Home / AIG Australia Limited / Determination 12-00-1095600

Determination 12-00-1095600

Extent of hail damage to roof and fairness of cash settlement offer

FirmAIG Australia Limited
Decided2025-11-13
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$222,476
Non-financial loss—
Amount claimed$317,823
SourceAFCA PDF

Summary

A body corporate claimed for hail damage to the roofs of two buildings, and the insurer offered a cash settlement of 10% of the repair quote. AFCA found the hail damage was more extensive and required the insurer to pay 70% of the quote less excess plus a 15% uplift.

The complainant's experts showed more extensive hail damage, but the full replacement was not shown to be solely hail-related given excluded wear, tear and deterioration, so 70% of the quote was fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination | Case number | 12-00-1095600 | Financial firm | AIG Australia Limited Case number: 12-00-1095600 6 November 2025 1 Determination overview 1.1 Complaint The complainant is a body corporate that held a strata insurance policy with the financial firm (insurer). In September 2022, the complainant lodged a claim for hail damage to the roof of the insured buildings for damage which occurred on or about 12 May 2021. There are two buildings, termed Building A and Building B. The insurer says the complainant has only shown 10% of the damage to the roof is caused by the hailstorm and has offered to cash settle $31,282.30 plus 15% uplift. The insurer also says it can rely on exclusions to limit its liability, relating to wear, tear, deterioration and faulty materials or faulty workmanship. To resolve the complaint, the complainant wants the insurer to pay $317,823, being the cost of a full roof replacement. The complainant does not dispute the insurer’s decision to cash settle the claim and has commenced repairs. This means this determination will only address whether the insurer’s cash settlement offer is fair. The body corporate was represented throughout the complaint. Any references to the complainant will include the representative. 1.2 Issues and key findings Does the insurer’s settlement offer satisfy its obligations under the policy? No. Having regard to all the circumstances of the complaint, I consider it fair for the insurer to increase its cash settlement offer to 70% of the complainant’s (XB’s) quote. It is also fair to pay a 15% contingency on this amount to account for the transfer of risk to the complainant. Why is the outcome fair? The outcome is fair because: · I consider the complainant’s experts have persuasively shown there is more extensive hail damage to the roof that the insurer is liable to cover · however, whilst the complainant seeks the cost of a full roof replacement, I do not consider the information persuasively shows the roof replacement is required solely due to the hail damage, rather than other excluded factors such as deterioration and wear and tear due to the overall age of the roof · I consider the fair assessment of the insurer’s liability is based on XB’s report, which persuasively explains how the hail damage is limited to 70% of all roof sheeting and associated components. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of receipt of the complainant’s acceptance of this determination, the insurer is to pay the complainant 70% of the cost of XB’s quote that totals $317,823, less the applicable excess, plus a 15% uplift. 2 Reasons for determination 2.1 Does the insurer’s settlement offer satisfy its obligations under the policy? No. Having regard to all the circumstances of the complaint, I consider it fair for the insurer to increase its cash settlement offer to 70% of the complainant’s (XB’s) quote. It is also fair to pay a 15% contingency on this amount to account for the transfer of risk to the complainant. Policy covers accidental damage, subject to conditions and exclusions The policy covers the insured property against accidental loss or damage. Cover under the policy is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). Relevant sections of the PDS are included in section 3 below. There is no dispute the complainant has established a claimable loss for damage under the policy. The insurer accepted coverage for hail damage at the property. However, there is a dispute regarding the extent of the insurer’s liability under the policy. The insurer says the hail event has not caused the roof to require a full replacement and says only 10% of the roof damage is due to hail. It says the remaining damage is caused by age-related wear and tear, poor workmanship and associated maintenance issues, which are excluded causes. The insurer says the structural integrity and performance of each roof is not compromised and they do not require a full replacement because of the claimed event. The insurer says it is possible to complete a partial roof replacement and also refers to the reinstatement definition in the PDS. It says its liability is limited to rectification of the damaged property relating to the hail event only. The insurer offered a cash settlement based on 10% of the complainant’s quote to replace the roof of each building, being $31,282.30. It included a contingency uplift of 15%, meaning the total amount offered was $35,974.65. The complainant disagrees and says one report deems 70% of the roof is damaged, and the other deems 65/70 panels for one building and 59/73 panels for the other building are damaged. The complainant seeks a full roof replacement. The complainant also says its quotes include damage to internal plasterboard ceilings. Insurer’s reports limit hail damage and refer to excluded causes The insurer obtained reports from forensic engineer CR and structural/civil engineer SW to comment on the extent of damage. It says both reports support that it is only liable for 10% of the roof damage. CR’s report dated 16 February 2023 states: · damage to the TrimDek roof, Whirly Bird wind ventilators, solar panels, aerial, chimney, and skylights was partially caused by