Determination 12-00-877293

Foundation and internal cracking damage from escape of liquid claim denied as excluded

FirmIAG
Decided2025-01-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$5,000
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed foundation and internal damage to his investment property from an escape of liquid from a neighbouring property, which the insurer largely denied as excluded. AFCA found the disputed damage was caused by the covered event, ordered all claim-related repairs and loss of rent, reimbursement of $5,000 expert costs with interest, and $3,000 non-financial loss compensation.

Where the insured event is the proximate cause of earth movement and resulting damage, the earth movement exclusion does not apply, and the insurer bears the onus of proving any exclusion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial lossrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-877293 | Financial firm | Insurance Australia Limited Case number: 12-00-877293 28 November 2024 Determination overview Complaint The complainant holds home building insurance with the financial firm (insurer), covering his investment property. In July 2019, he lodged a claim for damage said to have been caused by escape of liquid (EOL) from a neighbouring property. The insurer accepted the resultant damage to the kitchen and bathroom but denied liability for damage to the foundations and related internal cracking. It says that damage was not caused by an insured event but was due to excluded building defects and long-term soil movement. The complainant wants the insurer to accept the claim in full and attend to all claim-related repairs. He also seeks payment for loss of rent (LOR), reimbursement of expert costs, and non-financial loss compensation for stress and inconvenience. Issues and key findings Is the insurer required to accept the disputed damage? Yes. The panel is satisfied that it is more likely than not the disputed damage was due to the EOL rather than excluded causes. The insurer is to accept all the claim related repairs. Is LOR payable? Yes. The tenant vacated the home due to claim related habitability issues. The insurer is to pay LOR from the date the home was vacated until it was re-tenanted or expiry of the maximum 12-month period. If the home was re-tenanted within 12 months, the remainder of that period is to be applied when the home is unliveable during the repair process. Is the insurer required to reimburse expert costs? Yes. The complainant’s expert reports have assisted him in establishing a greater entitlement to indemnity. The insurer is to reimburse up to $5,000 of his expert costs and pay interest on that amount. Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have unreasonably caused the complainant stress and inconvenience. It is to pay him $3,000 in compensation. Why is the outcome fair? As the disputed damage is due to EOL rather than excluded causes, it is fair that the insurer accepts all claim-related repairs and pays LOR. The insurer’s poor claim handling means it is also fair that the insurer reimburses expert costs and pays compensation. Determination This determination is in favour of the complainant. Upon receiving the complainant’s written notice he accepts this determination the insurer is to:  if the complainant wants it to attend to repairs, promptly arrange for claim related repairs, including to the disputed damage, to commence  if the complainant elects to be cash settled, follow the process set out in section 2.1 below  attend to the assessment and payment of LOR in accordance with section 2.2 below  within 14 days of receiving proof of payment, reimburse the complainant for $5,000 of his expert engineering costs, and pay interest pursuant to section 57 of the Insurance Contracts Act, 1984 (Cth) (ICA) from the date of the invoice that resulted in the $5,000 figure being reached, until the reimbursement is paid  within 14 days, pay the complainant $3,000 in non-financial loss compensation. Reasons for determination Is the insurer required to accept the disputed damage? Yes. The panel is satisfied that it is more likely than not the disputed damage was due to the EOL rather than excluded causes. The insurer is to accept all the claim related repairs. Complainant must show claimable loss under the policy terms ​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a claimable loss under the policy. This means he must show the loss was caused by a risk for which he is insured. ​Subject to the terms and conditions set out in the product disclosure statement (PDS), the policy covers loss or damage to the complainant’s home caused by a listed insured event. The insured events include ’Storm’ and ‘Water and oil leaks’ (EOL). The complainant also purchased optional accidental damage cover, meaning the home was covered for loss or damage caused unintentionally. That cover only applies if an insured event does not. ​On 29 July 2019, the complainant notified the insurer that the home had sustained damage because of an EOL for six weeks from a neighbouring property. The insurer initially denied the claim but subsequently accepted the resultant damage to the kitchen and bathroom. To that extent, it has accepted the complainant has established a claimable EOL loss. However, the insurer maintains that the complainant has not established a claimable loss in relation to the damage to the home’s foundations and related internal cracking. ​Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. Insurer denied disputed damage The insurer’s appointed engineer FE inspected the home on 19 May 2020 and concluded: The cracking of internal linings and misalignment of timber flooring is considered to be the result of movement and differential settlement of the structural foundations attributed to abnormal moisture conditions in the foundation soils due to the prolonged exposure to overland water flow as a result of the plumbing issue on the neighbouring property to the south of the