Cash settlement amount for storm damage building repairs, contents storage and compensation for delay
Text of the determination
Determination
|
Case number
|
12-00-1097542
|
Financial firm
|
AAI Limited
Case number: 12-00-1097542 30 October 2025
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
The complainant lodged a claim for storm damage occurring on 25 December 2023. The claim was accepted. The insurer assessed the damage and offered to cash settle the claim.
The insurer issued a cash settlement for the contents. A dispute arose regarding the amount of the cash settlement offered by the insurer for building repairs. The complainant obtained her own quotes, but these were rejected by the insurer who stated they were excessive.
The complainant wants her quotes to be accepted. She wants the insurer to reimburse costs incurred by her, and fund outstanding building repairs. She also seeks compensation for non-financial loss and says the insurer failed to provide temporary accommodation.
1.2 Issues and key findings
Is the insurer’s cash settlement fair and reasonable?
No. The insurer’s scope of works does not include all accepted damage. The complainant’s trade quotes are mostly fair and reasonable, but do not include the cost of plastering. It is fair for the insurer to increase its cash settlement for building repairs to $48,776.30.
Is the complainant entitled to any other amounts?
Yes. The insurer is to pay the policy limit of $13,430 for contents storage (in addition to the repair costs) and reimburse the complainant’s expert costs in the amount of $440.
Is the complainant entitled to compensation?
Yes. The complainant has not established an entitlement to compensation for indirect loss, but the insurer is required to pay $6,300 compensation for non-financial loss. The insurer handled the claim poorly and failed to provide temporary accommodation.
Why is the outcome fair?
The outcome is fair because the scope of works relied on by the insurer is inadequate. It is fair for the insurer to increase its cash settlement offer to reflect the reasonable cost of all necessary repairs, reimburse the complainant’s expert costs and pay compensation.
1.3 Determination
This determination is in favour of the complainant. Within 14 days of notification of acceptance of this determination, the insurer is required to pay the complainant:
· $48,776.30 for building repairs
· $13,430 for contents storage
· $440 for expert costs
· $6,300 compensation for non-financial loss.
2 Reasons for determination
2.1 Is the insurer’s cash settlement fair and reasonable?
No. The insurer’s scope of works does not include all accepted damage. The complainant’s trade quotes are mostly fair and reasonable, but do not include the cost of plastering. It is fair for the insurer to increase its cash settlement for building repairs to $48,776.30.
Complainant has established a claimable loss
The complainant is required to show, it is more likely than not, the loss or damage claimed is covered under the policy. If the complainant can do this, the onus shifts to the insurer to show, on balance, it is entitled to decline or limit cover in accordance with the policy terms.
There is no dispute that the complainant was provided with the policy documents including the Certificate of Insurance (COI) and Product Disclosure Statement (PDS).
The policy provides cover for loss or damage caused by a series of insured events (including storm) and optional cover for accidental damage. There is no dispute the complainant’s home was damaged by a storm on 25 December 2023, and a claimable loss has been established.
The dispute relates to the cash settlement being offered by the insurer.
History of claim and issues in dispute
The insurer appointed a restorer, AR, to complete remediation works and a builder, HR, to assess the damage and prepare a scope of works.
HR completed make safe works and prepared a detailed assessment report and scope of works for repairs in January 2024. In March 2024, HR provided a further report and scope of works for water damage to electrical items at the property.
On 23 April 2024, the insurer offered to cash settle the building repairs by paying the complainant $29,110.38. The complainant rejected this offer on the basis it was inadequate.
A leak detection test was conducted at the property on 13 June 2024 which revealed that water was escaping from the shower enclosure into the bathroom. The damage due to the leak was not accepted under the claim and does not form part of this dispute.
The insurer obtained an updated scope of works from HR dated 21 June 2024 and increased its cash settlement offer to $38,618.31.
The complainant submitted her own quotations for repairs which totalled over $50,000. The insurer’s assessor reviewed these in July 2024 and reported that the only acceptable one was the carpet quote in the amount of $12,838. The complainant was dissatisfied with this and expressed concerns that the insurer’s assessment does not account for all necessary repairs.
The insurer arranged for a building coordinator, BC, to review the claim. The BC reported that the carpet had already been cash settled and the quote by HR was fair and reasonable.
The insurer maintains that the updated scope of works and quote by HR is adequate.
Policy outlines how the insurer settles home claims
The policy sets out how the insurer settles home claims on pages 90 to 91 of the PDS. There are different methods of settlement depending on whether a member of the insurer’s supplier network is able to complete the repairs.
