Summary

A former bank manager complained of delay and poor communication in restructuring his loans after a property sale, and of an alleged agreement to use the sale proceeds. AFCA found unreasonable delay and poor communication, ordered a credit to his loan for excess interest and $1,500 non-financial loss, but found no agreement proven.

The bank could not explain the delay between May 2022 and April 2023 and did not communicate progress as it had undertaken to do.

Issues

Subjects and remedies

pay compensationpay non financial loss

Related

All NAB determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1097387 | Financial firm | National Australia Bank Limited Case number: 12-00-1097387 14 November 2024 Determination overview Complaint In November 2014, the complainant, a former manager with the financial firm (the bank) entered into a range of loans, either directly or through companies he controlled. These were:  loan ending 2570 for $868,000 over 30 years (interest only for 5 years) at a rate of 4.60% in the complainant’s personal name  loan ending 0238 for $1,008,000 over 30 years (interest only for 5 years) at a rate of 4.60% in the name of Company M, as trustee for the complainant’s family trust and  loan ending 0326 for $52,000 over 15 years at a rate of 4.60% in the name of Company M. Company M and Company R, a corporate trustee for the B Trust, provided guarantees and indemnities for the full amount of each of the loans. In addition:  loan ending 2570 was secured by mortgages over two properties in B suburb, Western Australia (WA) (Property B and Property Ba)  loan ending 0238 was secured by mortgages over two properties, one in D suburb, WA (Property D) and one in M suburb, WA (Property M) and  loan ending 0326 was secured by mortgages over Property D and Property M. In 2022-23, the complainant attempted to change the structure of the loan portfolio. The complainant says the bank:  failed to honour an agreement he had with his original business banking manager to use proceeds of sale from any of the properties to reduce the balance of loan ending 0238  unreasonably delayed the restructure of the loans for over 9 months The bank says there is no record of any undertaking about the sale proceeds being used in the manner described and the restructuring took time due to the deregistration of Company R and the complainant’s inability to provide certain documents on request. Issues and key findings Did the bank unreasonably delay the restructure process? Yes. I am satisfied there is no clear explanation for why this process took so long between May 2022 and April 2023. Did the bank fail to appropriately communicate with the complainant? Yes. There are multiple occasions where there is no record of the bank advancing the process or communicating with the complainant at all, despite undertaking to do so. Why is the outcome fair? The outcome is fair and reasonable in all the circumstances as it fairly compensates the complainant not only for the additional interest paid on loan ending 0238 due to unreasonable delays caused by the bank, but for the complainant’s stress and inconvenience as a result of the bank’s failure to communicate its progress at key times in the restructuring process. Determination This determination is partly in favour of the complainant. Within 7 days of the date the bank is advised the complainant has accepted this determination, it must:  refund into loan ending 2570 (or any other remaining credit facility) an amount equal to the reduction in the outstanding balance of loan ending 0238 which would occur after the account was reconstructed as if: > the loan had been paid down by $390,000 on 12 May 2022 > interest had been calculated at a rate reduced by the amount of interest earned by the first term deposit (approximately 0.7%) and applied to the account between 12 May 2022 and 31 January 2023 then: > the loan had been paid down by $280,000 on 31 January 2023 > interest had been calculated at a rate reduced by the amount of interest earned by the second term deposit and applied to the account between 31 January 2023 and October 2023 and  pay into an account of the complainant’s choosing non-financial loss compensation of $1,500.00. Reasons for determination Did the bank unreasonably delay the restructure process? Yes. I am satisfied there is no clear explanation for why this process took so long between May 2022 and April 2023. The complaint spans 18 months A chronology of key events, taken from emails provided by the complainant, as well as the bank’s system notes in respect of the issues in dispute, is set out in section 3.2 of this determination. Relevantly, the issues first arose when:  the complainant first required changes to the loan portfolio in April 2022 following his acceptance of an offer for the sale of Property B  in May 2022, the bank required the complainant to provide alternate security, in the form of term deposits, for the loan ending 2570 which had been partly secured by Property B and  in June 2022, the complainant sought to use the sale proceeds from Property B to pay down the loan ending 0238, rather than the loan ending 2570 which had been secured by Property B. It appears the complications commenced from this point as loan ending 2570 was in the complainant’s sole name (as was the title to Property B), but once Property B was removed from the security for that loan, there was insufficient security (vis a vis the complainant’s personal loan) to meet the bank’s lending criteria if loan ending 2570 was not paid down, at least in part, using the sale proceeds. There is insufficient evidence of an arrangement The complainant says, in May 2021, he fixed the interest rate on loan ending 2570 on the understanding that if any of the security properties were sold, he would be able to use the sale proceeds to pay down the variable rate loan ending 0238 as it had a higher interest rate. The complainant