Home / Youi / Determination 12-00-1100752
Determination 12-00-1100752
Home insurance claim for bathroom waste pipe leak damage denied as pre-existing
Summary
The complainant's home insurance claim for water damage from a bathroom waste pipe leak was denied as pre-existing. AFCA found the insurer had not established the exclusions, ordered the claim accepted and awarded $3,150 non-financial loss.
Once a valid claim is shown the onus shifts to the insurer, which failed to prove on the balance of probabilities that the damage pre-dated policy inception.
Issues
- Claim denial primary · upheld“The insurer has not established it is entitled to rely upon a policy exclusion to deny the claim.”
- Inadequate claim investigation secondary · upheld“The insurer has presented no evidence to establish, on balance, that the wood rot proves the defect pre-dates policy inception.”
Subjects and remedies
home or building damagemental healthpay claimpay non financial lossrepair or rectify
Related
Text of the determination
Determination
|
Case number
|
12-00-1100752
|
Financial firm
|
Youi Pty Ltd
Case number: 12-00-1100752 2 December 2024
Determination overview
Complaint
The complainant holds a home insurance policy with the financial firm (the insurer) for his property located in a hinterland suburb behind the Gold Coast, in the state of Queensland (the property). In April 2024, he lodged a claim for damage to the property caused by a leak from a bathroom waste pipe.
The insurer denied the claim. It says the damage was long-term in nature, and pre-dates the inception of the policy in January 2024.
The complainant says he discovered the damage after the policy came into effect. He did not know about the defective waste pipe or the damage it caused before he made the claim in April 2024. He seeks cover for the loss. In the event the policy excludes it, he says section 46 of the Insurance Contracts Act 1984 (Cth) (the Act) should apply to prevent the insurer from denying his claim.
Issues and key findings
Should the insurer accept the claim?
Yes. The exchanged material shows the damage was caused by an insured loss event that is not otherwise excluded from cover under the terms and conditions of the policy. In such circumstances, there is no need to consider whether section 46 of the Act applies.
Should the insurer pay non-financial loss compensation?
Yes. The insurer should pay to the complainant the sum of $3,150 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
the complainant has established a valid claim for the damage
the insurer has not established it is entitled to rely upon a policy exclusion to deny the claim
an award of non-financial loss compensation is fair and reasonable.
Determination
This determination is in favour of the complainant.
The complaint should be resolved in accordance with section 2.3, below.
Reasons for determination
Should the insurer accept the claim?
Yes. The exchanged material shows the damage was caused by an insured loss event that is not otherwise excluded from cover under the terms and conditions of the policy. In such circumstances, there is no need to consider whether section 46 of the Act applies.
Circumstances of the claim
The property includes a detached, single-storey, brick-veneer residential home sitting atop a concrete slab foundation. The pitched, timber-framed roof is covered in Colorbond sheeting.
The dwelling has a main bathroom and an ensuite. This complaint and the associated claim concerns damage to the main bathroom and some adjoining areas.
The complainant purchased the property in late January or early February 2022. The policy was incepted about two years later on 31 January 2024, after the complainant changed insurers. The relevant period of insurance is 31 January 2024 to 31 January 2025.
The complainant lodged the claim on 3 April 2024. He advised the insurer:
We have issues with a water leak. We are not too sure where the leak is coming from, but the carpets are wet, as well as the walls.
The insurer arranged for AG, plumber, to inspect the property on 3 May 2024. Upon inspection AG reported, amongst other things:
the main bathroom includes a shower and a separate bathtub. It is located between a bedroom on one side, and a separate, enclosed toilet room on the other side. A second bedroom is located on the other (far) side of the toilet room
there was moisture and mould present above the skirting tiles in the adjoining toilet room
moisture was detected in the walls of the toilet room
there was moisture in the bedroom carpet next to the toilet room and moisture detected in the wall between that bedroom and the toilet room.
AG conducted a dye-test to detect signs of leakage. Dye water was found in the carpet of one of the bedrooms in the vicinity of the main bathroom. Dye water also leaked out of the floor tiles in adjoining toilet room.
AG concluded the leak was:
Possibly caused from the Lego [brick] stuck in the bath plug and waste pipe, or a crack in the bathtub waste pipe.
The insurer then arranged for LR, builder, to inspect the property on 17 May 2024. LR reported:
the complainant advised he noticed wet carpet in the spare bedroom, which led to the lodgement of the claim
AG’s report identified the cause of damage to be a leaking plumbdinger attached to the bathtub in the main bathroom
the damage includes visible wood rot and mould growth in the smooth-edge under sections of the carpets in bedrooms two and three, as well as mould growth on parts of the carpet backing in those rooms. This damage is indicative of a ‘long-term water leak’
visible moss was growing through the exterior brickwork mortar directly outside the main bathroom and toilet room areas, indicating the leak has been occurring for a ‘prolonged period of time’.
the complainant ceased using the bathtub after AG’s report.
LR noted all the damaged areas and completed some preliminary mould containment and make-safe works.
Around this time the insurer conveyed its decision to deny the claim. It says the damage has been occurring for more than 12 months and, as such, mostly happened before the policy was incepted. The insurer advised the complainant to contact his previous insurer about the damage.
