant further Landslide 2 movement occurs creating an impassable situation.
The complainant says the length and depth of driveway rotational damage due to LS2 extends for approximately 30m from the main LS2 head scarp (exposed edge) towards the house. The complainant has not provided any quote or scope of work for this damage.
With regards to the landscaping the complainant says LS2 has caused loss or damage by way of:
· loss of soil supporting topiarised trees along driveway
· loss of soil safety due to creation of fall hazards due to lost soil
· loss of amenity for landscape maintenance. The extreme surface slope now prevents the use of a ladder for landscape maintenance.
· loss of property value due to reduction in aesthetics.
The complainant also says LS2 has caused damage to the constructed embankment by way of:
· Loss or damage to the embankment due to fracturing and subsequent saturation of soil/ fill
· Loss or damage of the embankment’s ability to provide adequate foundation and lateral support for overlying buildings
· Loss of grazing amenity
· Loss of aesthetics
· Loss of accessibility
The insurer disagrees and has provided two quotes based on separate scopes of work. The first quote dated 14 March 2024 is only for the driveway repairs while the second quote dated 7 February 2024 is for land stabilisation. The quotes were different insofar as:
· Quote one was for $118,982.86 and allowed for driveway repairs of 6m2 and associated micropiling to stabilise that part of the driveway
· Quote two was for $694.663.10, being the cost of stabilising the entire land, including the embankments of the property by adding two rows of 140 micropiles.
Since the submission of those original quotes the insurer has become aware of a Council project to construct further drainage and a retaining wall on the Council land facing T Road. The insurer says this means adding micropiling to protect embankment 1 is unnecessary.
The insurer has submitted a revised quote dated 13 January 2025 for the reduced works which comes to $624,754.65 (Quote three).
The insurer has paid the complainant in accordance with Quote one but says neither Quote two or three is applicable as the policy does not cover the stabilisation of the land.
The complainant disagrees and says Quote one is not an adequate reflection of the damage as it fails to account for the full extent of the driveway damage and makes no allowance for the damage to the landscaping and constructed embankments.
The complainant also disagrees with the decision to not cover the costs of the land stabilisation, as he says given that none of the accepted repairs can proceed without the stabilisation of the land, the insurer should cover these costs on that basis.
Insurer required to pay for further works
The driveway is 47 years old, overlaid with asphalt and is described by the complainant as being in a near even state and in generally good condition prior to the landslides. The complainant is relying on his own commentary, together with photos he says were taken prior to the landslides.
The complainant conducted repairs to the asphalt shortly following the landslides so while there are general signs of patching, he says these issues were not present prior to the landslides.
The insurer in turn says only 6m2 of the driveway was damaged, being that area which showed physical cracking. It also says the driveway was deteriorated and was otherwise at the end of its design life.
The panel having considered all the available information disagrees that the extent of the damage to the driveway should be limited to the 6m2. This is supported by the consensus between the experts that because of the landslides the driveway has rotated and subsided, leading to a section of the driveway to be uneven and having a significant cross fall.
The panel agrees with the finding that given the degree of the subsidence, which is now 500mm and more importantly the degree of the cross fall, the section of the driveway which is no longer even because of the landslides should be considered as damaged.
Given the current levels, the panel agrees that both the usefulness and aesthetics have been negatively affected, which is consistent with the ordinary meaning of ‘damage’.
Neither party has submitted any costings for the additional driveway repairs which the complainant says should total 30m of driveway.
Stabilisation of the land is fundamental to repair of driveway
The policy requires the insurer to pay the reasonable cost of repairing or replacing the ‘building’ which includes the driveway and landscaping to a condition substantially the same as when new.
The panel is satisfied that stabilisation of the land is necessary to effectively repair the damage to the driveway and prevent further damage. In the panel’s view, the driveway damage extends beyond the strict confines of the driveway itself; given the surrounding/supporting areas were compromised by the landslides. The experts also note the land is at risk of further landslides.