says his initial business banking manager accepted this due to the other properties being subject to mortgages to the bank, and it holding multiple guarantees in respect of each of the loans. The complainant also says the business banking manager agreed if either Property B or Property Ba were sold, the fixed loan ending 2570 could be ‘transferrable to the other properties’, by which I understand him to mean the other properties would be substituted as security for the loan. While this is the complainant’s recollection, and I accept it is genuinely held, there is no documented contemporaneous evidence of this arrangement being formally agreed to by the bank. On balance, while I accept the business banking manager may have said this arrangement was something which could be tried if the properties were sold, I am not satisfied it was an unconditional guarantee this would happen as the arrangement would need to be reviewed and agreed to by the bank’s credit and legal teams. The complainant agreed to term deposits being used as replacement security On 6 May 2022, following a meeting with Mr D, the complainant’s business banking manager at the time, the complainant arranged to establish a term deposit as interim security for loan ending 2570 in order to achieve settlement in respect of the sale of Property B. On 11 May 2022, the complainant signed a term deposit letter of set-off, dated 10 May 2022, confirming he accepted a term deposit in the amount of $390,000 would be used as security for the loan ending 2570 and another facility held by a family trust. Property B was sold the following day, 12 May 2022, for $511,000.00. Subsequently, on 31 January 2023, the complainant signed another term deposit letter of set-off, dated 30 January 2023, confirming he accepted a term deposit in the amount of $670,000 would be used as security for the same two facilities. I am satisfied these documents collectively confirm the complainant’s willingness to utilise the term deposits as security during the restructuring process. The bank undertook to make the adjustments in June 2022 In an email on 27 June 2022, Mr D told the complainant, as per the complainant’s request, he was going to close the term deposit applying the $390,000 to the home loan ending 2570. Once done, he would back date this deposit to 12 May 2022 and adjust the interest charged on the loan. There is no indication this was ever done. Instead, Ms P, another Customer Relations Manager, spoke to the complainant about his request in early August 2022 and undertook to look into it as the request had changed back to having the term deposit funds applied to the loan ending 0238. It was not until 16 August 2022 that the bank confirmed this could occur. Unfortunately, when it sent him the paperwork to do so, the complainant could not initially open the attachments. This appears to have been rectified on 25 August 2022, but there is no record in the system notes, or the emails, of the documents being returned until 27 March 2023. Despite a follow up from the complainant in September 2022, there does not appear to have been any progress made until early October 2022 when the bank identified Company R had been deregistered. The complainant had not advised the bank about Company R’s deregistration It is unclear from the available information when Company D replaced Company R as the corporate trustee, but online records from the Australian Security and Investments Commission (ASIC) indicate Company R was deregistered in February 2016. I am satisfied there is no evidence the bank was aware of the deregistration prior to 7 October 2022. As the bank could not rely on the guarantee previously given, modifications to the credit facilities were needed. On 27 March 2023, the bank advised it would require a new guarantee and indemnity from Company D as it was the entity which generated the income that, in turn, serviced all the credit facilities within the loan portfolio. There is no clear explanation for why it took the bank almost six months from identifying the issue to providing this advice to the complainant. The bank took until 13 April 2023 to present the refinanced portfolio In an email to the complainant on 13 April 2023, the complainant’s small business banker at the time, Mr V, relevantly said: Following our phone conversation this morning we are proposing the following changes to the lend which are impacted by the release of cash funds: Loan limits: Home loan ending # 2570 remains no change to limit Home loan ending # 0238 is paid out & closed in full Home loan ending # 0326 remains no change to limit Bank guarantee (under [name] family trust) remains open no change to limit Securities: $390k cash deposit funds released (to reduce debt above) $670k cash deposit funds released (to reduce debt above) Guarantee of $36,367 to remain as cash deposit, retained and contracted into bank guarantee. (this constitutes creating a new term deposit security, noting there will be no penalty for early breakout due to deposit primary purpose being ‘security’) [Property D] contracted into loan ending # 2570 [Property M] contracted into loan ending # 2570 *any residual funds from the cash release after the above has been met will remain as ‘surplus’ and to be credited to your nominated bank account, free from any encumbrance* Please take your time to review and confirm. Once we are ready to move forward, I will require the following to be completed – Attached letter of instruction confirming release of deposit funds FY21 & FY22 business financials for trading entity [Company D] which is the subject entity to provide servicing guarantee FY21 & FY22 business financials for trading entity [Company R] FY21 & FY22 business financials for trading entity [Company M] Individual tax return in your personal name for FY21 &22 Individual tax return in [complainant’s daughter’s] personal name for FY21 &22 From the available information, after