Home / Suncorp Group / Determination 12-00-1097845

Determination 12-00-1097845

Insurer denied disputed storm/flood damage as pre-existing or excluded, declined further loss of rent, and did not pay lock replacement costs

FirmSuncorp Group
Decided2025-07-28
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$1,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A family trust's landlord policies covered a rental property damaged in a February 2022 storm/flood. AFCA found the insurer could deny the disputed damage and further loss of rent, but ordered it to pay the $1,000 lock replacement limit plus interest.

The complainant did not establish the disputed damage came from the claim event given expert evidence of pre-existing and excluded causes, but the policy covered lock replacement up to $1,000.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1097845 | Financial firm | AAI Limited Case number: 12-00-1097845 17 July 2025 Determination overview Complaint ​The complainant is a trustee of a family trust that holds a landlord building insurance policy (building policy) and a landlord contents policy (contents policy) with the financial firm (insurer). Both policies include cover for loss of rent (LOR). The complainant lodged claims on the policies after a weather event in February 2022 damaged the insured rental property. The insurer accepted the claims but says some of the damage to the insured building was pre-existing and/or the result of excluded causes rather than the flood/storm. The insurer paid out the full LOR sums insured under both policies. The complainant maintains that all the damage is claim related so should be accepted by the insurer. He also seeks additional LOR on the basis the insurer unreasonably delayed the claims’ progression, and reimbursement of key and lock replacement costs. Issues and key findings Is the insurer entitled to deny the disputed damage? Yes. The complainant has not established that the disputed damage is from the claim event. Rather, it is more likely than not that damage was pre-existing and/or from excluded causes. Is further LOR payable? No. The insurer paid the complainant 58 weeks of LOR under the policies, meaning it paid LOR for 10 weeks after it completed the accepted repairs. The complainant only raised concerns about the disputed damage after those repairs were completed, and I am satisfied the insurer is entitled to deny the disputed damage. Is the insurer required to pay key/lock replacement costs? Yes. The complainant had to replace locks as keys went missing in the flood/storm. The insurer is to pay him the $1,000 lock replacement limit under the building policy plus interest. Why is the outcome fair? The disputed damage was not from the claim event so it would not be fair to require the insurer to pay for its repair or to pay for LOR beyond the policy limits. However, it is fair that the insurer pays the building policy lock replacement limit. Determination This determination is substantially in favour of the insurer. Within 14 days of receiving notice from the complainant that he accepts this determination, the insurer is to pay him $1,000 plus interest under section 57 of the Insurance Contracts Act, 1984 (Cth) (ICA) from 4 June 2023 to the date of reimbursement. The insurer is otherwise not required to take any further action. Reasons for determination Is the insurer entitled to deny the disputed damage? Yes. The complainant has not established that the disputed damage is from the claim event. Rather, it is more likely than not that damage was pre-existing and/or from excluded causes. ​Complainant must show a claimable loss under the policy terms ​The complainant is required to show, on the balance of probabilities (that it is more likely than not), that he suffered a loss claimable under the policies. This means he must show the loss was caused by a risk for which he is insured. Once the complainant proves the existence of a claimable loss, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proving on the balance of probabilities the application of the exclusion or condition. ​Subject to the terms and conditions set out in each product disclosure statement (PDS), the policies cover the complainant’s family trust for loss or damage caused by a listed insured event. Those events include ‘Storm’ and ‘Flood’. ​On 11 March 2022, the complainant notified the insurer that the rental property had been damaged by flooding during a severe weather event on 28 February 2022. The insurer accepted the claim and undertook repairs. In and after February 2023, the complainant informed the insurer that the following claim related damage remained unrepaired: garage wall cracking, debris in the garage, and damage to the garage door damage to the rear cement slab ceiling mould in the laundry and other rooms cracks, bubbling and missing paint to internal walls dipping of the front patio pavers water damage to the kitchen flooring and cupboards water damage to the front door and to the French doors from the office/sunroom holes in fencing, damage to the garden shed and greenhouse, front gate torn off. The insurer disputes that the damage listed above is claim related. It says that damage is pre-existing and/or due to excluded causes. ​Insurer denied cover for the disputed damage In its first report dated 28 March 2022, the insurer’s external loss adjuster CC said water had reached halfway up the laundry wall, appeared to have entered the sunroom/office, but did not appear to have reached the higher level of the house. CC said based on the property manager’s routine inspection reports, the lounge room wall damage was pre-existing. In its report dated 6 December 2022, CC said builder JL had submitted a negative variation to its scope of works (SOW) totalling $18,759.20. CC said trades had determined that ‘the water damage did not reach the kitchen and did not pass the skirting boards’. The variation also removed all items relating to the office/sunroom. The insurer mostly relies on reports from engineer SW. On 29 March 2023, SW inspected the rental property and reported that: the garage wall