The complainant says he did not know about the damage or the defective waste pipe before he made the claim in April 2024. He says if the loss is not covered by the policy that section 46 of the Act should apply to prevent the insurer from denying his claim.
Complainant has onus to establish a valid claim
It is established insurance law that the complainant first has the onus to establish the claimed loss is a result of an event covered under the policy. This must be established on the balance of probabilities, meaning that it is more likely than not. This is sometimes called a valid claim.
If the complainant is able to establish a valid claim, the onus shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the Certificate of Insurance. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the contents of the documents.
Complainant has established a valid claim
I am satisfied the complainant has established a valid claim for the damage. This is because of the following factors.
First, there is no dispute a defective (or failed) waste pipe in the bathtub in the main bathroom caused the damage.
Second, damage of the type claimed is, on the face of it, covered by the terms and conditions of the policy. For instance, page 17 of the PDS sets out the cover for the insured event, ‘Escaping water’:
Escaping Water
What is covered?
Loss or damage to the insured property caused by escaping water that occurred:
• suddenly and without warning; or
• slowly over a period of time and you could not reasonably have been aware of it.
Third, the complainant says he was not aware of the damage until he discovered the carpet in one (or both) affected bedrooms was wet. The implication from this is that the defect in the wastepipe did not come about until relatively shortly before the consequential damage was discovered. In other words, had the waste pipe in the bathtub failed many months prior to April 2024, in light of AG’s dye-test results, one would expect the consequential damage (including the water affected carpets) to have also been discovered many months prior to April 2024.
As mentioned, the onus now shifts to the insurer to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim.
Insurer says defect and damage pre-dates inception of policy
The insurer says the damage is excluded from cover under the terms and conditions of the policy. Specifically, in this regard, the insurer relies upon the general policy exclusions set out on pages 30 and 31 of the PDS:
General exclusions
These general exclusions apply to all sections of your policy.
We will not pay for:
1. repair of any damage that existed prior to the start date of the policy
[…]
We will not pay for death or bodily injury to any person, or loss or damage to property, caused by, resulting or arising from:
29. any event that occurred before your cover started with us or after it ended
Does the defect and damage pre-date policy inception?
The insurer says the damage and cause of loss pre-dates policy inception. In support of this contention the insurer points to the nature and characteristics of the damage. The insurer says the damage is substantial and, pursuant to LR’s report, includes:
extensive wood rot of sections of the smooth-edge under the carpets in the two affected bedrooms which is indicative of a long-term water leak
visible moss and plant material growing through the brickwork mortar directly outside the main bathroom and toilet room area, which indicates the leak has been occurring for a prolonged period.
The insurer also says the complainant should have known about the defective pipe or, at least, the damage it caused, when he purchased the property. In this regard, the insurer relies upon a pre-purchase inspection report by JB, builder, dated 11 January 2022.
JB’s report is comprehensive and well-reasoned. It also includes many helpful and illustrative photographs of the property.
Relevantly, in respect of the main bathroom, JB’s report states:
Building: Main Building
Location: Bathroom - Existing
Finding: Tiles - Drummy
Information:
Drummy tiled areas were identified at the time of inspection. The term 'drummy' refers to tiles that have become detached from their fixing, despite otherwise being in relatively good condition. Such defects are generally caused by physical or moisture damage to the area. Drummy tiled areas may also be a direct result of poor workmanship during the construction process.
Tiled areas may swell and shrink with changes in air humidity if the area has sustained moisture damage. Any exposure to moisture is capable of causing tiled areas to become drummy and/or cracked over a prolonged period of time. Drummy tiled areas generally require removal and replacement of affected tiles, with adequate sealant and grouting.
Insurer has not established defect and damage pre-dates policy inception
Based on the exchanged information, I am not satisfied the insurer has established, on balance, the application of the policy exclusions upon which it relies. I am not satisfied the insurer has shown the damage existed prior to the inception of the policy or that the loss event (being the defect in, or failure of, the wastepipe) occurred before policy inception. This is because of the following considerations.
First, as mentioned, the complainant became aware of the defective bathtub waste pipe shortly after he noticed part of the consequential damage (being the wet carpets and walls) and made the claim. This was during the period of insurance. The complainant says he was not aware, and had no way of becoming aware, of the defective waste pipe before he made the claim. In fact, when he lodged the claim in April 2024, the complainant advised the insurer, “We are not too sure where the leak is coming from, but the carpets are wet, as well as the walls”. The complainant did not report any other defect or damage at that juncture.
On balance, I accept the waste pipe failed (or became defective) only a relatively short period before the claim was made. Indeed, as mentioned, considering the results of AG’s dye-test in May 2024, it is reasonable to conclude that, had the waste pipe failed prior to January 2024, the consequential damage would have also become apparent to the complainant prior to January 2024.
Second, the insurer has presented no evidence to impugn or undermine the credit of the complainant. It follows there is no persuasive reason to doubt the veracity of the complainant’s reports about the condition of the property, and his knowledge of it, prior to policy inception.
