Text of the determination
Determination
|
Case number
|
12-00-1097928
|
Financial firm
|
AAI Limited
Case number: 12-00-1097928 17 October 2025
1 Determination overview
1.1 Complaint
The complainant holds a landlord property and contents policy of insurance with the financial firm (insurer). The complainant runs a short-term rental or holiday letting business from the insured property. On 6 June 2022, the complainant lodged a claim in respect to damage to the roof of the insured property and related water entry into a bedroom. The insurer has assessed its liability under the policy for repairs as being limited to plaster works and carpet restoration. The insurer also says it has paid $130 for temporary make-safe works arranged by the complainant. The insurer says its liability under the policy in respect to these repairs and make-safe works is $2,423.73. The complainant disagrees with the insurer’s scope of works and says the insurer should cover additional costs including electrical work, replacement of the bedroom ceiling and replacement of the roof batten in the roof cavity. He seeks a total of $7,782.50 for the repair works, $1,170 for contractor works he arranged, and $603.16 for carpet restoration. Additionally, the complainant says the insurer’s contractor caused additional damage and seeks $700 as reimbursement for a refund he paid to a guest due to the room being unusable.
Furthermore, the complainant seeks $34,400.00 in compensation for non-financial loss.
The insurer says it has paid the complainant a total of $3,423.73 inclusive of repair costs, make-safe costs and an ex-gratia payment of $1,000 to resolve the complaint. The insurer says it issued cheques to the complainant on 2 February 2023 in this amount. The complainant says he has not received any payment from the insurer and does not accept a cash settlement.
1.2 Issues and key findings
Has the insurer properly assessed the claim?
Yes. Based on the available information, the insurer has covered resultant damage caused by the insured storm event and related water entry. The insurer is required to pay an additional $325 in respect to initial temporary repairs to the roof arranged by the complainant. Other repair works claimed are either not clearly related to the insured event or are excluded under the policy.
Is the insurer liable for the guest refund following make-safe works by its contractor?
Yes. In the absence of further information, it is likely that the make-safe works caused the bedroom to be unusable.
Is the complainant entitled to non-financial loss?
No. The insurer’s ex-gratia payment of $1,000 included in its offer of settlement adequately compensates the complainant for any confusion caused by the insurer’s correspondence.
Why is the outcome fair?
The outcome is fair because the insurer has met its obligations under the policy to cover resultant damage as a result of the insured storm event. The insurer is not liable for any damage to the ceiling more likely caused by water ingress over time and further, exclusion clauses apply for rot and gradual deterioration in the roof cavity. It is fair however, that the insurer cover the cost of additional make-safe works reasonably incurred by the complainant.
In the absence of further information, it is fair in the circumstances that the insurer cover the complainant’s refund to a guest following its contractor’s make-safe works.
It would not be fair to require the insurer to pay an award for non-financial loss as its actions in the handling of the claim do not warrant a payment more than the $1,000 ex-gratia payment already included in the offer of settlement.
1.3 Determination
This determination is substantially in favour of the insurer. However, the insurer is required to increase its offer of settlement to include:
· an additional $325 for initial temporary repairs on 3 June 2022 and further repairs on 2 July 2022; and
· $700 in compensation to the complainant due to faulty make-safe works by the insurer.
If the complainant accepts this determination, within 14 days of being notified of the acceptance, the insurer is required to:
· cancel cheques previously issued to the complainant in settlement of the claim; and
· contact the complainant to confirm his bank account details in order to pay the revised offer of settlement via electronic funds transfer.
2 Reasons for determination
2.1 Has the insurer properly assessed the claim?
Yes. Based on the available information, the insurer has covered resultant damage caused by the insured storm event and related water entry. The insurer is required to pay an additional $325 in respect to initial temporary repairs to the roof arranged by the complainant. Other repair works claimed are either not clearly related to the insured event or are excluded under the policy.
Onus is on the complainant to establish a claimable loss
The complainant has the initial onus of establishing he suffered a loss from an event covered by the policy. If the complainant can establish he suffered a valid claimable loss, the onus shifts to the insurer to show, on balance:
• it is entitled to rely on an exclusion under the policy, or
• it is otherwise entitled to decline the claim.
For both the complainant and the insurer, the onus of proof is the balance of probabilities (that is, it is more likely than not).
Policy covers loss and damage caused by storm
The cover provided by the policy is set out in the product disclosure statement (PDS) and Certificate of Insurance (COI). The COI states that the insured address is used for short-term rental or holiday letting and therefore, the Supplementary Product Disclosure Statement (SPDS) provides further details on coverage. The SPDS which is annexed to the COI must be read in conjunction with the PDS. Where relevant, I refer to the SPDS below.
