Home / QBE / Determination 12-00-921008
Determination 12-00-921008
Storm damage claim partly denied for pool and roof
Summary
The complainants' storm-damaged pool claim was denied under the hydrostatic pressure exclusion, which AFCA found the insurer had not proved. AFCA ordered the pool to be cash settled on three actionable quotes plus 10%, plus interest, $5,000 towards engineering costs and $5,400 non-financial loss, and upheld the roof denial.
The insurer bears the onus of proving an exclusion applies on the balance of probabilities, and where the expert evidence is evenly weighted the exclusion is not established.
Issues
- Claim denial primary · upheld“I am not satisfied the insurer has shown, on balance, the cause of damage to the swimming pool was hydrostatic pressure.”
- Claim amount dispute secondary · not upheld“I agree with SW that the three highest quotes appear to be excessive and include additional features”
- Poor claim handling secondary · upheld“$5400 compensation for non-financial loss in recognition of the claims handling issues is fair and reasonable”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss
Related
Text of the determination
Determination
|
Case number
|
12-00-921008
|
Financial firm
|
QBE Insurance (Australia) Limited
Case number: 12-00-921008 23 October 2024
Determination overview
Complaint
This complaint relates to a claim by the complainants under their home and contents insurance policy held with the financial firm (insurer), for storm damage to the insured property.
The insurer has partially accepted the claim but denied the claim for damage to the roof and swimming pool. The insurer says the causes of damage to these items are excluded under the policy.
The complainants say the insurer should accept the claim for both items as they were damaged by the storm.
They also say the insurer should pay interest on the cash settlement paid for accepted damage, reimburse them for the costs of their professional reports and pay them a further amount of compensation for non-financial loss.
Issues and key findings
Is the insurer entitled to deny the complainants' claim for damage to their swimming pool?
No. I am not satisfied the insurer has shown, on balance, the cause of damage to the swimming pool was hydrostatic pressure. Therefore, it is not entitled to deny the claim for damage to the swimming pool.
Is the insurer entitled to deny the complainants’ claim for damage to the external roof?
Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainants’ claim for damage to the external roof.
Are the complainants entitled to interest on the cash settlement payment for accepted damage?
Yes. The complainants are entitled to be paid interest on the cash settlement amount paid for damage to the study and pergola from the date of the accepted quote.
Are the complainants entitled to be paid their professional costs?
Yes. The complainants are to be paid the costs of their engineering reports up to $5000 in accordance with the AFCA rules.
Are the complainants entitled to compensations for non-financial loss?
No. I consider the insurer’s offer to pay the complainants $5400 compensation for non-financial loss in recognition of the claims handling issues is fair and reasonable and I do not consider a further payment is warranted in the circumstances.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainants, regarding the claim
Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination, within 14 days of being notified of their acceptance the insurer is to:
pay the complainants interest on the cash settlement amount agreed by the parties for the pergola and study damage in accordance with Part 2 of this determination
pay the complainants $5000 towards the costs of their professional reports
pay the complainants $5400 compensation for non-financial loss if it has not already done so.
Should the complainants accept this determination, within a reasonable time after being notified of their acceptance the insurer is to:
obtain three quotes for replacement of the swimming pool and cash settle the claim for damage to the swimming pool in accordance with Part 2 of this determination.
Reasons for determination
Is the insurer entitled to deny the complainants’ claim for damage to the swimming pool?
No. I am not satisfied the insurer has shown, on balance, the cause of damage to the swimming pool was hydrostatic pressure. Therefore, it is not entitled to deny the claim for damage to the swimming pool.
Coverage of the policy
The complainants‘ home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
I am satisfied that the PDS and COI have been provided to the complainants. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainants.
Swimming pools are covered under the policy, and the policy cover insured events including storm and accidental damage as follows:
Accidental loss or damage
Unintended and unexpected loss or damage to your building and/or contents.
...
Loss or damage due to:
...
• Any process Storm, rain or flood Damage caused by storm, rain or flood.
Damage caused by storm, rain or flood damage caused by landslide and/or subsidence that happens within 72 hours of, and as a direct result of the storm, rain or flood.
