Whether the firm was entitled to pass on bushfire rehabilitation costs, road construction costs and interim management fees to the investor
Text of the determination
Determination
|
Case number
|
12-00-745547
|
Financial firm
|
Agriwealth Capital Limited
Case number: 12-00-745547 30 June 2026
1 Determination overview
1.1 Complaint
In 2004, the complainant invested in a primary production managed investment scheme. He purchased seven units in the land trust and seven plantation interests in the associated managed investment scheme (Project). The financial firm is the trustee of the trust and responsible entity of the Project.
In 2019-2020, bushfires substantially damaged the forestry plantation trees. The financial firm arranged to rehabilitate the land and passed the rehabilitation costs on to the investors. It also invoiced for interim management fees and passed on road construction costs. The complaint is about whether the financial firm was entitled to do so.
AFCA issued a preliminary assessment (recommendation) in favour of the financial firm. The complainant rejected the recommendation. A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings in the recommendation correct?
The recommendation incorrectly categorised the road construction costs as rehabilitation costs when they were not. This does not materially change the outcome of the complaint because the financial firm was also entitled to pass on the road construction costs. Aside from this, the findings in the recommendation were correct and are adopted in this determination.
The complainant made further submissions, but for the reasons set out in this determination, I am satisfied they do not change the outcome.
Why is the outcome fair?
The outcome is fair because the financial firm acted in accordance with the terms of the investment. It was entitled to pass on the costs to the complainant and did not incorrectly charge management fees. It would therefore not be fair to require it to compensate the complainant for those costs.
1.3 Determination
This determination is in favour of the financial firm. The financial firm is not required to compensate the complainant.
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
The recommendation incorrectly categorised the road construction costs as rehabilitation costs when they were not. This does not materially change the outcome of the complaint because the financial firm was also entitled to pass on the road construction costs. Aside from this, the findings in the recommendation were correct and are adopted in this determination.
The complainant made further submissions, but for the reasons set out in this determination, I am satisfied they do not change the outcome.
The recommendation made key findings
I am satisfied the recommendation contains an accurate summary of the complaint, the issues to be determined, and the relevant law. The findings in the recommendation are correct and are adopted in this determination.
The recommendation found the financial firm operated the Project according to the Forestry Management Agreement (FMA) between the financial firm and the complainant and was able to:
· rehabilitate the land
· charge investors for the rehabilitation costs
· charge management fees
· deduct the fees and costs from money it owed to investors.
It also found the financial firm had proportioned the complainant’s share of the rehabilitation costs correctly. The financial firm accepted the recommendation. The complainant rejected the recommendation.
A number of the matters raised by the complainant are outside jurisdiction
The complainant also raised several concerns about AFCA’s jurisdiction and handling of his complaint, the financial firm’s conduct and the way in which it calculated the costs, which he says have not been adequately addressed. I set out a summary of his objections in section 3.3 of this determination.
In this regard, I note AFCA previously excluded certain aspects of the complaint under AFCA Rule C.1.5(b) because they related to management of a fund or scheme as a whole and notified the complainant by letter on 11 November 2025.
I am satisfied the complainant’s subsequent submissions predominantly relate to matters AFCA has previously assessed and communicated to the complainant are outside its jurisdiction; they are not relevant to the issue within AFCA’s jurisdiction which I address in this determination (matter 4 in section 3.3). AFCA excluded the further matters the complainant has raised and objected to under AFCA’s Rules C.1.5(b) and C.2.1, and it has considered the complainant’s claims in accordance with Rule B.2.1(e). AFCA again notified this to the parties by letter on 30 April 2026.
The financial firm was entitled to pass on rehabilitation costs
On 24 April 2020, the financial firm invoiced the complainant $2,922.60 for initial rehabilitation costs related to the Project pursuant to clause 7.1 of the FMA. On 9 July 2020, it invoiced him $10,898.25 for further rehabilitation, spraying, fencing, and incidental costs.
