Determination 12-00-906838

Water damage claim partly declined: roof, bathroom and toilet excluded, cash settlement offered

FirmHollard
Decided2024-07-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$104,850
Non-financial loss$5,000
Amount claimed$50,000
SourceAFCA PDF

Summary

After a burst kitchen pipe, the complainant sought full repair of roof, bathroom and toilet damage and extra contents money. AFCA found those areas not covered, but ordered the insurer to re-scope mould remediation, pay half the quote plus uplift, process the contents cash settlement and pay $5,000 non-financial loss.

Damage from pre-existing maintenance issues and slow, gradual leaks is not covered, though the insurer must share mould remediation costs because its contractor likely accelerated the spread.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossreassess claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination | Case number | 906838 | Financial firm | Hollard Insurance Partners Limited Case number: 906838 12 October 2023 Determination overview Complaint The complainant holds a home and contents policy with the financial firm (insurer). On 19 May 2021, she contacted the insurer to lodge a claim for damage to the property caused by a sudden escape of liquid. The insurer partially accepted the claim for damage to the building and offered a cash settlement. The insurer says it is unable to warrant the building repairs as the property has maintenance issues that are not caused by an insured event. The complainant disagrees and is seeking for the building claim to be accepted in full, together with additional temporary accommodation, an additional amount for contents, a formal letter of apology and compensation for stress caused by poor claim handling Issues. Is the insurer entitled to cash settle the claim? Yes. The insurer is entitled to cash settle the claim. The insurer has provided information to show that the property has significant maintenance issues that require repair by the complainant at her own cost. Is the insurer required to increase the building cash settlement offer? Yes. The insurer must increase the building cash settlement amount for mould remediation as detailed in section 2.1 of this determination. Is the insurer entitled to decline the claim for the damage to the areas in dispute? Yes. The available information shows, on balance, the insurer is not liable for the damage to the roof, bathroom and toilet. Is the insurer is required to increase the settlement amount for contents? No. The available information shows the insurer has accepted the contents claim as total loss. Further the complainant has not provided any information to support the loss of items she is disputing. Is the insurer is required to pay for an additional amount for temporary accommodation? No. The insurer has offered a cash settlement for temporary accommodation to the policy limit. Is more in non-financial loss compensation payable? No. The information available shows the insurer has handled the complaint in a reasonable manner within the relevant guidelines. However, recognising the complainant’s vulnerability the insurer has offered $5,000 as ex gratia which represents reasonable compensation. Determination The determination is mostly in favour of the insurer. The insurer must: re-attend to scope the site for mould remediation pay the complainant 50% of the quote for mould remediation, with a 15% uplift for contingencies process the payment for contents’ cash settlement pay the complainant $5,000 in non – financial loss compensation. Reasons for determination Is the insurer entitled to cash settle the claim? Yes. The insurer is entitled to cash settle the claim. This is because, the insurer has provided information to show that the property has significant maintenance issues that require by the complainant at her own cost. Circumstances of loss On 19 May 2021, the complainant lodged a claim for water damage to the property caused by a burst flexible pipe under the kitchen sink. The damage observed from this event was to the kitchen, lounge room, laundry and hallway. The insurer accepted the claim and engaged restorer SR for mould remediation. The complainant contacted the insurer advising the restorer’s actions caused cross contamination and as a result mould had spread to other areas at the property which were not previously affected. Given the health concerns of the family members, the insurer engaged plumber TBP to identify any further leaks at the property and hygienist IECL to determine if mould contamination was present and how to proceed with remediation. Additional assessments were arranged to address the complainant’s concern over mould growth and to assess further damage. The insurer identified multiple maintenance related issues with the roof, drainage, shower base and toilet at the property that were not caused by an insured event. As the issues identified were extensive the insurer offered the complainant a cash settlement for the accepted portion of repairs. The complainant disagrees as she says all damage surfaced after the escape of liquid event. She also says that the property was left unattended for too long due to insurer delays that led to additional damage to the property. Therefore, the insurer should be liable to cover the costs required for these repairs. Complainant to establish a claimable loss The initial onus lies on the complainant to establish, on the balance of probabilities, that the loss arose from an event covered by the policy. This is referred to as a valid claim. If a claimable loss is