Homeowners claimed flood damage to tiles, subfloor and sewer pipe, plus lost rent on a granny flat, and the insurer declined the disputed damage. AFCA upheld the decline and rent refusal but ordered $1,500 non-financial loss for poor claim handling and delay.

The complainants bear the onus of proving the flood was the proximate cause of the damage, the expert evidence attributed it to pre-existing foundation movement and installation defects, and non-financial loss is payable for unusual claim-handling delay.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-991048 | Financial firm | AAI Limited Case number: 12-00-991048 28 February 2025 Determination overview Complaint The complainants held a home and contents insurance policy with the financial firm (insurer). They lodged a claim on 24 February 2022 for damage to the property which they say was due to a flood. The insurer accepted the claim and agreed to cover part of the claimed damage (covered damage). The insurer did however decline cover for some of the claimed damage (disputed damage) on the basis that the disputed damage is not consistent with a flood event or any other insured event. It says the disputed damage is due to defects in building or construction, wear, tear and gradual deterioration. The complainants disagree with the insurer and seek that it covers the disputed damage. Issues and key findings Is the insurer required to cover the disputed damage? No. On balance, the complainants have not established a claimable loss in relation to the disputed damage. Therefore, the insurer is entitled to decline cover of the disputed damage. Is cover available for loss of rental income? No. The policy does not provide cover for loss of rent unless the entire property is tenanted. In this case, only the granny flat was tenanted. Therefore, the policy does not cover any loss of rent. Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $1,500 in non-financial loss compensation. Why is the outcome fair? I am not satisfied the complainants have established a claimable loss under the policy for the disputed damage. It would not be fair in the circumstances to require the insurer to cover the disputed damage. Determination This determination is in favour of the insurer. If the complainants accept the determination, within 14 days of being notified of their acceptance, the insurer is required to pay the complainants $1,500 in non-financial loss compensation. Reasons for determination Is the insurer required to cover the disputed damage? No. On balance, the complainants have not established a claimable loss in relation to the disputed damage. Therefore, the insurer is entitled to decline cover of the disputed damage. Onus on complainants to establish a claimable loss The complainants are required to show, on the balance of probabilities (that it is more likely than not), that there is a claimable loss under the policy. This means the complainants must prove the loss or damage was caused by a risk that is covered under the policy. Once the complainants prove there is a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving, on the balance of probabilities, that the exclusion or condition applies. Policy covers insured events subject to exclusions The insurer’s policy consists of the policy schedule and product disclosure statement (PDS). It is not in dispute the insurer provided the policy documents to the complainants. The policy is an ‘insured events’ policy. This means not all loss and damage is automatically covered. Rather, only loss or damage caused by an insured event, and not subject to an exclusion, is covered. The insured events are set out in the PDS and include flood. The insurer accepts that there has been damage to the complainants’ property as a result of the flood. However, it says the policy excludes cover for damage which has not occurred within 72 hours of the flood or which is not directly because of flood but rather erosion, structural fault or design fault. The insurer also relies on the general exclusions in the policy for: ground movement that is specifically covered under insured events, including flood; home, unit or contents not in good condition; seepage of water; wear, tear, mould, gradual deterioration and other conditions; and defects, faults workmanship. Complainants say disputed damage was caused by flood The insurer has declined cover for the disputed damage which comprises cracks in the floor tiles in the hallway, a ‘twang’ noise at the back of the house (in the renovated section) and a gurgle in the sewerage pipe. The complainants say in relation to the disputed damage: the subfloor noise was not present before the flood. They mentioned the ‘twang noise’ in the subfloor during the first call to the insurer. Two weeks later the property flooded again; the flood came as high as the subflooring which in the front of the house is hardwood and in the rear of the house is yellow tongue. All of the subfloor was submerged and this is the cause of the cracked floor tiles and noisy subfloor; the insurer’s experts did not look in the subfloor and therefore could not see under the centre of the floor where the noise is coming from; mould was not considered until 18 months after the fact when the claim was escalated by the insurer. Therefore, the moisture under the house would have dried out by then; there is no basis for the insurer’s argument that the sewerage pipe is out of alignment and was not installed correctly. The gurgle only started after the flooding event; the SH report mentions the pipe bowing is commonly seen when not backfilled or compacted properly, however that is not the only possible cause. The pipe was installed by a licensed plumber and signed off by a registered builder; they are concerned about the qualifications of the insurer’s engineer and say it is unreasonable for the insurer to rely on MC’s report for the purpose of declining the disputed damage. They were also given conflicting information at the inspection of the property and in the subsequent report; the cracks have now extended from the join to walls and grout in the bathroom; they have incurred a loss of rent of $330 per week since the tenant was required to move out for the insurer to inspect the granny flat. During an early call the insurer indicated this would be covered but then changed its position. The insurer further says that some issues may have been exacerbated by the flood however the flood was not the proximate