Home / Chubb / Determination 12-00-963469
Determination 12-00-963469
Storm damage claim partly declined as maintenance; settlement of accepted damage
Summary
A strata body corporate claimed storm damage across a unit and sought about $13,966 in repairs. AFCA accepted the skylight and ceiling damage as storm-related but found the other damage was excluded maintenance, ordering settlement of accepted damage on an updated quote and $500 non-financial loss compensation.
The policy covers only sudden and unforeseen damage from an event, and the additional damage was shown to be from excluded wear, tear, upkeep or long-term leaks.
Issues
- Claim denial primary · not upheld“I am satisfied the additional damage claimed by the complainant is for maintenance issues and have not been shown to be sudden to establish cover.”
- Poor communication secondary · upheld“The insurer acknowledges it could have communicated more clearly regarding the assessment of mould at the property.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-00-963469
|
Financial firm
|
Chubb Insurance Australia Limited
Case number: 12-00-963469 28 June 2024
Determination overview
Complaint
The complainant is a body corporate for a residential strata, holding an insurance policy with the financial firm (insurer).
It lodged a claim on 8 August 2022 for storm damage to one of the units on 22 May 2022. The complainant is represented by the affected unit owner. Both the complainant and the unit owner are referred to as the complainant in this determination unless otherwise stated.
The insurer accepts the damage to the skylight and resultant damage to the ceiling in the main bathroom were caused by the storm. It declined cover for the other damage, as it says the other damage claimed is for maintenance issues excluded from cover.
Issues and key findings
Is the insurer liable for the further damage claimed?
No. The insurer is not liable for the further damage claimed.
How should the claim be settled?
Settlement should be based on reimbursement of the skylight cost and an updated bathroom ceiling repair quote, less the applicable excess.
Why is the outcome fair?
The outcome is fair because:
the complainant has cover for sudden and accidental damage from an event during the period of insurance
the additional damage claimed has not been shown to be sudden or from the claimed storm event
it would not be fair to require the insure to cover damage not shown to be from the claimed event, and shown to be maintenance issues excluded from cover under the policy.
Determination
This determination is in favour of the insurer.
If the complainant accepts this determination, the insurer is to pay its representative $500 for non-financial loss and settle the complainant for the accepted damage.
Reasons for determination
Is the insurer liable for the further damage claimed?
No. The insurer is not liable for the further damage claimed.
Complainant must show a loss of the type covered by the policy
When making a claim, the complainant has the onus to show it suffered a loss of a type covered under the policy. The complainant must show this on the balance of probabilities (i.e. that it is more likely than not).
If a claimable loss is shown, the onus transfers to the insurer to show, on the balance of probabilities, it is entitled to deny the claim or reduce its liability.
The full terms and conditions of cover are set out in the product disclosure statement (policy) and certificate of insurance. Relevant policy terms are included in section 3.2 of this determination.
The policy provides cover for physical damage to the insured property caused by an event occurring during the period of cover. ‘Event’ is defined as an occurrence or accident resulting in sudden and unforeseen damage to the property.
Complainant seeks cover for water damage from storm event
The complainant provided an invoice dated 26 May 2022 from a roofing contractor (AR) engaged to investigate leak locations and causes at the property. AR identified a leak in the upstairs bathroom and found a cracked skylight panel and lifted TV antennae screws that were not sealed. AR patched the skylight and fastened and sealed the screws. AR did not comment on or provide photographs of any other damage.
The complainant provided a quote from builder (KM) dated 7 September 2022 totalling $13,965.60 for repairing water damaged ceilings through the upper floor, replacing the ceiling insulation, repairing wall linings in both bathrooms, re-grouting tiles in the ensuite, installing a new shower screen in the main bathroom and repainting the top floor.
KM did not provide a report or any further details regarding the cause of the damages quoted to be repaired.
The complainant seeks cover for all damages to the property. For cover to be provided, the complainant must show, on balance, the damage claimed was sudden and unforeseen as a result of the claimed event. If it can do so, the onus shifts to the insurer to show why the damage is excluded from cover.
The complainant provided photographs showing some cracking and separation between the cornice and wall in the main bathroom and ensuite, and in the corner of each shower. The complainant says this damage is due to water collecting along the fire wall shared with the neighbouring unit during the storm. Photographs also show some cracking to the ceiling in the main bathroom next to the skylight and manhole. No photographs have been provided showing any damage to the shower screen or insulation.
The complainant provided a roof restoration quote dated 24 January 2019 totalling $36,904. The quote provided for the replacement of faulty tiles and defective valley irons, re-bedding and repointing ridge capping where necessary and surface sealing the entire roof. The complainant disputes the damage could be due to maintenance issues with these works being completed three years before.
Insurer says most of the damage due to maintenance issues
The insurer’s builder (BB) provided a report dated 20 October 2022 following an inspection on 28 September 2022 to determine the cause of the water entry. BB confirmed there was a large storm in the area around the reported date of loss, and accepted the damage to the skylight and cracking to the surrounding ceiling were likely caused by hail impact.
BB noted some of the popped screws in the upstairs ceilings had been patched over, indicating an ongoing issue with the fixings failing. This was shown in photographs included with the report. Accordingly, BB did not agree this damage was from the claimed storm event. BB also noted the cracked ensuite tiles had been resealed previously and had cracked again. BB said this was due to age and wear and tear.