Third, apart from ‘drummy’ tiles, upon inspection of the property in January 2022, JB found no evidence of a defective bathtub waste pipe, or any other damage, in the main bathroom. Moreover, as JB points out, there are multiple causes of drummy tiles, including the presence of moisture to the area and, in addition, poor workmanship during the construction process. However, neither the insurer nor its experts addressed the very real possibility that the drummy tiles observed by JB had been caused by poor workmanship during construction, and not a defective bathtub waste pipe. Indeed, AG did not observe water leaking from (or around) the drummy tiles during the dye test it conducted. This adds weight to the conclusion the drummy tiles are not related to the insured loss event. I also note that neither AG nor LR mentioned the drummy tiles in their reports.
Fourth, upon inspection JB found no other relevant damage in the toilet room or in the bedrooms in the immediate vicinity of the main bathroom.
Fifth, the insurer has presented no evidence to establish, on balance, the degree of wood rot in sections of the smooth-edge under the carpets in the two affected bedrooms observed by LR proves the defect (and/or the damage) pre-dates policy inception. Importantly, in its report dated 17 May 2024, LR states the following:
The degradation to the smooth-edge is indicative of a long-term water leak… [the] visible moss and plant material… growing through the brickwork mortar directly outside the bathroom and toilet areas… indicates that the leak has been occurring for a prolonged period of time [emphasis added].
The phrases ‘long-term water leak’ and ‘prolonged period of time’ are not qualified by LR. In fact, LR does not elaborate about the intended meaning of these phrases.
However, despite this absence of detail, and in the absence of any additional persuasive evidence, in its Home Assessment Report dated 29 May 2024 the insurer makes the analytical leap that the defect has been ongoing for:
At least 12 months and well prior to policy inception.
I am not satisfied the insurer has proven this, on balance. Moreover, I am satisfied the photographs of the smooth-edge and the brickwork mortar included in LR’s report do not depict damage that has definitely been occurring for ‘at least 12 months’.
Sixth, it is common knowledge, and reasonable to conclude, that the environmental conditions in the Gold Coast Hinterland during the months of January to April include ‘humid-rich’ periods. However, neither the insurer nor its experts address the reasonable possibility that the mould and associated damage observed by LR could potentially have developed during the early months of 2024 after the policy was incepted.
Insurer must accept the claim
I am satisfied the complainant has established a valid claim for the damage. I am not satisfied the insurer has discharged its burden to establish, on balance, the application of either of the policy exclusions upon which it relies. I am of the opinion the insurer has not shown the damage existed prior to the inception of the policy or that the loss event (being the defect in, or failure of, the wastepipe) occurred before policy inception. Given this, it is not necessary to consider whether section 46 of the Act applies.
Should the insurer pay non-financial loss compensation
Yes. The insurer should pay to the complainant the sum of $3,150 in non-financial loss compensation.
Complainant suffered undue stress and anxiety
Under the AFCA rules, non-financial loss compensation (capped at $6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss is not intended to be a punishment for any wrongdoing on the part of the insurer.
I accept the complainant suffered an unusual degree of physical inconvenience and interference with his expectation of enjoyment and peace of mind.
The complainant is a vulnerable individual. He suffers from post-traumatic stress (unrelated to the claim) which, from time to time, requires medical treatment. I accept the drawn-out claim process, together with the way the evidence was analysed, caused him significant stress, anxiety and interference with his expectation of enjoyment and peace of mind.
Understandably, the complainant now feels aggrieved.
Given these considerations, the insurer should pay to the complainant the sum of $3,150 in non-financial loss compensation.
Complaint should be resolved in this way
Time is of the essence
Within 14 days’ notice that the complainant accepts this determination, the insurer must pay to the complainant the sum of $3,150 in non-financial loss compensation.
Within 21 days’ notice that the complainant accepts this determination, the insurer must engage a qualified builder, or other suitably qualified expert, to attend and inspect the complainant’s property. This expert must draw up a scope of works (SOW) regarding the necessary repairs and associated works required to repair the damage in accordance with the terms and conditions of the policy.
After receipt of the SOW, the insurer must promptly obtain at least one actionable quotation based upon the SOW, either by way of a tender process or otherwise. All repairs and remedial works included in the SOW and quotation(s) must also comply with all current and applicable Commonwealth and Queensland building-related, safety-related and health-related laws, regulations and codes.
Within seven days of receipt of the associated quotation(s), the insurer must elect to either:
agree to commence the necessary repairs and associated works as soon as possible, or
offer a cash settlement to the complainant comprising a sum equal to the total of the preferred actionable quotation, plus a 20% contingency on top of this to factor in the risk of the works passing to the complainant and the likely possibility that further works may be required.
Given the time since the claim was lodged, I emphasise that time is of the essence in the resolution of this complaint.
Why is the outcome fair?
Complainant was not aware of defect prior to policy inception
The outcome is fair in all the circumstances because:
the complainant has established a valid claim for the damage
the insurer has not established it is entitled to rely upon a policy exclusion to deny the claim
an award of non-financial loss compensation is fair and reasonable.
Supporting information
The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.