established, the insurer then has the onus of establishing an exclusion applies, or that it is otherwise entitled to decline the claim. The policy is an insured events policy. It provides cover for loss or damage for escape of liquid from defined sources, however, is subject to exclusions and conditions. There is no dispute that the property sustained damage. However, a dispute has arisen over whether all the damage was caused by the escape of liquid event. The damage in dispute is the leak to the roof, toilet, bathroom and resultant mould found through the property. Given the damage in dispute is to the areas that were not immediately affected by the escape of liquid from the kitchen. The panel is satisfied that the complainant has the onus to establish that an insured event has caused damage to the above-mentioned areas. Information shows insurer will not be able to warrant repairs The insurer accepted the damage caused from the escape of liquid in the kitchen. TBP and builder QAT concluded that the property has multiple leaks and drainage issues. Given the extent of the maintenance issues the insurer decided to offer cash settlement. QAT identifies that the front elevation has pavers installed minimising flow of water and allowing it to pool. QAT says the house has minimum fall with signs of water ponding and a strip drain installed which is higher than floor level. Further, the roof gutters have rust with big holes allowing water to discharge near the rooms and not the storm drains. Based on the above, rain or storm water does not have adequate channels to flow away from the property. Rather, water tends to pool, eventually seeping into the walls of the surrounding rooms overtime causing moisture to build up. Therefore, the property continues to have elevated moisture levels and mould issues. The panel is satisfied that given these issues it would not be reasonable for the insurer to complete repairs until the property is water tight and the maintenance issues have been rectified by the complainant at her own cost. Accordingly, the panel is satisfied that it is fair that the insurer cash settle the claim. Is the insurer required to increase the building cash settlement offer? Yes. The insurer is required to increase the cash settlement offer to assist in mould remediation. Insurer to increase the cash settlement for mould remediation The insurer engaged SR to complete mould remediation before repairs could commence. Because of this, mould remediation was limited to the kitchen. Once notified by the complainant that mould had spread to other areas of the home, further assessments were organised to determine whether cross contamination occurred. Hygienists IECL and ELS concluded that inadequate drainage and roof leaks were the main cause of high moisture levels in the bedrooms. IECL and ELS identified that missing silicon in the bathroom allows water to penetrate through wall linings. There is no dispute that the property has extensive mould and that it is not suitable to be occupied unless the whole property has been remediated for mould as recommended by experts. However, a dispute has arisen over whether the presence of mould in other areas of the property was solely caused by SR’s remediation method. The panel notes that SR did not provide a post remediation certificate and that it was unable to retest moisture levels in the kitchen, carpet and walls in the bedroom after remediation was completed. Further it is unclear if the kitchen was isolated during mould remediation to avoid cross contamination. Given the poor condition of the property, The panel considers it is likely that high moisture levels were already present throughout the property. However, there is a possibility that cross contamination during remediation allowed mould spores to reach other areas of the property where the existing high moisture levels worsened the spread of mould. Given this, the panel is satisfied that the cause of the mould contamination at the property is from a combination of the pre-existing condition at the property and the escape of liquid. The panel accepts that the insurer is not solely liable to cover the cost of mould remediation. However, the panel accepts that SR’s actions likely have accelerated the mould spread. Accordingly, the panel is satisfied that the insurer should contribute towards mould remediation. The insurer is to scope the property for mould remediation. Once completed, the insurer is to pay 50% of the remediation quotation with a 15% up lift for contingencies. The remediation quotation is to be actionable. Is the insurer entitled to decline the claim for damage to the areas in dispute? Yes. The available information shows that the damage in dispute was not caused by a single insured event that the policy responds to. Therefore, the insurer is not required to accept the damage to the areas in dispute. Insurer not liable for roof replacement The complainant says the water staining on the bedroom ceiling was caused due to heavy rains and cyclonic weather that occurred over weeks prior to the assessments done at the property. She says she had the house repainted in 2020 and that there were no stains and damage to the ceiling. The policy covers damage or loss caused by storm however, it does not cover loss or damage caused by rain or wind which entered the building through an opening not created by the storm. The insurer accepted the internal damage to the stained ceilings and has included the cost of insulation, painting, plastering to these areas in the QAT scope of works. However, it maintains that it is not