Home / IAG / Determination 12-00-1097737

Determination 12-00-1097737

Sum insured safety net uplift, professional rebuilding fees and loss of rent after fire total loss

FirmIAG
Decided2025-10-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$166,615
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

A fire destroyed the complainant's insured investment property and the insurer offered the sum insured, denying the safety net uplift, professional fees and loss of rent. AFCA found the complainant entitled to the safety net and professional fees, ordered a further cash settlement with interest and $2,000 non-financial loss, but upheld the loss of rent denial.

The policy's safety net and rebuilding fees provisions applied on their terms, while loss of rent was not payable because the property was untenanted when the fire occurred.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1097737 | Financial firm | Insurance Australia Limited Case number: 12-00-1097737 9 October 2025 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (the insurer) for her investment property that is located in the State of New South Wales (the property). She lodged a claim after fire destroyed the property on 17 October 2021 (the fire). The insurer initially denied the substantive claim for building damage. Subsequently, AFCA determination 1022953 accepted the claim. It recommended cash settlement of the rebuild cost and interest on the final settlement sum pursuant to section 57 of the Insurance Contracts Act 1984 (the Act). Eventually, the insurer offered the complainant the sum insured of $733,000, plus interest. The insurer also denied the claim for loss of rent (LOR) on the basis there was no tenant in the property at the time of the fire (or during the two weeks prior to the fire). The complainant says she wants the following to resolve the claim and the complaint: · a 25% safety net/uplift on top of the sum insured as per the terms of the policy · interest · professional fees in the sum of $86,000 · LOR since the fire · non-financial compensation for the stress and inconvenience caused by the claim process. 1.2 Issues and key findings Is the complainant entitled to the sum insured safety net? Yes. The exchanged material demonstrates the complainant is entitled to the cover provided by the sum insured safety net in accordance with the terms and conditions of the policy. Is the complainant entitled to professional fees? Yes. The terms and conditions of the policy, together with the exchanged material, clearly demonstrates the insurer should provide cover for the complainant’s reasonable rebuilding-related professional fees. Should the insurer cover loss of rent? No. The insurer is entitled to rely upon the terms and conditions of the policy to deny this part of the claim. Should the insurer pay non-financial compensation? Yes. If it has not already done so, upon notice that the complainant accepts this determination, the insurer should pay her the sum of $2,000 in non-financial loss compensation. Why is the outcome fair? The outcome is fair in all the circumstances because: · the exchanged material demonstrates the sum insured safety net applies in this particular instance · the policy provides cover for rebuilding-related professional fees · the property was not tenanted when the insured event occurred · an award of non-financial loss compensation is reasonable and appropriate. 1.3 Determination This determination is substantially in favour of the complainant. The complaint should be resolved in accordance with section 2.5, below. 2 Reasons for determination 2.1 Is the complainant entitled to the sum insured safety net? Yes. The exchanged material demonstrates the complainant is entitled to the cover provided by the sum insured safety net in accordance with the terms and conditions of the policy. No dispute that fire destroyed the property The property included a freestanding, single storey, three-bedroom weatherboard dwelling with a pitched tiled roof. The Certificate of Insurance (COI) states the dwelling, originally built in about 1964: … is watertight, structurally sound, secure and well maintained. The property was tenanted until about two weeks or so before the fire occurred. The fire was severe. In a text message dated 7 May 2024, the complainant stated: The fire forensics experts report [sic] states that the house was completely destroyed and the photos attached to the police report confirm that. In addition, the fire brigade concluded in their own report the house was completely burnt down and considered a total loss. This has been clarified from the start and confirmed all along. The complainant lodged the claim on 18 October 2021. Subsequently, and after AFCA’s determination 1022953 was issued and accepted by the complainant, the insurer offered the following cash settlement: Based [upon] the updated scope of works from [WW, the insurer’s builder], together with interest calculated in accordance with section 57 of the Act… a cash settlement in the amount of $610,032.63, less any applicable policy deductions. This cash settlement offer was based upon a quoted scope of works (SOW) prepared by WW, the insurer’s builder, to rebuild the property in the sum of $586,415.35, together with interest in the sum of $23,617.28. At this juncture, the insurer did not consider the property to be a total loss. Nevertheless, WW’s SOW includes the costs of a full demolition of the fire damaged dwelling. Eventually, however, the insurer effectively accepted the property was a total loss. Policy includes safety net (uplift) on sum insured The terms and conditions of the policy are set out in the