The policy is an ‘insured events‘ policy which means it only covers damage caused by specific events.
Insured Events
At page 38 of the PDS, the policy states that there is cover for loss or damage caused by storm. At page 97, the word “storm” is defined as “a single weather event being a cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust”.
Additional Cover
At page 47 of the PDS, the policy states that additional cover may be available under the policy when a claim for loss or damage to the property is covered.
The policy comes with additional cover for ‘Loss of rent following an insured event’. On page 48 of the PDS, the policy states “If following an insured event the property cannot be lived in or cannot be re-leased, we will pay the weekly rental amount for the time it should take to repair or rebuild the property so that it can be lived in again or released”. However, the SPDS specifically excludes cover for loss of rent or income if the property is used for a short-term rental or holiday letting.
The policy also comes with additional cover for ‘Other repair/rebuilding costs (Property cover only)’. On page 50 of the PDS, the policy states “When you are covered for the costs of rebuilding or repairing damaged parts of the property, we will pay the reasonable and necessary costs: of any temporary work required to make the damaged or destroyed property and insured address safe;…”.
For completeness, the policy has optional cover for ‘Accidental damage at the property’ which was not taken out.
General Exclusions
There are general exclusion clauses which apply to all sections of the policy listed from page 30 of the PDS. Relevant to this determination, the policy excludes loss or damage caused to, or caused by, connected with or arising from ‘Wear, tear and gradual deterioration’. This includes any part of the property that has wear, tear, rot, or gradual deterioration.
Additionally, there is a general exclusion clause for ‘Extra costs or other losses following an incident covered by your policy’. The general exclusion clause states there is no cover for a number of extra costs and other losses including:
· loss of rent (except as expressly covered by the policy);
· the costs of the insured’s time or costs incurred by the insured to prove their loss or assist the insurer with the claim; and
· cleaning costs (unless stated otherwise in the policy).
Settlement of Property Claims
At page 72 of the PDS, the policy states that when a claim for loss or damage to the property is covered, the insurer will engage a builder to prepare a scope of works and provide a quote on the cost to repair the property. If the amount of the assessed quote to repair is less than or equal to the property sum insured, the insurer will offer the insured the choice to have the property repaired based on the recommendation of the builder.
The policy further states that if the insured choses to not accept the offer,
“You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note: this amount may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network.”
The parties agree that a ‘storm’ event occurred causing water entry, to which the policy responds under cover for ‘storm’. However, they disagree on the scope of works to repair the resultant damage and coverage for claimed make-safe works.
Insurer obtained expert reports
Following claim lodgement, the insurer engaged builder, KB, to assess the damage. KB provided an assessment report dated 21 June 2022 and identified resultant damage related to the event as:
“Bedroom 2 Water damage to ceiling-minor patch repair-2m2-paint ceiling-10m2”.
The report also states that the property manager’s husband had sealed all possible ingress points on the roof above the bedroom and no further water had penetrated since then.
Photographs are provided in the report showing water staining to the bedroom ceiling and sealing applied to various parts of the roof.
KB provided a scope of works which is titled “Property & Speciality Claims Panel Estimate/Invoice Format” with a submission dated 21 June 2022 (KB quote). The total amount quoted is $1,690.57 which includes a 15% builders mark up. The scope includes plastering work to the ceiling limited to a small patch repair, replacing insulation, painting the ceiling and waste removal.
Additionally, KB provided a roof report dated 09 July 2022. The KB roof report made the following observation:
“The roof has corroded over a long period of time from the pools solar heating. The chemicals have rusted out the roof sheet completely”.
With respect to the roof cavity, the KB roof report:
· noted the presence of roof sarking/insulation but did not mention any damage;
· confirmed water damage to the ceiling; and
· noted no water damage to the roof trusses.
Various photos are provided with the KB roof report and related photo schedule. Some of these show corrosion to metal roof sheeting. No photographs are provided of the roof cavity or roof trusses.
Additionally, the insurer obtained an assessment/completion report from a cleaning and restoration company, ST, dated 27 June 2022. Upon inspection, ST found that the underside of the carpet and underlay were wet but there were no visible signs of mould. The ST report states the insured did not allow the installation of drying equipment or the completion of any works because the roof repair was not finalised.
ST has provided an Estimate Quotation dated 1 August 2022 in respect of costs to restore the carpet. ST estimated the cost to be $603.16 inclusive GST. The costs relate to the installation of drying equipment and the relaying/re-stretching of carpet.
