Home / Chubb / Determination 12-00-954650

Determination 12-00-954650

Incomplete and defective fire repairs, cash settlement and temporary accommodation

FirmChubb
Decided2024-07-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$5,400
Amount claimed—
SourceAFCA PDF

Summary

After a fire at her heritage home, the insurer paid $212,890.83 as a cash settlement when building repairs stopped. AFCA ordered a new inspection and up-to-date quotes to finish the building work, storage costs up to $100,000, and $5,400 non-financial loss compensation, but refused further temporary accommodation and extra contents payments.

The insurer remains liable for claim-related repairs not completed to the policy standard and must settle using current quotes, and its poor claim handling warrants compensation.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossreassess claimrepair or rectify

Related

All Chubb determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-954650 | Financial firm | Chubb Insurance Australia Limited Case number: 12-00-954650 25 June 2024 Determination overview Complaint The complainant holds a home building and contents insurance policy underwritten by the financial firm (insurer) for her heritage listed home. The home sustained extensive fire damage in September 2017, for which the complainant lodged a claim. The insurer accepted the claim and arranged for builder RW to undertake repairs. These repairs ceased before completion in or about late 2019, due to the complainant’s dissatisfaction with the quality of work. The insurer later accepted there were some issues which required attention. However, the work has never re-commenced. The insurer sought an inspection opportunity to review the complainant’s concerns, however this could not be agreed upon. The insurer later paid the complainant $212,890.83 as a cash settlement. The complainant remains dissatisfied. She wants the property restored or an increased amount paid. She also seeks cover for storage invoices and additional temporary accommodation (TA) whilst the work is completed. Issues and key findings How should the building issue be resolved? The parties are required to arrange a further inspection of the property as detailed in section 2.1 of this determination. How should the other issues be resolved? The insurer must pay further storage costs, as detailed in section 2.2 of the determination, up to a maximum of $100,000. It is otherwise not required to pay additional TA or other costs. Is the insurer required to pay compensation? Yes. The insurer’s handling of the claim was poor and this had a severe impact on the complainant. It is appropriate the insurer pays compensation of $5,400. Why is the outcome fair? Further work is required to repair the home. The extent of this can only be determined with a new inspection. Given its poor handling of the matter, it is fair the insurer pays compensation. Determination This determination is partially in favour of the complainant. Within 14 days of the complainant accepting the determination, the insurer must contact the complainant about undertaking the further work stipulated in section 2 of this determination. The insurer is also required to pay non-financial loss compensation of $5,400. Reasons for determination How should the building issue be resolved? The parties are required to arrange a further inspection of the property as detailed below. Complainant’s home damaged by fire for which the insurer is liable The terms of the policy include the Insurance Certificate and the Product Disclosure Statement (PDS). There is no dispute: the insurer sent these documents to the complainant fire damage is a claimable loss under the terms of the policy the insured home was damaged by fire on or about 15 September 2017. The insurer agreed to cover the claim-related damage. To the extent it considers any of this damage is not covered, the insurer has the onus of establishing the application of any exclusion or condition it relies on to deny or reduce its liability. Whilst repairs were undertaken, the complainant remains unhappy with the quality and the scope of this work. The relationship between the parties deteriorated in or about late 2019. At the complainant’s request, the insurer ceased repairs. The complainant disputes the insurer’s assessment of its liability and says it has not fulfilled its obligations under the policy. She believes the property has not been restored to its pre-loss condition. Complainant obtained expert report to question quality of repair work Repairs were undertaken by builder RW. This was pursuant to an original quote dated 19 October 2017 for $395,435.88. A repair contract to address the damage was later signed for this amount on 9 November 2017. Variations and amendments to this original contract amount were later added, increasing the final repair estimate significantly. At some point in or about late 2019, the complainant became dissatisfied with the work. She retained a solicitor and appointed builder TB to review the scope of the damage and the work undertaken by RW. The complainant held concerns about the quality of the work and errors she considered