...
The policy also has several general exclusions that apply to all cover and include the following:
Condition of your home
...
There is no cover under any section of your Policy for any:
• wear, tear, depreciation, rust, oxidisation, corrosion, fading;
...
• gradual deterioration due to action of light, air, sand, sea salt, sea water, or atmospheric or climatic conditions
For example, the gradual weathering of brick, mortar or concrete or the breakdown of grouting or tile adhesive over time.
• previous damage that hasn’t been repaired
...
Other loss or damage
There is no cover under any section of your Policy for any claim, loss, damage, cost, injury, death or legal liability, that is caused by or arises from:
...
• earth movement except for landslide or subsidence where it occurs within 72 hours of, and as a direct result of, the following Insured Events:
Storm, rain or flood; Water or other liquid; Earthquake or tsunami; or Explosion;
• hydrostatic pressure;
For example, if you empty your swimming pool or spa, the pressure exerted on it by water in the surrounding ground due to heavy rain, can cause it to move, warp or lift out of the ground
It is accepted insurance law that the complainants carry the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainants have established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim for damage to the swimming pool
The complainants lodged their claim with the insurer on 11 March 2022, advising that their property, including their swimming pool, had been damaged by a storm on 8 March 2022.
The complainants engaged pool builder ISP to report on the damage to the pool, and they provided a report dated 17 March 2020, although presumably the correct date is 17 March 2022.
ISP noted there was evidence of substructure erosion and damage causing thee pool shell to have multiple cracks, and that there was considerable site subsidence resulting in surrounding coping, fencing and pool movement.
The insurer engaged forensic structural engineer EIS who attended the property on 4 June 2022.
EIS noted previous photos of the pool showing it was working well and in good condition, and agreed the pool was damaged in the storm event.
EIS made the following observations:
two (2) bulges and cracks have been formed at the bottom of the pool approximately 2.5m long.
pool side walls have bulges
the pavers along the eastern and western side of the pool have dropped by approximately 10mm
the soils in the area are slightly reactive
the site received 507.4mm of rain in March 2022 which is almost 4 times the average
the complainants reported the pool was overfilled during the heavy rain event
. EIS says:
for the observed bulges in the pool wall and floor to have occurred, the external hydrostatic pressure would have been greater than the internal hydrostatic pressure from the water inside the pool
if the pool were filled with water, the hydrostatic pressure of the internal pressure would be
greater than the external hydrostatic pressure and so the damage would not be able
to occur.
EIS says pools constructed in accordance with the relevant standards (AS 1839) have a hydrostatic valve installed so the water table cannot rise above the level of the pool floor. When the external hydrostatic pressure exceeds internal hydrostatic pressure, the valve allows the ground water into the pool to relieve the external hydrostatic pressure.
EIS concluded that because the complainants pool cracked during the heavy rain, rather than being relieved of pressure via the hydrostatic valve, it must have been non complaint with the AS 1839. EIS concluded the cause of damage was the defective installation of the swimming pool therefore preventing damage from hydrostatic pressure.
Based on the EIS report the insurer denied the claim for damage to the pool citing the exclusion in the policy for damage caused by hydrostatic pressure.
In response to the suggestion that the swimming pool was not properly installed, the complainants provided council records showing the pool installation was approved by council and the plans had the input of a structural engineer.
The complainants also engaged pool expert MW who inspected the pool and provided two reports on 17 November 2022 and 6 January 2023.
MW says the cause of damage to the pool was not hydrostatic pressure but the soil around the pool becoming saturated and collapsing towards the centre of the pool.
The second MW report responds to the EIS report. MW says he understands how hydrostatic pressure works, and he says:
In my 50+ years of building experience I have never seen water pressure bulge a fiberglass pool shell inwards when it was full of water as in this case
The insurer’s engineer EIS provided a supplementary report on 19 December 2022 disputing that soil slippage could be the cause of the damage.