this point, there was a lot of correspondence between the parties and the complainant’s accountant. I am satisfied the time taken from this point forward was a result of the complexity of the arrangements and the time taken for the bank to obtain all the necessary information. The restructure of the lending, including the release of the term deposits, was completed in October 2023. The bank has not adequately explained the significant delay From the chronology of the key events as set out above, I am satisfied there were several delays between May 2022 and April 2023 which could have been avoided by the bank handling the complainant’s requests and situation in a more efficient manner. I acknowledge the situation was complicated by the identification of Company R’s deregistration and further by the sale of Property Ba and Property D during this period. However, the bank has not addressed the delays where there is no indication of any work being undertaken to resolve the issues for the complainant. The complainant is entitled to compensation for direct financial loss I am satisfied, had the complainant’s request been actioned in a timely manner, the complainant would have reduced the balance of loan ending 0238 by:  $390,000 from a point on or about 12 May 2022 (after backdating as per Mr D’s undertaking) and  a further $280,000 from 31 January 2023 (being the balance of the term deposits entered into on that date). The complainant’s direct financial loss is therefore the difference in the interest charges which were applied to the loan ending 0238 and the interest charges which would have applied (less the rates obtained by the term deposits) had loan ending 0238 been paid down on those dates. As I understand the refinancing resulted in loan ending 0238 being paid out, this should be calculated by the bank and refunded to the complainant in the form of a reduction on the outstanding balance of loan ending 2570, or any other remaining credit facilities, by the commensurate amount. I am satisfied past this point, the parties engaged in a reasonably timely manner and any undue delays were beyond the reasonable control of the bank. Did the bank fail to appropriately communicate with the complainant? Yes. There are multiple occasions where there is no record of the bank advancing the process or communicating with the complainant at all, despite undertaking to do so. The bank accepts it should have communicated better In a letter to the complainant, provided to AFCA on 19 July 2024, the bank set out its response to the dispute and relevantly said: We acknowledge the delays you have experienced in completing the review of your lending facilities with [the bank]. We recognise that there was an opportunity for us to have kept you updated and informed, provide clear communication with the progress of the review and the restructure of your lending facilities. We also acknowledge the extended period of time to complete this. I am sorry that this did not occur. AFCA may award non-financial loss compensation AFCA may award, in certain circumstances, non-financial loss compensation up to a particular limit. For this complaint, the limit is $6,300. However, AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation, AFCA expects the complainant to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. The complainant is entitled to some non-financial loss compensation While I appreciate the time taken to resolve the restructure was not optimal for the reasons set out in section 2.1 of this determination, this claim focuses on the bank’s failure to properly communicate with the complainant and the associated ‘interference with the complainant’s expectation of enjoyment or peace of mind’. Having regard to AFCA’s normal approach to non-financial loss compensation, I am satisfied there were two main instances of the complainant needing to follow up with the bank and re-iterate his concerns due to the bank not managing the process efficiently. These were after the resignation of Mr D without notice, and the inaction in responding to the request made on 27 June 2022 which was not responded to by the bank until 5 October 2022. I am satisfied it is therefore fair in all the circumstances to award the complainant $1,500 in non-financial loss compensation. Why is the outcome fair? The outcome is fair and reasonable in all the circumstances as it fairly compensates the complainant not only for the additional interest paid on loan ending 0238 due to unreasonable delays caused by the bank, but for the complainant’s stress and inconvenience as a result of the bank’s failure to communicate its progress at key times in the restructuring process. Supporting information The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Chronology Timeline of key events | Date | Event | 24 Nov 2014 | Complainant entered into a number of loans with the bank | 22 Feb 2016 | Company R deregistered | 3 Mar 2022 | Mr D called the complainant and advised of his assignment as the complainant’s business banker | 4 Apr 2022 | Complainant emailed Mr D advising of acceptance of offer on Property B and intention to transfer $300,000 to loan ending 0238 | 27 Apr 2022 | Mr D advised discharge request is being considered | 29 Apr 2022 | Complainant raised concerns about a full review of his financials and asked whether the bank would match the loan rate if he left security funds in term deposits. Mr D responded arranging time to discuss | 6 May 2022 | Mr D met with the complainant and arranged to establish a term deposit as interim security for loan ending 2570 in order to achieve settlement and subsequently review financials to complete a restructure of the loans | 12 May 2022 | Sale of Property B for $511,000 | 29 May 2022 | Complainant emailed Mr D enquiring about a waiver of penalties if the fixed rate loan was paid out early | 2 Jun 2022 | Mr D advised the complainant the matter is being worked on | 