Partial denial of storm damage claim and dispute over cash settlement amount, mould remediation, contents and temporary accommodation
Text of the determination
Determination
|
Case number
|
12-00-1102763
|
Financial firm
|
Insurance Manufacturers of Australia Pty Ltd
Case number: 12-00-1102763 19 December 2025
1 Determination overview
1.1 Complaint
This complaint relates to a claim by the complainant under his home and contents insurance policy held with the financial firm (insurer), for damage to the insured property caused by a storm.
The insurer has denied the claim and says that the complainant has not established a loss which is covered by the policy.
Alternatively, the insurer says that the cause of the damage is excluded from cover under the terms of the policy.
There are two policyholders and complainants in this complaint, however the complaint has been managed solely by the male complainant. For simplicity, a reference to ‘the complainant’ in this determination includes both complainants.
1.2 Issues and key findings
Is the insurer's cash settlement offer for building repairs fair and reasonable?
Yes. The panel is satisfied the cash settlement offered by the insurer for the claim related damage is fair and reasonable, aside from an amount for air filtration on completion of repairs.
Is the insurer liable for damage to the contents?
The panel considers assessment of the damaged contents from the rooms which sustained damage accepted under the claim is required in order to determine the insurer’s liability if any, for damage to the complainant’s contents under the claim.
Is the complainant entitled to be reimbursed for his professional costs?
Yes. The panel is satisfied it is fair for the insurer to reimburse the complainant $1,100 for the cost of the LM mould remediation report.
Is the complainant entitled to the temporary accommodation benefit?
The complainant is entitled to the cost of reasonable and appropriate temporary accommodation in the event he moves out of the home while the repairs to the accepted damage and subsequent air filtration are completed because the property cannot be lived in while they take place.
Did the insurer mishandle the claim?
Yes. The information shows there was a delay between the assessment process being finalised and the insurer making a claims decision, and the panel is satisfied payment of $3,000 compensation for non-financial loss offered by the insurer is reasonable compensation in the circumstances.
Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is entitled to partially deny the complainant’s claim.
Should the complainant accept this determination:
· within 14 days of being notified of his acceptance, the insurer is to
> pay the complainant $17,589.87 plus a 20% uplift in settlement of the building claim, if it has not already done so
> obtain a quote for the post building repair air filtration works described in the LR report and pay the complainant that amount in settlement of the mould damage at the property
> pay the complainant $1,100 to reimburse him for the costs of the LM report
> pay the complainant $3,000 compensation for his non-financial loss, if it has not already done so
· within a reasonable time of being notified of his acceptance, the insurer is to assess the storm related damage to the complainant’s contents, if any, in accordance with the terms and conditions of the policy.
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this determination, and each party has had the opportunity to address all issues.
This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable.
While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary has been restricted to those issues considered directly relevant to the outcome only.
2.1 Is the insurer's cash settlement offer for building repairs fair and reasonable?
Yes. The panel is satisfied the cash settlement offered by the insurer for the claim related damage is fair and reasonable, aside from an amount for air filtration on completion of repairs.
Coverage of the policy
The complainant’s home and contents insurance policy provides cover for loss or damage at the insured address caused by an insured event during the period of insurance.
The coverage provided by the policy is subject to conditions, limitations, and exclusions. This means that not all loss and damage is automatically covered. Rather, only loss and damage caused by an insured event, during the period of insurance and subject to the conditions, limitations and exclusions, is covered.
The full details of the policy coverage, conditions, limitations, and exclusions are contained within the Product Disclosure Statement (PDS) and Certificate of Insurance (COI).
The panel is satisfied that the PDS and COI have been provided to the complainant. Therefore, the insurer is entitled to rely upon the terms of the policy, including its conditions, limitations, and exclusions, to determine its obligations to the complainant.
The policy covers loss or damage caused by a storm.
The policy also includes several general exclusions that apply to all cover as follows
General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
• rust, corrosion, gradual deterioration, depreciation, wear or tear
...
• mould, unless arising from loss or damage covered by a listed event
…
We don't cover loss, damage, injury or death arising from:
• faulty design or workmanship
• previous damage that has not been repaired
…
• you not maintaining your home in good repair and condition. This means your home must be watertight, structurally sound, secure and well maintained
…
• you not taking reasonable care to protect your home or contents against loss or damage.