I adopt the finding in the recommendation the financial firm was entitled to charge investors for rehabilitation costs and any other costs incidental or necessary to rehabilitate the land and I am satisfied it was able to do so under clause 7.1.
The Project is governed by a Forestry Management Agreement (FMA). The FMA is the contractual agreement between the parties and sets out each parties’ obligations and entitlements. I set out the relevant clauses in sections 3.2 of this determination.
I am satisfied it is clause 7.1 that obligated the complainant to meet all costs associated with the rehabilitation of land following destruction. It says:
The Grower must itself meet all costs associated with the Rehabilitation of their Forestry Right Land following Final Harvest, destruction as contemplated in clause 9 or other abandonment.
Clause 9.7 defines destruction. It says:
A Grower’s trees will be taken to be ‘destroyed’ if they are damaged to an extent that makes it unsuitable for use as contemplated in this document.
I am also satisfied the Agreement gives quite broad rights to the financial firm and imposes broad obligations on the complainant. In addition to clause 7.1, the financial firm also had the entitlement to charge the complainant ‘for work of an emergency or necessary nature’ (clause 4.5 of the and for management fees for ongoing forestry services.
I also adopt the finding:
· the spraying and incidental costs, which included tree clearance
· road rehabilitation/stabilisation, replacing damaged signs/fences/culverts/pipes
· weed spraying
· remediating the land after mudslides arising post bushfires,
were costs that were reasonably associated with rehabilitating the land, and the financial firm did not invoice the complainant for any costs that were not related to rehabilitating the land.
Rehabilitation costs were payable in the event of destruction
The bushfires significantly destroyed the trees. I accept this damage was ‘to an extent that made it unsuitable for use’ (this being the applicable test for destruction in clause 9.7). I am therefore satisfied the complainant was obliged to pay all costs associated with rehabilitation under clause 7.1.
However, the complainant says:
· if a service is not included as an ongoing forestry service, the financial firm may only provide the service and charge for the service if it enters into a separate agreement with the complainant
· rehabilitation services provided after a fire are not included as an ongoing forestry service
· because the financial firm did not enter into a separate agreement with the complainant, it was not entitled to issue an invoice or charge for the rehabilitation services.
I note investors pay for ongoing forestry services through management fees.
The complainant relies on schedule 1 and clauses 4.8 and 4.9 to support his position. Schedule 1 lists what ongoing forestry services are not included, and says the financial firm may be able to provide those services by separate agreement and at an additional cost to investors. Clauses 4.8 and 4.9 says the parties may agree on additional services to be provided by the financial firm and paid for by the investors according to the size of their investment.
I do not accept the complainant’s submissions. I am satisfied the onus to pay for rehabilitation services is already contemplated by clause 7.1; it clearly obligates the complainant to meet all costs of rehabilitation, and it is not subject to or conditional on any other clause. And I am satisfied the schedule, and clauses 4.8, and 4.9, are to provide a way in which the parties may agree to additional services when they have otherwise been excluded or not contemplated by the parties.
The financial firm was not required to enter into a separate agreement
As set out above, I am satisfied rehabilitation costs are covered by clause 7.1, and the complainant’s obligation to pay them is a separate and additional obligation to paying management fees for ongoing forestry services. I am therefore satisfied there is no need for me to consider whether rehabilitation after fire is an ongoing forestry service for which the financial firm could charge management fees, or whether the financial firm was required to enter into a separate agreement before it could invoice the complainant.
However, for completeness, as I discussed above, schedule 1 sets out which categories of ongoing [emphasis added] forestry services are included (and hence what the financial firm can charge the complainant management fees for under clause 8). It also sets out what is excluded and requires a separate agreement; I note rehabilitation services are not specifically excluded.
While I accept rehabilitating land after a bushfire is not included as an ongoing forestry service in schedule 1, I am not surprised. The categories of services that are included are mostly preventative and maintenance measures that need to be conducted on a continual basis. They are services that are quite different to rehabilitating land after a bushfire, which I consider is work that is responsive and would not usually be expected to be ongoing.