cracking was due to lack of waterproofing measures to the wall and around its window, leading to moisture issues and deterioration over time there were no sudden deviations or displacements consistent with storm damage. The blockwork had subsided over time due to settlement and age the rear concrete slab had several joints consistent with multiple concrete pours within the same section, which had led to settlement cracks along the junctions there had been ongoing water penetration and deterioration to the rear slab Google imagery confirmed a large crack to the slab’s step was present in October 2020 the concrete pathway did not show evidence of recent subsidence or storm related damage. Instead, the damage was due to long term deterioration and lack of maintenance there was minor surface mould growth on the laundry ceiling. That growth was consistent with general use of the laundry, which was a high moisture area the mould growth was attributable to the age of the ceiling paint and general condensation build up the front patio paver sinkage was due to weed and organic plant growth throughout the paver joints, causing them to dislodge Google imagery showed deviations in the pavers has been evident since 2020 the paver sinkage was not due to a one-off event, but was from a long-term issue which had been left unattended and had worsened the fencing holes were due to the connecting wire from the fence to the frame having deteriorated and failed over time because of corrosion and weathering the issues with internal walls were due to the age and deteriorated condition of the paintwork. There were evident attempts to repair and conceal pre-existing building issues the kitchen flooring had one corner of a floorboard damage. That was due to localised exposure to moisture from kitchen sink overspills through general usage. There were also signs of general wear and tear throughout the main traffic areas. In a report dated 24 May 2023, CC set out further comments from SW, including that: Google imagery established the front gate was in a rusted and deteriorated condition dating back to 2020. The damage to the gate was due to long term deterioration rather than the claim event the dirt and debris in the garage were consistent with the surrounding external areas. The garage was a non-habitable area and the need for cleaning did not constitute damage the water level did not reach floor height in the main house. The internal wall damage was not consistent with having been caused by water penetration or moisture migration. The multiple attempts to repair and repaint showed the damage was pre-existing as there was no evidence of stormwater directly contacting the laundry ceiling, the fungal growth cannot be attributable to the storm event. It was mildew from the long-term exposure to damp environmental conditions, not from water penetration the peeling wallpaper was the result of poor building techniques there was no evidence of storm related damage to the front door, which was in an aged and dilapidated condition. In an email dated 4 October 2024, SW provided more information on the laundry ceiling. It said the fungal growth appeared to be superficial mildew rather than penetrative mould. It noted that mildew is caused by atmospheric conditions, while mould is due to moisture penetration, for example, from a leak. SW said the fungal issue in the laundry was from the ongoing environmental conditions of general use, and lack of ventilation and regular cleaning. In an email dated 3 February 2025, SW provided more comments on the garage wall cracks. It said the cracks were aged and localised around the window. There was no cracking propagating from the floor to suggest sudden subsidence. The significant rising damp on the walls had contributed to the wall’s deterioration. The damage was due to general building movement and long-term settlement consistent with age and building methodology. SW provided more information about the kitchen in an email dated 10 February 2025. It said there was no evidence of widespread damage in the kitchen. The water damage was isolated to directly in front of the sink. If the claim event had damaged the floor, there would have been widespread cupping, swelling and tenting but that was not present. Also, there was no evidence of water damage or staining to the timber subfloor. The insurer also refers to the property manager’s routine inspection report dated 10 August 2021. The report refers to and/or contains images of: grass and weeds growing through the front patio pavers the greenhouse adjoining the shed had rotten beams, rusted covers, and was unstable the shed showed signs of age and deterioration rusting to the gate and fences the rear concrete slab was notably deteriorated mould on the bathroom ceiling and in the laundry cupboard damage to the loungeroom walls. The insurer says the disputed damage is not from the claim event. Instead, that damage is excluded from cover as the building policy PDS says the policy does not cover damage caused by, connected with or arising from: any part of the insured building that has wear, tear, rust, corrosion, rot, rising damp, atmospheric or climatic conditions or gradual deterioration (PDS page 70) mould or mildew unless directly caused by a covered incident and there is no evidence of pre-existing mould in the building (PDS page 71). The insurer also notes that the building policy PDS says: on page 25 that the Flood insured event does not cover the cost of cleaning the building on page 34 that when settling a building claim, it will not fix defects, faults, faulty/poor workmanship, or pre-existing damage. Complainant says insurer should accept the disputed damage The complainant maintains that the disputed damage was caused by the claim event and was not present beforehand. He says the insurer should therefore reimburse the costs he incurred in rectifying the damage. He notes that JL’s original scope of works (SOW) had allowances for the disputed damage, only for those allowances to be subsequently withdrawn without justification. The complainant has not provided any expert reports. However, he