dwelling. In a report dated 12 May 2021, plumber AP advised that the shower base had failed flood testing due to a lack of adequate waterproofing. After reviewing AP’s findings and the lease entry condition report prepared prior to the claim event, FE provided a report dated 6 August 2021, in which it said:  the cracking to the lounge room wall linings, bathroom ceiling linings, and laundry floor tiles were due to foundation soil movement and differential settlement of the foundations as a result of abnormal foundation soil moisture conditions  the abnormal foundation soil moisture conditions were caused by water coming through the bathroom’s failed waterproofing over an extended period  that damage was pre-existing, but may have been exacerbated by the claim event  the cracking to internal linings elsewhere in the home and the misalignment of the kitchen floor was caused by the claim event, as described in the conclusion of its first report. However, after reviewing the report dated 24 June 2022 from the complainant’s engineer NE, FE provided a further report dated 16 September 2022 in which it stated that:  it agreed with NE that ‘Most if not all the damages could be attributed to the flooding [claim] event and the subsequent shrinkage and settlement of the foundations’  movement of the dwelling footings/piers was the result of the claim event  to the extent concrete stumps/piers had settled more than 40mm, they required removal and replacement with appropriate brick piers and concrete footings  following a drying period, the foundation soil would return to normal moisture conditions, and the claim event would cease to cause further movement. In a report dated 7 July 2023, FE said it did not disagree with the complainant’s second engineer NS that the damage it had previously said was pre-existing could be related to storms in 2018 and 2019. However, FE said that required further investigation. After reviewing rainfall data, on 2 November 2023, FE said the pre-existing damage was not storm related but was the result of long-term changes in soil moisture content. The insurer says the complainant has not established on the balance of probabilities that the damage to the home’s foundation and any related internal cracking was the result of EOL or storm. It submits that damage was more likely than not due to excluded causes as the policy does not cover:  damage arising from: > gradual deterioration, wear or tear (PDS page 65) > earth movement (PDS page 65) > faulty design or workmanship (PDS page 66) > previous unrepaired damage (PDS page 66) > the home not being maintained in good repair and condition (PDS page 66)  the settling, shrinkage or expansion of foundations (PDS page 66). Complainant wants disputed damage accepted In its report dated 24 June 2022, engineer NE said:  the EOL claim event had caused flood induced soil movement settlement under the load from the home, causing damage to the piers  that had in turn caused internal cracking and flooring unevenness throughout the home  ‘Most if not all the damages could be attributed to the flooding event and the subsequent shrinkage and settlement of the foundations’. The complainant also relies on the report dated 26 May 2023 by engineer NS. NS concluded: there is a considerable likelihood, exceeding 50%, that the observed damage to the insured property can be attributed to an insurable event, notably sewerage flow from the neighbouring property and the significant storm that took place on 22nd March 2018. This indicates that the damage is not primarily the result of general movement over time, gradual deterioration, structural defects, or faulty workmanship. It is crucial to emphasize that the property seems to have been properly maintained in accordance with the relevant standards. NS provided a second report dated 16 August 2023, in which it:  confirmed its view the home was consistently and properly maintained  stated that due to intense storm events in 2018 and 2019, there was notable surface runoff from neighbouring properties, as well as severe and overwhelming local flooding  the flooding likely intensified existing differential issues typically found in reactive clay soils  the floodwater remained on site for some time, and this could have softened and weakened the foundation soil, causing further sinking  there was no evidence of pre-existing structural defects and/or faulty workmanship, or of gradual movement over an extended period  it therefore stood by the conclusion set out in its first report. On 9 October 2023, NE provided its second report, stating it agreed with NS as to the likely contribution of the 22 March 2018 storm, and otherwise reiterated its previous conclusions. In a desktop report dated 22 November 2023, engineer AS commented on the reports of FE, NE and NS. According to AS: In conclusion, we find the assessments made by [NE] and [NS] to be well-supported by their observations, with valid logic and reasoning. There is no reason to doubt the technical accuracy of observations or logic used by either [NE] or [NS]. In the circumstances, the complainant submits that the insurer should accept the claim in full and attend to claim-related repairs. Insurer required to accept disputed damage Based on the exchanged information, the panel is satisfied that it is more likely than not the disputed damage was due to the EOL rather than excluded causes. This is because:  the conclusions of NE, NS and AS are consistent and to the extent FE has reached a different conclusion, the panel finds the reports of NE, NS and AS more persuasive  FE agreed with NE that ‘Most if not all the damages could be attributed to the flooding [claim] event and the subsequent shrinkage and settlement of the foundations’  FE also agreed movement of the dwelling footings/piers was the result of the claim event. The insurer was previously willing to attend to the kitchen and bathroom repairs. As the panel has determined the insurer is also liable for the foundation damage and any