Page 90 of the PDS states:
If the amount of the assessed quote to repair or rebuild is less than the home sum insured, we will offer you the choice to have the home repaired or rebuilt (based on the recommendation of our builder).
Where the complainant chooses not to accept the offer, the PDS states that the complainant will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. There is a note stating the amount may be less than it would cost the complainant to arrange the repairs or rebuild with her own builder.
If the builder is unable to complete repairs, different provisions apply. Pages 90-91 state:
When your claim for loss or damage to the home is covered and a member of our supplier network is unable to complete the repair or rebuild, we will ask you to engage a builder to provide a scope of works and provide a quote on the cost to repair or rebuild your home on a ‘new for old’ basis.
Once the scope of works and quote is provided to us, we will arrange for it to be assessed…
If the quote is appropriate and reasonable for the scope of works, we will then pay you the assessed amount. If it is not, the quote may be adjusted. This may include adjusting the scope of works or the quote. We will then pay you the adjusted amount of the quote.
Insurer is to cash settle the reasonable costs of repairs
The insurer’s Notice of Response to AFCA says it is willing to engage HR to complete the repairs. However, the initial assessment report by HR states ‘We recommend the claim be cash settled’. The complainant says the assessor also verbally told her she would need to take a cash settlement due to significant delays starting repairs.
The complainant has since commenced repairing the property herself on an ad hoc basis.
In the circumstances, I consider the only viable way to resolve the dispute is for the insurer to cash settle the cost of the repairs. This will facilitate a prompt resolution of what has been a protracted claim.
The insurer relies on the policy wording for cash settlement. Page 90 of the PDS states:
You will be paid the amount of the assessed quote to repair or rebuild on a ‘new for old’ basis. Note, this amount may be less than what it would cost you to arrange the repairs or rebuild with your own builder. We are able to secure supplier discounts from within our supplier network.
I am not satisfied the insurer’s builder can complete the repairs. The insurer is therefore required to settle the claim based on quotes provided by the complainant, which are to be assessed for reasonableness and may be adjusted (pages 90-91 of the PDS).
AFCA’s approach to cash settlement is that it must be sufficient to enable the complainant to undertake the necessary repairs. AFCA therefore requires a cash settlement to be based on a reasonable quote for claim related repairs, actionable by a retail customer. An uplift may be applied to the quoted amount to allow for contingencies and the loss of the lifetime guarantee.
Insurer’s scope of works and cash settlement are inadequate
The insurer has offered to cash settle the claim by paying the complainant $38,618.31 based on the updated scope of works by HR dated 21 June 2024.
The complainant has disputed the scope of works and cash settlement offer by the insurer.
I have reviewed the expert reports (outlined in section 3.2 below) together with the updated scope of works (HR SOW). The HR SOW appears to be lacking some of the accepted claim related damage including:
· damage found in bedroom 3
· ceiling damage in the kitchen, dining, lounge and main bathroom.
The insurer’s electrical report from EE identified water damage to kitchen appliances which require replacement. This is not included in the insurer’s scope of works. The water damage to the ceiling in the kitchen should also have been included based on the findings by EE.
In addition, the insurer’s restorer, MC, reported water damage in several areas of the home including the ceiling in bedroom 3. However, this was not included in the insurer’s SOW.
For the above reasons, I consider the HR SOW does not include all identified areas of damage. The insurer’s cash settlement offer is therefore inadequate.
There is also no persuasive evidence that the HR quotation is actionable. While the insurer has assessed the complainant’s quotes and deemed them unreasonable, it has not provided an adjusted figure as required by page 91 of the PDS. Instead, it has relied on the quote by its own builder, which is inadequate.
Quotes obtained by the complainant are mostly reasonable
The complainant has provided the following quotes for repairs obtained in 2024:
· Electrical quote for $10,516.00 (plus $3,098 for oven and cooktop)
· Air conditioning quote for $715.00
· Insulation quote for $4,070.00
· Fencing quote for $4,858.70
· Painting quote for $14,597.00
· Carpet quote for $12,838.00
· Shed quote for $4,318.00
· Contents pack out and storage quote for $32,050.00
· Repair quote from NB in the amount of $44,994.90 (no GST).
There appears to be some duplication in the quotes provided. The itemised repair quote by NB includes repairs to the fencing, electrical, shed and plastering works, but no allowance for carpet, painting or contents removal. The complainant has also provided separate quotes for each trade, but these do not appear to cover plastering which is a significant part of the claim.