were made by RW. The complainant later obtained two expert reports from TB. These extensive reports raise concerns about the insurer’s approach and settlement of the claim. The first TB report was dated 17 February 2020. TB wrote: the work undertaken by RW was incomplete and contained ‘numerous defects’ it will cost about $487,270 to address these defects much of the work done failed to adhere to the scope of works (SOW), was incomplete, defective and/or uncertified. Annotated photos of the home provided by TB show some of the alleged issues, including unfinished or poorly completed work, wrong colours or replacements and additional damage. A second TB report was issued on 22 July 2020. TB found: it considered the shortfall in work now equates to $429,252.48 in value noting the insurer offered to pay $57,404.46 to address the outstanding issues with the home, TB estimates the additional amount payable is $353,125.37. TB undertook a detailed analysis of individual areas of damage identified at the home, noting areas it considered were damaged by RW or during the period it was present. TB says the insurer is responsible to address this damage. Electrical group AB also assessed the damage for the complainant. On 8 February 2023, AB wrote that the work ‘has not been completed to a satisfactory [or safe] level’. AB estimates it would cost $30,000-$40,000 to rectify. Abandoning the completion of repairs, the insurer wrote to the complainant on 1 October 2019 and again on 23 December 2020. It acknowledged the repair work was not complete and proposed to cash settle the balance of the claim for $212,890.83. This comprised: balance of building repairs $ 60,833.86 additional costs for the full payout of contents cover $132,038.07 additional storage costs $ 4,775.65 agreed additional costs from first TB report $ 15,243.25 total $212,890.83 The insurer paid the above amount to the complainant on or about 15 July 2020. Parties unable to agree on further inspection Whilst she did not accept the payment made by the insurer as full and final settlement of the claim, the complainant did not immediately address her concerns with the payment. Due to health and other issues, the matter entered a period in which ongoing (and voluminous) correspondence was exchanged between the parties, but no progress was made. Ultimately, the insurer said it was prepared to ‘address the alleged defects identified’ in the second TB report. To do this, it sought a further inspection of the property in or about July 2021. This inspection was initially agreed to but did not go ahead. The parties have not been able to agree on terms for a re-inspection to proceed. They remain unable to resolve the matter. Further inspection of the property is necessary to progress claim The panel accepts a further inspection of the property is required. It is not possible to estimate a fair value to resolve the complaint, noting the issues involved, the time elapsed since quotes were obtained and the differences in opinion. Both parties agree the repair work was not completed and further work is required. The panel further accepts the insurer should be liable for these repairs, notwithstanding the additional $76,077.11 it allowed in its settlement payment for this work to be completed. Whilst the panel acknowledges this amount may have been sufficient for RW to complete the work, it does not ensure: a new repairer could attend to it for that amount the repairs adequately address the concerns raised by TB and others adequate allowance has been made for the costs increase which will have occurred since the quote was obtained, or there is adequate allowance for repair contingencies or other possible costs. Parties to work co-operatively to arrange new quotes to settle the claim To progress this matter, the parties may each engage an independent builder and/or engineer (experts) to prepare up-to-date SOWs/quotes to complete repairs to the home. To ensure the respective experts are not disadvantaged, new experts with no previous involvement in the matter must be appointed. If the complainant is unable to obtain such experts, it is fair that the insurer nominates three suitably qualified experts (from each field) for her to choose one each of her choice. The insurer is to cover the costs of the respective experts for both parties. The respective experts must visit the site and: through the respective engineers prepare individual SOWs, and through the respective builders prepare new and costed repair quotes based on each SOW to complete the outstanding work. The SOWs should be based on the insurer’s responsibilities under the policy to repair the claim-related damage. Each repair quote must be itemised and costed. The respective quotes must be actionable. That is, regardless of whether the insurer agrees to undertake the work, the complainant must be able to rely on the quote to have the work completed by that builder. Once the respective quotes are obtained, the insurer may choose whether to repair the damage or to cash settle the complainant, subject to the policy’s coverage limits. If the insurer is to repair the damage, it must use the quoting builder to do