liable to cover the cost of roof replacement. It says the damage to the roof itself occurred overtime and is not caused by any single insured event. Plumber NP inspected the site on 31 May 2022 and found: the roof had debris accumulating under solar panels and gutters, the lead apron flashings were cracked in multiple locations, there were broken tiles, flat tile clips and cracked ridge cap pointing. The same issues were identified later in the QAT report with recommendations that a roof replacement was required to make the property watertight. After carefully reviewing the relevant reports the panel agrees that all the above roof issues would allow water to stop from flowing down the roof, causing pooling and allowing capillary action causing water ingress into the home. This is confirmed in the stains found on the timber battens that occurs overtime and not from an insured event. While the panel acknowledge that the complainant may not have known about the extent of damage to the roof, however, it does not mean that these issues did not exist or that they were caused by a single event. On balance, the panel accepts that the damage to the roof occurred overtime, rather than from a single storm event. In addition to this the panel notes that the complainant has not been able to provide any information to support that the damage to the roof was caused by a single insured event. Based on the reasons above, the panel is of the view that the damage to the roof is not caused by any single insured event the policy provides cover for. Accordingly, the panel is satisfied the insurer is not required to cover the cost of repairs or replacement of the roof. Increased moisture level in the bathroom and toilet is excluded The complainant says that the bathroom was renovated by a licensed plumber and that there were no signs of damage. She also says that the TBP assessment occurred 5 months after the escape of liquid and that the damage could have occurred during that period. She also says that the toilet started leaking after the insurer engaged trades to attend the property to strip out the kitchen. The complainant says that the baby wipes and tissues found near the external pipework were left behind by the insurer trades. However, the complainant has not provided any evidence to support these statements. The insurer says that the high moisture levels in the bathroom and the toilet are caused by sources that are not covered by the policy. The insurer engaged plumber TBP to do a leak detection test to identify any additional issues. TBP concluded that the shower recess is the cause of the leak in the bathroom. It also identified 2 separate points of leak in the toilet. One was to the pan collar in the internal toilet pipe and the other on the external drainage pipe. QAT identified the high moisture level in the toilet was a result of combination of the roof leak and drainage issues which impacted the bedroom wall which shared a common wall with the toilet. For the policy to respond to the escape of liquid, the loss or damage must be from one of the defined sources outlined in the policy. The complainant has not provided any information or expert report to show that the leak has occurred from any of the defined sources the policy provides cover for. Having carefully reviewed the TBP report, the panel agrees that the leak in the bathroom was from the shower recess. This is confirmed from the thermal imaging undertaken by TBP, which shows the shower recess failed the flood test. As a result, the leak has caused water to ingress into the surrounding room and shower base which is not covered. The panel accepts that the leak found in the internal pan collar and external pipework of the toilet is not covered as the pipe itself should be repaired by the complainant at her own cost as the policy does not cover repairs for the item that caused the leak .Further the nature of the leak identified was slow and gradual which is specifically excluded by the policy. In addition to this the panel accepts that the significant drainage issues and roof leak has caused the high moisture levels in the toilet walls which again is not a defined source that the policy covers. Accordingly, the panel is satisfied the insurer is not required to cover the cost of repairs to the bathroom and the toilet. Is the insurer required to increase the contents cash settlement offer? No. The available information shows the insurer has accepted the claim for the full sum insured including 25% gap cover. Further the complainant has not provided any proof of loss for the items she is claiming for. Insurer has settled the contents claim as a total loss The insurer has accepted the contents claim for total loss as per the full sum insured of $86,396. The insurer further included 25% gap cover increasing the amount to $104,850.00 as the contents claim exceeded the sum insured. The complainant is also seeking an additional $50,000 as she says the restorers engaged by the insurer threw away items such as her grandfather’s ashes, vintage bottle of alcohol and Rolex watches. She says the actions of the insurer caused immense distress in a situation when she and her family were already struggling. The complainant must provide proof of ownership, and replacement costs for items she is seeking cover for. Further the complainant should also be able to establish that these items weren’t damaged during the escape of liquid. The complainant has not been able to provide any evidence to show that the she owned the items she is claiming for or that the items weren’t damaged during the escape