The BC advised the carpet quote is reasonable but this has already been cash settled under the contents claim. Page 22 of the PDS states that carpets are covered as contents and this is not in dispute. The complainant therefore is not entitled to any further amount for the carpet.
The disputed items are discussed below:
Electrical works
The HR SOW allows $13,564.76 for electrical works (including builder’s margin and GST) and specifies replacement of the oven and cooktop and two air conditioning units.
The complainant’s electrical quote covers the same works as the HR SOW. However, she says she will incur supply costs for the oven and cooktop of $3,098 which brings her total estimate to $13,614. The repair quote by NB allows $15,560.65 for electrical works.
EE reported the oven and cooktop require replacement due to water ingress. This is not in dispute, but the BC found the complainant’s supply costs were excessive.
The HR SOW and the complainant’s estimate are approximately the same amount including supply costs. I consider the complainant’s estimate of $13,614 to be fair and reasonable.
Air conditioning cleaning
EE reported there was mould present in some of the air conditioning units, with two requiring replacement and two requiring cleaning. These costs are not included in the HR SOW.
The air conditioning quote provided by the complainant includes cleaning five units. The BC advised two units were being replaced under the electrical works and did not require cleaning.
The complainant has since provided a report and invoice from KA in the amount of $503.41. This relates to the cleaning and assessment of units in the living room and four bedrooms at the property. KA noted that all units at the property had been infested by mould.
I accept that the living room unit was to be replaced, and EE did not identify any issues with the units in bedrooms 1 and 2. However, the report by KA suggests all units were affected by mould and the complainant incurred the costs of cleaning five units.
There is no dispute that mould was present in at least some of the units and this is a known health risk. Given the significant delay finalising the claim, I consider the complainant acted reasonably in having the air conditioning system cleaned.
There is no evidence regarding the cost to clean only three units. The amount invoiced by KA is modest, and less than the complainant’s original quote. I consider it fair for the insurer to reimburse the full amount charged by KA being $503.41.
Shed
The BC found the complainant’s shed quote excessive and double the amount quoted by HR.
The HR SOW does not contain a breakdown for the supply and installation of the shed; the costs listed are for the labour only. The shed quote provided by the complainant for $4,318 includes both supply and installation. The repair quote by NB includes labour in the amount of $2,750 (which matches the trade quote) but no supply costs.
I am not satisfied the complainant can actually replace the shed for the amounts quoted by HR or NB. I consider the complainant’s quote of $4,318 for the shed is fair and reasonable.
Fence
The BC says the fence quote is not accepted due to inclusion of treated pine sleepers which is not like for like replacement, and the fact it is a shared fence with a neighbouring property.
The HR SOW includes the cost to remove, supply and install a Colorbond fence and a 50% shared timber fence in the total amount of $2,952.68 (including builder’s margin and GST).
The repair quote by NB allows $7,980 for removal and replacement of the fence.
Based on the available information, the complainant’s quote of $4,858.70 for the fences does not appear excessive. However, I accept that the insurer is only liable for 50% of the cost of replacing the timber fence due to it being a boundary fence.
As the complainant’s quote does not provide a breakdown of labour between the two fences, it does not establish the reasonable repair cost with any accuracy. In the circumstances, I accept the insurer’s quote of $2,952.68 as a fair and reasonable estimate for the fences.
Insulation
The BC says the complainant’s insulation quote includes replacement of insulation throughout the entire home, whereas HR only allowed the areas where the ceiling is being replaced.
There is no dispute water entered the home through the roof. The insurer’s restorer, MC, confirmed there was water damage to the ceiling in multiple areas of the home. I consider it likely that water travelled through the ceiling cavity saturating the insulation.
I have already found the HR SOW fails to allow for repairs to the ceiling in some of the damaged areas. It follows the allowance for insulation is inadequate. I also am not persuaded the amount quoted for insulation in the accepted areas is sufficient. The amounts shown next to the line items for ‘remove and replace ceiling batts’ are very low and it is unlikely the complainant would be able to complete the works for that amount.
I consider the complainant’s quote of $4,070 for insulation is fair and reasonable.
Painting and plastering
The HR SOW includes allowances for painting and plastering including replacing the entire garage ceiling, plus repairs to the ceilings and cornices in other rooms. However, it does not include an allowance for the damage to bedroom 3 and the insurer is liable for this.
The repair quote by NB allows $13,825.62 for plastering and insulation. This appears to be for the same works in the HR SOW and there is no allowance for the additional areas of ceiling damage. There is also no reference to painting. I therefore am unable to accept the NB quote.