policy documents, including the Product Disclosure Statement (PDS) and the COI. The parties agree the insurer provided a copy of the policy documents to the complainant. It follows the insurer is entitled to rely upon the terms and conditions of the policy. The COI indicates the buildings sum insured is $733,000. Moreover, pages 73 to 74 of the PDS include the following: How we settle your buildings claim We will choose to settle your claim for loss or damage to your home and any ‘other benefits’ in one of the following ways: […] 3. Pay you the Buildings sum insured We may pay you the Buildings sum insured, when we consider your home to be a total loss or when we choose to do so. In addition, page 45 of the PDS states: Safety net We pay more than your Buildings or General Contents sum insured if a listed event causes loss or damage to your home or contents and the cost to rebuild, repair or replace them is higher than your sum insured. Covered under Buildings Insurance • up to 25% of your Buildings sum insured to cover reasonable extra costs to repair or rebuild your home. For example, a widespread disaster leads to a high demand for building services which increases your rebuilding costs. If your Buildings sum insured is $300,000, then we provide up to $75,000 on top of your Buildings sum insured to cover those extra costs. We pay this benefit on top of your Buildings sum insured. This means the complainant has paid for, and the policy provides, up to an extra 25% of the sum insured (over and above the sum insured) if an event or condition, such as a major catastrophe, has an inflationary effect on the costs of local trades and building materials. Insurer’s offers As indicated, initially, the insurer did not deem the property a total loss. It was willing to complete the repairs and bring the property back to pre-damage condition within the sum of $586,415.35. However, the complainant disagreed with this proposal. Consequently, on 9 September 2024, the insurer made a final offer to resolve the complaint comprised of: Building SOW $586,415.35 Plus a 20% Uplift $117,283.07 Sub Total $703,798.42 Plus updated interest $28,340.73 Total $732,139.15 The insurer rounded the above total to $733,000, knowing the complainant wanted the sum insured in resolution of the complaint. Of the sum insured ($733,000), it appears the insurer has already paid: · $140,106.27 directly to the complainant’s bank due to an outstanding mortgage; and · $469,926.36 to the complainant. Therefore, the insurer has already paid a total of $610,032.63. Accordingly, the insurer proposes to settle the remaining sum of $122,967.37 (minus any applicable deductions) to resolve the complaint. Complainant’s position On 11 September 2024 the complainant sent an email explaining why she rejected the sum insured and wanted a cash settlement over and above the sum insured. She referred to page 45 of the PDS and stated the following: I’m also covered under the “safety net” where building fees have suddenly increased. [The insurer] will make an allowance of 25% of the insured amount to build on top of the insured amount payable. This hasn’t been applied and the sudden inflation of 70% (government proofed) to build applies directly to this… Apart from the insured amount/cost to rebuild that I am seeking of $733,000 of which I have already organised and paid for quotes from builders, I am seeking the above also as I am entitled to it - it is in my cover and was paid for under my insurance. Complainant is entitled to uplift on sum insured The complainant provided a SOW dated 17 October 2024 from RK, builders, which totals $875,648. The SOW includes a 20% builder’s margin in the sum of $121,674, as well as the rebuilding-related professional fees in the sum of $86,000 (see section 2.2, below). The panel notes WW included a 19% builder’s margin in its SOW. The insurer reviewed RK’s SOW and the complainant’s final submissions and stated: [The insurer] has considered the [complainant’s] submissions and considers it fair and reasonable to maintain our position. In all the circumstances, the panel is satisfied the complainant is entitled to the cover provided by the 25% safety net (uplift) on the sum insured. This is because of the following considerations. First, the example given on page 45 of the PDS (a widespread disaster that inflates costs) is but one example of when the safety net might be required, but it does not act in an exclusionary manner. There are many other examples of when the safety net might cover gaps caused by underinsurance in circumstances where customers choosing a sum insured were not aware of all the potential costs to rebuild after a total loss. Second, some parts of the locality in which the property is situated have been impacted by repeated flood events in recent years. It is reasonable to conclude these events have, in fact, adversely affected the availability and costs of trades and materials. Third, whilst the complainant’s SOW is higher than that provided by the insurer, the complainant’s SOW was prepared by a licensed builder and is properly itemised by trade and stage. Moreover, a line-by-line comparison of the two SOWs does not reveal anything particularly overpriced or exorbitant in the complainant’s documents. The insurer’s submission that the complainant’s SOW is too high is not supported by persuasive evidence. Moreover, the insurer has not provided detailed information as to why its SOW is lower than the complainant’s. Insurer should cash settle the claim based upon RK’s SOW The panel is of the opinion RK’s SOW should form the basis of the final cash settlement for this claim. RK’s quotations