EIS says the fact that the complainants’ pool sits on a flat area means a soil slippage is unlikely for the following reasons:
there is no visual indication of any significant subsidence from the surrounding soil and pavers
if any significant landslip had occurred, then movement and destabilisation of the boundary and pool fencing would have been expected
for the soil slip to have occurred on both sides of the pool at the same time is unlikely
the theoretical slip arc happens to coincide with the base of the pool which is unlikely
there is no void for the soil to fall into
the complainants’ version of damage would be valid if hydrostatic pressure has caused the pool to initially bulge, creating the void/space for the soil erosion to occur.
The insurer then engaged structural engineer SW to provide a desktop assessment. The first of the SW reports is dated 20 March 2023.
SW provided modelling based on the pressure at various fill levels of the pool. SW agrees that as the pool and surrounding ground becomes completely submerged the external pressure decreases but says that it is likely the damage occurred before that point.
SW says:
We note that the Insured has asserted that the pool has been designed in accordance with AS 838-1994 and AS 1839-1994, based on the Council-approved drawings
...
from review of the drawings, we note that the backfill had been specified to be in accordance with Clause 5 of AS 1839-1994 which states: “A suitable backfill shall be used which will not be subject to washaway or slumping behind the pool walls.”
On the basis of the above, if the pool was constructed compliantly, erosion of the backfill material during the claimed storm event would not be plausible.
To this end, in our opinion, the experienced bulging and cracking to the pool is unrelated to substructure erosion from the claimed storm event
...
in our opinion, the subsidence of the pool pavers is pre-existing and has not occurred as a result of the claimed storm event nor has it contributed to the damage to the pool.
SW says that a noticeable drop in the pool water level does not necessarily need to occur for external hydrostatic pressure to cause damage to the pool shell.
SW also says the view of MW supports that hydrostatic pressure was forcing the pool walls inwards. He says that when soil becomes saturated pressure ultimately comprises of both soil and hydrostatic pressure components which both act on the pool concurrently. He says saturated soil pressure cannot occur without a hydrostatic pressure component.
SW provided two further reports on 29 May 2023 and 6 October 2023 reiterating their view that the cause of damage to the pool was hydrostatic pressure.
The complainants engaged structural engineer PX to report on the cause of damage to the pool. PX attended the property and provided a report dated 28 November 2023 regarding the cause of damage. PX was also asked by the complainants to comment on the insurer‘s reports.
PX says with equal water levels inside and outside the pool there is no net hydrostatic force, and the only force left to deform the pool wall is earth pressures.
PX observed the following regarding the pool:
settlement of the pavers along the long edges of the pool
movement of the pool walls inward at the lower wall level corresponding with the areas of paver settlement
the hydrostatic valve was manipulated and found to operate
deformations and cracking of the pool floor, appearing most significant towards the shallow and middle sections of the pool
It is PX’s opinion that the earth slip had a circular slip plane that went under the pool, and the pool floor does not have the stiffness to provide significant restraint to the soil. He says the damage to the pool is primarily to the floor which has split under an upwards load and that
this mode of earth failure is entirely consistent with the movements and the worst of the damage to the pool shell
...
In this case I believe that the evidence is strong enough that it is proven that there was no net hydrostatic force acting on the pool because there is good evidence that the water levels were equal inside and outside the pool.
Insurer and complainants provided multiple additional engineers reports
PX ultimately provided a further five reports in response to further reports provided by the insurer’s engineer SW. The following points were raised in the exchange of supplementary reports:
PX says hydrostatic pressure cannot be the cause of the damage because the bends in the pool are not symmetrical, however SW says as the pool structure is not uniform or symmetrical in shape, an exact bending at the midspan would not be expected.
SW disagrees that because the pool was full there was no hydrostatic pressure. They say that even if the internal and external water tables are equal, there is still lateral earth pressure acting on the pool walls in which the external pressures ultimately exceed the internal pressure. PX disagrees.
PX observed the hydrostatic valve was working. SW says the fact the pool failed indicates that it was not functioning properly and says it was likely at the end of its serviceable life.
SW says AS 1838-1994 says that pools may be subject to external hydrostatic pressures even though a hydrostatic valve is incorporated in the pool floor. Build-up of this pressure may be avoided by the incorporation of sub-surface drainage, and inadequate surface drainage around the complainants’ pool had enabled water to pond rather than effectively discharge from the site.