It is not a case of the surrounding land stabilisation being a distinct additional area of damage relating merely to ‘soil’. Instead, it is a case of the land stabilisation (including, to the extent necessary, the embankments) being an essential component of the required repair methodology and outcome for the driveway. This is acknowledged by all the consulting experts.
The purpose of the policy is to cover the complainant for loss or damage caused by an insured event. The panel is satisfied the information supports the broader site around the driveway is unstable due to the landslides. The insurer is liable for repair of the damage, which includes stabilisation of the site itself, to allow the repairs to occur.
The insurer has presented a quote for the stabilisation works, which comes to $694,663.10. The complainant does not dispute the reasonableness of this quote. The panel accordingly considers this amount to reflect a fair estimate of the costs of stabilisation.
The insurer has raised concerns that because of recent council works performed on T Road the micropiling immediately downslope of T Road is no longer required. It is now unnecessary to consider this issue, given the costs of the land stabilisation based on the reduced amount would still exhaust the building sum insured and the claim should be settled as a total loss.
Insurer must cover claim up to building sum insured and pay interest
To date, the insurer has paid $130,932.86 after deduction of report and make safe costs, which should not be accounted for as part of the building sum insured of $536,527.00.
This leaves a balance of $405,594.14. This amount is well exceeded by the insurer’s costings for land stabilisation and further driveway repairs. It is fair in those circumstances for the insurer to declare the property a total loss and pay the balance of the sum insured of $405,594.14.
The insurer should also add interest pursuant to section 57 of the Act.
The insurer had the quote for the land stabilisation works since 7 February 2024. It would have been on notice at that date that the cost of the total repairs would well exceed the sum insured. While the panel acknowledges the insurer disputed the extent of its claim liability, in view of this determination’s findings the panel is not satisfied the insurer’s position was fair in the circumstances or reasonably founded.
Therefore, the panel is satisfied it was unreasonable for the insurer to have not accepted the claim within 30 days of this quote being issued. This means interest is payable on the balance of the sum insured from 8 March 2024 until payment is issued.
2.3 Is the insurer entitled to charge an excess?
Yes. The insurer is entitled to charge an excess, as the complainant has not shown an exception applies.
Insurer entitled to charge excess
The insurer under the policy is entitled to charge an excess when a claim is made and accepted. The excess applicable to a building claim under the policy is $550.
The complainant says no excess is payable because the policy says:
You will not be required to pay any excess in the event that your building or contents are a total loss or when the loss or damage is a result of a government declared natural disaster other than earthquake or tsunami.
The onus lies with the complainant to establish the above condition is met to allow for the excess waiver.
The complainant refers to the disaster declarations of the NSW government, specifically AGRN 1012 – which is headed ‘NSW Severe Weather and Flooding from 22 February 2022 onwards’. The declaration lists the area affected as Central Coast Cessnock.
The Central Coast is a geographically dispersed area with the insured property being over 100kms from Cessnock. While the Central Coast is listed in the declaration as an area affected by a declared natural disaster, this does not mean the loss which is the subject of this claim was a result of that disaster.
It is the panel’s understanding the natural disasters which the subject of the declaration are severe rainfall together with flooding that occurred afterwards in parts of the listed municipalities. The panel does not accept the complainant has shown the cause of the landslides were as a result of that same natural disaster that caused the declaration to be made. The complainant has not drawn a link between this and the insured event. Accordingly, the insurer is therefore entitled to charge an excess on the claim.
2.4 Is the insurer required to pay more than the building sum insured?
Yes. The policy includes amounts which are payable above the building sum insured. Some of the amounts raised by the complainant would fall within those categories. It is fair for the insurer to pay those additional amounts once assessed.
Complainant says the insurer should pay more than the building sum insured
The certificate of insurance issued for the policy period from 30 September 2021 to 30 September 2022, records the sum insured for building cover to be $536,527.