of liquid. Further, she has not been able to provide any information to support her position that the restorer’s actions caused the loss. The panel understands it is difficult to put a cost on items that are of significant emotional value. However, the policy does not respond to or provide cover for items of sentimental value. In addition to this, consideration needs to be given that the insurer has already paid over and above what the complainant is entitled to under the policy. Given the absence of information, the panel agrees that it will not be fair or reasonable for the insurer to increase the cash settlement to an amount that has been presented purely based on emotional loss without any supporting evidence to show otherwise. Accordingly, the insurer is not required to increase the contents cash settlement offer. This payment if not already processed is to be made within 14 days of receiving notice of the complainant’s acceptance of this determination. Is the insurer required to pay an additional amount for temporary accommodation? No. The insurer has already paid the alternative accommodation costs for up to 52 weeks which is the policy limit. It would not be fair for the insurer to pay an additional amount for temporary accommodation beyond the policy limit. Insurer is not required to pay an additional amount for temporary accommodation The policy entitles the complainant to alternative accommodation cover for a period of up to 52 weeks. The complainant says the insurer should be liable for additional accommodation benefits as it unreasonably delayed the claim making the property condition worse. She also says additional temporary accommodation should be considered due to her and her family’s vulnerabilities. While the panel accepts the property is not habitable, it does not agree it is solely because of the insurer’s actions. As the above-mentioned information shows the property has significant maintenance issues that the insurer is not liable for. These issues are required to be completed to make the property watertight, so mould remediation can be completed for the escape of liquid related repairs to be performed. Further the insurer has paid the temporary accommodation benefit to the complainant as per the policy limit. While it recognises the complainant’s vulnerabilities, the insurer says, it has exhausted the additional benefit the complainant is entitled to. The panel notes the insurer has already paid $160,000 towards the temporary accommodation for 52 weeks which is in line with the policy terms and conditions. In addition to this, the insurer offered the cash settlement for the repairs and contents items to the complainant on 2 September 2022. However, the complainant refused to accept the offer as she was seeking for the insurer to cover the cost of all the damage. This has further contributed to the delays, because if the complainant accepted the offer she could have begun the repairs required to make the property habitable. Due to the reasons above the panel is satisfied the insurer is not required to pay an additional amount towards temporary accommodation. Insurer to settle storage benefit once sufficient evidence provided The complainant is also seeking the storage cost benefit from the insurer. She says the she was advised over the phone that she is entitled to this benefit however, is not aware what information the insurer requires so she can access it. The policy entitles the complainant for storage costs up to 120 days. The insurer says that the complainant is required to provide either a quotation or invoice and once received the insurer’s claims team will be able to reimburse the complainant. Is the complaint entitled to further non-financial loss compensation? No. The information available shows the insurer has handled the complaint in a reasonable manner within the relevant guidelines. However, recognising the complainant’s vulnerability the insurer has offered $5,000 as an ex gratia payment which represents reasonable compensation. AFCA can award compensation for poor claim handling Under AFCA rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of stress, inconvenience, or delay because the insurer mishandled the claim. Insurer’s offer of compensation is fair The complainant says the insurer caused unreasonable delays causing her and her family immense stress and inconvenience as a result. While the panel acknowledges the complainant must have found the process stressful and together with her family’s vulnerability the event has caused trauma. The panel notes the delays were a combination of multiple assessments required as further damage was identified and because of the catastrophic events that occurred around the time the claim was on foot. This caused further challenges for the insurer in organising the relevant experts to do these assessments which was not within its control. Further, a review of claim notes shows the insurer offered vulnerability support to the complainant on multiple occasions however, she declined. The insurer has acknowledged that the complainant found the claim process challenging, stressful and inconvenient. It has offered $5,000 in compensation. The panel is satisfied this offer reasonably addresses the stress the complainant experienced due to the claims handling process. The insurer is required to pay the complainant $5,000 in total as non-financial loss compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: an ombudsman a member with significant experience in consumer and small business advocacy a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.