It is accepted insurance law that the complainant carries the initial onus to establish, on the balance of probabilities (that is, more likely than not), a loss which is covered by the terms and conditions of the policy.
Once the complainant has established a loss which is covered under the policy, the onus transfers to the insurer to establish the application of a condition, limitation or exclusion upon which it seeks to rely, to limit its obligations regarding the claim, or to deny the claim.
Circumstances of the loss and claim
The complainant lodged his claim with the insurer on 4 December 2023, advising that the property had been damaged by a storm event several days earlier.
On receipt of the claim the insurer arranged make safe works to the roof, as several tiles had dislodged during the storm.
Builder PA attended the property on 8 December 2024 to assess the storm damage. PA noted the following damage at the property:
On inspection of the property we found water damage throughout the first floor areas of the property including the Kitchen, Small Bedroom, Double Bedroom and walk in wardrobe, Hallway, Prayer Room and Bathroom, all of which have been caused by water ingress due to long term maintenance issues that have visible attempts at previous repair along with water ingress due to missing/damaged shingles due to strong winds...
Externally to the roof, asphalt shingles have been dislodged and come free due to strong winds and require repair, a make safe has been completed to install a tarp to mitigate further water ingress and damage for the short term.
PA arranged for a roof report from their roofing specialist NP who also attended the property on 8 December 2023 and conducted leak detection testing. NP noted the following:
· roof shingles have blown off/become damaged during storm causing water ingress into upstairs rear bedroom. Make safe plumber has glued the tarp down to the roof using silicone to prevent any further water ingress.
· failure of the lead flashing joins has allowed water ingress. Make safe plumber has attended and applied lead flashing to the joins to prevent any further ingress.
· water ingress into kitchen window frame is due to soaker flashing which has become loose creating an opening into the wall cavity susceptible to wind driven rain. Failure of the fixing has caused the flashing to slide to the right.
NP concluded:
Based on the evidence collected on site we believe the cause of water ingress/damage into the hallway ceiling is due to high winds causing damage to shingles. Water ingress/damage to the rear bedroom ceiling is due to high winds causing damage to shingles. Water ingress/damage to the prayer room ceiling is due to failure of lead flashing joins. And the kitchen window frame leak is due to soaker flashing that has become loose due to a failed fixing. This is allowed a large gap between the foam render and flashing allowing water into the wall cavity
NP identified that the storm related repairs were replacement of the shingles and that the maintenance repairs were:
· repair soaker flashing above kitchen window.
· reseal any pipe penetrations through foam render walls.
· repair condensation pipe discharging onto lower roof at rear of upstairs bedroom.
NP reattended the property on 14 December 2023 to conduct leak detection to rooftop patio/balcony. NP stated that
The insured failed to advise us previously that he resealed the outlet penetrations pits to the patio base after the initial leak. He advised he forgot as we were inspecting the roof and not the balcony/patio.
Damage to the upstairs hallway ceiling are directly below the outlet penetration for the balcony.
• An inspection to the balcony found:
– Spray test to the balcony base passed.
– Drain spray test passed.
– Spray test to walls passed.
– We believe newly applied [silicone] seals to the outlet penetration has resolved the leak temporarily however ultimately the membrane has failed at the outlet penetration.
– Cavity inspection via damaged ceiling found no evidence of water ingress into the affected area as we believe the leak is no longer occurring due to the newly applied [silicone] seal.
– Thermal imaging found no evidence of ingress into the ceiling below.
PA also arranged for hygienist PR to attend the property on 23 February 2024.
PR says:
Visible mould growth was identified to nominated sections of the ceilings at the site, and was suspected in additional areas within the ceiling space where visible water damage was present. As such, remediation works have been recommended.
It is noted that airborne mould concentrations in the internal areas of the property were found to be lower than the external reference samples indicating the area is suitable for occupation under normal conditions.
Based on the above reports the insurer partially accepted the claim. On 7 May 2024, PA provided a scope of works (SOW) and quote for the repairs to the storm related damage identified by PA and NP, as well as the remediation works recommended by PR.
PA recommended denying the claim for damage to the storeroom, upstairs gallery, bedroom 4 and prayer room as the cause of this damage was associated with the balcony and roof flashings which were not damaged due to the storm.
On 29 May 2024, the insurer advised the complainant it was partially denying the claim due to the lack of maintenance. It says this meant water entered the home and caused damage prior to the storm occurring. The insurer offered the complainant a cash settlement for the damage based on the PA quote or $17,589.87 plus a 20% uplift.
