Non-financial loss$3,000
Amount claimed$84,299
SourceAFCA PDF

Summary

The complainant claimed repair costs for building movement damage linked to an escape of liquid and storms. The insurer offered 25% of repair costs, which AFCA found reasonable because the damage was from excluded soil movement; AFCA ordered an updated quote, payment of 25% of it, and $3,000 non-financial loss compensation.

The damage was on balance caused by excluded long-term soil movement and drainage issues, so the insurer may limit its liability for repairs to 25%, updated to current prices.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 988346 | Financial firm | Allianz Australia Insurance Limited Case number: 988346 13 June 2024 Determination overview Complaint The complainant holds home building insurance with the financial firm (insurer). On 7 October 2022, he lodged a claim for movement damage he attributed to escape of liquid (EOL) from a leaking pipe. He also said storms earlier in 2022 had contributed to the damage. The insurer denied the claim but later agreed to cover damage directly resultant from the EOL or storm events. It then found that all damage was from excluded causes but offered to pay 25% of repair costs plus $2,532.63 in compensation. It also paid $7,167.37 for exploratory costs incurred locating the leak and $13,300 in temporary accommodation (TA) costs. The complainant wants the insurer to pay all repair costs, to rectify the damage caused by the exploratory work, additional TA costs, and more non-financial loss compensation. Issues and key findings Is the insurer entitled to limit its liability for repairs to 25%? Yes. The offer to pay 25% of repair costs is reasonable because the damage was on balance due to excluded long term soil movement and drainage issues. However, as the insurer’s quote is over a year old, it is to have the quote updated then pay 25% of the new amount. Is the insurer liable for rectification costs? No. The insurer has already paid the cost of exploratory work to locate the leaking pipe and for associated make safe repairs. It would not be fair to require it to also pay rectification costs when the policy does not cover the claim. Is the insurer required to pay more for TA? No. As the claim is excluded, the insurer is not obliged to pay additional TA costs. Is more to be paid as non-financial loss compensation? Yes. The insurer has acknowledged it should have handled the claim in a better manner, but I am not satisfied its offer represents adequate compensation. It is to pay $3,000 instead. Why is the outcome fair? As the insurer accepted the claim only to find all damage was from excluded causes, it’s offer to pay 25% of repair costs is fair. However, it is also fair that the 25% is on current prices. The insurer is to pay more to fairly compensate the complainant for stress and inconvenience. Determination This determination is substantially in favour of the insurer. Upon receiving written notice that the complainant accepts this determination, the insurer is to:  take the steps set out in section 2.1 below, and  within 14 days, pay the complainant $3,000 in non-financial loss compensation. Reasons for determination The complainant is represented by insurance broker D. For brevity’s sake, the complainant and D are referred to below as ‘the complainant’, unless context requires otherwise. Is the insurer entitled to limit its liability for repairs to 25%? Yes. The offer to pay 25% of repair costs is reasonable because the damage was on balance due to excluded long term soil movement and drainage issues. However, as the insurer’s quote is over a year old, it is to have the quote updated then pay 25% of the new amount. Complainant has shown a claimable loss under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy held jointly by the complainant and his wife covers damage to their home caused by a listed insured event. Those events include ‘Water and other liquid damage’ (covering damage caused by EOL) and ‘Storm, cyclone, rainwater or run-off’. The policy also includes optional accidental damage cover. The PDS defines ‘accidental damage’ as ‘damage caused by sudden, unforeseen and unintended events’. On 7 October 2022, D on behalf of the complainant notified the insurer that the evening before he had discovered a leaking pipe. He said the EOL had caused the rear of the home to move and sink. Later, the complainant reported that storms in March and July 2022 had contributed to the movement and damage. On 26 April 2023, the insurer denied the claim. However, on 30 June 2023, it said it would cover damage shown to be directly resultant from the EOL or storm events. The insurer noted it was ‘arranging a further assessment to ascertain the reasonable repair costs for the accepted damage’. In the circumstances, I am satisfied the insurer accepted that the complainant had shown a claimable loss under the policy terms. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer denied the claim On 8 November 2022, the insurer’s engineer CR inspected the home and reported that:  the home was built in 1860, with an extension with asbestos wall linings added in 1970  the cracking throughout and the floor undulations were due to differential movement of reactive clay foundation soils and leaking pipes over an extended time period  water was directed into and then pooling within the subfloor area due to the surrounding landscaping’s gradient towards the subfloor area and lack of surface drainage  the gradient and surface drainage issues were breaches of the National Construction Code  while water may have entered the subfloor area due to the claimed EOL event, the property had been experiencing differential ground movement and cracking (over time) due to the lack of surface drainage  the complainant’s plumber had reported the drainage connecting to various plumbing connection items had been broken due to ground movement  reactive clay soils expand and contract depending on