But I am satisfied this does not mean the financial firm was required to enter into a separate agreement.
Instead, I am satisfied that even if rehabilitation costs were not covered under clause 7.1 as the complainant alleges, the financial firm would have been entitled to charge for the rehabilitation services under clause 4.5. This is because I accept rehabilitating land after a bushfire would meet the definition set out in that clause of ‘work of an emergency or other necessary nature’ required due to ‘the need to conduct significant work on the relevant land’ and/or an ‘act of God’ (event outside human control). The financial firm therefore would not have been required to enter into a separate agreement with the complainant before it could charge for those costs.
The financial firm was not required to incur costs before seeking payment
The complainant says the financial firm was only entitled to be ‘reimbursed’, that is, it had to have incurred the relevant costs for the work before it could pass costs on to investors, including the complainant. The complainant relies on clauses 7 and 9 in support of his position and says the financial firm did not first incur the costs.
I do not accept the complainant’s submissions. I am satisfied the financial firm was entitled to invoice the costs of rehabilitation after destruction even if it had not yet completed the work and/or incurred the relevant cost for the work, and the complainant was obliged to pay them. This is consistent with clause 7.1, which says:
The Grower must itself meet all costs associated with the Rehabilitation of their Forestry Right Land following Final Harvest, destruction as contemplated in clause 9 or other abandonment.
It is clause 9.7 that sets out the definition of destruction. It says:
A Grower’s trees will be taken to be ‘destroyed’ if they are damaged to an extent that makes it unsuitable for use as contemplated in this document.
The only reference to reimbursement is in clause 9.5, which says:
Regardless of whether any or all of the Plantation Produce on a Grower’s Forestry Right Land is destroyed, the Grower will however remain liable to pay the Management its contribution to any costs and indemnities for which the Manager may be reimbursed under this document…
I am not satisfied clause 9.5 qualifies the financial firm’s entitlement to be paid.
First, this is because I accept the complainant’s obligation to meet rehabilitation costs after the trees were destroyed is absolute. I do not accept the reference to ‘clause 9’ in clause 7.1 should be taken as a reference to all of clause 9. Instead, I accept the reference to clause 9 should be taken as a reference to the definition of destruction in clause 9.7 only. I do not accept clause 7.1 is qualified by anything set out in the balance of clause 9, including clause 9.5.
Second, if this is not the case, I do not accept the reference to the word ‘reimbursed’ in clause 9.5 meant the financial firm was first required to pay for the rehabilitation services before it could seek payment from the complainant. There is nothing in this clause or the FMA that required the financial firm to first incur the costs of rehabilitation or similar before it could invoice the complainant. I accept the use of the words ‘may be’ can be substituted for ‘could be’, and if an entitlement existed for the financial firm to be paid any amount under the Agreements, then the complainant was liable to pay them, no matter when or if they were incurred.
As set out above, I am satisfied the complainant was liable to pay all rehabilitation costs, so it follows the financial firm could be repaid those costs. I note here that while this information is not before me, it is reasonable to imagine that any manager or responsible entity may not have had liquid funds to pay for significant rehabilitation costs itself upfront. If so, I would accept it was reasonable to require payment from investors in advance in those circumstances in order for the Project to continue.
The interim management fee did not cover roading costs
The complainant says he paid for roading costs when he paid the interim management fee, so the financial firm was not entitled to invoice him separately for those costs.
On 1 April 2020, the financial firm sent the complainant a letter explaining what road construction works had been completed and paid for in relation to the Project. It said the costs related to ‘road construction [emphasis added] from accessible highways to the perimeter of the plantation’.
The financial firm also enclosed an invoice for the complainant’s share of $2,234.76. The invoice described the costs as ‘roading costs incurred in preparation for the first thinning’. The financial firm said it was issuing the invoice in accordance with clause 4.5 of the FMA. By letter dated 24 April 2020, the financial firm informed the complainant he did not need to separately pay those costs (which it had reduced to $2,145.51) as it would set the costs off against the insurance proceeds.