for the trades and materials (that is, all works required) is $588,370. To this should be added a builder’s margin of 20% (that is $117,674). GST should then be applied to this subtotal of $706,044 (that is, $70,604). This totals $776,648. As indicated, it appears the insurer has already paid the sum of $610,032.63 to the complainant and her bank. Therefore, the insurer should pay to the complainant the balance of $166, 615.37, plus interest on this sum in accordance with section 57 of the Act, from the date of denial of the claim, until payment of the balance of the cash settlement to the complainant. In addition, if it has not already done so, the insurer must pay to the complainant interest on the sums already paid to the complainant’s bank ($140,106.27) and to the complainant ($469,926.36) in accordance with section 57 of the Act, from the date of denial of the claim, until the date payment of these sums was made. The parties should note that the panel is of the opinion the claimed rebuilding-related professional fees in the sum of $86,000 should be dealt with separately in section 2.2, below. 2.2 Is the complainant entitled to professional fees? Yes. The terms and conditions of the policy, together with the exchanged material, clearly demonstrates the insurer should provide cover for the complainant’s reasonable rebuilding-related professional fees. Policy provides cover for rebuilding-related professional fees Page 44 of the PDS includes the following: Rebuilding fees Buildings Insurance […] If a listed event causes loss or damage to your home and you need to pay certain fees to repair or rebuild your home. Covered under Buildings Insurance • the reasonable fees for architects, engineers or surveyors • any fees we agree you need to pay to meet the requirements of a statutory authority. Not covered • fees to rebuild any part of your home which was an illegal construction • if a statutory authority served a notice on you before the listed event took place. Conditions • we must agree to pay the rebuilding fees before you make any arrangements. RK’s SOW includes the following professional fees totalling $86,000: Engineer: $8,000 Quantity surveyor: $8,000 Architect: $40,000 Home warranty insurance: $10,000 Management fee: $20,000 In her email dated 11 September 2024, the complainant stated: I reiterate, page 44 of my insurance policy booklet (attached) where rebuilding fees are covered, for example the professional fees that being architects, council related, engineers or surveyors. The building report that [the insurer] provided does not include that. The insurer responded with the following: [The insurer] does not consider it fair and reasonable to increase interest paid, nor to reimburse for expert fees, as the result has not contributed to a resolution in this matter. This is consistent with the insurer’s Further Response to AFCA dated 26 August 2024, in which the insurer stated: [The insurer] wishes to note that there is no necessity to account for additional costs relating to rebuilding fees or to meet building regulations as all costs to repair and restore the property to its prior condition have been included in the cash settlement offer proposed, which to reinstate has been discussed in prior submissions dated 7 June 2024 and 13 August 2024. In its response the insurer appears to have confused the rebuilding-related professional fees claimed by the complainant with the costs of expert reports and opinions which are sometimes obtained by insureds in support of a claim. In this matter, the panel is of the opinion the types of rebuilding-related professional fees claimed are expressly covered under the terms and provisions of the policy, as set out on page 44 of the PDS. The complainant generally claims, ‘fees for architects, engineers or surveyors’ and ‘any fees [the insurer] agrees [the complainant] need[s] to pay to meet the requirements of a statutory authority’. However, the panel notes the fees claimed must be reasonable and must be agreed to by the insurer before they are incurred. It follows that, upon the complainant’s provision of documentation which proves the exact cost of each type of fee claimed, the insurer must assess the reasonableness of each such rebuilding-related professional fee in accordance with the terms and conditions of the policy and the terms of this determination. If the complainant is subsequently dissatisfied with a decision of the insurer related to any particular fee claimed, she is entitled to lodge a further complaint with AFCA regarding that specific issue. 2.3 Should the insurer cover loss of rent? No. The insurer is entitled to rely upon the terms and conditions of the policy to deny this part of the claim. Property was not tenanted when insured event occurred On 12 August 2024, the complainant claimed the sum of $95,800 for loss of rent. The lease of the tenant living at the property immediately before the insured event occurred expired on 30 September 2021, about two weeks or so before the fire happened. It is also reasonable to assume that, in accordance with tenancy laws, the tenant would likely have advised the complainant a month in advance (that is, around the beginning of September 2021) whether they intended to remain and renew the lease, or vacate the property. Page 41 of the PDS provides: Loss of rent for landlords Buildings Insurance […] If a listed event causes loss or damage to your home and we agree your tenants can’t live in it and need to move out so it can be repaired or rebuilt. Covered under Buildings Insurance • the rent you lose during the reasonable time it should take to repair or rebuild your home, for up to 12 