resultant other internal damage, it should therefore attend to all claim related repairs. Alternatively, if the complainant informs the insurer he wants a cash settlement, the insurer is to take the following steps:  within 14 days of being informed the complainant wants a cash settlement, appoint an engineer other than FE to prepare a SOW encompassing claim related repairs, including the disputed damage  within 14 days of receiving that SOW, request from two builders quotes on the current, retail cost of attending to the claim related repairs and estimates of for how long the home will be unliveable during the repair process  within 14 days of receiving the quotes, provide the SOW and the quotes to the complainant and pay him the higher quoted amount plus 25% (or, if the building sum insured is exceeded, the sum insured). The insurer is entitled to apply any relevant policy excess yet to be paid. Is LOR payable? Yes. The tenant vacated the home due to claim related habitability issues. The insurer is to pay LOR from the date the home was vacated until it was re-tenanted or expiry of the maximum 12-month period. If the home was re-tenanted within 12 months, the remainder of that period is to be applied when the home is unliveable during the repair process. Policy covers LOR in specified circumstances The PDS confirms on page 41 that where a listed event causes damage to the insured home meaning the insured’s tenants cannot live in it and need to move out so it can be repaired, the insurer will pay LOR for the reasonable repair period (capped at 12 months as a maximum). Insurer is to pay LOR The insurer says it is not obliged to pay LOR. It submits that the home was not rendered unliveable by an insured event and notes the complainant’s tenant continued to reside there. The complainant has provided an email from his managing agent. The agent notes various rental credits were given to the tenant due to interference with their quiet enjoyment of the home caused by make safe work and expert investigations. The email also says: 17/04/2023 – credit $871.44 for final 2 weeks rent + water as compensation for mould damaged items and loss of belongings since insurance event It is therefore reasonable to conclude that by the beginning of May 2023, the tenant had vacated the home due to habitability issues associated with mould and other damage caused by the claim event. Therefore, subject to the complainant providing relevant information requested by the insurer on the lease, precisely when the tenant vacated, and when/if the home was re-tenanted, the insurer is to pay him LOR for the period up to the re-tenanting or 12 months (whichever occurred first). Further, If the home was re-tenanted within 12 months, the remainder of that period is to be applied when the home is unliveable during the repair process. If the complainant elects to be cash settled for the building repairs pursuant to section 2.1 above, the insurer is to also cash settle his entitlement to LOR during the repair process based on the higher of the two builders’ estimates plus 25%, but subject to the 12 month maximum period. Is the insurer required to reimburse expert costs? Yes. The complainant’s expert reports have assisted him in establishing a greater entitlement to indemnity. The insurer is to reimburse $5,000 towards his expert costs and pay interest on that amount. AFCA may require insurer to contribute to a complainant’s professional costs The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by the complainant. These costs are, however, usually capped at a total of $5,000. When considering whether to require an insurer to make a costs contribution, AFCA considers matters such as the complexity of the complaint and whether the complainant needed to incur costs to understand or establish their claim. Insurer is required to reimburse expert costs The reports of NE, NS and AS have assisted the complainant in establishing a greater entitlement to indemnity. However, the cost of their reports has exceeded the $5,000 AFCA cap. In the circumstances, the insurer is to reimburse the complainant $5,000 and pay interest under section 57 of the ICA on that amount from the date of the invoice the resulted in the $5,000 figure being reached, until the reimbursement is paid. Is non-financial loss compensation payable? Yes. The insurer’s poor claim handling and delays have unreasonably caused the complainant stress and inconvenience. It is to pay him $3,000 in compensation. AFCA can award compensation for poor claim handling Under paragraph D.3.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of physical inconvenience, time taken to resolve the situation, interference with the complainant’s expectation of enjoyment or peace of mind. ​​​Insurer is to pay non-financial loss compensation The complainant says the insurer’s poor claim handling and extensive delays have caused him considerable stress and inconvenience. The insurer says it has previously paid $6,205 to the complainant on a goodwill basis, which exceeds AFCA’s maximum compensation amount, such that further compensation may not be awarded. However, the $6,205 was comprised of costs the complainant had incurred. The panel also notes that during the complaint the insurer offered to pay the complainant a further $2,000 in compensation. The panel accepts that the insurer’s poor claim handling has caused the complainant notable stress and inconvenience. However, the panel also notes the complainant did not reside in the home and did not rely solely on it for income. Balancing those issues, the panel is satisfied it is reasonable to require the insurer to pay $3,000 compensation. Why is the outcome fair? As the disputed damage is due to EOL rather than excluded causes, it is fair that the insurer accepts to all claim-related repairs and pays LOR. The insurer’s poor claim handling means it is also fair that the insurer reimburses expert costs and pays compensation. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.