a hailstorm event (approximately 10%), while the rest of the damage occurred due to poor workmanship at the first installation and a lack of maintenance · there are hail dents to several whirly birds, rust and dents to the air conditioner unit, hail damage to one antenna and no signs of damage to the gutters other than to one rain head · there is incorrect flashing material and sealant installed on some roof penetrations, including a chimney sealed with aluminium flashing with flexible sealant · the sarking is damaged due to age-related wear and tear, several weather events and a lack of maintenance. SW’s report dated 22 March 2023 states: · no more than 10% of the “overall building footprint” of buildings A and B has been directly impacted by hail strikes · this 10% figure includes damage to roof sheets, whirly birds, flashings, and air conditioners · no impact damage to flashings, solar panels and polycarbonate sheets · the property is in excess of 30 years of age, with the roof sheeting, gutters, flashings, cappings and services in a deteriorated condition, consistent with the age of the property · long-term ponding of water is evident with numerous penetrations, which has compromised the integrity of the cladding, with removal and replacement required · due to historical age and the minor size of the indentations, the hail indentations have no bearing on its structural integrity and performance · given the indentations are localised, entire removal and replacement is not required · there is evidence of patch repairs to the polycarbonate cladding and foot traffic damage to roof sheets and corrosion to the roof cladding and fixings. The insurer says that the reports from CR and SW are more compelling as both have reached the 10% figure without reviewing the other’s findings. The insurer says the reports confirm entire removal and replacement of the roof is not required. The insurer says the complainant’s reports have not adequately considered age-related deterioration and wear and tear issues. Complainant’s reports show more extensive hail damage is present The complainant obtained reports from builder XB and builder TC. XB’s report dated 3 June 2022 states: · it inspected the roof on 31 May 2022 · there are two structures, being Building A and Building B, both with TrimDek sheeting · the hail event caused indentations to about 70% of all roof sheeting and associated components · the damage is extensive enough to warrant a full roof replacement, and the recommendation is for all hail damaged sheeting, associated caps and flashings be replaced. XB’s report included photos showing indentations to the roof and ridge caps, whirly birds and one gutter water head. It does not identify damage to the air conditioner, solar panels or aerial, but notes these would need to be removed and refitted to conduct repairs and will need to be tested. TC’s report dated 26 May 2023 states: · 59/73 roof sheets are damaged on Building A and 65/70 on Building B; 68% and 93% respectively · there is damage to the roof sheets, whirlybirds and solar panels. Fair for the insurer to increase its cash settlement offer I am satisfied there is widespread hail damage to each roof. The XB report includes several photos which clearly show hail damage to several areas of the roof. TC’s report, whilst brief, includes a significant number of photos to support its conclusion regarding the number of roof sheets hail damaged. SW’s report refers to some foot traffic damage in some photos but has not explained how this relates to foot traffic damage as opposed to hail marks. There is insufficient reasoning provided for SW’s conclusion. Also, whilst SW says the hail marks are localised, it has not adequately supported this finding and fails to take into account the evidence from the complainant’s reports that refer to widespread markings across each roof. However, I also acknowledge there is deterioration and maintenance issues on the roof, which is clearly identified in the insurer’s reports. This damage is not covered under the policy. Whilst XB recommends a total roof replacement, it is unclear whether this is due solely from the hail damage or due to a combination of the hail damage and other damage unrelated to the event. XB and TC fail to acknowledge the deterioration and maintenance issues present and their contribution to the damage present. When exercising the discretion to cash settle a claim, the insurer must do so fairly, reasonably and consistent with its obligations of utmost good faith. The insurer based its cash settlement offer on 10% of the complainant’s quoted amount to repair the roof from XB, less $500 excess. This is based on the fact it considers the remaining damage is excluded as it is due to age-related wear and tear and maintenance issues. XB provided quotes and a scope of works (SOW) for each building. The updated quote and SOW dated 23 February 2023 totals $317,823 comprised of the following: · quote and SOW for Building A for $158,835.60 · quote and SOW for Building B for $158,987.40. Given the complainant has already commenced repairs, as well as the significant time since the event took place, I do not consider it fair to require a further assessment of the damage or a new quote to repair the damage. I consider it fair to base any settlement on XB’s quote, given it is the complainant’s quote and most likely represents an actionable quote to repair the roof. However, I consider the insurer has unfairly limited its liability to only 10% of the quote. I consider both XB and TC have persuasively shown there is more extensive hail damage to the roof that the insurer is liable to cover. I also do not consider the complainant has adequately shown it is fair for the insurer to cover the cost of the full roof replacement. I acknowledge the complainant’s preference may be to replace the roof due to the extent of damage present and the age of the roof. However, I do not consider the information persuasively shows the roof replacement is required solely due to the hail damage, rather