Insurer’s assessment of costs for resultant damage is preferred
The insurer says that costs included in the repair quotes supplied by the complainant are not covered under the policy.
In respect to these repair works, the complainant has supplied two documents titled “quote” issued by an individual ‘K’ with quote numbers QU-0143 and QU-0153. These are dated 10 February 2023 and 19 October 2023 respectively. Quote QU-0143 is for a total amount of $5,582.50 and quote QU-0153 is for a total amount of $2,200. Therefore, the complainant seeks a total of $7,782.50. By comparison, the insurer says it has settled the property damage aspect of the claim for $1,690.57 based on the KB quote.
I am not satisfied that the works items in Quote-0153 relate to damage caused by the claimed insured event. In particular, I note the following regarding QU- 0153.
· it includes replacement of the roof batten “due to rot” but no information has been provided by the complainant which links the rotting of the roof batten to the same single storm event that caused damage to the plasterboard of the bedroom ceiling;
· similarly, the quote includes replacing roof sarking under damaged sheets but no information has been provided by the complainant which links the damaged sarking to the single storm event.
· given the roof truss is said to have rotted, this indicates the damage has occurred over a period of time most likely due to contact with water or other liquid. I am not persuaded that the rotting is likely to have been caused by the storm which is defined in the policy as a “single weather event”. Further, the general exclusion in the Policy for “Wear, tear and gradual deterioration” excludes cover for rot.
· the quote was obtained almost 16 months after lodgement of the claim. The rotting of the roof batten is more likely to have developed due to water ingress over time and not the single storm event to which the policy responds.
· the quote includes removing sheets and investigating a “smell in opposite room” but it is unclear how the subject insured event caused a smell to develop in the opposite room. If a smell had developed as at 19 October 2023, I am not convinced this was due to the insured event. The complainant says one possible source of the smell could have been mouldy underlay. If that were the case, given ST found no mould growth in June 2022, any mould which developed would have more likely been the result of a failure to dry and restore the underlay immediately after the claimed storm event. Further, there is no information which assists to draw a conclusion that any smell was due to putrid water within the wall cavity caused by the claimed storm event.
I acknowledge the complainant says that the KB assessor did not examine the roof cavity. However, the KB roof repot includes observations of the roof cavity including a comment that there was no water damage to the roof trusses. While there is contradictory information on this point, it remains that rot is excluded under the general exclusion for “Wear, tear or gradual deterioration”. Therefore, replacement of the roof batten “due to rot” is not covered.
Furthermore, I am not satisfied that the insurer is liable under the policy for the broader scope of works in Quote QU-0143 for the following reasons:
· the quote is for the replacement of the ceiling in the bedroom due to water damage and related works. By comparison, the KB scope of works was limited to a patch repair and related works. The quote is dated 10 February 2023, approximately eight months after the claim was lodged.
· it is reasonable to expect that the damage to the ceiling would worsen over time if there was continued water ingress after June 2022. The insurer was not liable under the policy to cover costs of any substantial repairs to the roof to stop any leaks. It is more likely than not that if the ceiling bedroom required replacement in February 2023, this was not as a result of the single insured storm event but it was caused by a continuation of water ingress which impacted the ceiling. The insurer is not liable for that further damage.
· the quote includes the costs of disconnecting and reconnecting electrical fittings which are not included in the KB quote. It is reasonable to expect that these electrical works were only necessary as the ceiling was replaced. It is unlikely that these electrical works would have been necessary to undertake a small patch repair which KB determined was necessary to rectify the storm related damage. It would not be fair in all the circumstances for the insurer to cover the costs of electrical works as its liability under the policy is limited to loss or damage caused by the insured storm event.
For completeness, the insurer’s offer of $603.16 for carpet restoration is not an issue in dispute between the parties.
Claim for additional costs paid to contractors
On 11 September 2022, the complainant sent an email to the insurer in which he refers to a list of additional costs he incurred totalling $1,170 for “direct costs incurred and paid to contractors”. The complainant seeks reimbursement of this amount.
The insurer has not accepted the email as adequate proof of loss because it is not a tax invoice and does not contain particular details. In relation to this, I accept the complainant’s assertion that in some instances, sole traders may not have ABN numbers. The complainant subsequently provided three documents titled “invoice” numbered INV-128, INV-127, and INV-129 issued by B&D.
The email and supporting invoices include work items completed between 3 June 2022 and 19 July 2022 and provides brief descriptions of the tasks completed. In relation to the work items:
· I accept that the “Repair roof Eastern end of house” on Friday 3 June 2022 relates to the make-safe works completed to stop the water ingress into the bedroom. I accept that the higher rate of $130 per hour is likely to have been an after-hours rate as the complainant contends. I am satisfied that the complainant is entitled to have this cost totalling $390 covered by the insurer.