The complainant says the roading costs were covered by the interim management fee he had already paid and the financial firm was not entitled to separately invoice him. He says this is because the categories of ‘ongoing forestry services’ in schedule 1 include roading costs.
As also set out in the 24 April 2020 letter, I accept the complainant was taken to have paid the interim management fee when the financial firm said it had deducted the fee from his entitlement to the first thinning proceeds. However, I cannot be satisfied the interim management fee covered these particular roading costs.
Schedule 1 is not relevant to roading costs
Schedule 1 includes the following categories of ongoing forestry services that relate to roads:
However, these services relate to the maintenance and repair of roads on private property and internal to the plantation land. Given the costs related to the construction of roads, and constructing roads is clearly different to maintaining and repairing roads, I do not accept it was captured by these categories. I also note even though it was not included as an ongoing forestry service, it was also not expressly excluded such that it required a separate agreement before the financial firm could charge for it.
The financial firm was entitled to pass on roading costs
Instead, I am satisfied the financial firm was entitled to pass on the cost of the road construction under clause 4.5. This is because I accept constructing roads required to connect the perimeter of the plantation to highways to access the plantation land was work of a ‘necessary nature’.
I accept clause 4.5 should be interpreted broadly, and the words ‘necessary nature’ should be given their ordinary meaning. This is because the operative part of FMA is the clause itself. Titles or headings in a contract are used for convenience and to organise it; they are not intended to be binding or restrict/define the meaning or application of the clauses.
On this basis, I am satisfied constructing roads to connect the plantations to highways was work that was necessary for the purpose of harvesting and removing trees. I am therefore satisfied the costs for constructing the roads are captured by this clause. I am satisfied of this even though clause 4.5 sits directly under the title ‘Additional emergency work by Manager’, and note it may not be correct to describe road construction costs, that are foreseeable and non-urgent, as additional emergency work.
The financial firm was entitled to set off fees and costs
The financial firm sent a letter to the complainant on 2 April 2020 in relation to his $16,559.82 share of the insurance proceeds following the destruction of the plantation by the bushfires. In a letter dated 24 April 2020, the financial firm set out the road construction and rehabilitation costs it had deducted from this amount, and the net insurance amount of $11,491.81 it would pay to the complainant. It relied on clause 8.17 of the FMA to do so. Also on 24 April 2020, the financial firm invoiced the complainant $4,131.08 for an interim management fee. The financial firm noted the complainant was not required to pay this fee as it had wholly offset it against the proceeds from the first thinning.
In this regard, in addition to the clauses cited in the recommendation, I note:
· clause 8.1 obligated the complainant to pay management fees to the financial firm as set out in schedule 2 of the FMA
· schedule 2.1.1 set out how that interim management fee would be calculated
· clauses 8.16 and 8.17 broadly entitled the financial firm to set off any costs or fees the complainant owed from any amounts payable to the complainant.
I adopt the finding in the recommendation the financial firm was entitled to charge management fees, including interim management fees. I am also satisfied the financial firm was entitled to wholly offset the fee from the proceeds of the first thinning, which the financial firm said could not be completed due to the destruction of the plantation, and it calculated the fee in accordance with the schedule. I am also satisfied the financial firm was entitled to deduct costs from the insurance payout under clause 8.16 and 8.17.
The PDS is not the governing document
The complainant says the additional fees and costs are contrary to representations in the product disclosure statement (PDS) there would be no ongoing fees.
A PDS is a disclosure document and not the contract itself. While the PDS should be accurate, in cases of discrepancies, the contract takes precedence. As outlined above, I am satisfied the financial firm has acted in accordance with the FMA.
However, for completeness, I have reviewed the PDS and consider it to be consistent with the FMA. There are two parts to the investment – forestry right interests in a plantation investment, and units in a land trust. The PDS includes a summary of each part of the investment, on pages 8 and 9 respectively. The representation there would be ‘no on-going fees’ relates to the land trust investment. The plantation investment (in relation to which the fees and costs have been charged) does not make any such representation.