The complainant has provided a trade quote for painting in the amount of $14,597, which includes patching but no major plastering. The BC reported that the painting quote had not been broken down and he was unable to validate the costs. I have reviewed the quote and the reports which confirmed the areas of damage.
Although the painting quote lacks detail, I am satisfied that it is an actionable retail quote which represents what it would realistically cost to complete the necessary painting works.
Fair for insurer to apply a 25% uplift to its cash settlement
As stated above, I have found that most of the trade quotes obtained by the complainant are fair and reasonable, apart from the fencing quote. I am satisfied that the complainant’s quotes were actionable at the time they were obtained in 2024, but they may no longer be valid.
The repair quote by NB does not include all necessary works and the amounts quoted for the fencing and electrical works appear excessive. I therefore do not accept the NB quote.
The total amount of the accepted quotes/invoice is $40,055.09 broken down as follows:
· Electrical works $13,614
· Air conditioning cleaning $503.41
· Shed $4,318
· Fencing $2,952.68
· Insulation $4,070
· Painting $14,597.
Based on AFCA’s approach to cash settlements and the terms of the policy, I consider the correct method of settlement is for the insurer to pay the amount of the quotes provided by the complainant (adjusted for reasonableness). However, given the absence of any evidence regarding the cost of plastering and repairing all damaged areas, this may leave the complainant in a situation where not all the necessary repair costs are covered.
In the circumstances, I consider a fair approach is for the insurer to apply an uplift of 25% to its previous cash settlement offer of $38,618.31 to account for contingencies and further works. The insurer is to reimburse $503.41 for the air conditioning costs in addition to this.
This brings the total cash settlement for repairs to $48,776.30, which exceeds the total of the complainant’s trade quotes and the repair quote by NB. I consider this a fair outcome.
I am satisfied a cash settlement of $48,776.30 is sufficient to cover the reasonable cost for the complainant to complete all necessary claim related repairs.
2.2 Is the complainant entitled to any other amounts?
Yes. The insurer is to pay the policy limit of $13,430 for contents storage (in addition to the repair costs) and reimburse the complainant’s expert costs in the amount of $440.
Fair for insurer to pay policy limit for contents storage
The complainant sought $32,050 for the removal and storage of undamaged contents.
Page 58 of the PDS states that the maximum the insurer will pay for storage of undamaged contents is 10% of the general contents sum insured. The COI shows that the contents sum insured is $134,300. Therefore, the maximum amount the insurer is required to pay for storage of undamaged contents is $13,430. The complainant does not dispute this.
HR included an allowance of $440 per hour for the removal and storage of contents in the garage but only one hour of labour was allowed. This is clearly inadequate.
The insurer says repairs have been completed to the garage and the complainant’s son was operating an aquarium business from the garage which was described as a hobby.
I accept that the complainant has commenced repairs, and her contents storage requirements may have changed. However, it would be unfair for the insurer to refuse to pay a benefit she was entitled to under the policy in circumstances where settlement of the claim was delayed by the insurer’s actions and inadequate settlement offer.
The insurer has accepted the claim and was aware of the presence of fish tanks from the outset. This is noted in the BC report which also references the policy limit.
I consider it fair for the insurer to pay the complainant $13,340 for contents storage.
Insurer to reimburse complainant for expert costs
Under its Rules, AFCA may require an insurer to contribute to a complainant’s professional costs incurred (usually capped at $5,000) in bringing their complaint. This may include legal costs or expert reports. AFCA will consider the complexity of the complaint, whether the costs are reasonable and whether they helped resolve the complaint.
The complainant has provided an invoice from building expert, JB, in the amount of $440. These costs were incurred during the AFCA complaint. I am satisfied the JB report was required and assisted the complainant to establish the extent of the damage. The amount of the invoice is reasonable, and I consider it fair for the insurer to reimburse these costs in full.
2.3 Is the complainant entitled to compensation?
Yes. The complainant has not established an entitlement to compensation for indirect loss, but the insurer is required to pay $6,300 compensation for non-financial loss. The insurer handled the claim poorly and failed to provide temporary accommodation.
Complainant has not established an entitlement to indirect loss
Under paragraph D.3.2 of the AFCA Rules, we may require an insurer to compensate a complaint for indirect financial loss (also known as consequential loss). For complaints made after to 1 January 2024, this is capped at $6,300.