· The policy has a general exclusion clause for “Extra costs or other losses following an incident covered by your policy”. Cleaning costs are excluded. Further, costs of assisting the insurer with the claim are excluded. Therefore, costs related to the mopping up of water on 3 June 2022 in the amount of $390 are not covered. The cost of liaising with insurance assessors on 29 June 2022 is also not covered
· On 2 July, the contractor checked the roof and applied more silicone charging $65. On 5 July, 8 July and 19 July, there were further checks of the roof. I am satisfied that the insurer should cover the works on 2 July given that the complainant says a further leak occurred after the insurer carried out make-safe works on 29 June 2022 (I discuss this further below in the determination). I am not satisfied that the insurer should cover the further roof checks in July as these are maintenance related.
Given the above and noting that the insurer has previously agreed to pay $130 to cover temporary roof repair reimbursement, the insurer is required to pay an additional $325 for initial temporary repairs on 3 June 2022 and 2 July 2022.
On 19 September 2022, the complainant provided copies of three emails from an individual ‘DA’ to the complainant. These emails include a summary of works completed by a contractor, ‘B’, between 12 May 2022 and 17 October 2022. The total cost of the works outlined in the emails is $7,495. The complainant agrees that the invoices include works unrelated to the roof repairs. I accept that most of the work is not claimable under the policy. With respect to the roof:
· the email in respect to the period 16 July 2022 to 15 September 2022 refers to “check roof for repair leak”. The precise charge for this work item is not given and it appears to be related to general maintenance; and
· the email in respect to the period from 12 May 2022 to 12 July 2022 includes “repair to roof & check”. It is reasonable to assume that the “repair to roof & check” is the same initial temporary roof repair work captured in the email from the complainant to the insurer on 11 September 2022 (discussed above). I have already found that the insurer’s offer of $130 is insufficient in respect to these repairs. The insurer is required to pay an additional $325 for these initial temporary repairs on 3 June 2022 and 2 July 2022.
2.2 Is the insurer liable for compensation paid to a guest following make-safe works by its contractor?
Yes. In the absence of further information, it is likely that the make-safe works caused the bedroom to be unusable.
Insurer should cover payment to guest
The complainant says that the insurer’s contractor completed make-safe works to the roof on or about 30 June 2022 after his contractor completed initial temporary repairs that stopped the leak. He says that the roof leaked following the make-safe completed by the insurer and as a result, he paid a refund of $700 to a guest because the bedroom was unusable.
The insurer submits that the complainant was compensated under an Internal Dispute Resolution (IDR) Review in July 2022 and further that loss of rent is not covered under the policy. I accept that the SPDS specifically excludes cover for loss of rent or income following an insured event if the property is used for a short-term rental or holiday letting.
However, the complainant seeks compensation for a refund he paid due to alleged damage caused by the insurer’s contractor. This is a separate issue to loss of rent caused by an insured event under the policy.
The insurer has not provided any information which would contradict the complainant’s assertion that its contractor’s make-safe works resulted in a further leak. The claim file notes indicate that on 1 July 2022, the insurer sought information from its contractor, KB, in relation to the make-safe completed given the complainant’s concerns. However, the insurer has not supplied any relevant information on this point or which would contradict the complainant’s assertion. An invoice provided by the complainant indicates that on 2 July 2022, his contractor attended to reapplying silicone to the roof to address a leak. Therefore, weighing the available information, it is more likely than not that the make-safe works resulted in a further leak. It is fair in all the circumstances that the insurer compensate the complainant for the refund in the amount of $700 as claimed.
I acknowledge that the insurer says the ex-gratia offer of $1,000 was not made with the intention of covering any specific expenses but was a compensatory payment having regard to the complainant’s concerns. This offer is further discussed below in regards to non-financial loss.
2.3 Is the complainant entitled to non-financial loss?
No. The insurer’s ex-gratia payment of $1,000 included in its offer of settlement adequately compensates the complainant for any confusion caused by the insurer’s correspondence.
Non-Financial Compensation is awarded conservatively
Under the AFCA Rules, we can award up to $6,300 compensation per claim for non-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree of stress, inconvenience, or delay because the insurer mishandled their claim. We recognise making a claim can be stressful and time-consuming, even if the insurer handles the claim correctly.
We take a conservative approach to compensation for non-financial loss. We will not award compensation for the ordinary degree of inconvenience that comes with making a claim.
