Home / Allianz Australia / Determination 12-00-1102789

Determination 12-00-1102789

Denial of storm and escape of liquid damage claims and dispute over cash settlement for accepted bedroom damage

FirmAllianz Australia
Decided2025-08-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,212
Non-financial loss—
Amount claimed$8,118
SourceAFCA PDF

Summary

Complainants claimed storm and escape of liquid damage to their home; the insurer accepted only one bedroom and denied the rest. AFCA largely upheld the denial but required a slightly increased cash settlement for the bedroom and a written apology.

Complainants did not establish a claimable loss because damage arose from poor condition and lack of maintenance, which the policy excludes, while the accepted bedroom settlement should be adjusted to the insurer's builder's quote plus 15%.

Issues

Subjects and remedies

home or building damagenatural disastercorrect recordspay claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1102789 | Financial firm | Allianz Australia Insurance Limited Case number: 12-00-1102789 1 August 2025 1 Determination overview 1.1 Complaint The complainants lodged three claims with the financial firm (insurer) under their home and contents insurance policy for storm(s) and subsequent ongoing/worsening damage to the property in February 2024, April 2024 and February 2025. They lodged another claim for possible escape of liquid damage in October 2024. The insurer accepted liability for the water ingress damage to one of the bedrooms. It denied liability for all other damage on the basis the damage arose from the property’s poor condition including the roof and not from the storms/storm created openings or escape of liquid. The damage arose from various causes not covered or excluded under the policy. The complainants seek the insurer to accept all the claims. They say the property suffered storm damage. The insurer’s inadequate and poor makesafe works caused additional damage to the property. 1.2 Issue and key findings Is the insurer’s settlement fair? Yes, mostly. The complainants have not established a claimable loss for storm(s) or escape of liquid damage to the property. The pre-purchase inspection by JB highlighted the poor condition of the roof and existing cracking to the internal and external walls. The property damage was caused by the poor condition and maintenance issues for which there is no cover under the policy. Make safe works are temporary measures and the insurer cannot be held liable for additional and worsening damage over the claim(s) period. The responsibility remained with the complainants to arrange roof and other maintenance works in a timely manner preventing further damage to the property. It is fair the insurer accepted the internal damage to one of the bedrooms and it should increase its settlement offer slightly to account for transfer of risk and contingencies. Why is the outcome fair? The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of being notified of the complainant’s acceptance of this determination, the insurer is required to settle the claim as detailed in section 2.1 of this determination. The insurer is otherwise not required to take any action in relation to the claim or this complaint. 2 Reasons for determination 2.1 Is the insurer required to increase the settlement? Yes, mostly. The complainants have not established a claimable loss for storm(s) or escape of liquid damage to the property. The pre-purchase inspection by JB highlighted the poor condition of the roof and existing cracking to the internal and external walls. The property damage was caused by the poor condition and maintenance issues for which there is no cover under the policy. Make safe works are temporary measures and the insurer cannot be held liable for additional and worsening damage over the claim(s) period. The responsibility remained with the complainants to arrange roof and other maintenance works in a timely manner preventing further damage to the property. It is fair the insurer accepted the internal damage to one of the bedrooms and it should increase its settlement offer slightly to account for transfer of risk and contingencies. Complainants must establish a claimable loss When making a claim, the complainants have the initial onus of establishing they suffered a loss for which the insurance policy provides cover. The complainants must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability or deny the claim. Policy cover is subject to terms and conditions The policy covers loss or damage caused by storm, cyclone, rainwater and runoff. It defines storms as violent wind (including cyclones and tornadoes), thunderstorms or hail which may be accompanied by rainwater or snow. The policy however excludes cover for rainwater, run-off, hail, wind or water that enters the buildings through an open door, window or other opening (this exclusion does not apply to openings made by the storm or cyclone, or, if there was cover for accidental damage). The policy also excludes cover for loss or damage as a result, caused by or arising from depreciation, gradual deterioration, wear and tear or lack of maintenance. Parties provided different views on the cause of damage to the