The complainant rejected the insurer’s cash settlement offer. He says not all the claim related building damage was included in the PA SOW, namely
· upstairs cornice cracking
· upstairs linen cupboards door frame
· upstairs middle bedroom ceiling
· upstairs middle bedroom wardrobe ceiling damage
· upstairs front bedroom wardrobe ceiling damage
· master Bedroom Ensuite ceiling damaged
· roof structure – rotting ply beneath the tiles.
The insurer responded to the complainant’s concerns by saying that PA had not noted most this damage and it was not shown to its contractors by the complainant.
It says it has included the repairs to the upstairs middle bedroom ceiling damage, and that the rotting of the roof structure was identified during the roof make safe and the area under the roof tiles will need to be replaced. However, the roof tiles can't be installed until the roof structure is repaired. PA maintains the rotting of the roof structure indicated long term damage and was not caused by the storm event.
The complainant says additional roof tiles were damaged during the make safe when the roofer secured the tarp by putting a white glue onto undamaged tiles. He also says the make safe did not make the roof watertight and that it took almost six months until May 2024 to secure the roof causing further damage to the roof structure.
The insurer says:
· PA confirmed that a make safe was undertaken to the existing roof and tarp fixed with silicone to the shingles where storm damage has occurred
· a plumber has also applied lead flashing to flashing joins allowing water ingress into the prayer room as a make safe and this white glue/adhesive is only a temporary make safe to the roof to mitigate loss and will not cause any further damage
· once the roof is repaired, the temporary glue will be removed, and a permanent repair will be put in place.
In response to the complainant’s ongoing concerns, on 5 June 2024 the insurer offered the complainant two options for the settlement of the claim, being:
· a re-assessment of the property to determine if the damages claimed are caused by the listed event. If they are, an amended scope of works can be provided.
· settlement based on the PA SOW of $17,579.89 plus a 20% uplift for unexpected
contingencies and loss of lifetime guarantee.
The complainant did not accept either offer. He remains dissatisfied with the insurer’s cash settlement offer. He says the insurer should pay the following amounts in accordance with quotes for repairs which he has obtained:
· mould affected building repairs by builder EJ $210,400.00
· quote from EJ builders for additional mould remediation works $49,990.00
· roof repairs by roofer CN for $31,185.27
· materials quote for roof materials from roofer BO $6,379.60
· mould restoration from restorer ER mould related repairs for $105,362.00
The complainant’s quotes are not accompanied by causation reports apart from the report from CN who agrees that multiple asphalt shingles have been dislodged from the roof by high winds.
As stated, the complainant has the initial onus to demonstrate a loss that is covered by the terms and conditions of the policy.
There is no doubt there is damage, but it is accepted insurance law and consistent with the coverage provided by the policy, that the complainant must establish that the damage was caused by an escape of liquid, as detailed within the terms and conditions of the policy.
Not satisfied all damage caused by the storm event
The PA report, based on the inspection done in the weeks after the storm, notes that the ply beneath the shingles is rotten, The panel is not persuaded a one off storm event could cause timber damage in such a short period of time, and the panel notes CN does not suggest the damage to the ply was caused by the storm.
This is consistent with the complainant’s roofer CN also stated that they could not guarantee the repairs to the shingles unless the damaged plyboard was replaced.
Given the above, the panel is not satisfied the damage to the ply beneath the roof was caused by the storm. Therefore, the panel prefers the insurer’s roof repair quote.
Regarding the disputed internal damage, the complainant denies that there were other water ingress points aside from the dislodged tiles. However, as stated, PA inspected the property in early December, less than two weeks after the event and noted timber rot to the ply lining of the roof. This suggests water ingress had been occurring for some time.
The panel acknowledges the complainant denies saying to ND he had repaired waterproofing since the event on their second attendance on 14 December 2023, almost three weeks after the event, however the panel considers the ND report is a contemporaneous record of the conversation.
Further, the complainant says the works he had done were regular maintenance rather than damage repairs, similar in nature to clearing out the gutters.
Both ND and PA note the previously repaired damage to the roof. Further, PA noted some of the disputed internal damage corresponded with the locations of these repaired areas of the roof, which supports that these locations were a cause of water ingress.