The policy provides for benefits as being payable outside the sum insured. The complainant has indicated the following benefits apply to his claim:
Additional things we will pay when you have insured your buildings
If you have cover for your buildings, the following will be paid in addition to the sum insured as listed on your schedule.
‒ If your buildings are unable to be lived in after loss or damage has occurred, we will pay your rental costs. The amount we will pay will not exceed the amount that your buildings could have been rented out for each week
‒ We will pay the reasonable costs of demolishing and removing and disposing of any building debris when damage or loss occurs
‒ We will pay the reasonable costs of architects, surveyors and engineers and also pay any legal fees that arise from reinstating your buildings when loss or damage occurs
‒ We will pay the costs necessary to meet the requirements of any statutory authority in connection with rebuilding or repairing the buildings at the situation. We will not pay any costs which resulted from any notice which a statutory authority served on you before loss or damage to your buildings occurred if you were required to comply with the notice and had not done so before the loss or damage occurred. The most we will pay in any one period of insurance is $25,000.
Additional things we will pay when you have insured your buildings and/or contents
If you have cover for your buildings and/or contents, the following will be paid in addition to the sum insured as listed on your schedule.
‒ We will pay reasonable expenses to protect your buildings or contents from further damage following insured damage we have agreed to cover.
Further to this, the complainant says he is entitled to be paid an additional amount of $339,000 over and above the sum insured, comprised of:
· Costs of a consultant town planner of $24,000
· Temporary Accommodation costs of $12,000
· Engineering and surveying costs of $175,000
· Building Debris and Removal Costs of $100,365
· Building Protection Measures of $27,635
The complainant claims these amounts based on the above listed benefits.
Insurer says additional amounts claimed not payable above sum insured
The insurer has responded to each of the additional amounts claimed and said they are not payable because:
· Costs of the town planner are project management fees and project management fees fall outside of policy coverage beyond the sum insured.
· Temporary Accommodation costs are not payable as the building will not be rendered unliveable because of the works.
· The engineering and surveying costs are not payable because the costs are either unnecessary, not reasonable or otherwise already included in settled building costs
· The building protection measures have already been accounted for in the payments made to date.
Complainant is entitled to payments above building sum insured
The panel has reviewed the amounts claimed by the complainant as items payable over and above the building sum insured. The panel accepts the following categories of payments as ones which the insurer should accept as payable in addition to the building sum insured in accordance with the policy terms:
· Costs of the town planner are payable as costs necessary to meet the requirements of any statutory authority in connection with the repair or rebuilding of the building. This is because the panel accepts on balance, that in order to perform the repairs there will be requirements for building and development approvals, which will require the assistance of a town planner.
· Temporary accommodation is payable because while the home itself is not affected, it is accessed by a single driveway and the driveway works on balance will sufficiently restrict access to the home to the extent it would be unliveable. Accordingly, is fair the insurer covers these costs subject to assessment for reasonableness and up to the policy sublimit on that item.
· The engineering and surveying costs, other than those claimed for project management ought to be covered in addition to the sum insured. The policy specifically allows for those costs, and the panel considers those costs are likely to be reasonable in the circumstances, given the scope of the required repairs.
· Building debris removal is to be covered as an additional cost as the quote based upon which the insurer has previously settled the complainant was only based upon 6m2 of driveway repairs. As the panel has found the entire length of the driveway which has shifted and rotated is required to be covered, the insurer is also required to cover the additional removal of debris costs associated with this.
· The building protection measures are to be covered as an additional cost because the quote based upon which the insurer has previously settled the complainant was only based upon 6m2 of driveway repairs. As the panel has found the entire length of the driveway which has shifted and rotated is required to be covered, the insurer is also required to cover the additional protection costs arising from this finding.
The complainant in seeking cover for these additional items has only provided estimates, which are not supported by any independent quotes. The complainant and insurer must work together to have these costs assessed and settle the complainant the reasonable cost of repairs for those items in accordance with this determination and applicable policy sub limits.