Further, on pages 65 and 66, under sections titled ‘Authorised deductions’, ‘Additional emergency work by Manager’ and ‘Plantation rehabilitation’, the PDS sets out the same information as clauses 8.17, 4.5 and 7.1 respectively. I am therefore satisfied the PDS sets out the same information as the FMA.
2.2 Why is the outcome fair?
The outcome is fair because the financial firm acted in accordance with the terms of the Project. It was entitled to pass on the rehabilitation and road construction costs to the complainant and did not incorrectly charge management fees. It would therefore not be fair to require it to compensate the complainant for those costs.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Forestry Management Agreement
Relevant clauses
3.3 Matters the complainant raised objecting to AFCA’s decisions
1. The complaint refers to the complainant’s interests in the 2004 forestry schemes managed by the financial firm and the ultimate values of his interests in the scheme.
2. The fact the financial firm might have treated many other investors in the scheme in a similar manner to how the financial firm has treated him does not mean his complaint related to the management of the scheme as a whole.
3. The complaint regarding the Forestry Management Agreement (FMA) matters should relate solely to the complainant and the financial firm’s management of their obligations to him. This is because he says each Grower had their own FMA and the financial firm had specific obligations to him in relation to the FMA.
4. AFCA should be concerned with fees being imposed and the services not being provided.
5. Following the Full Federal court’s decision in the [financial firm] v Australian Financial Complaints Authority Limited [2023] FCAFC 118 (decision), the issues of the subject of the complaint should be within AFCA’s jurisdiction.
6. The financial firm provided incorrect information about the land size held in the 2004 Land Trust in particular ‘The Valley’ which should, the complainant says, be approximately 2,600 hectares but the financial firm says it was 496.80 hectares valued at $1,242,000.00 after the sale of Dr Vance property in March 2022.
7. The complainant sold his interests for the seven units in the 2004 Land Trust in January 2023, but the financial firm sold ‘The Valley’ on 17 November 2023 at $20,378,600.00 and did not pay the complainant the sale proceeds from ‘The Valley’.
8. the financial firm unlawfully withheld his share of the Dr Vance Plantation Investment and land trust distribution for over a year.
Recommendation
|
Case number
|
12-00-745547
|
Financial firm
|
Agriwealth Capital Limited
Case number: 12-00-745547 18 October 2024
1 Recommendation overview
1.1 Complaint
In 2004, the complainant acquired Forestry Right Interests “timber lots” in the AFM 2004 Softwood Forestry Plantation Project (the plantation), and units in the Australian Forestry Management 2004 Land Trust (land trust). The financial firm was the responsible entity for the plantation, and the trustee of the land trust. The plantation was governed by a Forestry Management Agreement (FMA).
Bushfires substantially damaged the forestry plantation trees in late 2019 and early 2020. The financial firm then informed the investors, including the complainant, of the need to rehabilitate the land.
The complainant disputes the financial firm’s entitlement to rehabilitate the land, and he says it charged him fees and costs it was not entitled to, including:
• Management fee
• rehabilitation costs
• roading costs
• fencing costs
• spraying costs
• incidental costs
I note all costs associated with the rehabilitation of the land will simply be referred to throughout this document as “rehabilitation costs”. As a resolution to his complaint the complainant requests Agriwealth refund rehabilitation costs and management fees he says he was incorrectly charged.
The financial firm says it was entitled to charge “growers” (the complainant) rehabilitation costs and a management fee as per the FMA.
1.2 Issues and key findings
Was the financial firm entitled to charge a management fee and rehabilitation costs?
Yes, the financial firm was entitled to charge the disputed fees and costs as per the terms of the FMA. Additionally, the financial firm was entitled to deduct fees and costs from money owed to the complainant.
Why is the outcome fair?
The outcome is fair because the land was damaged by fire and as per the FMA the financial firm was entitled to rehabilitate the land, and charge the disputed fees and costs.
1.3 Recommendation
This recommendation is in favour of the financial firm. No action is required.
