Home / Suncorp Group / Determination 12-00-1098825

Determination 12-00-1098825

Settlement of storm water ingress claim including repairs, mould remediation and roof replacement, and claim handling compensation

FirmSuncorp Group
Decided2025-09-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$59,781
Non-financial loss$6,300
Amount claimed$211,908
SourceAFCA PDF

Summary

Complainants disputed the insurer's cash settlement offer for storm water damage, mould and roof replacement after a failure to disclose roof maintenance issues. AFCA partly upheld the complaint, requiring uplifted settlements, expert costs and $6,300 non-financial loss, but not roof replacement.

The insurer's offer needed large contingency uplifts because the quote was not actionable and mould was accidental damage covered under the policy, but the roof issues were wear and tear and the owners' maintenance responsibility.

Issues

Subjects and remedies

health or medicalhome or building damagemental healthpay claimpay compensationpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1098825 | Financial firm | AAI Limited Case number: 12-00-1098825 25 June 2025 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy underwritten by the financial firm (insurer). They lodged claims for a hail event in 2020 (first claim) and for a storm event in 2022 (second claim). The insurer accepted the claims. However, the parties have not come to an agreement about how to settle the second claim. The complainants say: · the insurer failed to tell them during the first claim of maintenance work required to the roof · this meant there was damage caused inside the home during the second claim · if told about the issue, they would have replaced the roof, preventing this damage. The insurer accepted it was liable for water ingress for the second claim. It began repairs but a breakdown in trust between the parties meant they were not completed. The insurer offered to pay the complainants $26,457.51 to complete the work but this offer was refused. The complainants want the insurer to pay $211,907.60 to complete repairs, plus the costs to replace the roof and compensation for the poor handling of the matter. 1.2 Issues and key findings Is the insurer’s final settlement offer fair? No. The insurer is required to: · increase the settlement offer of $26,457.51 by adding a contingency uplift of 40% · pay $33,323.46 to remediate the mould in the home, plus an uplift of 30%. The insurer is not required to pay for the roof replacement as it was not covered by the policy. Are the complainants entitled to compensation? Yes. The insurer must pay $6,300 in total compensation for non-financial loss. Why is the outcome fair? The insurer assessed the claims in line with the policy, but it is fair that large contingency uplifts apply. It is fair the insurer pays compensation for the impact its claim handling had. 1.3 Determination This determination is partially in favour of the complainants. Within 14 days of acceptance of this determination, the insurer is required to: · cash settle the complainants for the outstanding repairs of $26,457.51 (if it has not already done so), plus a contingency uplift of 40% · pay $33,323.46 plus a contingency uplift of 30% for remediation costs · pay the complainants’ expert fees up to but not exceeding $5,000 in total, and · pay the complainants $6,300 in total as compensation for non-financial loss. The insurer is to pay the amount into an account accessible to both complainants, or split the amount in whichever way the complainants advise within 7 days of the request. 2 Reasons for determination 2.1 Is the insurer’s final settlement offer fair? No. The insurer is required to: · increase the settlement offer of $26,457.51 by adding a contingency uplift of 40% · pay $33,323.46 to remediate the mould in the home, plus an uplift of 30%. The insurer is not required to pay for the roof replacement as it was not covered by the policy. Complainants unhappy with the insurer’s resolution of the two claims The complainants’ home is a double storey brick veneer construction, believed to have been built in or about the 1980s. The first claim was lodged for hail damage to the roof which occurred on 31 October 2020. The insurer cash settled this claim, and the complainants attended to the minor repairs. It is not in dispute one of the insurer’s contractors found damage to the roof not caused by hail. This damage required attention which was maintenance related. A copy of the report detailing the necessary required maintenance was not provided to the complainants at the time. They say had they received it, they would have immediately replaced the roof. Later, the complainants lodged a second claim for storm damage which occurred on 26 January 2022. This involved rainwater ingress through the roof, which caused damage inside the home. The complainants say this damage would not have occurred if the insurer had informed them in 2020 of the maintenance work it had identified was needed. The insurer agreed to settle the complainants for internal damage from the second claim. It did not cover the roof damage. It says this was not caused by either claim event. Based on an original scope of work for $146,005.08 from builder AB on 12 June 2023, the insurer began repairs to the home. These repairs were not completed due to ongoing disputes between the parties as to the quality of the work and the scope of what was required. The parties are now at an impasse on settlement. To resolve the matter, the insurer offered a cash settlement of $26,457.51 for the outstanding repairs. The complainants rejected the offer. They want the insurer to pay $211,907.60 based on a quote from RI to repair the damage and rectify the mould in the home. Complainants required to show insurer is liable to cover the claimed loss The terms of the policy include the Certificate of Insurance and the Product Disclosure Statement. There is no dispute the insurer sent these documents to the complainants, or that they established a claimable loss for both claims. There is disagreement about the extent of the loss caused and what the insurer is liable for in relation to the second claim. The complainants bear the initial onus of proof for this. They must show an entitlement under the policy or that due to the insurer’s negligence they are otherwise entitled to cover for the claimed items. Only once this onus is discharged is the insurer required to show why it is not required to cover the damage. For both the complainants and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not). The policy provides cover for listed