Providing this determination is accepted, the insurer is to contact the complainant within 21 days of the notification with a cash settlement offer concerning the additional amounts payable outside the sum insured in accordance with this determination. If the insurer requires further documentation or inspections to facilitate this, the complainant is to co-operate with any reasonable requests.
The insurer in making any cash settlement offer for those additional amounts should include a 15% uplift to reflect transfer of risk, variability in pricing (as the insurer will not be conducting those works) and loss of lifetime guarantee.
2.5 Is the insurer required to reimburse costs and pay compensation?
Yes. The complainant has been unduly inconvenienced by the length and handling of this complaint by the insurer. In view of this, the insurer must pay $4,000 non-financial loss compensation.
The complainant has also incurred expert fees while responding to the insurer’s submissions. As this was of assistance to the panel and the costs are reasonable, it is fair the insurer reimburses these costs.
Complainant entitled to non-financial loss compensation
Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $6,300 for each claim of loss.
AFCA will only award this type of compensation if there has been an unusual degree or extent of inconvenience. The panel recognises making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim or for loss a complainant may incur because of pursuing a complaint or rectifying the insurer’s error.
When assessing whether the circumstances are of an unusual nature we will review:
· the degree or extent of physical inconvenience suffered
· the general time taken to resolve the dispute
· the extent to which the insurer’s actions interfered with the complainant’s expectation of enjoyment or peace of mind.
The complainant says the insurer’s handling of the claim caused him to suffer significant distress and anxiety. He is seeking $6,300 in compensation for the manner in which the insurer handled the claim, including the arguments which the insurer has raised to decline his claim, which he says have been unreasonable; together with the protracted length of time of the claim.
The panel considers compensation for non-financial loss is warranted because it is not satisfied the insurer’s decision was reasonably founded and it led to significant delays.
Whilst this delay has continued, the complainant has been living in a house with access affected due to the continuing movement of the land.
It is accordingly fair for the insurer to pay $4,000 in non-financial loss compensation.
Insurer to reimburse for expert fees
While the panel notes the complainant has raised these costs as financial losses resulting from the insurer’s decision to decline the claim and its subsequent changes in position through the claims process, it considers it appropriate to deal with these costs under AFCA’s rules concerning costs of dealing with the complaint, including expert fees.
Under AFCA Rules, the panel can require the insurer to contribute to legal and other professional costs a complainant incurred in making a complaint. In considering whether the insurer should contribute to the complainant’s costs, the panel considers the complexity of the complaint, whether the complainant needed to incur the costs to understand or establish their claim, and whether the costs are reasonable in the circumstances. A $5,000 limit applies unless there are special circumstances applying to the claim.
The complainant has provided invoicing showing it has incurred $23,776.50 in expert costs during the AFCA complaint. These costs relate to the engagement of an engineer to assist him in drafting his submissions and responses to the insurer’s reports and position. He has asked the insurer to fully reimburse him for those costs.
Given the highly technical nature and complexity of matters in dispute, and the technical arguments raised by the insurer, the panel considers the complainant’s expert costs were reasonable and necessarily incurred and was of assistance to the panel in arriving at its determination. The panel also considers that given the technical complexity of the subject matter and the amount of work involved, that special circumstances should apply and the insurer is required to fully reimburse the complainant for those costs, to the total sum of $23,776.50.
If the complainant has paid these costs, the insurer is to pay interest in accordance with the Act, from the date payment was made until the date of reimbursement.
The complainant is to provide proof of payment.
2.6 Why is the outcome fair?
The complainant has shown the damage claimed was caused accidentally, which is an insured event under the policy. The insurer has not shown the damage is excluded under the policy terms. It is therefore fair that it covers the claim.
It is also fair that the complainant is reimbursed for his costs of dealing with the complaint and compensated in accordance with this determination’s terms.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry,
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.