cause of the disputed damage. The movement issues are preexisting, as per its engineering evidence. Insurer says disputed damage is not due to flood The insurer says some issues may have been exacerbated by the flood however the flood was not the proximate cause of any of the disputed damage. It says the ongoing foundation movement and deterioration has not been caused by the flood. Rather, it submits the movement issues affecting the disputed damage are pre-existing, as per its engineering evidence. In particular, it says: the damage to the hallway floor tiles is due to the absence of an expansion movement/isolation joint at the junction between the old and new floor; the joint between the 100mm PVC sewerage pipe and the old earthenware pipe has collapsed and the sewerage does not flow to standard. This issue is pre-existing (and an installation issue) and has not been affected by the flood; the damage to the pipe is a result of poor workmanship/installation with a lack of compacting materials applied at the time of installation; the complainants have provided their own reports however they are not clear as to the proximate cause of the disputed damage; and the final inspection in September 2023 included an inspection of the subfloor space. The insurer’s assessor (KB) says there was no visible mould and the moisture readings ranged for 12.8-13.6% which is of dry standard. Available information does not show disputed damage was caused by flood In order to establish a claimable loss, the complainants must first show, on the balance of probabilities, that the proximate cause of the disputed damage was the flood event. If the complainants establish a claimable loss, the onus will shift to the insurer to show it is entitled to decline cover for the disputed damage. The proximate cause of a loss is the dominant, effective or operative cause. It does not have to be the first, the last or the sole cause. This is a question of fact depending on the circumstances. If there are several causes, each needs to be examined for qualities of reality, predominance and efficiency to identify the proximate cause. For example, if one cause would have caused the loss in any case, and the other one would not have done so without the first, then the first is the proximate cause. I have considered the various expert reports filed by the parties including, but not limited to, the engineering reports of MC and KY. I am satisfied that they, along with the other experts, are suitably qualified to comment on the cause of the disputed damage. In particular, I am satisfied that MC’s engineer is suitably qualified to provide comment on the cause of the damage. Based on the exchanged information, I am not satisfied that the flood is the proximate cause of the disputed damage. Both MC and KY have stated that the property has been exposed to several weather events. KY states it has been exposed to low, medium and high-risk flooding. Further, the experts agree that the property is likely to have continual foundation movement. Therefore, I do not consider the complainants have satisfied the onus of establishing that the disputed damage was caused by the flood event. I also note as follows in relation to the various items which comprise the disputed damage. In relation to the cracked tiles, this is confined to the cracks in the hallway. If the tiles had been impacted by flood, you would expect, on balance, that tiles in different areas of the property would also be impacted (rather than being confined to one point in the house). However, it is only the tiles at the join of the old and the new parts of the flooring that have been impacted. On balance, I accept the insurer’s evidence that the absence of expansion joints between the tiles and at the junction between the old and new floors is the proximate cause of the cracked tiles in the hallway. The complainants have raised the issue of the ‘twang’ noise in a certain area of the property, being a small area in the renovated back part of the property. However, their expert says the flooring system is still adequately braced and stable and the load carrying capacity of the structure is sound in this area. KY does say the flood levels reached the height of the plywood floorboards. KY suspects that the water contact of the flooring system has caused the plywood flooring to absorb moisture and has caused delamination of the tiles and plywood floor structure. The loose and drummy tiles should be replaced and an inspection of the plywood floor should be considered. In fact, the insurer did arrange such an inspection. I am satisfied that the insurer’s inspectors entered the crawl space beneath the property. I note their conclusions that there is visible pooling of water under the property indicating water frequently pools under the property during poor weather conditions. The insurer’s experts also say there are no signs of visible mould, swelling, water staining or water damage to the underside of the yellow tongue flooring that would cause movement to the tiles within the property. Moisture readings taken of the timber framing and yellow tongue flooring are also below benchmark. They acknowledge there is minimal water staining to the underside of the timber flooring. However, they say it appears to be historical from surrounding wet areas (such as bathrooms) and that it does not appear to be related to flood water entry. On balance, I am more persuaded by the insurer’s evidence. I acknowledge the complainants’ evidence that the noise is only sometimes present and there is no pattern as to when the noise occurs (for example, when there are storms or not). Some experts also said they could not hear any noise at the time of inspection. Even if you assume the noise constitutes damage in addition to the loose or drummy tiles, there is no clear evidence as to what the cause of this sporadic sound might be. I accept the evidence of the insurer’s expert regarding the lack of moisture and damage to the underside of the subfloor in the new part of the house where the noise is present. In the circumstances, I do not consider the complainants have established that there is damage, in the form of the ‘twang’ noise or the drummy or loose tiles, which has been caused by the flood. On balance, I consider the proximate cause of the drummy or loose tiles is the foundation movement caused by the constant moisture conditions in the subfloor. This is excluded under the policy in any event. Further, even