14 Jun 2022 | Complainant followed up for a response | 20 Jun 2022 | Mr D advised a partial waiver of penalty fee was possible and undertook to look into reducing the interest rate on loans following principal reduction by the complainant Complainant enquired about using $390,000 sale proceeds from Property B to reduce the loan in the name of Company M to below the bank’s lending margin | 27 Jun 2022 | Mr D confirmed the bank would waive any early repayment costs for partial payment on the complainant’s fixed home loan Complainant requested Mr D cancel the term deposit, backdate the deposit to loan ending 2570 to the date of settlement (12 May 2022) and adjust the interest charged | 29 Jun 2022 | Mr D advised he was arranging to close term deposit 1106 and applying the $390,000 sale proceeds to home loan ending 2570. Once done, he would back date the deposit to 12 May 2022 and adjust the interest. Complainant confirmed this was correct. | 13 Jul 2022 | Complainant followed up the request as it had not been actioned | 21 Jul 2022 | Complainant spoke to the bank about Mr D resigning and leaving the bank without notifying him. Needs new business banker | 1 Aug 2022 | Ms P, a bank customer relations manager, contacted complainant to apologise and offer assistance with using the $390,000 term deposit to reduce loan ending 0238 | 16 Aug 2022 | Ms P confirmed the $390,000 term deposit would be released and funds used to pay down loan ending 0238. Needed documents signed. | 25 Aug 2022 | Complainant advised Ms P documents could not be opened and Ms P re-sent to an alternate email address. Ms M, a bank customer relations manager, advised complainant she was awaiting a signed form to proceed with the security swap – release of term deposit funds | 21 Sept 2022 | Complainant enquired about the status of the term deposit and the variable loan account | 5 Oct 2022 | Complainant emailed Ms M to follow up the request made to Mr D on 27 Jun 2022, noting the bank was sending him overdue notices because the request had not been actioned Ms M emailed confirming file had been approved, subject to the rectification of an internal error relating to Company R | 7 Oct 2022 | Ms M called complainant advising as Company R had been deregistered, the bank needed to rely on guarantees and indemnities from Company M | 9 Nov 2022 | Complainant emailed Ms M enquiring about when the fixed interest period fell due and thanking her for her understanding and perseverance | 10 Nov 2022 | Complainant forwarded an email from his Real Estate Agent to Ms M about the work required on one of the properties prior to sale | 15 Nov 2022 | Ms M undertook to contact the complainant by phone the following day | 16 Nov 2022 | Complainant emailed following up call | 18 Nov 2022 | Complainant emailed Ms M enquiring about when the fixed rate mortgage fell due Ms M called complainant and discussed options for debt reduction. Complainant advised he would consider and let her know what he wanted to do. | 21 Nov 2022 | Ms M advised complainant the date the fixed rate mortgage was due was 28 May 2023 | 23 Nov 2022 | Complainant emailed Ms M regarding the term deposit being rolled over for another 6 months at 2.55% and proposing an ex-gratia payment from the bank of $13,831 plus the interest on the term deposit and interest from the maturity date to 28 May 2022 | 24 Nov 2022 | Ms M recorded a system note saying the complaint has been referred to Regional Manager, Ms G, and the complainant had not yet decided about the restructure | 6 Jan 2023 | Bank received a PEXA invite for Property Ba | 17 Jan 2023 | Mr V, a customer relations manager, emailed the complainant to advise Ms M was on annual leave and provide a discharge authority relating to the complainant’s intention to sell Property Ba | 23 Jan 2023 | Bank attempts to call complainant on 3 occasions, connecting on the last and receiving instructions to use new term deposits as security and restructure the debt after settlement on Property Ba so as not to disturb settlement | 2 Feb 2023 | Property Ba settled Mr V advised complainant there remained an issue regarding the deregistration of Company R, given the bank was reliant on Company R for the servicing guarantee | 27 Mar 2023 | Complainant forwarded the discharge authority apparently signed on 28 August 2022 to the bank Complainant explained the history of events to Mr O Mr O requested the complainant review and sign a new discharge authority | 28 Mar 2023 | Complainant provided signed discharge authority to Mr O along with information about Company D | 4 Apr 2023 | Complainant followed up Mr O for an update Mr O advised Mr V would call the following day with an update | 9 Apr 2023 | Complainant emailed Mr O advising he had not heard from Mr O and again needed to make the repayment on loan ending 0238 when it should have been paid out | 11 Apr 2023 | Mr O advised he was following up with Mr V | 12 Apr 2023 | Complainant advised he had still not heard from Mr V | 13 Apr 2023 | Ms G advised Mr O had escalated the complainant’s concerns to her and would be in touch shortly Mr V called the complainant and advised the complainant would need to provide financials. In a confirmation email, Mr V advised of the changes to the loans and securities and requested business financials and individual tax returns for the complainant and his daughter. Ms O emailed the complainant expressing frustration financials were required, but undertook to resolve the situation once financials were provided | 21 Apr 2023 | Mr V followed up complainant re accountant’s progress with required documentation | 3 Jun 2023 | Mr O confirmed complainant’s new business account details under a new entity | 16 Jun 2023 | Mr O called complainant and confirmed the complainant wished to payout $20,000 on loan ending 0326 as part of the facility restructure | Oct 2023 | Restructure completed

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.