Determination 12-00-953025

Storm damage claim: scope of repairs, mould and further contents and accommodation losses

FirmBlue Zebra
Decided2025-02-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$102,040
Non-financial loss—
Amount claimed$978,928
SourceAFCA PDF

Summary

After storm damage, the complainant claimed about $979,000 including a $680,430 builder quote, $188,199 contents and $84,002 out-of-pocket costs. AFCA accepted the insurer's $62,916 repair scope with a 20% uplift and a further contents and temporary accommodation payment, and rejected mould-related and other claimed losses.

On balance the further mould and damage were caused by unrelated pre-existing moisture, atmospheric conditions and interference with the remediation, which are excluded or not attributable to the insurer.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Blue Zebra determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-953025 | Financial firm | Blue Zebra Insurance Pty Ltd Case number: 12-00-953025 23 December 2024 Determination overview Complaint The complainant holds insurance with the financial firm (insurer) covering building and contents. She lodged claims for damage from a storm event in December 2021. The insurer accepted liability for storm damage, but the complainant says there have been ongoing delays and issues in the insurer’s handling of her claim, with repair work not starting until May 2023, further damage developing and the matter still not resolved. She says she has experienced significant inconvenience, as well as health issues as a result. She is also concerned about the insurer’s proposed scope of works and quote (which does not match one she obtained); as well as the adequacy of cover for contents items, temporary accommodation and other out of pocket expenses she says she has incurred. 1.2 Issues and key findings Is the insurer entitled to limit its liability for repairs? Yes. The insurer is entitled to limit its liability, as the evidence does not establish it was responsible for additional mould and other damage. Instead, that was, on balance, from a combination of the complainant’s own actions (in interrupting the remediation process), pre-existing issues and atmospheric conditions, which is a policy exclusion. The insurer is entitled to use its quotes as a basis for cash settlement of the claim. It is, however, required to increase the quoted amounts (for building) by 20% to allow for contingencies and the age of the quotes. Is the insurer liable for further costs and losses? The insurer is required to pay $26,541.80, being its base offer for further contents and storage, increased by 20%; together with a further 9 weeks’ temporary accommodation, based on reasonable quotes to be obtained by the complainant. The insurer is not liable for other miscellaneous costs or the complainant’s experts’/claim advocates’ fees. Why is the decision fair? It would not be fair to require the insurer to pay for further damage (or consequential loss) which has not been shown to have been caused by the claimed event, or is either excluded under the relevant policy or more likely than not caused by the complainant’s/her representative’s actions. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of receiving notice that the complainant accepts this determination, the insurer is required to pay $75,498.65 for building damage, a further $26,541.80 for contents and storage, and also cover the reasonable cost of an additional 9 weeks’ temporary accommodation based on new quotes, once they are obtained. It is not required to take any other action. Reasons for determination Is the insurer entitled to limit its liability for repairs? Policy cover is for ‘accidental loss’ The policy cover is for accidental loss to the buildings and contents. That cover is, however, subject to terms, conditions and exclusions, including: There is no dispute the property was accidentally damaged by storm. The underlying issue is the extent to which the damage and other losses now being claimed can be attributed to the storm event, and whether the insurer should be liable (either under the terms of the relevant policy, or otherwise) for more than it has accepted. Essentially, the complainant’s position is that the storm caused mould, and failings by the insurer in dealing with the claim allowed that to develop, with the complainant needing to vacate the property, which in turn further altered the atmospheric conditions inside the property, leading to a worsening of the mould and more widespread damage. The complainant says she was not aware of any pre-existing damage or mould before the storm event. No dispute that there was accidental damage from storm The reported damage was from roof leaks in multiple areas during a storm on 2 December 2021. Damage was noted in the walls and ceilings of the master bedroom, living area, entryway, study, and dining room, which the insurer agreed to cover. The garage also showed signs of water damage from runoff. Following various attendances and other preliminary steps taken by both the complainant and insurer in the preceding period, a scope