insured events, which includes loss or damage caused by a storm. It also provides optional cover for accidental damage at the home, which the complainants selected. Extent of building damage the insurer is liable for is limited The insurer does not dispute it should have informed the complainants of the damage found to the roof in or about 2020. Whilst acknowledging the complainants are ultimately responsible for the pre-loss condition of the home, the panel accepts the insurer should have informed them of the other roof damage. Even so, the insurer agreed to cover water ingress damage from the second event. After accepting liability for this damage, builder AB for the insurer quoted $146,005.08 to attend to these repairs on 12 June 2023. AB started but could not complete the repairs due to a relationship breakdown between the insurer and the complainants. It says most of the work is done. The complainants appointed builder RI to quote for repairing the remaining issues. On 12 January 2025, RI provided a quote for $211,907.60. This included remediation costs for the mould in the property and to repair the outstanding damage. The insurer considers the quote excessive and says it involves work not related to the claimed loss. To resolve the matter, the insurer offered a cash settlement of $26,457.51 based on a new quote from AB dated 17 March 2025. This quote covers what AB says are the outstanding repairs it has yet to complete. No allowance was made for mould remediation in this quote. The insurer undertook mould remediation and considered this aspect of the loss has been resolved. The complainants disagree. Leaving aside the mould damage, the panel acknowledges the complainants’ concerns about poor repairs and/or damage they attribute to the insurer’s contractors. However, beyond that which the insurer accepts, the complainants’ evidence suggesting there was additional or other damage caused by the insurer’s contractors is speculative. It is certainly not persuasive. The onus rests with the complainants to show the insurer is liable for this damage. The panel is not satisfied they have successfully done so. Insurer to pay AB quote amount with significant contingency uplift The panel notes the insurer offered to attend and further assess the damage. However, the complainants do not want this. They provided extensive submissions about the negative effect their dealings with the insurer and its contractors have had on them. Therefore, the panel accepts the only viable solution is to proceed with a cash settlement. Noting the RI quote includes items not related to the loss, the panel considers the AB quote is the only quote available which can be relied upon. However, this quote is not without flaws. Due to the breakdown between the parties, AB will not attend to the work. This means the quote is not actionable. It is not only conceivable, but likely, the complainants will incur additional costs to involve another builder. Further, no contingency uplift was offered to cater for the transfer of risk to the complainants, the loss of the lifetime guarantee, or other damage which may have been overlooked. To this end, the panel considers a significant contingency uplift is warranted. This will cater to the above factors and the fact that AB will not be asked (and is likely not prepared) to undertake the work. Therefore, the panel considers the amount quoted by AB ($26,457.51) must be paid, plus a 40% contingency uplift ($10,583). This will cater to the above issues and the absence of an interest component in the settlement. It is important to note this award does not include any allowance for mould remediation or roof damage. These is addressed separately below. Complainants obtained evidence of mould and other damage to home Photographs show extensive water and mould damage was caused to the ceiling areas in several rooms of the home. Both parties obtained mould inspection reports. On 30 January 2024, the insurer’s remediator, AD, wrote that it found no visible mould or elevated moisture levels during its most recent inspection, a week before. Mould expert OR for the complainant noted on 25 June 2024 that mould was still present in the home. The insurer says as it had completed mould remediation, this mould is not related to the covered water ingress and is more likely due to atmospheric issues. Whilst the panel acknowledges it is possible that mould from the claimed event may have been cleaned, this does not necessarily mean the insurer has discharged its obligation. There is no evidence of mould infestation at the home which preceded the claim. This means it is more likely than not that any continuing mould issue is related to the water ingress events. Further, the policy extends beyond listed events and provides cover for accidental loss and accidental damage at the home. Therefore, even if the mould was not caused by the storm event, the panel accepts it was accidental. The insurer has not shown why it would be excluded in these circumstances. Given this, the panel accepts the claimed mould remediation loss should be covered. Whilst it is arguable that a new claim should be lodged (with a new excess), the panel is also not satisfied this should not be the case. The insurer has not adequately shown the loss was caused by a separate event. Noting there is an accepted event for water ingress into the home, and evidence that this caused mould damage, the panel considers it fair that the insurer covers the damage under the second claim. Given this, the panel accepts the insurer is liable to cover the cost to attend to further mould remediation at the home. Insurer to settle mould remediation based on CO quote with uplift Noting the breakdown of the relationship between the parties, the panel accepts it is not viable to have the insurer attend to further mould remediation. The complainant had hazardous materials expert CO provide a quote to clean the home for $33,323.46 on 5 November 2024. This is the best quote to rely upon as a basis for settlement. However, the panel considers a 30% contingency uplift ($9,997.04) should be added due to: · the loss of the lifetime guarantee, and transfer of risk · time elapsed since CO’s quote was obtained, meaning pricing may have increased · the likelihood that mould has spread, and · to bring finality to the complaint. Complainants also want the insurer to reimburse the cost to replace the roof The complainants say the failure to inform them of the roof issue during the investigation of the first claim meant they were unable to take appropriate steps to address it. This is the reason the insurer agreed to