home The complainants say: · the insurer should accept liability for all the damage to the various rooms at the property as the damage was caused by storms, the insurer’s poor make safe works and degraded tarping: > living room repairs (walls, floors, window frames, mould remediation) > hallway and front room repairs (ceiling, walls, floors) including hallway light > kitchen repairs (ceiling, walls, floors) > tape removal and cleanup costs, including neighbour’s yard debris · the insurer should have tarped the entire roof after its initial attendance in February 2024 and its failure caused damage to other areas of the property in April 2024 after heavy rains · the insurer’s makesafe trades put the tarp running over the gutters and taped it so when it rains, the water did not get into the gutters but ran over it and damaged the window and the wall in the living room · the insurer’s cash settlement offer is inadequate to complete the repairs for the resultant damage to the bedroom. The insurer should increase the settlement to $8,118.33 (the complainants’ builder’s repair quote $8,250 plus $868.33 (hoop skirt) less excess $1,000) · the damage has worsened over the period due to the insurer’s inadequate make-safe measures which failed to prevent ongoing water ingress and not their inaction · the insurer should extend a formal apology for its unwarranted accusation that their claims were ‘frivolous and vexatious’. The insurer says: · the expert evidence from various builders and plumbers (AJ, RW, EP, TB and BR) and its engineer DW confirmed the movement and cracking to the property was not caused by the claimed rainfall events · pre-purchase inspection report by JB confirmed the property was suffering from cracking internally and externally, and that corrosion was already present to the roof at the time of purchase · DW confirmed the property has been suffering from movement issues over an extended period of time as evidenced by historic repairs sighted in all areas impacted · it reviewed the videos from the complainants showing water ingress into the living room. While it does show water entry at the window, roofer BR confirmed this is a result of the poor seal of the window frame. This was identified as requiring maintenance by JB. DW confirmed the bubbling of paintwork below the windowsill was not caused by water ingress due to rainfall, but rather has been an ongoing issue caused by rising damp · while the complainants’ engineer SS attributed water ingress to the cracking, builder TB did not notice moisture staining, material deterioration or mould growth in the bedrooms or hallway during its attendance · make safe works are temporary measures and the responsibility to address the maintenance issues identified and effecting lasting repairs remains with the complainants. Complainants did not perform works recommended by JB The prepurchase inspection report compiled by JB dated 13 May 2023 indicated the assessment findings was limited due to: · the low roof pitch preventing full inspection · no access to areas of skillion or flat roof · inspection of the ceiling cavity and roof exterior was completed in part · other areas of the property due to various obstructions. JB observed: · masonry walls - cracking - damage category 2 - noticeable (up to 5mm) - localised cracking evident to sections of the internal/external masonry walls and external concrete. JB attributed this damage to age, general wear and tear, expected building movement, general expansion/contraction of building materials in different weather conditions · doors & windows - the doors and windows generally were found to be in serviceable condition, areas of weathering, binding/jamming were noted, with some fixtures/locking and weather seals in need of serving - a licenced builder or glazier could advise on the extent of this service · roof coverings - not all areas of roof were accessible; all internal ceiling areas should be monitored. If any leaks, water staining, peeling or bubbling of the paint become evident a licensed roofing contractor is recommended to investigate this further. JB noted that if any new plaster, render or paint work has been completed before the inspection, it had the potential to mask any existing cracking or water staining. JB recommended the complainants to replace areas of corroded roof, patched areas of flashing and installed sealant, weathered or water damaged timber trims. JB recommended them to monitor the areas around chimneys, skylights, solar panels and flat roof sheeting for water ingress. While the complainants say JB did not raise concerns about the condition of the property, the report shows he recommended a further inspection by a licensed roofing contractor to go over the complete roof covering and advise on the extent of replacement/repair and maintenance items. The complainants have not shown they undertook these works prior to the storm event(s). The property also exhibited cracking at the time indicating it was suffering from long term movements from the various causes highlighted above by JB. Insurer entitled to deny cracking and other damage to the property The complainants lodged the claim with the insurer on 21 February 2024: There was a heavy storm in Sydney on