so. The complainant will need to reimburse the amount received for building costs from the insurer ($76,077.11). If the insurer is to cash settle the claim, it must pay an amount: based on the average of the provided quotations which adds a 25% contingencies uplift, and which deducts the amount the insurer has already paid to the complainant for the building repairs ($76,077.11). The contingencies uplift serves to address the transfer of risk passing to the complainant to complete the work. It will also compensate her for the loss of the lifetime guarantee and caters to the possibility there may be variations required during the repair work. Given any cash settlement will be based on up-to-date estimates with a contingencies uplift, the panel is satisfied there is no need to award interest. To ensure the matter is resolved in a timely fashion, the respective parties must work cooperatively and as expeditiously as possible. This is pursuant to their mutual duty of utmost good faith, as detailed in section 13 of the Insurance Contracts Act 1984. 2.2 How should the other issues be resolved? The insurer must pay further storage costs, as detailed below, up to a maximum policy limit of $100,000. It is otherwise not required to pay additional TA or other costs. Insurer not liable for lost deposit to kitchen manufacturer The complainant had a custom made and imported kitchen designed by SK in her home. As part of the repair process, the insurer agreed to replace this kitchen. Certain aspects of the kitchen could not be replaced. The complainant contacted SK’s Australian representative and negotiated to include alternate options of her choosing. The insurer considered some of these choices were improvements and informed the complainant it would not cover all these amendments as part of the claimed loss. Whilst she disputed the insurer’s view, the complainant ultimately agreed to pay an additional $45,438.86 directly to SK to facilitate her preferred changes. This payment was not covered within the scope of the policy. SK’s Australian contact for the work allegedly took receipt of this payment from the complainant and decamped with it. The panel is satisfied this is a transaction between the complainant and SK. There is no persuasive evidence the insurer should be liable for it. Whilst the panel acknowledges the complainant was apparently a victim of crime, her loss in this regard was not the insurer’s fault. It is also not a claimable loss under the terms of the insurer’s policy. Contents settlement is for more than the sum insured and is fair The complainant remains dissatisfied with the insurer’s handling and settlement of her contents claim. She says: the payout made was insufficient and did not appropriately compensate her for her loss the payout included allowances for amounts paid to store contents and this is not fair the insurer’s contractors lost or damaged some of her other contents and she has not been compensated for this. At the time of the loss, the complainant held contents cover for up to $229,890. The insurer settled the contents claim for $258,720. It says it is therefore not required to pay any increased amount. In its letter to the complainant dated 23 December 2020, the insurer’s lawyers confirmed what was paid for the contents limit included $60,529.13 for contents restoration. Given this was a necessary part of the post-loss work (and there is no dispute about this), the panel considers the inclusion of this amount within the payment of the policy limit is fair. The complainant also raised concerns about the apparent loss, removal or discarding of salvageable and/or non-salvageable items at the home. She believes there were numerous items which have not been returned and/or have not been accounted for. The evidence that the insurer should be liable for these items is not strong, nor is there firm evidence of a loss. Many items were taken from the home and remain in storage. The panel accepts there may be items which remain unaccounted for, however there is no strong evidence the insurer or its agents should be liable. The exchanged material does not, for instance, detail whether these items were present in the immediate aftermath of the loss. They might have been unsalvageable and/or removed by police or other workers at the scene. To the extent items were too badly damaged, they are subject to the limits of the policy. Proof of ownership is also not clear. On balance, the panel is not satisfied the complainant has provided persuasive evidence to show she incurred a loss for these claimed items. Further, she has not shown the insurer should be required to pay an amount which exceeds the sum insured for contents under the policy. Insurer liable for further storage costs The complainant covered storage payments for other items, subject to reimbursement from the insurer. This was done over a prolonged period, however the parties have not detailed when (or if) this arrangement has since ceased. Whilst the panel accepts the insurer is liable for storage costs for the duration of repairs, it is apparent no such work has been done since about late 2019. The panel is not satisfied the