cover the internal water damage for the second claim. However, the complainants also say they would have replaced the roof had they known of the damage. They have since done so. They seek reimbursement for these costs (more than $32,000) from the insurer. The complainants cite section 46 of the Insurance Contracts Act 1984 (the Act) in support of their view. Section 46 of the Act does not apply. This section is only relevant where the insurer relies on a policy provision that has a reference to the condition of a thing at a time prior to the contract commencing. No such clause was relied upon by the insurer here. Insurer is not liable for the costs incurred to replace the roof Amongst the problems cited with the roof were unsecured tile clips, gaps between roof tiles, chipped and broken tiles and a broken beam in the roof space. None of these were linked to any single insured or accidental loss event. The panel is satisfied the insurer bears no responsibility to replace the roof. The panel considers: · none of the roof issues were caused by an event the policy covers · the insurer’s failure to inform them of roof issues does not make it liable for the roof itself · maintaining the property is the complainants’ responsibility. Whilst the complainants say the roof was previously ‘fully restored’ in 2016, issues with it were found in 2020. The panel considers none of the individually cited roof issues with the roof were related or caused by an incident or occurrence to which the insured event or accidental damage provisions would respond. Further, even if the above damage might be considered within the accidental damage provision, the panel is satisfied the damage is not covered. The roof issues were consistent with long term wear, tear, gradual deterioration and maintenance issues. The policy excludes those causes. Fair that the insurer covers expert costs up to $5,000 The AFCA Rules enable AFCA to require an insurer to contribute to the professional costs incurred by a complainant. These costs are, however, usually capped at a total of $5,000, unless special circumstances apply. When considering whether to require an insurer to make a costs contribution, AFCA considers the complexity of the complaint and whether the particular complainant(s) needed to incur costs to understand or establish their claim. In this matter, the complainants retained experts which supplied helpful reports regarding the mould issues at the home. They say the insurer only reimbursed them for one of these reports. The panel accepts the insurer should reimburse the complainants for the costs incurred to retain experts, up to but not exceeding a maximum payment of $5,000 (inclusive of what it has already paid). The complainants are required to provide the insurer with evidence of having incurred these fees before the insurer reimburses the complainants. Complainants must individually notify insurer of settlement preferences Noting the complainants have separated since the lodgement of this complaint, they must individually inform the insurer about their preferences for settlement payments. This includes where and into what account any funds should be paid. Such an approach should ensure the payments are issued fairly and without undue benefit to one complainant in preference to another. 2.2 Are the complainants entitled to compensation? Yes. The insurer must pay $6,300 in total compensation for non-financial loss. AFCA can award compensation for non-financial loss Under our Rules, AFCA can award up to $6,300 compensation for non-financial loss. This must relate to poor claims handling or other actions of the insurer which cause an unusual degree of stress, delay, or inconvenience. We expect complainants to be moderately robust, and we will not award compensation for the ordinary degree of inconvenience involved in making a claim. Complainants say the insurer’s handling of the matter was poor The complainants both suffer health issues and say the insurer’s poor handling of the claims meant their conditions were exacerbated. This left them frustrated, upset and (at times) unable to deal with certain aspects of the complaint. They say they were consistently ‘bullied’ by the insurer’s staff, which made settlement offers whilst informing them they ‘would not win’ if the matter proceeded. They consider the insurer must be ‘held to account’ for their experiences and say further: · the claim was poorly managed, which had a detrimental impact on their family, including causing physical medical symptoms and responses · the insurer unreasonably delayed the claim and has still not settled it · the property has been mould infested and has impacted their physical and mental health · they suffered indirect loss by way of job loss and a relationship breakdown. The complainants seek the maximum compensation award for non-financial loss compensation for each of them. Insurer is required to pay $6,300 total compensation for non-financial loss In acknowledgment of the complainants’ hardships and its relatively poor handling of the claim, the insurer offered to pay non-financial loss compensation of $4,300. The panel accepts aspects of the claim were handled poorly and it has gone on far longer than it should have. However, the panel also notes that differing views on approach, settlement, extent of loss and impact have also been factors in the delays. Further, the panel acknowledges that the damage from the second claim stemmed primarily from a poorly maintained roof. Given this and the impact the insurer’s (at times) poor handling of the matter, the panel accepts a total award of $6,300 ($3,150 for each complainant) is warranted. For the reasons detailed above, the panel does not consider it appropriate to extend this award to each of the complainants. The panel notes one of the complainants says he lost his job due to the stress of this matter. However, it is not persuasively shown in the exchanged material that the insurer caused this to happen. Any number of factors may have been influential in this. The panel accepts the complainants experienced frustration, hurt, anxiety and delay due to the handling of the matter. The award of compensation satisfactorily addresses this. However, the panel is not persuaded any further payment is required. 2.3 Why is the outcome fair? The insurer assessed the claims in line with the policy, but it is fair that large contingency uplifts apply. It is fair the insurer pays compensation for the impact its claim handling had. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience in insurance. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.