Many insurance policies exclude cover for indirect loss. If this is the case, we will not award this type of compensation for loss caused by the event giving rise to the claim. However, if the complainant has suffered an additional loss because the insurer mishandled the claim, we may require the insurer to compensate the complainant for the additional loss.
The complainant says that due to the storm damage and collapsed ceiling, large holes remained in the property which caused a persistent rat infestation problem. She says she engaged pest control services to manage the issue and wants the insurer to reimburse these costs. However, she has not provided any invoices or receipts substantiating the loss.
The policy does not cover loss or damage caused by insects, vermin or rodents unless it is covered under the insured events of ‘Fire’ or ‘Escape of liquid’ (page 47 of the PDS).
The PDS also states on page 34 that the insurer does not cover ‘extra costs or other losses (financial and non-financial loss) following an incident covered by your policy’.
I accept that the claim has been delayed, and the complainant’s house was in a damaged state for a prolonged period. I consider this highly unsatisfactory. However, the presence of rats is not confirmed in the expert evidence, and the complainant has not provided any persuasive evidence that she incurred pest control costs due to the insurer’s actions.
In the circumstances, I am unable to award compensation for indirect loss. To the extent that the complainant suffered stress and inconvenience due to the insurer’s claims handling, this can be dealt with by an award of compensation for non-financial loss (discuss below).
Insurer is required to pay compensation for non-financial loss
Under the applicable AFCA Rules, we may award compensation (capped at $6,300) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind.
In determining whether it is appropriate to award non-financial loss compensation, AFCA considers whether a complainant’s conduct has contributed to their loss. If so, it may be appropriate to discount the award of compensation that might otherwise have been made.
The complainant says the insurer unreasonably delayed the claim and prolonged settlement despite the claim being accepted. She says further that the insurer failed to provide her family with suitable temporary accommodation as required by the policy.
The claim was lodged in December 2023 and has been on foot for approximately 22 months. It is clear the claim has not progressed smoothly and there have been numerous delays.
I acknowledge that both parties contributed to the delays. However, I am satisfied the insurer acted unreasonably by failing to obtain a complete scope of works including all claim-related damage. Had the insurer included all items of damage and correctly assessed the claim in accordance with the policy, the delays most likely would not have occurred.
I also consider the insurer made errors in its assessment of the claim because it:
· did not include all the items deemed as claim related damage in the scope of works
· incorrectly assessed the claim on a like for like basis, when the policy states new for old
· incorrectly assumed the complainant requested a cash settlement and based its cash settlement on the HR SOW, when insurer’s trades recommended a cash settlement
· deemed the complainant’s quotes excessive and failed to provide a reasonable adjustment as required by the policy.
In addition, the policy provides cover for temporary accommodation when an insured incident damages the home to the extent it cannot be lived in (page 55 of the PDS).
The exchanged material shows that there was internal water damage, holes in the ceilings plus sagging ceilings in the bathroom, dining, lounge and garage. There was also mould in the air conditioning units, and several electrical appliances required replacement, including cooking equipment. I consider the property was uninhabitable in the circumstances.
The insurer says that it offered the complainant temporary accommodation, but this was not accepted. The complainant says the insurer only offered two weeks in a hotel and told them they would have to pack up their house themselves (which they were unable to do). She therefore says the insurer’s proposal was inadequate, impractical and unreasonable.
Based on the exchange information, I accept that the complainant and her family were not provided with suitable temporary accommodation. As a result, they have continued to live in the damaged property for almost 2 years. The complainant has taken steps to mitigate the loss by commencing repairs, but she has been limited due to financial constraints and the delay in cash settling the claim. She says that her family has no access to a stove or oven, and they have had to use a camping stove and eat takeaway during this time.
Overall, I consider the insurer handled the claim poorly and caused delays and errors which resulted in the complainant suffering a significant degree of stress and inconvenience.
I consider an award of $6,300 for non-financial loss is warranted in the circumstances.
2.4 Why is the outcome fair?
The outcome is fair because the scope of works relied on by the insurer is inadequate. It is fair for the insurer to increase its cash settlement offer to reflect the reasonable cost of all necessary repairs, reimburse the complainant’s expert costs and pay compensation.
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:
· the legal principles
· applicable industry codes or guidance
· good industry practice
· previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence.
When we assess complaints, we consider:
· available documents
· the recollections of the parties
· all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.
3.2 Summary of expert evidence
|
Report
|
Key points
|
Insurer’s expert (MC)
Assessment Report
3 January 2024
|
· On 25 December 2023 water entered the roof cavity underneath the ridge on the south facing front side rood and underneath the solar panels on the west face.