SW disagrees with the PX earth slip theory. They say a global slip failure generally requires a sloped topography where the soil mobilises along a slip arc under gravitational force and deposits at an unrestrained end. Where the site is flat and the pool is embedded within the surrounding soil, SW says the soil is completely restrained with no passage for any significant mobilisation to occur.
PX responded to this saying the soil moved into the pool swimming space. PX says pool floors typically have little or no strengthening to resist forces so in this case, with the pool water and groundwater both at the surface level due to the storm, there is no net hydrostatic force on the pool floor. Consequently, there is no significant resistance to the soil pushing up on the pool floor and into the pool space as part of the overall soil slip or “slumping” failure mechanism.
SW disagrees that there could be an upward motion of the soil, even if there was an earth slip around the pool. They say in the case of a landslip, the soil mobilises laterally and downwards with gravity to which no upward forces against the pool floor would be expected. They say PX’s opinion of the soil forces acting against gravity without any external influence is physically implausible.
SW says more obvious subsidence around the pool would be expected if the damage was caused by earth movement. PX says in their experience in multiple investigations of pool failures is that surface ground movements are relatively small compared to the damage caused to the pool, and that the landslip that occurred was not a significant landslip in terms of the quantum of soil that moved.
Neither SW or PX moved from their view of the cause of damage throughout the process of exchanging reports, and each was able to provide a reasonable response to issues raised by the other regarding their theory as to the cause of damage.
Insurer must establish a policy exclusion applies on the balance of probabilities
The engineers all agree that the pool was damaged during the storm event. As such, the complainants have established a loss of the type covered by the policy.
Therefore, the insurer bears the onus of proving, on the balance of probabilities, the cause of damage was hydrostatic pressure and is therefore excluded from cover.
I am not satisfied the insurer has met its onus.
Proving an event occurred on the balance of probabilities means showing that it is more likely than not to have occurred. The more serious the matter, the more substantial the evidence that will be required to prove the event occurred.
I find the reports from both the insurer’s engineers and the complainants engineer to be logical, compelling and supported by helpful photographs. Both put forward well-reasoned arguments for the cause of damage they suggest, and I consider the evidence regarding the cause of damage to be evenly weighted.
I am satisfied the reports provided by the complainants engineer PX cast sufficient doubt on the insurer’s engineers reports regarding the cause of damage.
In particular, the following aspects of the exchanged reports cause me to doubt the hydrostatic pressure theory of damage:
The EIS (insurer’s engineer) initial report contains a clear statement that if the pool were filled water, the hydrostatic pressure of the internal pressure would be greater than the external hydrostatic pressure and so the damage would not be able to occur.
SW disputes soil slip is the mechanism of the failure because there is no other evidence of subsidence, however the report from pool builder ISP who attended the property in the weeks after the storm noted considerable site subsidence has resulted in surrounding coping, fencing and pool movement.
EIS also says its conclusion that hydrostatic pressure caused the damage is premised on the pool being incorrectly installed, however the complainants have provided the information from his local council from the time the pool was built showing a development application was approved and the plans were drawn up by a structural engineer an engineer was involved in the construction.
The complainants engineer PX, also conducted a physical examination of the hydrostatic valve and confirmed that it was both present and working.
Because I consider the evidence is evenly weighted, and that the PX reports therefore cast doubt on the insurer’s view that the cause of damage is hydrostatic pressure, I cannot be satisfied on the balance of probabilities that this was the cause of damage to the pool.
Therefore, the insurer has not met its onus of proving, on balance, the cause of damage to the pool is hydrostatic pressure.
The result is the insurer is not entitled to deny the claim for damage to the pool.
The complainants have provided several quotes for repair
Pool builder ISP attended the property in the weeks following the event. As well as providing a damage report ISP provided a quote to replace the pool.
ISP provided a quote to replace the pool for $72,000 inclusive of GST, exclusive of crane costs estimated to be $3000. The complaint subsequently provided three further quotes for repair of $120,920.00, $122,750.00 and $178,300.