months from when the listed event took place. We pay this benefit on top of your Buildings sum insured. Not covered • if you or your family live in your home. The insurer says it is entitled to deny the claim for LOR because the property was not tenanted at the time of the fire. Therefore, the insurer says, the complainant has no entitlement to LOR under the terms of the policy. The panel is not satisfied the complainant has established a valid claim for LOR. It follows the insurer is entitled to rely upon the terms and conditions of the policy to deny this aspect of the claim. This is because of the following considerations. First, there is no dispute the property was not tenanted when the fire occurred. Therefore, the relevant provision of the policy (which states LOR will be covered if the tenants cannot live in the property due to the damage caused by the insured event) is not activated. Second, there is no persuasive contemporary detailed evidence about when a new tenant, or other occupant, was planning to move into the property, had the fire not occurred. In this regard, the complainant did not provide evidence of advertisements posted by her or her real estate agent in search for a new tenant and/or any expression of interest from potential tenants before 17 October 2021. Third, whilst the complainant provided a letter stating that one of her neighbours wanted a long-term lease at the property, but could not execute that lease due to the fire, the panel considered the letter was not persuasive. Further, it did not show the complainant met the criteria necessary under the policy to trigger the benefit. 2.4 Should the insurer pay non-financial compensation? Yes. If it has not already done so, upon notice that the complainant accepts this determination, the insurer should pay her the sum of $2,000 in non-financial loss compensation. Claim delays caused upset Under the AFCA rules, non-financial loss compensation ($6,300) may be awarded in circumstances where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Moreover, non-financial loss compensation is not intended to be a punishment for any wrongdoing on the part of the insurer. The panel accepts the complainant in this matter has suffered an unusual degree of physical inconvenience and interference with her expectation of enjoyment and peace of mind. For instance, ongoing disputes delayed the satisfactory resolution of this claim. The complainant says these delays have had an adverse effect upon her, causing her stress, anxiety and financial hardship. Moreover, the insurer accepted there were unreasonable delays and instances of mismanagement in the claim handling process and stated the following in their responses to AFCA: [We] also unreservedly apologise for any unreasonable delays or mismanagement of the claim…. In acknowledgement of unreasonable delays or mismanagement of the claim, [we] are prepared to propose ex gratia of $2,000 for non–financial loss in compensation, in addition to the cash settlement. The panel is satisfied this offer by the insurer is fair and reasonable in all the circumstances. If it has not already done so either during the course of this complaint or as part of AFCA complaint number 1022953, upon notice that the complainant accepts this determination, the insurer should pay her the sum of $2,000 in non-financial loss compensation. 2.5 Complaint should be resolved this way Time is of the essence Within 21 days’ notice that the complainant accepts this determination, the insurer must: · apply the sum insured safety net in accordance with the terms and conditions of the policy and the terms of this determination where necessary · assuming it has already paid a total of $610,032.63 to the complainant and her bank, pay to the complainant the balance of $166, 615.37. (If this assumption is incorrect, the parties must promptly contact AFCA and provide details of the exact amounts the insurer has already paid) · pay to the complainant interest on the sum of $166, 615.37 in accordance with section 57 of the Act, from the date of denial of the claim, until payment of the balance of the cash settlement to the complainant · if it has not already done so, pay to the complainant interest on the sums already paid to the complainant’s bank ($140,106.27) and to the complainant ($469,926.36) in accordance with section 57 of the Act, from the date of denial of the claim, until the date payment of these sums was made · provide to the complainant an explanation, and breakdown, of how the interest sums have been calculated · upon the provision by the complainant of documentation which proves the exact cost of each type of rebuilding-related professional fee claimed, the insurer must assess the reasonableness of each such professional fee in accordance with the terms and conditions of the policy and the terms of this determination · if it has not already done so, either during the course of this complaint or as part of AFCA complaint number 1022953, pay to the complainant the sum of $2,000 in non-financial loss compensation. 2.6 Why is the outcome fair? The outcome is fair in all the circumstances because: · the exchanged material demonstrates the sum insured safety net applies in this particular instance · the policy provides cover for rebuilding-related professional fees · the property was not tenanted when the insured event occurred · an award of non-financial loss compensation is reasonable and appropriate. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes: · an ombudsman · a member with significant experience in consumer and small business advocacy · a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.