of work for the accepted repairs was prepared for the insurer by KAS on 1 January 2023 (together with later variations). On 9 March 2023, the insurer provided KAS with authority to proceed with the repairs based on a quoted cost of $62,915.55. KAS said the repairs would take up to 4 weeks, with a 3 week lead time. However, the complainant declined to sign the building contract. She provided a quote from KAB (dated 24 June 2024) for building work for $678,565.08. This has since been amended (as at 29 November 2024) to $680,430.41 based on an updated itemised format. I note, however, that KAB’s scope of works includes certain upgrades/additions that are not related to the event. While KAB indicated the complainant showed them the event-related damage, it is not clear that she also shared other relevant material from the insurer, including reports and scopes of work, which would have assisted in distinguishing what had been accepted by the insurer as claim-related damage, from broader unrelated issues. Expert reports indicate further mould growth and other unrelated causes A mould remediation assessment had been provided by the insurer’s expert PIR on 29 December 2022, after their attendance on 22 August 2022. The insurer gave PIR authority to proceed with the work on 13 February 2023. PIR estimated the work would take about 4 weeks, although some ongoing restoration of certain contents might take an additional 2 weeks. Meanwhile, the complainant had obtained a mould and moisture inspection report from KE in March 2022. While KE said there was ‘no strong evidence of pre-existing and long-term water damage nor wood rot’, their visual inspection did find ‘macroscopic fungal growth...on the South Western exterior of the property’. However, acknowledging the areas of water entry from the roof (likely from the storm event), KE also noted 3 ‘long-standing moisture issues’: ‘suspected water vapour from the damp soil in the under-croft area travelling through the floor into the occupied space above’; and previously active moisture problems (now in drying phase) in the bathroom and from the feature window/roof area into the ceiling cavity above the study. KE expressed concern that the prolonged dampness since the storm event meant fungal contamination was a risk, as confirmed in their reporting. KE recommended repair of roof water entry points, together with mould decontamination, followed by a complete drying process. At the time of their attendance at the property in August 2022 (and having reviewed KE’s report), PIR also observed that, as well as the storm-related damage, there was ‘prolific mould growth...due to multiple factors’. PIR referred to areas showing evidence of long-term moisture entry or water damage, lack of subfloor ventilation and ‘ongoing microbial activity and growth due to normal environmental ambient conditions’ and unrelated to the storm event. After PIR had completed mould remediation work, CDE then inspected the property and provided post-remediation verification (PRV) on 28 and 29 September 2023. They noted all water-damaged furniture was either removed or relocated; carpets were lifted, and some gyprock had been removed from walls and ceiling areas. CDE indicated that final sampling showed normal mould ecology, and on that basis they said that once affected building materials had been appropriately dried, construction could be commenced to allow the property to be occupied again. In their report, CDE also referred to other areas of previous (apparently unrelated) water damage and some repairs. They also noted that while there had been no reported damage in bedrooms 2, 3 and 4, the carpets in those rooms had been lifted and cleaned, and those areas were then used to store contents. On 14 November 2023, building biologist ECB provided a report for the complainant (and a subsequent report on 28 May 2024), having been engaged to review and comment on the PIR report. At the time of their inspection they said the house was under containment and there were dehumidifiers and air scrubbers currently running. They reported the complainant had told them her plasterer IE had said on 2 August 2022 ‘There is as much evidence in the bedrooms of mould as in the other rooms”, although ECB found no elevated moisture at the time of assessment. ECB identified a high mould count in the study, master bedroom and bedrooms 2 and 3, with an extremely high mould count in bedroom 4 (as well as other areas of the house where storm damage had been accepted). They said that indicated recent active mould growth at that time. The reports observed ‘old’ and ‘limited’ water damage which ECB said needed further investigation and remediation, and which they said was likely to have ‘contributed to [what ECB said was] the failed PRV’. The complainant also obtained her own remediation quote dated 18 February 2024 following an inspection by BML, for $167,695.51 (for a significantly broader scope of work throughout the house than had been accepted by the insurer). With regard to the presence or otherwise of mould, BML stated there was ‘visible Condition 3 Actual Growth’ - going on to