We may reduce the amount of compensation we award if your loss was partially caused by your own actions, or by factors outside the insurer’s control.
Complainant‘s concerns
The complainant has raised several concerns in respect to the insurer’s handling of the claim which have been considered. While not exhaustive of all the issues raised, the complainant’s main concerns are:
· there were multiple delays by the insurer, the complainant had to repeatedly follow up and the insurer did not respond to emails.
· the insurer’s claim decision and offer on 26 July 2022 did not take into account all relevant information including quotes subsequently obtained by the complainant relating to initial temporary repair works, electrical work in the roof space and repairs to the roof truss;
· the insurer has not provided a copy of the quote from KB for the repair work. The insurer only provided a scope of works on their own letterhead.
· the insurer’s scope of works was insufficient and limited to plastering. It did not cover the full repair work needed.
· the insurer‘s contractor did not properly inspect the damage as he did not pull up the roof and check the roof space for damage;
· the insurer says additional information is required to substantiate the claim but has not detailed the information which is insufficient or lacking;
· the insurer issued cheques to the complainant without his agreement to a cash settlement or payment via cheque. The insurer unilaterally closed the claim.
· the insurer has not acted in good faith and has been unfair it in its dealings with the complainant.
Complainant has been adequately compensated
The complainant seeks compensation in the amount of approximately $34,400.00 for non-financial loss. This figure is based on the insurer’s previous ex-gratia offer in respect to delays and communication issues up until 1 July 2022. The amount sought is above AFCA‘s monetary limit of $6,300. In any event, I am not satisfied that an award by AFCA for non-financial loss is warranted for the following reasons:
· I am not convinced there were any significant delays caused by the insurer. In summary:
> the claim was lodged on 6 June 2022, KB attended the site on 20 June 2022 and provided its reports shortly after that.
> the IDR decision was confirmed by letter dated 26 July 2022 which stated that $1,000 would be paid in compensation relating to delays in progressing the claim, providing updates and a lack of communication.
> the claim decision was then communicated to the complainant on 7 September 2022 within four months of claim lodgement. The complainant disputed the claim decision.
> A letter was sent to the complainant on 30 November 2022 requesting further evidence to substantiate additional amounts claimed. That letter also stated that if the complainant were dissatisfied, the next step would be for the complainant to lodge a complaint with AFCA.
> the complaint was lodged with AFCA on 26 May 2024.
· I am satisfied that the KB scope of works adequately details the works to be completed and related costings. For completeness, I am satisfied that the KB scope of works was adequate in terms of rectifying resultant damage caused by the insured storm event;
· by letter dated 29 December 2022, the insurer informed the complainant that cash settlement was the only option as the complainant had refused to allow the insurer to complete repairs to the property until it fixed the roof. However, works to the roof fell outside of the terms of cover under the policy. This approach is in accordance with the terms of policy. On page 72 of the PDS, the policy states that if an insured does not accept the insurer’s offer to have the property repaired based on the insurer’s supplier’s assessed quote, the insured will be paid the amount of the assessed quote;
· the insurer requested bank account details from the complainant so the settlement funds could be electronically transferred but these were not provided. I accept that in the circumstances, it was reasonable for the insurer to issue cheques. For completeness, at the time of issuing the cheques, the insurer was not informed that the complainant dd not have access to a local bank branch;
· I am not convinced that the insurer has failed to act in good faith. The insurer closed the claim but did inform the complainant that upon receipt of new information, there would be a further assessment of any claimed costs; and
· I acknowledge that the complainant sent hundreds of emails to the insurer before the complaint was lodged with AFCA and he has been dissatisfied with the insurer’s responses or lack of response. However, the complainant was advised on 30 November 2022 and on other occasions that he would need to lodge a complaint with AFCA if he remained dissatisfied.
I accept that some of the insurer’s communications to the complainant may have caused some confusion. In particular, communications by which the insurer required particular details on tax invoices. I am satisfied that the insurer’s offer of $1,000 by way of an ex-gratia payment in recognition of issues with the handling of the claim is adequate.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer has met its obligations under the policy to cover resultant damage as a result of the insured storm event. The insurer is not liable for any damage to the ceiling more likely caused by water ingress over time and further, exclusion clauses apply for rot and gradual deterioration in the roof cavity. It is fair however, that the insurer cover the cost of additional make-safe works reasonably incurred by the complainant.
In the absence of further information, it is fair in the circumstances that the insurer cover the complainant’s refund to a guest following its contractor’s make-safe works.
It would not be fair to require the insurer to pay an award for non-financial loss as its actions in the handling of the claim do not warrant a payment more than the $1,000 already included in the offer of settlement.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.