says SW’s comments are vague and notes that JL initially reported that there were no maintenance issues or pre-existing defects. The complainant has provided numerous images of the flooding and of the disputed damage. In addition, he has submitted invoices from trades as follows: dated 27 May 2023 for $2,785.50 from gardener/handyman G – ‘post flood mould cleanup and application of mould protective layer’ dated 16 June 2023 from G for $4,246 from G – front door and French door repair, and extensive waterproofing dated 24 June 2023 for $2,809.40 from G – kitchen floor repair, waterproofing surrounding areas, and repair of French door undated for $2,200 from roofer V – ‘two bedroom ceiling and walls plus entry ceiling and laundry ceiling’. Insurer is entitled to deny the dispute damage Based on the exchanged information, I am not satisfied that the complainant has established that the disputed damage is from the claim event. Rather, it is more likely than not that damage was pre-existing and/or from excluded causes. This is because: Google imagery and the property manager’s routine inspection report dated 10 August 2021 establish that several aspects of the damage were present before the weather event on 28 February 2022 SW’s commentary on the disputed damage is supported by detailed analysis and images while the complainant has provided numerous images of the flooding and of the disputed damage, I am not satisfied they are enough on their own to undermine SW’s conclusions in the absence of any contrary expert opinion, I find SW’s conclusions persuasive the French doors are located a step up from the rear concrete slab, which is itself two steps up from ground level there are no images of the claimed damage to the garage door or the front door on review of the images provided by the parties, and noting the comments by CC and SW, I consider it unlikely that floodwater entered the main home, with only the much lower laundry subjected to ingress I acknowledge that JL initially reported that there were no maintenance issues or pre-existing defects. However, it’s SOW variation included the notation ‘supervisor has noticed items not required due to no signs of damage or not in line claim’ several of the repairs listed in the invoices the complainant submitted may reasonably be characterised as not being claim related eg waterproofing. The insurer is therefore entitled to deny the disputed damage. Is further LOR payable? No. The insurer paid the complainant 58 weeks of LOR under the policies, meaning it paid LOR for 10 weeks after it completed the accepted repairs. The complainant only raised concerns about the disputed damage after those repairs were completed, and I am satisfied the insurer is entitled to deny the disputed damage. Policies cover LOR in specified circumstances The building policy PDS and the contents policy PDS both say that if the insured property becomes untenantable for at least seven days because of covered damage, the insurer will pay LOR until the property becomes tenantable again. The maximum period of cover under the building policy is 52 weeks and under the contents policy is six weeks. Further LOR is not payable The insurer has paid the complainant 58 weeks of LOR (52 weeks plus six weeks). The complainant says the insurer should pay further LOR above the limits of the policies: due to the delays and inefficiencies in repairs. The contractors hired by the insurance company completed their work in January/February 2023, which was too late for me to restore the property to a tenantable condition before the end of the rent coverage period. Furthermore, several damages were not adequately addressed… I accept that it took the insurer about 48 weeks from claim notification to complete repair of the damage it accepted as covered. That is a considerable period, although it seems the discovery of asbestos extended the timeframe. However, the insurer paid in 58 weeks of LOR. Even if the insurer caused unreasonable delay, the complainant received another 10 weeks’ LOR after the insurer’s repairs were completed. Further, it was only after the repair completion that the complainant raised the disputed damage. I am satisfied the insurer is entitled to deny cover for that damage. Accordingly, the insurer is not required to pay further LOR. Is the insurer required to pay key/lock replacement costs? Yes. The complainant had to replace locks as keys went missing in the flood/storm. The insurer is to pay him the $1,000 lock replacement limit under the building policy plus interest. Building policy provides limited cover for key/lock replacement costs The building policy PDS says on page 30 that the insurer will pay up to $1,000 to replace or alter the insured building’s locks and/or keys if the locks are damaged or the keys are lost, damaged or stolen. The contents policy provides up to $250 for lock replacement but only when a tenant defaults in paying rent and relevant court orders are made. That is not relevant to this case. ​Insurer is required to pay key/lock replacement costs ​The complainant has provided a paid invoice for $1,276 dated 4 June 2023 from locksmith M for lock replacement at the rental property. He says most of the keys for the old locks went missing during the flood/storm. ​I am satisfied that it is reasonable for the insurer to pay the complainant the $1,000 lock replacement limit under the building policy. It is also reasonable hat the insurer pays interest under section 57 of the ICA from 4 June 2023 to the date the reimbursement is paid. Why is the outcome fair? The disputed damage was not from the claim event so it would not be fair to require the insurer to pay for its repair or to pay for LOR beyond the policy limits. However, it is fair that the insurer pays the building policy lock replacement limit. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: the legal principles applicable industry codes or guidance good industry practice previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: available documents the recollections of the parties all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.