PA also identified the soaker flashing above the kitchen window and the seal around the pipe penetrations through foam render walls was deteriorated as the cause of some observed internal damage. He says:
water damages to the Store Room, Upstairs Gallery, Bedroom 4 and the Prayer Room as these damages have been caused by the maintenance defects associated with the balcony and roof flashings, which the insured was aware as evidenced by his many repair attempts over a long period of time.
The panel is satisfied the reports from PA and ND are thorough, logical, compelling, and supported by helpful photographs.
It is the panel‘s view that these reports have established that there are multiple causes of water ingress at the property, and that the storm related damage is limited to the items noted in the SOW prepared by PA The panel is not persuaded timber rot identified in the weeks following the storm event were could have been caused by a recent one off storm event.
Rather, the presence of the rotting timbers shows there was likely other points of water ingress causing damage at the property prior to the storm.
The panel is satisfied that the policy does not provide coverage for this damage.
The complainant has not met his onus to establish the disputed damage is a loss covered by the terms and conditions of the policy, Given this, the panel considers the insurer’s cash settlement offer for the covered building damage to be fair and reasonable.
Complainant says additional internal damage has occurred since the event
The complainant has identified some damage to the following areas occurring after the storm, he says due to ongoing water ingress through the dislodged tiles:
· home theatre on the middle floor of the house, including to the ceiling, furniture, and carpet
· timber flooring in the upper floor rear bedroom.
· linens, pillows, and other contents due to stormwater and mould exposure.
He says that the water has travelled through the timber floors of the small bedroom into the ceilings of the theatre room in the middle floor of the house.
The complainant has not provided any information to show this damage was caused by the storm or any failings of the make safe.
In response to the complainant’s concerns the insurer arranged for a further assessment.
Plumber IP attended the property on 6 May 2025. IP says it conducted a thorough inspection of the roof in the presence of the complainant. IP noted the two areas previously subject to temporary make safe measures had deteriorated.
IP also noted significant defects were evident, including clear separation of the slate tiles from the underlying timber underboard, with multiple slates appearing loose or no longer securely fixed. The underside of the slates showed advanced signs of water damage, including visible mould growth, material delamination, and decay—indicative of prolonged moisture exposure and insufficient sealing.
IP says:
In addition to the two highlighted areas, a broader assessment of the roof revealed multiple points of concern throughout various rooflines and elevations. These include lifted or cracked slates, deteriorated flashing, and inconsistent overlaps—all of which present as potential future entry points for water ingress. The condition is consistent across both lower and upper storeys, suggesting widespread deterioration likely due to age, weathering, and insufficient past maintenance.
IP says the complainant did not allow it to inspect the internal damage. The complainant informed IP that all internal impacts resulting from previous water ingress had already been thoroughly documented and reported during earlier attendances by other assessors or contractors.
The insurer says the make safe works conducted by its contractors were reasonable and appropriate under the circumstances.
It says the make safe was expressly intended to be temporary. It says the long delays have been caused by the complainant’s refusal to accept its offer for the relatively minor damage caused by the dislodgement of a few roof tiles during the storm event.
As stated, the panel considers the insurer’s cash settlement offer was fair and reasonable. It was put to the complainant in May 2024.
While the complainant is entitled to reject the settlement offer, the panel is not satisfied the insurer is liable for failings of the make safe almost one year later.
Further, IP established that there are multiple issues with the roof causing damage to the property unrelated to the storm event.
Given the above, the panel is not satisfied the complainant has established the insurer is liable for further damage to the theatre room or timber flooring of the small bedroom.
Reasonable for the insurer to cash settle the claim
The complainant says initially he wanted the insurer to undertake repairs at the property. He says on 11 December 2023 the insurer gave him an option to cash settle the claim by providing it quotes and scope of work, but at that time he did not want to go through that process.
He says he assumed that the insurer would attend to the repairs, and the fact that it did not offer to repair the property is partly the reason for the delay in the claim being finalised.
The policy sets out how claims will be settled:
How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home or 'other benefits' in one of the following ways. Our choice will have regard to the circumstances of your claim and consider any preference you may have.
1. Arrange for repairers, builders or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
• pay you
• pay your nominated repairer, supplier or builder, or
• provide you with store credits from one of our nominated suppliers.
The insurer says its builder PA cannot warrant the works due to the fact there is non-claim related damage to the roof. The other damage cannot be repaired until this issue is addressed.