The issue of the quotes was addressed by SW who says the quotes appear to be excessive for the works required in comparison to industry rates specified within Rawlinsons Australian Construction Handbook 2023. SW also notes that the quotes include optional extras including heating, lighting, and cleaning facilities to the pool which do not appear to be present in the damaged pool.
SW says:
In our opinion, the only works required for a like-for-like replacement of the pool would entail the following:
a. Removal and replacement of the 10m x 4m in-ground fibreglass pool, inclusive of all necessary pipework, skimmer, filter, pump and drainage system.
b. Cranage provisions for transporting pool into rear yard.
c. Removal and replacement of pavers and coping, inclusive of foundation preparation.
d. Removal and replacement of pool fencing, in facilitating access to undertake works.
e. Inclusion for DA/CDC documentation preparation and submission.
Given the wide range in quoted prices, I consider it fair for the insurer to obtain three quotes for the items listed by SW, recommend a panel builder to be engaged to provide quotation on the abovementioned works, in order to obtain a fair and reasonable cost estimate.
I agree with SW that the three highest quotes appear to be excessive and include additional features, and I note that the difference between the lowest and highest quotes is more than $100,000. Given this, I do not consider these quotes to be reasonable estimates of the cost to replace the pool
The insurer’s liability is limited to replacing the complainants’ pool to a condition substantially the same as, but not better than, when new. The complainants therefore are not entitled to the cost of rebuilding a different or better pool, or to the cost of additional features. They are entitled to the cost of replacing the pool with a pool of the same standard.
Given the above, I consider the settlement method proposed by the insurer’s engineer above to be fair and reasonable.
Should the complainants accept this determination, the insurer is to obtain three actionable quotes to repair the pool as detailed by SW and set out above. The insurer is to pay the complainants an amount equal to the highest quote plus 10% to compensate them for the loss of the insurer’s lifetime warranty on the works.
Given the quoted amounts will be actionable and therefore will have up to date pricing, I do not consider it fair for the insurer to pay interest on this amount.
Is the insurer entitled to deny the complainants’ claim for damage to their external roof?
Yes. Given the exchanged material the insurer is entitled to rely upon the terms and conditions of the policy to deny the complainants claim for damage to the external roof.
Circumstances of the loss and damage to the external roof
As stated, the insurer’s builder JL attended the property on 21 April 2022 to inspect the damage.
Regarding the roof and corresponding ceiling damage, JL noted the following:
rainwater breached the ceiling lining in the office
an assessment of the main roof above noted cracked/deteriorated lead apron
flashings due to age, wear, and tear with large amount of foil tapes applied on top, suggesting a previous or ongoing issue.
It was JL‘s opinion that rainwater entered the ceiling cavity via the cracked and deteriorated lead apron flashing, in turn breaching the office ceiling lining below. JL also said the complainants would reasonably have been aware of the issue given the previous repairs.
Based on the JL roof report the insurer denied the claim for damage to the external roof but accepted the resultant damage to the study.
As stated, the complainants must show that the damage to the roof was caused by the storm or was due to accidental damage.
They say the fact that the mould and water stains on the gyprock ceiling in the study only started appearing a few weeks after the 8 March 2022 storm event shows the damage to the roof above the study was caused by the storm.
I do not consider the fact the roof allowed water ingress for the first time necessarily means the roof was damaged in the storm, or that the damage was unintended and unexpected. I note the experts' reports indicating that almost four times the monthly average rainfall was received in March 2022.
I am not satisfied the complainants have provided any information to establish that the damage to the roof was sustained during the storm or that it occurred accidentally and suddenly.
I am satisfied that the report from SB is supported by helpful photographs showing no clear storm damage to the roof, but that the lead apron has been taped up previously supporting that the roof damage and point of ingress predates the storm event.
I am satisfied that the policy does not provide coverage for this damage.
The complainants have not met their onus to establish a loss covered by the terms and conditions of the policy.
The result is that the insurer is entitled to deny the complainants claim for damage to the external roof.
Are the complainants entitled to interest on the cash settlement payment?
Yes. The complainants are entitled to be paid interest on the cash settlement amount paid for damage to the study and pergola from the date of the accepted quote.