if the noise was covered (which I do not accept), there is nothing in the expert reports which suggests that it needs to be repaired and, if so, what that repair should be. The complainants also say the sewer pipe has been affected by flood waters. They say the backfill in the trench at the location of the sewer pipe has eroded due to moving flood waters and has caused the sewer pipe to become dislodged. The sewer pipe should be reconnected and the compaction of the trench with new blue metal aggregate be carried out. The insurer’s experts say the joint between the sewer pipe and the old earthen pipe has collapsed and that it appears that the pipe has not been laid to standard. They say the condition of the sewer pipe is pre-existing and has not been affected by flooding. They note that the stormwater drain is in good condition. Even though it has bellowed in sections, water continues to flow to standard from the downpipes and ground pits to the front gutter. I accept that there was a significant flood event and that the sewer pipe is said to be dislodged. However, there is insufficient evidence to establish that the sewer pipe was damaged by the flood. The complainants have not provided evidence regarding its installation and connection to the older earthen pipe and/or that sufficient blue metal aggregate has been used to compact the trench around the pipe. I also note the stormwater pipe has remained intact despite the flood. In the circumstances, I cannot be satisfied that the complainants have established a claimable loss in relation to the pipe. Even if a claimable loss were established, I accept the pipe damage has been caused by poor installation and the erosion of materials around the pipe. Therefore, such damage would be excluded under the ground movement exclusion in any event. I otherwise note for completeness that there is no evidence of mould damage at the property. Therefore, I do not consider this submission can give rise to a loss. On balance, I do not consider that the complainants have established a claimable loss for any of the disputed damage. Accordingly, the insurer is entitled to decline cover for the disputed damage. Is cover available for loss of rental income? No. The policy does not provide cover for loss of rent unless the entire property is tenanted. In this case, only the granny flat was tenanted. Therefore, the policy does not cover any loss of rent. Policy covers loss of rent subject to policy terms and conditions The policy covers loss of rent in specific circumstances. The policy states: Loss of rent due to an insured event (Home cover only) This additional cover only applies when you have home cover and your entire home is tenanted under a rental agreement. For the complainants to have cover for loss of rent, the entire home needs to be tenanted. This was not the case here. The complainants have raised concerns that the original terms of the policy were different. There is no dispute the insurer provided copies of the policy documents, which outline the terms and conditions of cover, to the complainants. Given this, I am satisfied the insurer is entitled to rely on the terms and conditions of the policy. Are the complainants entitled to compensation? Yes. The insurer is required to pay the complainants $1,500 in non-financial loss compensation. AFCA can award compensation for poor claim handling Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which causes: an unusual degree of stress, delay, or inconvenience, and/or interference with a person’s expectation of enjoyment and/or peace of mind. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Compensation is warranted in the circumstances The complainants say: they were often on hold for over 2 hours when they contacted the insurer; both complainants work for themselves so each time they had to take a call or have someone at the property they suffered a loss of income; they say they suffered a larger than ordinary degree of inconvenience, especially since things were missed at the initial inspection; there were constant delays getting trades to attend the property; they suffered a loss of rental income as the complainants were told the tenants had to vacate before a full inspection of the granny flat could be completed; the make safe on the spa and its gas heater was not completed properly and almost caught fire; and family members were sick for over 12 months due to the condition following the flood. Having reviewed the exchanged information, I am satisfied that the compensation is warranted in the circumstances. I note the insurer has made an offer of $500 in acknowledgment of its claims handling and delays. I also acknowledge that there have been various miscommunications with the trades and claims personnel making representations to the complainants which were inconsistent with the reports or responses they later received. While these personnel are entitled to consider matters after the inspection and discussions and to then put their formal opinions in writing later, this inconsistency has caused some confusion for the complainants. Further, the complainants advised the insurer that mould was starting to appear in March 2022. I accept that there was a significant delay in attending this. I am otherwise satisfied, based on the exchanged evidence, that the trades carried out appropriate inspections of the subfloor and that the insurer’s experts were suitably qualified. I consider it fair in all the circumstances that the insurer pays the complainants $1,500 in compensation. If the complainants accept this determination, within 14 days of being notified of their acceptance, the insurer is required to pay the complainants $1,500. Why is the outcome fair? I am not satisfied the complainants have established a claimable loss under the policy for the disputed damage. It would not be fair in the circumstances to require the insurer to cover the disputed damage. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Summary of relevant expert evidence SH’s March 2022 report says: the joint between the sewer pipe and the old earthen pipe has collapsed. The sewer pipe has bellowed which restricts the flow. It is not draining away to standard. It appears that the pipe has not been laid to standard; and the condition of the sewer drainage is pre-existing and has not been affected by flooding; the stormwater drain is in good condition. Even though it has bellowed in sections, water would flow to standard from the downpipes and ground pits to the front gutter. MC’s July 2022 report says: the brick piers under the front section of the house were uneven and several had some tilting. This has been caused gradually over time due to water ponding under the floor. One of the brick piers was supported on a concrete block rather than on a footing; the steel posts under the rear extension did not show any signs of movement or structural distress. The piers, which are anchored at 1.2-1.4 metres into solid ground, are not likely to be susceptible to movement from surface water which mostly affects the top layer of soil unless water percolates deep into the soil; the cause of cracking of the floor tiles in the hallway is most likely the different type of flooring in the original house to the extension floor. Cracking has occurred due to the absence of expansion joints between the tiles and at the junction between the old and new floors; at the time of the site inspection (July 2022), there were no signs of any audible squeaking sound in the floor. However, there were several drummy tiles which indicates the tiles have either debonded from the bedding or are not fully attached to the bedding. This has occurred gradually over time and finally collapsed due to the flood water build up behind the blocks. There was debonding which was pre-existing and resulted in the collapse during the storm. The damage was not caused directly or solely by the flood. It is an installation issue; and in its opinion, the damage was pre-existing and has not been caused directly by the flood. The damage did not occur within 72 hours of the flood. KY’s November 2022 report says: it did not carry out an assessment of the makeup and condition of the existing footings; major settlement and foundation movement has occurred at the northern brickwork wall of the building which supports the existing flooring system. The cracking in the brickwork wall appears to be a major problem as the wall is unstable. The load carrying capacity of the structure appears to be inadequate. Structural remedial works are required to be carried out; in its opinion, the cracking and displacement is due to a number of factors including foundation movement due to the erosion of sediment around the existing foundations; there are numerous internal flooring areas that have settled as a result of being exposed to low, medium and high-risk flooding. They suspect the site is prone to continual foundation movement; the displacement of the floor structure in its current state does not appear to be a major structural problem. The flooring system is still adequately braced and stable and the load carrying capacity of the structure is sound; and they recommend construction of a concrete ‘V-shaped’ surface drainage to allow water to be carried away from the subfloor. The insurer requested that a further inspection of the subfloor and moisture levels be carried out in 2023. SH’s 1 March 2023 report says: while on site, technicians entered the crawl space beneath the property; there is visible pooling of water under the property indicating water frequently pools under the property during poor weather conditions; there are no signs of visible mould, swelling, water staining or water damage to the underside of the yellow tongue flooring that would cause movement to the tiles within the property; moisture readings taken of the timber framing and yellow tongue flooring are also below benchmark; and there is minimal water staining to the underside of the timber flooring however this appears to be historical from surrounding wet areas (such as bathrooms). It does not appear to be related to flood water entry. In response to MC’s July 2022 report, KY’s letter dated 15 March 2023 says: the flood levels have reached the height of the plywood floorboards; it suspects that the water contact of the flooring system has caused the plywood flooring to absorb moisture and has caused delamination of the tiles and plywood floor structure. The loose and drummy tiles should be replaced and an inspection of the plywood floor should be considered; and the sewer pipework, in particular the pipe connected to the bathroom has been affected by flood waters. The backfill in the trench at the location of the sewer pipe has eroded due to moving flood waters and has caused the sewer pipe to become dislodged. The sewer pipe should be reconnected and the compaction of the trench with new blue metal aggregate be carried out. MC’s April 2023 report also says: the floor tile damage is caused by absence of an expansion movement/isolation joint at the junction between the old and new floor. As there were no other cracks in any other part of the floor, it is unlikely that the cracks in a relatively small area is resultant from a single storm event. It is an installation issue rather than directly caused by the storm event; the vertical cracks in the front sub-floor brick wall at the northwest corner was pre-existing and not caused by the single storm event; the cracks appeared old and were clearly noticeable in Google Street Views back in January 2010 images which indicates that the cracks have been present for very long time without being repaired or sealed; it stands by its original report conclusions that the damage was not caused by the storm event which occurred in February 2022. The insurer also appointed a further assessor, KB, to provide its views on the disputed damage. KB inspected the property on 13 July 2023 and says: the floor creaking is a maintenance issue related to wear and tear and ground movement. These should be attended to before any covered repairs are commenced; it conducted a leak detection report on 18 July 2023 and notes the pipes had bowed allowing the pipe to retain water. It was unable to determine whether the pipes had dislodged due to the volume of water; the pipe damage was a result of the lack of blue metal material when the pipe was installed; and there were no visual signs of mould, no odours indicated the presence of mould and the moisture readings taken were around 10% or dry standard. In July 2023, MC did provide a report in response. It acknowledged that the vertical cracks in the front sub-floor brick wall at the northwest corner have not impacted or contributed to the crack formed at the junction of old house and new extension floor. These two items are distinctly different and are not related.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.