Photographs included with BB’s report confirm some popped ceiling screws had been patched, and sealant had been applied around the separated tiles in the corner of the ensuite. I am satisfied these prior repairs show these damages were not sudden or caused by the claimed storm event. BB also noted the separation of grout around the bath which it considered was due to age and wear and tear. The complainant has not provided any information to explain how this damage was caused by the storm.
BB arranged a roof report by a plumber (NP). NP inspected the property on 20 December 2022 and noted the complainant reported a roof leak into the upstairs bathroom and ensuite after prolonged heavy rain in February 2022, with water seen dripping from the skylight during heavy weather events. NP noted sections of the bathroom ceiling and cornice had started to sag and paint was bubbling in the corner of the bathroom walls. NP found a large hole and hairline cracking in the skylight and said that was likely caused by hail and would have allowed the water into the ceiling cavity. NP also noted the insulation around the skylight was slightly clumped, but did not say it was water damaged.
NP considered the bubbling paint in the corner of the bathrooms along the fire wall was due to water ingress. NP noted there were gaps between the roof tiles along the fire wall. Photographs included with the report show separation between the over and underlapping sections of two lines of roof tiles, and water staining to the batten below the tile laps. Most of the gap between the tiles is painted, indicating the tile separation was present when the roof was painted several years prior. NP also identified broken tiles that had been painted over and not repaired correctly. NP said these areas could allow water ingress into the ceiling, and said the issues with the roof are maintenance issues.
The complainant has not provided any information to show the roof tile separation was caused by the storm. Given the gap was painted inside I am satisfied the separation was present since the roof was painted. Considering the exchanged information, I am not persuaded the water damage along the fire wall was sudden or mostly due to the claimed storm event, given this gap had been present for several years.
No expert comment on the cause or nature of any damage to the bathroom shower screen has been provided.
Insurer says other damage is maintenance and excluded from cover
The insurer says the declined damages are caused by maintenance issues the complainant needs to make good as part of the normal upkeep of the property. It notes the policy excludes cover for damage caused by or arising directly or indirectly from normal upkeep or making good.
I am satisfied the additional damage claimed by the complainant is for maintenance issues and have not been shown to be sudden to establish cover under the policy.
No mould issues shown to result from the claim
The complainant has raised concerns about mould possibly impacting the insulation at the property, which it says has caused the unit owner stress due to the potential impact on her health. No photographs or reports have been provided showing mould present.
The insurer notes the claim was lodged two and a half months after the storm event, yet no mould was identified by the loss adjuster or trades attending to inspect the damage. As this was several months after the claimed event, the insurer says any mould concerns would have been noticeable by that time. Additionally, it notes that other water ingress issues were identified at the property which could be responsible for any mould, if shown. The insurer was willing to reinspect the property for any mould relating to the claim, however the complainant did not agree. It has not provided information confirming any mould present as a result of the claimed storm event.
As such, I am not satisfied any mould damage relating to the claim has been shown.
How should the claim should be settled?
Settlement should be based on reimbursement of the skylight cost and an updated bathroom ceiling repair quote, less the applicable excess.
Updated quote required for settlement
The insurer accepted the damage to the skylight and resultant damage to the paintwork and cornice. The complainant provided an invoice dated 26 October 2022 totalling $350 for replacing the skylight, which she has paid.
BB provided a quote totalling $660 on 20 October 2022 for patching and painting the bathroom ceiling and cornice. The insurer has offered to pay a 20% uplift on this amount, being an additional $132. It notes this comes to a total of $1,142, which results in a settlement of $142 to the complainant once the applicable $1,000 excess is applied.
The complainant’s repair quote is not itemised to compare the quoted painting cost. Given the time since the insurer’s quote, I consider a current quote actionable by the complainant should be obtained for settlement of the accepted bathroom ceiling works.
Settlement should be based on reimbursement of the skylight cost and an updated bathroom ceiling repair quote based on BB’s scope of works, less the applicable excess.
Fair compensation offered for claim management concerns
The insurer has also offered the complainant’s representative (being the affected unit owner) $500 compensation for non-financial loss, as it acknowledges it could have communicated with her more clearly regarding the assessment of mould at the property.
I am satisfied this is fair compensation, noting no mould damage arising from the claim has been shown. If the complainant accepts this determination, the insurer should also pay the representative this amount.
Why is the outcome fair?
The outcome is fair because:
the complainant has cover for sudden and accidental damage from an event during the period of insurance
the additional damages claimed have not been shown to be sudden or from the claimed storm event
it would not be fair to require the insure to cover damage not shown to be from the claimed event, and shown to be maintenance issues excluded from cover under the policy
the insurer has offered compensation to the unit owner for her claim experience.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
Relevant policy terms
Section 1 Property: Physical Loss, Destruction or Damage
This Section covers:
Physical loss or destruction of or damage to Insured Property caused by an Event occurring during the Period of Insurance and not otherwise excluded.
…
2. Definitions Applying to this Section
Wherever the words listed below are used in this Section 1 and capitalised, they mean what is set out below:
…
2.3 Event
An occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property.
3. Exclusions Applying to this Section
The following exclusions apply to Section 1 in addition to the General Exclusions.
We will not cover physical loss, destruction or damage caused by or arising directly or indirectly from:
…
j) wear and tear, fading, scratching or marring
k) gradual deterioration or developing flaws;
l0 rust or oxidisation
m) mildew, mould, wet or dry rot;
n) corrosion, concrete or brick cancer;
o) normal upkeep or making good;
but We will pay for resultant loss, destruction or damage under exclusions j) to o) caused by any other Event covered by this Section 1;
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.