2 Reasons for recommendation
2.1 Was the financial firm entitled to charge a management fee and rehabilitation costs?
Yes, the financial firm was entitled to charge the disputed fees and costs as per the terms of the FMA. Additionally, the financial firm was entitled to deduct fees and costs from money owed to the complainant.
The financial firm was entitled to rehabilitate damaged land at the expense of growers
With respect to its entitlement to rehabilitate fire damaged land, the financial firm says:
The Manager formed the opinion that it was necessary to rehabilitate the land which had been adversely affected by the 2019/20 bushfires. The determination of whether rehabilitation works would be undertaken was the sole decision of the Manager. There was no requirement to involve a Grower in that decision, for the very good reason that with around 90 Growers in the Project it would be extremely unlikely that a consensus would have been reached by such a large group of people.
The Manager’s decision to undertake the rehabilitation works was in its opinion reasonable.
In addition to this, clause 4.11 of the FMA states: “the day-to-day management of the Plantation will be at the discretion of the Manager and its contractors”. Further, clause 4.5 of the FMA relevantly states:
If at any time the Manager in its reasonable opinion is required to do any work of an emergency or other necessary nature not otherwise covered by this document in respect of a Grower’s Forestry Right Land, then a fee may be charged for those services to the Grower. This fee may relate to matters including the need to conduct significant work on the relevant land, something required as a result of an act of God or any other thing required by good silvicultural practices.
and clause 7.1 of the FMA relevantly states:
The Grower must itself meet all costs associated with the Rehabilitation of their Forestry Right Land following Final Harvest, destruction as contemplated in Clause 9 or other abandonment.
With respect to how costs were to be calculated, clause 7.2 of the FMA relevantly states:
A Grower's obligation to meet these Rehabilitation costs will be calculated by reference to the overall costs of the Plantation Land of all Growers, pro rata to the size of the Grower’s Forestry Right Land compared with the overall size of the Plantation Land of all Growers.
The financial firm says rehabilitation costs levied on the growers were to cover road construction costs, fence repair costs, spraying costs, and incidental costs that were incurred directly as a result of the fires. Additionally, the financial firm says incidental costs included signage replacement, erosion control strips on internal plantation roads, clean out of drains, replacement of broken pipes, and remediation of land affected by mud slides arising post bushfires. The complainant was invoiced for these costs in proportion to the number of timber lots he held relative to the total number of timber lots held within the project.
It is not in dispute that land and trees were damaged by fire, and as per the terms of the FMA the decision to rehabilitate the land was ultimately at the managers discretion. Considering this, I am satisfied the financial firm’s decision to rehabilitate fire damaged land was appropriate. Furthermore, I am satisfied the financial firm was entitled to charge growers for rehabilitation costs, and that costs were calculated in accordance with the FMA.
The financial firm was entitled to deduct fees and costs from amounts owed to growers
The financial firm deducted its management fee from “thinning proceeds” and rehabilitation costs and road costs from insurance proceeds. Clause 8.1 of the FMA states “the grower agrees to pay the manager the management fees set out in schedule 2”, and as outlined previously, I am satisfied the manager was entitled to charge costs for land rehabilitation.
Additionally, with respect to the financial firm’s ability to deduct fees and costs from amounts owed to grower’s clause 8.17 of the FMA relevantly states:
A Grower's obligation to meet these Rehabilitation costs will be calculated by reference to the overall costs of the Plantation Land of all Growers, pro rata to the size of the Grower’s Forestry Right Land compared with the overall size of the Plantation Land of all Growers.
I am satisfied the manager was entitled to a management fee, which it could set off against other amounts payable to growers. The manager set off the management fee with all thinning proceeds. Furthermore, I accept the manager was entitled to deduct rehabilitation costs from insurance proceeds payable to the complainant.
2.2 Why is the outcome fair?
The outcome is fair because the land was damaged by fire and as per the FMA the financial firm was entitled to rehabilitate the land, and charge the disputed fees and costs.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has assessed this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this recommendation to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.