moisture content. ‘This is a repeated cycle that occurs seasonally and under various weather conditions’  ‘This is a pre-existing maintenance issue. No storm related damage has been identified…’. CR provided a second report, dated 9 February 2023. CR had reinspected the home the week before and had reviewed Bureau of Meteorology (BOM) 2022 rainfall data recorded at a station 1.2km from the home. CR maintained the opinions set out in its first report, and said:  the BOM data suggested the seasonal ground movement had been occurring since the home was built and would continue as the moisture conditions stabilised  the heavy rainfalls in March (519.8mm) and July (350.2mm) 2022 ‘would have added to this process and increased the soil moisture conditions over the days and weeks following the event, along with all preceding rain events’  that was a pre-existing maintenance issue, and the damage could not be attributed to a single storm event. On 14 March 2023, CR advised the insurer that it was ‘highly unlikely that the damage occurred within 72 hours of any single [storm] event’. Noting that the complainant’s plumber had said ground movement had caused the pipes to leak, CR also said: … the ground movement and damage had already occurred prior to the pipes failing. It is highly unlikely that the leaking pipes caused any further movement as the soil moisture conditions were already very wet following months of heavy rain. On 20 April 2023, CR confirmed its views and provided a scope of works (SOW) to repair the damage to the home. On 15 May 2023, quantity surveyor HM provided a quote based on CR’s SOW totalling $84,298.50. On 2 August 2023, CR responded to the insurer’s request for separate SOWs for damage relating to the EOL, and damage from soil movement due to inadequate drainage. CR said: The cause of movement to the property is a combination of water leaks over an extended period of time along with gradual building movement due to reactive soil. As a result, a definitive scope of works cannot be provided for each cause as both have been occurring over time. In the circumstances, the insurer says that the complainant has not established any damage resultant from EOL or storm. Further, as the damage has not been sustained suddenly, it does not meet the PDS definition of ‘accidental damage’. Instead, the insurer says the damage is from excluded causes because the PDS:  sets out on page 55 general exclusions for damage as a result, caused by, or arising from: > wear and tear, gradual deterioration or lack of maintenance > inherent defects, including faulty design, structural defects or poor workmanship > soil movement, unless it is directly caused by and occurs within 72 hours of a storm  confirms on page 43 that the accidental damage cover does not apply to damage caused by or arising from settling, shrinkage or expansion in buildings or foundations. Nevertheless, the insurer has offered to pay the complainant $21,074.62 for the cost of repairs, being 25% of H’s quoted price. The insurer says it has done so on a goodwill basis. Complainant says insurer should pay 100% of repair costs The complainant has provided a letter dated 8 October 2022 from CD, plumber. CD confirmed it attended the home the day before because of a leaking water pipe. CD said the floor at the home’s rear would need to be removed to enable repairs to be undertaken. It appeared that ‘the piers have moved due to the excess amount of water’. In a letter dated 27 October 2022, CD said on starting work at the home it discovered ‘the drainage connecting to various [plumbing connection] items has been broken due to movement of the piering which in turn, the rear of the house has moved and sunk due to the excess water’. CD said most piers were leaning over and not properly supporting the subfloor. The complainant says that as the insurer has not been able to separate the resultant damage from damage due to maintenance issues, it should cover all repair costs. He submits that: Just because the property is old, has no bearing on whether the claim is to be accepted. The claim should be accepted on the damages and whether they show signs of wear and tear/ occurring gradually over time, or if they were sudden/ unforeseen. None of [the insurer’s] engineers/ builders have been able to report that all the damages were pre-existing. The complainant has not provided any other expert reports, noting that it appeared unnecessary to do so considering the insurer’s letter dated 30 June 2023. However, he says as an engineer himself, he has a strong understanding of the issues and disagrees with CR. Insurer is entitled to limit its liability for repairs to 25% Based on the exchanged information, I am satisfied the insurer has established it is more likely than not the damage claimed is from excluded causes. This is because:  CR has provided several reports stating the damage was due to long term soil movement. That movement was primarily the result of seasonal moisture content changes, and water pooling in the subfloor caused by the gradient and surface drainage issues  CR has also said it is highly unlikely any damage was caused by soil movement happening within 72 hours of a storm  both CR and CD said the EOL was due to ground movement, not the other way around  CR’s reports are detailed, and its conclusions supported by scientific data, diagrams and many images  other than CD’s two letters, the complainant has not provided any expert reports or other independent evidence in support of his position. In the absence of contrary expert opinion, I find CR’s reports persuasive. As the insurer is entitled to deny the claim, its offer to pay 25% of repair costs is reasonable. It is also fair that the insurer be required to honour that offer given its letter dated 30 June 2023 led to an understanding that at least some damage would be covered as resultant from the EOL/storms. However, HM’s quote is now over 12 months old, so is unlikely to reflect current