Monday 19 Feb 2024. As a result of this we have noticed water damage to the corner ceiling of a Bedroom and water ingress in the kitchen-dining. This water damage was not identified in the Building Report, and we purchased and moved into this home in Sept 2023, and there have been no leaks since until this storm. The insurer initially denied liability for the claim as the proximate cause of the water ingress was the poor condition of the roof and maintenance issues. It reviewed the complainants’ concerns and subsequently accepted liability for the internal damage to one of the bedrooms on the basis this damage was caused by leaves and debris restricting drainage in the valley and causing water to overflow into the ceiling cavity during the storm. It offered a cash settlement for the accepted repairs on or around 22 May 2024. The insurer maintained its denial for the damage to the kitchen including the ceilings and the bulkhead as this was caused by the underpitched roof and a gap in the flashing. Previous sealant application in the area suggested this area suffered from ongoing leak. Several builders, plumbers, DW and SS have inspected the property for the storm(s) and ongoing worsening damage to various areas of the property. I acknowledge S’s findings: · living room wall cracks - cracks are attributed to water ingress from the roof gutter, caused by incorrect tarping over the gutter · hallway ceiling and wall cracks - damage resulted from storm-related water ingress, preventable by timely tarping. Immediate attention is required for the loose light fixture · kitchen skylight cracks - cracks are attributed to water leakage through degraded tarping around the skylight · bedroom ceiling and wall cracks - cracks, mould, and carpet damage are attributed to water leakage from the roof gutter, exacerbated by faulty tarping at a valley junction S however does not explain the proximate cause of the initial damage in February 2024 including the condition of the roof and comment on JB’s findings and their relevance to the damage observed. The insurer’s experts who assessed the hallway soon after the claim was lodged did not notice any water ingress during their attendance. S accepts that mould would not be an issue shortly after the water leak event (February 2024), but was reflective of an ongoing subsequent leak issue, caused by faulty tarping. DW concluded the observed movement cracking at the dwelling was related to general foundation movement due to seasonal changes in moisture content in the founding soils which have been amplified by the presence of the large tree towards the south of the dwelling and the inadequate levels of subfloor ventilation. DW observed evidence of previous patch repairs typically at the cracking locations suggesting that cracking has been an issue at the dwelling in the past. Previous attempts to repair the cracking at the dwelling had been undertaken which he found was consistent with the age of the dwelling and foundation soil type. While the complainants say they did not notice any issues with the property after they moved in September 2023, JB observed cracking to the property in May 2023 and indicated any recent plaster and paint work may mask the extent of existing issues with the property. I have reviewed the submissions presented by both parties. I acknowledge the complainant’s concern that they expected the insurer to tarp the entire roof during their initial attendance and make safe works. I am however satisfied the insurer is not obliged to arrange make safe works for other areas of the roof as the complainant did not report of any water ingress from these areas at claim lodgement in February 2024. The insurer has assisted the complainants with the required reasonable make safe works throughout the claim(s) period. The claim notes show by 19 March 2024; the insurer discussed its decision to deny the claim and explained the reasons for its decision. The denial letter was issued on or around 27 March 2024. I acknowledge the complainants believe the insurer should be held responsible for the make safe works. While I agree the insurer should not have covered the gutters above the living room when tarping and taping this area of the roof, I accept that make safe works are temporary measures to avoid further ongoing damage to the property. TB referred to the expert findings and indicated water ingress to the living room may have occurred due to the poor window seals. I accept the make safe works to the kitchen ceiling was necessary to prevent it from collapsing. I do not agree the complainants have suffered any financial detriment by these works as they will need to have these replaced in due course. There is no persuasive information from the parties to show the roof sustained any storm damage. The expert assessments and findings show the roof was in poor condition and required repairs/replacement. Given JB’s observations and the damage observed after the initial storms in February 2024, the responsibility remained with the complainants to undertake roof repairs and internal repairs to avoid further water ingress and worsening of damage from ongoing storm events. The trades who attended the property after the various storm events noted buildup