The panel notes that the complainant’s roofer CN expressed the same view. For CN to guarantee the roof repairs, it would also have to replace the rotting ply beneath the tiles.
Given the above, the panel is satisfied the insurer’s exercise of its discretion to settle the claim by way of cash settlement is fair and reasonable in the circumstances.
Panel considers it fair to allow additional amount for air filtration
The complainant has provided several photographs showing mould at the property. As stated, he is seeking payment of $105,362.00 for mould remediation works.
The insurer’s assessor PA says the mould caused by the storm was light surface mould, and the SOW identifies the damaged sections of plasterboard in the storm damaged rooms which needed replacing, being:
· sections of ceiling and walls in small bedroom
· sections of ceiling and wall in the hallway
· sections of ceiling where necessary in the prayer room
· sections of ceiling in the double bedroom
· sections of ceiling and wall in the kitchen.
The PA SOW does not include any amount for additional mould remediation. This is because the insurer’s mould sampling in February 2024 did not reveal any mould contamination beyond the surface mould at the property.
Prior to the mould assessment, the insurer made several offers to arrange a mould make safe in December 2023 and January 2024 when the complainant expressed concerns about the mould.
The complainant declined these offers stating he would arrange this himself. The claim notes suggest the complainant was concerned about his entitlement to the temporary accommodation benefit and wanted sampling done before a make safe, in case the home was uninhabitable.
Having rejected the insurer’s cash settlement offer and the report by its hygienist PR, the complainant arranged an assessment of the mould damage and mould sampling at the property by hygienist LR in August 2024.
The LR reports says:
Based on the assessment, it has been identified that water damage causing mould proliferation to surfaces have occurred to the building structure surfaces/materials, throughout the upper level, at [complainant’s address] property.
In addition to this, airborne mould spore levels were identified to be at very high levels, where personal exposure impacting on human health is a high risk, therefore the assessed areas are deemed unsafe for normal inhabitancy.
As stated, the insurer’s hygienist, PR, attended the property on 23 February 2024 and did not detect airborne mould at unsafe levels.
LR sampled the property on 2 August 2024. It appears from the PR results that the air quality at the property had become contaminated with mould between the two assessments.
Given the panel is satisfied the plaster in the rooms subject of the LR report is storm damaged, and that the insurer delayed the claim in the months following its mould assessment by PR, the panel is therefore satisfied the complainant has established that the air filtration recommendation in the LR report is required due to the storm.
The recommendation in the LR report is as follows:
Air Filtration:
Air filtration using air filtration devices (AFDs) should be utilised throughout all mould removal works, and within adjacent non-affected areas to minimise cross contamination.
▪ The use of air filtration devices (AFDs), quantity and placement, will be determined by the restoration contractor.
▪ Air filtration should also occur for an additional 48-72 hours, after the completion of mould removal, prior to undertaking a Post-Remediation Verification (PRV) assessment.
6. At the conclusion of mould remediation works, a Post Remediation Verification (PRV) assessment should take place by an Independent Environmental Professional (IEP)/Hygienist, to ensure all remediation processes have been successful in returning the structure back to a likely pre-event condition.
Should the complainant accept this determination, within 14 days of being notified of his acceptance, the insurer is to obtain a quote for the post building repair air filtration works described in the LR report and pay the complainant that amount in settlement of the mould damage at the property.
The panel notes the removal of mould damaged building materials, which LR identifies as the source of the airborne contamination, is accounted for in the cash settlement for the building repairs.
Panel is not satisfied additional items in LR remediation report are claim related
LR notes some additional moisture damage at the property which are not included in the insurer’s SOW, including damage to the timber flooring. However, LR provides no analysis or compelling opinion regarding the cause of damage.
LR also notes the timber decay in the ceiling the complainant showed it by cutting away some of the plaster. The timber rot is advanced, and the panel considers this degree of deterioration of the structural timbers is unlikely to be caused by a one-off storm event allowing water ingress by the dislodgement of a small number of roof tiles.
Given the non-claim related water ingress issues to the property identified by PA and ND, the panel is not satisfied, on balance, that the additional damage noted by LR is related to the storm event.
2.2 Is the insurer liable for damage to the contents?
The panel considers assessment of the damaged contents from the rooms which sustained damage accepted under the claim is required in order to determine the insurer’s liability, if any, for damage to the complainant’s contents.