retail prices. Accordingly, if the complainant provides written notice he accepts this determination, the insurer is to within 14 days ask HM to provide an updated quote based on CR’s SOW and reflective of current prices. Within 14 days of receiving the updated quote, the insurer is to provide the complainant with a copy and pay him 25% of the new quoted figure. Is the insurer liable for rectification costs? No. The insurer has already paid the cost of exploratory work to locate the leaking pipe and for associated make safe repairs. It would not be fair to require it to also pay rectification costs when the policy does not cover the claim. Insurer paid for exploratory work and make safe repairs Under the EOL insured event, if the insurer agrees to pay an EOL claim and it has authorised exploratory work to locate the source of the damage, it will pay the cost of that work. On 4 December 2022, CD issued an invoice for $7,167.38 to the complainant for ‘ongoing works to investigate issues with Plumbing and Drainage and minor works to make safe.’ In mid-January 2023, the insurer reimbursed that amount to the complainant. On 1 February 2023, the insurer’s appointed builder PD attended the home to attend to make safe repairs to the holes in the wall linings and floors CD had cut. PD:  covered the floor holes with screwed down plywood, and the wall holes with taped down builder’s plastic  removed loose asbestos sheets and sprayed the walls with PVA to prevent asbestos fragments becoming airborne. Insurer not liable for rectification costs The complainant says the insurer should pay the cost to permanently rectify the damage CD caused in undertaking the exploratory work. He has provided an extract of a letter he received from the insurer’s loss adjuster CC, which includes the following: We have reviewed the report from [CD] & we note the following from your policy with [insurer]: Location costs – escaping liquid. If this policy insures your home and we pay for damage caused by liquid escaping from any…fixed pipes used to hold or carry liquid, we will also pay the reasonable costs of locating the cause of the damage, and of reinstating the property damaged or disturbed during the course of work… However, CC’s commentary on the policy does not reflect the PDS, which only refers to coverage for the cost of exploratory work where the insurer agrees to pay an EOL claim. Further, as D was involved in the claim from the outset, the complainant presumably had access to expert advice on the content of the PDS and that a loss adjuster’s commentary does not typically represent a binding decision on coverage. Taking those matters into account and given my finding that the claim is excluded, I am not satisfied that it would be fair to require the insurer to pay the rectification costs. Is the insurer required to pay more for TA? No. As the claim is excluded, the insurer is not obliged to pay additional TA costs. Policy covers TA costs in specified circumstances The PDS confirms on page 28 that if an insured event causes damage to the insured home to the extent it cannot be lived in, the insurer will pay TA costs for the period it reasonably takes to repair the home. The maximum amount payable is 20% of the home building sum insured, which in the complainant’s case equates to $84,460. The maximum period covered is 12 months. Insurer is not required to pay more for TA The insurer has paid a total of $13,300 in TA costs, being 19 weeks at $700/week. It says that following the make safe repairs PD completed on 1 February 2023, the home was rendered habitable. Further, and in any event, an insured event did not cause damage to the home to the extent it could not be lived in. The complainant says there are ongoing concerns about habitability due to the presence of asbestos and mould. He wants the insurer to continue to pay for TA costs incurred since mid-February 2023 to the date repairs are completed. I prefer the insurer’s position. As the claim is excluded, it is not obliged to pay additional TA costs. Is more to be paid as non-financial loss compensation? Yes. The insurer has acknowledged it should have handled the claim in a better manner, but I am not satisfied its offer represents adequate compensation. It is to pay $3,000 instead. AFCA can award compensation for non-financial loss Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400 per claim) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer is required to pay more as non-financial loss compensation The complainant says the insurer mismanaged the claim, leading to major delays. He also refers to the insurer’s indication it would cover damage shown to be directly resultant from the EOL or storm events, only to later determine there was no such damage. He says these matters have caused him considerable stress and inconvenience. The insurer acknowledges that it should have communicated better and should have issued the initial claim denial decision more promptly. It has offered the complainant $2,532.63 in compensation. How that figure has been calculated has not been explained. The insurer took nearly seven months to issue its initial claim decision, despite the General Insurance Code of Practice setting a four-month timeframe for standard claims. There were occasions when the insurer did not adequately respond to the complainant’s queries. The insurer should also have worded its 30 June 2023 letter more clearly. I accept that the insurer acknowledged it should have handled the claim in a better manner, but I am not satisfied its offer represents adequate compensation. It is to pay $3,000 instead. Why is the outcome fair? As the insurer accepted the claim only to find all damage was from excluded causes, it’s offer to pay 25% of repair costs is fair. However, it is also fair that the 25% is on current prices. The insurer is to pay more to fairly compensate the complainant for stress and inconvenience. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.