than other excluded factors such as deterioration and wear and tear due to the overall age of the roof. Having regard to all the circumstances of the complaint, I consider it fair for the insurer to increase its cash settlement offer to 70% of XB’s quote. Whilst TC has included the number of panels damaged by hail, I consider it fair to base the settlement on an overall percentage of the quote. This is because XB’s report is more contemporaneous to the hail event and persuasively explains how the hail damage is limited to 70% of all roof sheeting and associated components. The insurer added a contingency uplift of 15% to its cash settlement offer. Given the transfer of risk to the complainant in cash settling the claim, I consider this to be fair. This means it is fair for the insurer to pay the complainant 70% of the cost of XB’s quote that totals $317,823, less the applicable excess, plus a 15% uplift. Whilst the complainant says it has incurred costs to partially repair the roof, I do not consider it fair for the insurer to pay these costs, as I consider these costs to be the complainant’s responsibility in mitigating its losses. I consider the fair outcome is for the insurer to pay the complainant the above cash settlement amount to finalise its obligations under the claim. 2.2 Why is the outcome fair? The outcome is fair because: · I consider the complainant’s experts have persuasively shown there is more extensive hail damage to the roof that the insurer is liable to cover · however, whilst the complainant seeks the cost of a full roof replacement, I do not consider the information persuasively shows the roof replacement is required solely due to the hail damage, rather than other excluded factors such as deterioration and wear and tear due to the overall age of the roof · I consider the fair assessment of the insurer’s liability is based on XB’s report, which persuasively explains how the hail damage is limited to 70% of all roof sheeting and associated components. 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to: · the legal principles · applicable industry codes or guidance · good industry practice · previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider: · available documents · the recollections of the parties · all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Policy extracts General Definitions Applicable to All Policy Sections Incident means a single occurrence or series of occurrences arising from one event, which occurs at a particular interval of time and causes or results in loss or damage that is insured by the Policy. … Reinstatement means: > where property is lost or destroyed, in the case of a Building, the rebuilding, or in the case of property other than a Building, the replacement of that property, by similar property, in either case in a condition equal to but not better or more extensive than its condition when new; and > where property is damaged, the repair of the damage and the restoration of the damaged portion of the property to a condition substantially the same as but not better or more extensive than its condition when new … Section 1 – Property Insured 1. The Indemnity We will pay You up to the Sum Insured specified in the Schedule for Building(s) and Common Contents, for accidental loss or damage to the Building(s) or Common Contents resulting from an Incident which occurs during the Period of Insurance. We will not pay You under Section 1 of the Policy in respect of any of the matters set out in the Exclusions or the General Exclusions. You must comply with the Special Conditions in Section 1 and the General Conditions. … 6. Basis of Settlement 6.1 Reinstatement or Replacement The basis upon which the amount payable to You is calculated will be the cost of Reinstatement of the Property Insured damaged at the time of its Reinstatement, subject to the following provisions and subject also to the terms, conditions and limit(s) or sub-limit(s) of liability of the Policy: > the work of rebuilding, or replacing, or repairing, or restoring or reinstating, as the case may be (which may be carried out at another site and in any manner suitable to Your requirements, but subject to Our liability not being increased), must be commenced and carried out within a reasonable time considering all surrounding circumstances of the replacement, repair, restoring or rebuilding. If work is not commenced within a reasonable time, We will not make any payment greater than the Indemnity Value of the Property Insured at the time it was lost or damage; > when Property Insured is damaged in part only, Our liability will not exceed the sum representing the cost which We could have been called upon to pay for Reinstatement if such property had been wholly damaged; > no payment beyond the amount which would have been payable under the Policy if this clause had not been incorporated therein will be made until a sum equal to the cost of Reinstatement shall have been actually incurred; > with Our prior consent, which shall not be unreasonably withheld, and where it is lawful, You are not bound to actually rebuild any Building destroyed, but may purchase an alternative existing building to replace the destroyed Building. Such replacement will be deemed to constitute “Reinstatement” for the purpose of this insurance, but We will not under any circumstances be liable to make any payment beyond the actual cost of rebuilding the Building destroyed; and > We will not be liable for the cost of Reinstatement of any illegal installations … 7. Exclusions … We will not be liable in respect of any physical loss, destruction or damage directly or indirectly caused by or arising out of or in consequence of or contributed to by: … 7.13 wear, tear, fading, gradual corrosion or gradual deterioration, concrete or brick ‘cancer’, wet or dry rot, rust, oxidation, chipping, scratching or marring, normal upkeep, making good or any developing flaws; … 7.15 faulty materials or faulty workmanship

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.