Complainant says his contents were damaged by the storm
The complainant says his contents have suffered mould damage because of the storm event. He is claiming the following amounts for contents:
· $49,791.50 for mould damaged clothes, curtains and linen
· $21,295.00 to replace custom made leather couches in affected areas
· $4,999 mould affected massage chair
· $77,994.00 to replace mould affected mattresses
· $3,999.00 to replace mould affected theatre chairs
· $14,578.52 to replace two wedding dresses
· $897.82 to replace mould damaged bed linen in children ‘s bedroom
There has been no assessment of the contents damage
It appears there has to date been no assessment of the damage to the complainant’s contents. The insurer arranged restorer LX to attend the property on about 23 April 2024 to assess the contents, however the complaint turned them away. He says this was a mistake as he was not aware of the appointment.
LX was rescheduled for 11 June 2024. However, the complainant cancelled because he was going overseas.
It was arranged that the complainant would contact the insurer when he returned to Australia to reschedule LX, however that does not appear to have occurred.
Immediately after the storm PA noted the mould damage was limited to light surface mould, and PR noted there was requirement for building or contents remediation apart from the strip out of water damaged building materials.
As stated, by August 2024 the mould contamination at the property had proliferated with LR reporting unsafe levels of airborne mould in the upper level of the property.
The panel is of the view that there should be an assessment of the complainant’s contents claim. The panel acknowledges that the contents assessment will be difficult given two years have passed since the storm event.
The panel notes the following factors that have likely exacerbated the damage to the contents:
· the complainant refused the insurer's several early offers of a mould make safe at the property
· the insurer delayed in making a claims decision between February 2024 and May 2024
· the complainant refused to accept the reasonable settlement offer and attend to the strip out of the water damaged plaster
Should the complainant accept this determination, within a reasonable time of being notified of his acceptance, the insurer is to assess the storm related damage to the complainant’s contents, if any, in accordance with the terms and conditions of the policy.
Bearing the above exacerbating factors in mind, the panel considers the parties must work together to reach a settlement for the contents claim. This is consistent with the parties’ mutual duty of utmost good faith, as outlined in section 13 of the Insurance Contracts Act 1984.
Should the parties not reach agreement the complainant can bring a further complaint to AFCA.
2.3 Is the complainant entitled to be reimbursed for his professional costs?
Yes. The panel is satisfied it is fair for the insurer to reimburse the complainant $1,100 for the cost of the LM mould remediation report.
Complainant seeks reimbursement of his professional costs
Paragraph D.5 of the AFCA Rules provides that we may determine an insurer should contribute towards a complainant’s professional costs in pursuing a complaint. AFCA typically caps this contribution at no more than $5,000 unless special circumstances apply.
The complainant seeks payment towards his costs in pursuing this complaint. The complainant obtained and provided an expert opinion (and report) from LM regarding the mould remediation, as well as various quotes from his own company JP at a cost of $1,100.
AFCA aims to provide a dispute resolution process which is accessible to complainants, without the need for professional advisors. Accordingly, professional costs will only be reimbursed where external advice is reasonably required, given the nature of the dispute.
In the present case, the panel is not satisfied the quotes from JP assisted the complainant or that it was necessary to obtain its services. Further, JP is the complainant’s company and its quotes are therefore not independent assessments of the claim related damage.
The panel is satisfied the report from LM assisted to resolve the complaint, as JM provided the recommendations which are fair and reasonable for the final mould remediation of the storm damaged areas of the property.
Therefore, the panel is satisfied it is appropriate to require the insurer to reimburse the complainant for the costs he incurred engaging LM.
Should the complainant accept this determination, within 14 days of being notified of his acceptance, the insurer is to pay the complainant $1,100 to reimburse him for the costs of the LM report.
2.4 Is the complainant entitled to the temporary accommodation benefit?
The complainant is entitled to the cost of reasonable and appropriate temporary accommodation in the event he moves out of the home while the repairs to the accepted damage and subsequent air filtration are completed because the property cannot be lived in while they take place.
Policy has additional benefit for temporary accommodation
The policy benefit for temporary accommodation is detailed at page 46 of the PDS as follows:
Temporary accommodation for home owners
Buildings Insurance
Contents Insurance
If a listed event causes loss or damage to your home and you are unable to live in your home and you need to move out so it can be repaired or rebuilt.