of debris on the roof and other maintenance works required at the property. Had the complainants arranged the necessary works, the property damage would not have worsened including the water ingress into the living room. While the complainants say they delayed the roof repairs pending resolution of the initial claim, I am not satisfied this was reasonable, given the poor condition of the property. If they were concerned, they could have informed the insurer about the intentions to repair the property while they continued their dispute. Given the above, I am not satisfied the complainants have established a claimable loss and the insurer is entitled to deny liability for the claim except for the part of the claim discussed below. It is therefore not necessary to address if the insurer had established if exclusions apply to the claim. The insurer is also not liable for damage, if any, arising from temporary make safe works as explained above. Insurer should increase its settlement offer for internal damage to bedroom It is fair the insurer attributed the damage to storm, regardless of the other issues discussed above, and accepted the claim for internal water ingress damage to one of the bedrooms. The insurer offered the following settlement on 30 October 2024 for the internal damage to the bedroom including a hoop: Carpet Quote: $1,161.60 Building Repairs: $3,484.00 Hoop Skirt: $868.33 Less excess: $1,000.00 Total Settlement: $4,513.93 The complainants seek the insurer to increase the settlement to $8,118.33 based on their builder’s quote. Their builder’s quote includes: Bedroom repair: Remove and discard the soaked carpet and padding, treat the subfloor for mold if needed, and install new underlayment and carpet. Cut out damaged drywall from walls, replace it, fill cracks with plaster, sand smooth, prime, and repaint to match existing color. Strip away ruined ceiling panels and cornice, fit new drywall and matching cornice, plaster seams, sand, prime, and apply two coats of flat white paint(sic). The above includes an allowance for possible subfloor mould remediation and repairs to cracked walls. The above scope of works therefore includes additional works not accepted by the insurer. The insurer is not obliged to accept the damage for cracked walls in the bedroom as I am satisfied given the overall condition of the property, this is not storm related. The insurer initially offered to cash settle the complainants in May 2024 and subsequently in October 2024 and the complainants rejected its settlement offers. While I acknowledge the insurer is not responsible for the delays in finalising this part of the claim, given it has been more than a year since the insurer’s builder’s AJ’s quotes were obtained, I consider it fair in all the circumstances the insurer settles this part of the claim based on AJ’s quote for building repairs ($3,662.21). It should also increase the settlement by 15% for transfer of risk and contingencies. Insurer should address any damage to the neighbour’s property The complainants say both sides of their neighbour’s roofs were damaged during the make safe process, with silver adhesive tape used to hold the tarp in place. It was noted a sandbag(s) had also fallen onto the neighbour’s property. The insurer’s builder confirmed the make safe works could be safely removed by them without causing any damage. The insurer should assist the complainants in this regard, if it has not already done so. The complainants are free to raise any concerns raised by their neighbours to the insurer so that it may address them in a timely manner. No evidence of escape of liquid damage from neighbour’s leaking pipe The complainants lodged a fourth claim in September 2024 as they were unsure if an escape of liquid from a broken pipe at their neighbour’s property may have caused or contribute to the cracking damage at their property. The responsibility remains with the complainants to show the above event damaged their property and I am not satisfied they have shown a claimable loss in this regard. Should the complainants obtain further expert information on the impact of this event on any damage to the property, the insurer should review their submissions, assess the claim further and provide an outcome in a timely manner. Insurer should extend an apology to the complainants Throughout the claim(s) process, the insurer continued to say the complainants’ various claims were frivolous and vexatious. The complainants are entitled to raise their concerns with the insurer’s various claim(s) decisions and request the insurer to reimburse their respective entitlements under the policy. While the insurer was entitled to deny majority of the damage claimed under the various claims lodged, the insurer’s submissions in this regard upset the complainants and in my view were unnecessary. The insurer should therefore extend a written apology for the complainants withdrawing its submissions that their claims were frivolous and vexatious. 2.2 Why is the outcome fair? The parties are bound by the policy terms and conditions. It would be unfair to require the insurer to cover a loss which does not fall within the scope of the policy. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.