insurer is liable for these costs indefinitely, particularly noting that some of the lengthy delays were not of its doing. The insurer further notes that much of the storage costs have been covered under the buildings cover for the policy not the contents. It did not specify any clause or policy condition upon which it relies. The policy says the insurer covers 25% of the sum insured ‘up to a maximum of $100,000’ for storage costs. As of 23 December 2020, the insurer had paid (or undertaken to pay) $27,832.08 worth of storage costs. This covers a period which extends to 8 October 2019. The panel accepts further cover beyond this date is appropriate (subject to provision of invoices). However, the sum total of the payable expenses the insurer is liable for is no more than $100,000. Any amount over and above this must be borne by the complainant. Upon acceptance of this determination, the panel accepts any storage costs incurred (but not exceeding $100,000 in total) must be covered by the insurer, until: repairs are completed by the insurer, or new quotes are obtained and a settlement is calculated and paid. If the settlement is paid, rather than repairs completed, the insurer must cover storage costs for the time it estimates it will take to complete the repairs. It must also pay an additional allowance of 25% to cater for delays and contingencies. The estimated repair timeframe must be based on the average repair time estimated by the quoting experts. No requirement to pay additional TA costs The complainant was frustrated by the level of accommodation offered and the changing arrangements which occurred with the insurer. She says she ultimately moved into a second home she owns, displacing a rent-paying tenant to do so. It appears this arrangement has remained in place for the last several years. The panel acknowledges the complainant’s inconvenience and frustration. However, the panel also acknowledges the complainant contributed to the lengthy delays involved with the resolution of the matter. At the very least, the delays are not solely the insurer’s fault. The insurer’s policy covers TA costs. The PDS says this cover is limited to: (a) a maximum period of twenty four (24) months; or (b) an additional amount of 20% of the Contents Sum Insured. Whichever is less. The insurer considers it has fairly discharged this portion of the loss. Based on the exchanged information, the panel calculates the insurer had paid at least $182,790.83 (including $15,243.25 in its settlement offer) for TA costs as of 23 December 2020. This amount far exceeds 20% of the contents sum insured, being $45,978. This means the insurer has paid approximately four times its maximum TA liability under the policy. Given this, the panel is satisfied the insurer has attempted to accommodate the complainant as fairly as it could. Whilst the panel acknowledges the inconvenience of the complainant’s situation, there is no need for the insurer to contribute further to these costs. 2.3 Is the insurer required to pay compensation? Yes. The insurer’s handling of the claim was poor and this had a severe impact on the complainant. It is appropriate the insurer pays compensation of $5,400. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $5,400 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Insurer’s handling of the claim was poor The panel acknowledges the repair of a heritage listed home is difficult. This home had significant bespoke finishes which meant care was required to: source suitable and appropriate replacement items ensure the correct items were chosen install these items and ensure they were fit for purpose. It is apparent the complainant considers the insurer did not do this. The repair process has taken too long and the panel accepts the complainant was inconvenienced by the insurer’s poor handling of the claim. More particularly, the matter has been unacceptably delayed, noting the original loss occurred nearly seven years ago. Whilst the panel acknowledges the complainant’s health issues and other concerns contributed to these delays, the insurer’s handling of the matter was poor. It did not do enough to address the complainant’s concerns or to ensure the repairs were adequately completed. The panel further accepts this caused an unusual degree of stress, delay and inconvenience for the complainant. Insurer to pay non-financial loss compensation of $5,400 Given the issues cited, the panel accepts the level of inconvenience and delay for the complainant was severe. To this end, the insurer must compensate the complainant. The panel is satisfied this should be to the maximum amount permissible under the AFCA Rules. This means the insurer is required to pay the complainant compensation for non-financial loss of $5,400. Why is the outcome fair? Further work is required to repair the home. The extent of this can only be determined with a new inspection. Given its poor handling of the matter, it is fair the insurer pays compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: an ombudsman a member with significant experience in consumer and small business advocacy a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.