We pay this benefit on top of your Buildings sum insured.
Covered under Buildings Insurance
• costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site
• any additional living expenses that we agree are appropriate
• costs to remove and store your contents and then return them to your home.
Conditions
• you must have lived in your home permanently before the listed event took place
• we must agree to pay the costs before you make any arrangements
• we won’t cover any additional costs caused by unreasonable delays by you or any repairer, builder or supplier you appoint or engage in repairing or rebuilding your home.
Complainant says property is uninhabitable due to mould contamination
The complainant is claiming $214,119 for relocation expenses, rental costs and temporary accommodation. He says the property is uninhabitable which is supported by the LR report.
The LM report notes that only the upper level of the house is uninhabitable. The complainant’s house is three stories, and while there will be inconvenience associated with the top story being unable to be used, the panel is not satisfied this renders the property uninhabitable. The habitable areas of the property include the first two floors which include the kitchen, bathroom, bedrooms and living areas.
The insurer agreed to pay temporary accommodation during mould remediation works; however, the complainant has not undertaken these works and has remained living at the property. He has not provided any information to show he has incurred temporary accommodation costs.
As stated, the panel consider the cash settlement offered by the insurer was fair and reasonable and notes PA’s view that the property will remain habitable during repairs. However, the LR report established that the mould levels at the upper level of the house are unsafe, and the panel also considers it fair that the air filtration recommended by LR should also occur for an additional 48-72 hours after the completion of mould removal.
In the event the above works render the property uninhabitable, and the complainant incurs reasonable and appropriate temporary accommodation expenses during that time, he may submit invoices for review and reimbursement from the insurer.
The insurer must agree to the expenses before they are incurred in accordance with the policy, and the panel notes that the insurer must exercise this policy obligation in good faith.
2.5 Did the insurer mishandle the claim?
Yes. The information shows there was a delay between the assessment process being finalised and the insurer making a claims decision, and the panel is satisfied payment of $3,000 compensation for non-financial loss offered by the insurer is reasonable compensation in the circumstances.
AFCA may award compensation for non-financial loss
AFCA may award compensation for non-financial loss if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered the usual inconvenience and delays associated with making a claim. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation.
The insurer delayed the claims decision
After conducting the roof make safe and assessing the building damage and mould damage the insurer delayed in making a claims decision for several months without any explanation. All assessments were completed in February 2024; however, no claims decision was made until late May 2025. There was also a delay in providing the complainant with the assessment reports.
The insurer acknowledges that this was poor claims handling. It apologised to the complainant for his claims experience and offered him $1,000 compensation.
In addition to this, the panel considers the insurer must pay the cost of air filtration and post remediation testing. These costs would not have been incurred had the settlement offer not been delayed, as the PR report shows at the time it assessed the property the mould was not at unsafe levels.
The information also shows the insurer did not assess the damage to the complainant’s contents. The clam notes show that the restorer LX was turned away by the complainant, it is not entirely clear why this was not rescheduled.
Aside from this initial delay and the delay in the contents assessment, the panel considers the insurer handled the claim reasonably well overall. The panel considers the lengthy delays in the claim being settled are largely due to the complainant’s non-acceptance of the reasonable offer made by the insurer.
While the complainant has the right not to accept the cash settlement and pursue a complaint at AFCA, where AFCA has found substantially in the insurer's favour, it would not be fair to require the insurer to compensate the complainant for the delays experienced during the complaint process.
The complainant says the insurer’s actions forced him and his family to live in a mould infested property. However, the insurer made multiple offers to undertake a mould make safe in December 2023 and January 2024. The complainant refused each offer.
Further, the insurer’s cash settlement offer involved a strip out of the water affected building materials which LR says is the source of the mould, however the complainant did not accept the offer.
As stated, due to the insurer’s delay in making a claim decision between February 2024 and May 2024, the panel considers it fair to require the insurer to undertake air filtration to account for the possibility this delay worsened the mould situation.
Given this, and the insurer’s apology and offer to compensate the complainant $3,000 for his non-financial loss, the panel does not consider a further award of compensation for non-financial loss is warranted in the circumstances.
2.6 Why is the outcome fair?
The outcome is fair as the insurer is entitled to rely upon the terms and conditions of the policy to determine its obligations to the complainant, regarding the claim.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:
· an ombudsman
· a member with significant experience in consumer and small business advocacy
· a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.