say ‘Actual growth includes growth that is active, dormant or visible’. In respect of the different areas of the property, and the presence, status and sampling of mould, they simply said ‘refer to mould testing by others’. The complainant relies on ECB’s remediation report and builder KAB’s scope of works in support of her claim for further costs. Her underlying concern appears to be that the remediation conducted by the insurer's expert, PIR, was inadequate and that had allowed further mould contamination to occur. Insurer not liable for further remediation or repair I appreciate there is some lack of agreement between the parties’ respective experts regarding the cause and source of further mould and associated damage, and the efficacy of the initial remediation work carried out. However, I am satisfied, on balance, that there were other factors impacting the mould levels in the property both before and after the insured event, and before and after the insurer’s remediation work. The evidence points to old and likely ongoing unrelated water damage (on balance, exacerbated by ventilation issues and the general atmospheric conditions pertaining to the geographical location of the property). In addition, I accept that the complainant’s representative at the relevant time (December 2023) had requested the PIR remediation/drying equipment be removed, while that was still in operation. The insurer says it then heard nothing more from the complainant's representative regarding the property until the 11 March 2024 when they advised they were no longer representing the complainant. That represents a period of about 3 months during which the insurer’s proposed work could not proceed. In the meantime, PIR is also reported as saying the complainant had ‘regularly compromised the contained and sealed environment, against all advice, both prior to, and post PRV sampling leaving lower rear door open to allow leaving of pets at the property in the lower level, laundry/toilet area. When this is done, the external air vents straight up the staircase to the upper level as the staircase acts as a chimney when the rear door is open’. The insurer points out that PIR would not accept any liability for any changes in site conditions, including (not unreasonably): Post-Proof of Restoration (PRV): any alterations to the site after the PRV has been issued. Removal of Dehumidification and Air Filtration Devices which were currently stabilizing the internal environment to prevent microbial growth, dust settlement, and the release of animal/pest dander and mould spores (since removing these devices could lead to significant deterioration of the property's condition). I am not satisfied the evidence establishes the PRV was incorrectly issued or that PIR’s further drying/remediation (up to the point it was interrupted) was otherwise inadequate. I do not consider it reasonable, in the circumstances, to attribute mould growth that occurred after the removal of the dehumidifiers and air filtration devices to the claimed event. I am satisfied it is more likely than not that interference with the remediation process, the general atmospheric conditions at the property (a policy exclusion) and pre-existing issues with the property contributed to any further mould and damage identified. I acknowledge that delays in finalising the claim (from the point at which the remediation was interrupted) and in being able to repair, open up and use the property may also have had some impact on the conditions inside the house. However, having weighed all the available evidence, I am not satisfied any delays in the relevant period were solely or substantially attributable to the insurer, nor that the insurer should be held liable for further building or contents damage being claimed, either under the terms of the policy or otherwise. Insurer entitled to use KAS quote (with variations) as basis for building repairs I do not consider the insurer should be held liable for additional remediation or building damage, beyond that scoped and quoted by KAS in January 2023, being $62,915.55 including variations. I acknowledge the complainant’s more detailed repair quote from her builder, however that still clearly includes more extensive work and items not covered under the claim. I also acknowledge the complainant’s concern that one of the insurer’s contractors caused additional damage to the living room flooring, however, I am not satisfied the available evidence confirms that. In cash settling the claim, the insurer offered to increase the final cash settlement amount by 15% to account for the transfer of risk and potential contingencies. However, the quotes are now over 1 year old, given the time taken for the parties to consider the complainant’s concerns. I consider it fair in the particular circumstances that the quoted amount be increased by 20%. That means the insurer is required to pay $75,498.65 for building damage. Is the insurer liable for further costs and losses? Complainant not entitled to all additional contents claimed I understand the insurer cash settled the complainant $149,375 in October 2023 (with her agreement) for damaged non-restorable contents, which had been disposed of with the complainant’s consent. In its final settlement proposal, it has offered a further $22,118.18 for carpet and storage of undamaged contents. The complainant has provided an itemised list of contents for which she is still claiming (to a total of $188,199.17). She says contents were not removed from the site to protect them from mould contamination. However, the insurer says certain contents had been stored on-site in areas of the house which had not been impacted by the storm event, and which had been partitioned off to limit any transfer of contaminants. The PRV report also shows photos of contents in those partitioned-off rooms, and they do not appear mould-affected. In addition, as already considered above, further mould contamination (if any) should not be the responsibility of the insurer. I am not satisfied the complainant has established an entitlement to the substantial additional settlement she is claiming for contents. In the circumstances, I consider it fair that the insurer pays the further amount of $26,541.80 (being its base offer of $22,118.18 increased by 20% to take account of contingencies and likely price increases since the original proposal was made). Miscellaneous costs and expert/advocate fees not payable The complainant is also wanting the insurer to cover other ‘out of pocket’ costs to a value of $84,001.76. Those costs include incidentals such as: dog walkers car washing petrol food and water taxis drycleaning computer, mobile and photography services. I appreciate this has been a difficult period for the complainant, and that her normal life has been disrupted because of the claim and the need to pursue her complaint. I also acknowledge the time that has elapsed since the claim arose. However, the insurer is not liable for consequential losses that might flow from her having to make a claim. Nor am I satisfied the complainant has established another basis for reimbursement of those costs. The complainant is also claiming the cost of her claim/complaint advocates, and remediation testing and restoration experts for the total of $26,297. However, I do not consider her expert reports assisted her in altering the outcome of her claim or complaint. As well, AFCA is a free service to complainants, and it would not normally be necessary for complaint advocates to be engaged. I also note the complainant has used the services of a number of different advocates in the course of this matter (which is likely to have caused a duplication of work and time) and she has lately requested the most recent advocate also be removed. In the circumstances, I am not persuaded the insurer should be liable for any such costs she has incurred. Temporary accommodation is payable for claim-related repair period Under the relevant policy terms, temporary accommodation can be provided when the property is uninhabitable due to damage covered by the policy (up to a set limit). The evidence indicates the insurer has covered her accommodation from November 2022 (and has reimbursed electricity costs), but payments have since ceased. I understand the complainant has been staying with a friend. I appreciate the insurer has already contributed a significant amount to the complainant’s accommodation costs, which is fair in the particular circumstances. However, I consider it reasonable that a further payment be made for the anticipated period needed for claim-related repairs (including lead time, and some allowance for unforeseen delays). The insurer’s builder has estimated that as 9 weeks. The complainant is required to obtain evidence from her previous accommodation provider (or equivalent) of the cost of accommodation in the current market for a 9 week period. The insurer is required to pay her the reasonable quoted amount. Compensation for non-financial loss is not payable The complainant has made a number of submissions regarding the insurer’s handling of the claim. She says, amongst other things, she has experienced emotional and financial hardship, been bullied by the insurer’s contractors and suffered health issues relating to the mould. She has also submitted the insurer had not acted with the utmost good faith or otherwise in accordance with the relevant industry code of practice. I acknowledge this has clearly been an extremely difficult time for the complainant over a protracted period. I also acknowledge there have been delays in progressing the claim at various stages. However, the evidence indicates the complainant (and her advocates) have also contributed to delays, with likely significant consequences. Based on the available evidence, I am not persuaded compensation is warranted in the circumstances. 2.3 Why is the outcome fair? It would not be fair to require the insurer to pay for further damage (or consequential loss) which has not been shown to have been caused by the claimed event, or is either excluded under the relevant policy or more likely than not caused by the complainant’s/her representative’s actions. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.