Interest is payable from date of claim acceptance
Interest will normally be awarded if AFCA accepts the consumer is owed a sum of money under the policy.
Interest will not likely be awarded when:
the financial firm is liable to repair or replace the relevant item; or
AFCA determines that the relevant sum to be paid is based on current rates.
Interest is payable from the date it was unreasonable for the financial firm to have withheld payment of the amount it was liable to pay. This will usually be:
the date the claim was denied
if there has been an unreasonable delay before the financial firm denied the claim – an earlier date that is considered reasonable; or
the date when the benefit was due to be paid under the policy
AFCA may also take into account other factors, such as whether a consumer has unreasonably failed to provide information reasonably requested by the financial firm.
The exchanged information shows the insurer accepted the claim for damage to the pergola and study ceiling on 27 June 2022. On 14 November 2022 the complaint provided the insurer with quotes for repairs and the parties agreed to use these quotes, plus a 20% contingency, as the basis of the cash settlement.
There is some misunderstanding between the parties regarding the actual payment of the quote amounts to settle the claim for these items.
The complainants say they communicated to the insurer they wanted a cash settlement for these parts of the claim. The insurer says it understood the complainants wanted to cash settle the entire claim and that therefore this could not occur until the matter of its liability for damage to the pool and the external roof had been finalised.
Given the insurer agreed to use the complainants quotes plus 20% as the basis of a cash settlement for the claim, which were provided to it on 14 November 2022, I consider it was unreasonable for the insurer to withhold payment from this date.
Therefore, it is fair for the insurer to pay interest on the $990 (plus 20%) agreed settlement for the pergola repairs and $3080 (plus 20%) for the study repairs from 14 November 2022 until the date the payment was made to the complainants.
Interest is to be calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth).
Are the complainants entitled to professional costs?
Yes. The complainant is to be paid the costs of their engineering reports up to $5000 in accordance with the AFCA rules.
Insurer can be required to contribute to complainants’ professional costs
Under its rules, AFCA can decide that the insurer is to contribute to the professional costs incurred by the complainants in the course of the complaint. Unless special circumstances apply, AFCA will not require the insurer to contribute more than $5,000 to these costs.
I am satisfied the complainants needed an expert engineer's opinion to respond to the insurer’s arguments, and that it is fair for the insurer to contribute $5000 to the complainants’ costs in engaging engineer PX.
I do not consider special circumstances apply justifying a greater contribution. The complaint did not involve complex financial calculations or complex or novel legal issues.
Further, I do not consider the earlier reports from ISP and MW obtained by the complainants were helpful in resolving the issues given neither were qualified engineers.
The complainants say they should be reimbursed the costs of the MW report and his interstate travel because he could not find a local expert willing to do the job. I do not consider this amounts to special circumstances requiring the insurer to contribute more than the $5000 cap.
Given the above, I consider it fair for the insurer to contribute $5000 towards the complainants’ professional fees.
Are the complainants entitled to compensation for non-financial loss?
No. I consider the insurer’s offer to pay the complainants $5400 compensation for non-financial loss in recognition of the claims handling issues is fair and reasonable, and I do not consider a further payment is warranted in the circumstances.
AFCA can award up to $5,400 compensation for non-financial loss
Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,000) where the insurer’s actions have caused an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainants’ expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect complainants to bear a normal degree of inconvenience during a claim.
Complainants say insurer mishandled the claim
The complainants make several allegations regarding the insurer’s conduct, including that it delayed in making cash settlement payments for accepted damage to the pergola and study and that it made misleading statements and failed to inform them of their entitlement to interest payments.
The complainants say due to the poor manner in which the insurer managed the claim they both experienced considerable stress and anxiety and their mental health was compromised.
The insurer has agreed to pay the complainants $5400 compensation for non-financial loss as a goodwill gesture.
While I accept the complainants have found the claims experience stressful, I consider the insurer’s offer of $5400 is fair and reasonable, and note it is the maximum amount AFCA can award under its rules. I do not consider a further amount is warranted in the circumstances.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainants, regarding the claim.
Supporting Information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.