· Water has gone down the timber structural beams and caused pooling in numerous rooms on the flooring.
· Areas of damage: front entry/lounge room, garage, bedrooms 2 and 3.
|
Insurer’s expert (MR)
Roofing Report
10 January 2024
|
· Recent tornado blew off 15 roof tiles causing water entry into three bedrooms, hallways, kitchen and living room.
· Owner had a roofer attend and replace the 15 roof tiles.
· Maintenance issues identified, raised cut tiles on top row of Dutch gable and lead flashing overlaps only 30mm and the minimum overlap is 150mm
· Owner is required to have the top row of tiles on Dutch gable realigned to prevent gaps in tiles and secured into place.
· Owner is required to fix the lead flashing overlaps.
|
Insurer’s expert (EE)
Solar Panel Report
10 January 2024
|
· The solar inverter was tested and was found to be working well and functioning correctly.
· The rooftop works were inspected and found to be in good condition and met Australian Standards
· The panels were inspected and found to be producing well.
· There were no signs of damage from the reported weather event.
|
Insurer’s expert (HR)
Assessment Report
15 January 2024
|
· Water damage to carpet
· Believe the water date damage is due to maintenance related issues to the adjoining bathroom and recommend the owner engages trades to rectify.
· Recommend a full cash settlement as repairs cannot be warranted.
|
Insurer’s expert (EE)
Electrical Report
8 March 2024
|
· AC Unit in dining room requires replacement
· AC Unit in living room has mould present and requires replacement.
· AC Unit in bedrooms 1, 2 and 3 all working.
· AC Unit in bedroom 3 requires a deep clean.
· AC Unit in bedroom 4 has mould present.
· Kitchen stove requires replacement due to water damage.
· Kitchen oven requires replace due to water damage.
· Fan in living room has signs of water ingress and requires replacement.
· Fan in bedroom 1 has signs of water ingress and requires replacement.
|
Insurer’s expert (HA)
Assessment Report
6 June 2024
|
· Assessor notes the builder has missed parts of the home in the scope.
· These areas in the garage.
· The scope of works required to be amended to include these areas.
|
Insurer’s expert (GC)
Leak Detection Report
13 June 2024
|
· Leak location investigations have been completed in the main bedroom area, a minor weep has been found in the vanity waste pipe that is not contributing to the claimed resulting damages.
· A hydrostatic flood test to the shower base conducted.
· The result of this test failed.
· Water was found to be escaping the shower enclosure via porous grouting and poor silicone seals into bathroom enclosure only.
· There was no evidence of water or heat trace in the adjourning wardrobe.
· A spray test to the shower screen has a result of fail, water is escaping the shower enclosure and tracking into the bathroom enclosure only.
· The grouting and silicon seals in the main bathroom shower enclosure are showing signs of aging and deterioration.
· Maintenance works are required.
|
Insurer’s expert (BC)
BC Report
19 September 2024
|
· Costs provided by the owner are excessive.
· The quote provided by HR has captured the event related damages and cots are fair and reasonable.
|
Complainant’s expert (JB)
Building Inspection Report
23 December 2024
|
· Ceiling nails popping in bedroom 2, hallway, lounge, dining and garage.
· Over time, the nails and screws can back out, which often a result of general aging and deterioration of the building structure.
· The ceilings appear to have been waterlogged during the storm.
· The weight of the water would also cause nails to pop.
· If left unmanaged, the ceiling sheets may become loose and unstable, increasing the rate of deterioration of the internal ceiling and creating potential for the development of secondary defects.
· Re-fastening of popped nails will help to maintain the stability of the internal ceiling and associated building elements.
· Ceiling sagging in bathroom, dining, lounge and garage.
· Sagging to the fixed ceiling structure generally indicates that the building materials have swollen due to contact with water or that fixings (e.g nails or glue) have become loose and require reattachment.
· All internal areas have water damage on the ceilings.
· Water damage to the ceiling lining is generally an indication of excessive moisture being present in the roof void, usually via a leak to the roof covering.
· The carpet was damaged and has been removed in the lounge room, bedrooms 1, 2, and 3.
· The paint work in various locations internally has bubbled due to the water ingress.
· The doors and door jambs, and the kitchen kick boards show evidence of swelling.
· Electrical items such as the AC in the dining room, fans in the lounge room and bedroom 3 have been compromised.
· The garden shed has been damaged due to the force of the winds.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.